CN106192636A - High efficiency transportation and rescue technique - Google Patents
High efficiency transportation and rescue technique Download PDFInfo
- Publication number
- CN106192636A CN106192636A CN201610571178.0A CN201610571178A CN106192636A CN 106192636 A CN106192636 A CN 106192636A CN 201610571178 A CN201610571178 A CN 201610571178A CN 106192636 A CN106192636 A CN 106192636A
- Authority
- CN
- China
- Prior art keywords
- highway
- railway
- train
- transport
- goods
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
- E01C1/04—Road crossings on different levels; Interconnections between roads on different levels
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
In order to solve as early as possible, highway, railway, the difficult problem being individually present in transit I after long-term research, invent, railway, highway, the high efficiency transportation of driving alongside and rescue technique, it is possible to realize round-the-clock transport and rescue, it is to the effect that;2 different railway lines in train vibration influence direction are built in the middle of highway, the compartment of axle driven electromotor is saved in every string train configuration two, then utilize grid line to power for the resistor below compartment and produce a high-temperature region, then by iron pipe and conduit steam blown on track and wheel, make rail and wheel, water, snow, ice, hasten soon to steam, ensure that train normally travels.The highway in 3 tracks is respectively built on the both sides of railway line, if the highway of side can be repaired in face first after damaging, then Bidirectional transporting is carried out with 3 tracks of opposite side, just repair the highway of opposite side after having repaired by same method, the most thoroughly solve the problem that must suspend traffic in highway repair process.
Description
Technical field
The present invention relates to transport and the rescue technique of a kind of highway, the world has transported since invention Freeway Transport
Defeated efficiency is greatly improved, and makes the transport by highway of the economy of many backward areas, has given play to this area
Resources advantage get rich rapidly, simultaneously also by significantly shortening haulage time, it is achieved that distance, passenger and freight at high speed
Defeated, make different regions tightr with exchanging of country variant.
Background technology
China is since introducing highway, and the economic development to country serves the biggest facilitation, and it is big
The haulage time that shortens of amplitude improves conevying efficiency, promotes the development of national economy, makes goods and personnel between area
Exchange convenient.
Find through long-term practice, Freeway Transport exists the difficult problem that many cannot overcome, wherein wraps
Include;In heavy snow sky, the big rainy day, the big greasy weather, icy road ... highway will be closed when waiting and make passenger and freight transportation interrupt, with
Shi highway occurs when pavement damage needs to repair, more be intended to suspend traffic for a long time and make all vehicles all detour, both
Extend transportation range and add again haulage time, also increase the energy resource consumption of transport, also have if it occur that great traffic
Also to close a road to traffic to break off a friendship during accident and process, simultaneously need to the wounded are quickly given treatment to, accident vehicle be cleared up, these
Will complete within the shortest time, but these in practice due to congested with cars Highway house cannot realize at all.
In order to solve the problems referred to above I through long-term conscientiously research, invented highway and railway be parallel, it is achieved advantage is mutual
Mend and improve conevying efficiency, railway breakdown car can also be utilized simultaneously quickly to give treatment to the wounded and the technology of cleaning accident vehicle.
Summary of the invention
I finds through long-term research, and highway exists the difficult problem that much cannot overcome in transit, including;
In heavy snow sky, the big rainy day, the big greasy weather, icy road ... highway will be closed when waiting and make passenger and freight transportation interrupt, simultaneously
When highway occurs that pavement damage needs to repair, more be intended to suspend traffic for a long time and make all vehicles all detour, both
Extend transportation range and add haulage time, also increase the energy resource consumption of automobile, also have if it occur that great traffic thing
Therefore time be also required to stop traffic and process, the wounded are quickly given treatment to simultaneously, accident vehicle are cleared up, these all need
To complete within the shortest time, but these in practice due to congested with cars Highway house cannot realize at all.
Simultaneously I also mode to railway transportation conduct in-depth research discovery and utilize regenerative braking, through technological innovation
Train the most just can be made to exist, heavy snow sky, the big rainy day, icy road ... when waiting, can transport normally equally, but it
Having fatal defect is exactly cannot to realize factory to the transport of door-to-door between factory, if it is possible to highway, railway, collection
In to forming mutual supplement with each other's advantages together, thus can set up one round-the-clock, the one-stop fortune of door-to-door between factory to factory
Defeated system.
In order to solve as early as possible, highway, railway, the difficult problem being individually present in transit I after long-term research, invention
, railway, highway, the high efficiency transportation of driving alongside and rescue technique, it is possible to realize round-the-clock transport and quickly rescue
Helping, it is to the effect that;
1. in the middle of highway, build 2 different railway lines in train vibration influence direction,
2. the highway one-way road in 13 track is respectively built on the both sides of railway line,
3. railway carriage is all with flat car, fills standard above. and big. in. little. container,
4. it is equipped with at each trains marshalling station, railway, highway relief car,
5. at railway, the intersection of highway, build viaduct and realize barrier free accessibility.
Utilize cooperating of they after setting up above-mentioned infrastructure, it becomes possible to set up one round-the-clock, factory arrives
One-stop transport and the Quick rescue system of door-to-door is realized between factory.
Concrete method is;
1, in the middle of highway, build 2 different railway lines in train vibration influence direction
In invention, I is in the different railway line of 2 travel directions of medium design of highway, make highway and
Railway becomes the means of transportation of driving alongside, simultaneously in order to reduce floor space and ensure transportation safety, at highway and ferrum as far as possible
To build the divider wall of high 50 centimetres together in the middle of road, can become by the civil engineering building highway to reduce cost divider wall, width
Do not limit, mainly can ensure the safety of Adjacent vehicles when vehicle accident occurs.String train to configure 2 joint bands simultaneously
The compartment of electromotor, 4 axletrees often saving compartment carry an electromotor, and the effect of electromotor is can be stopped in descending road surface
Car slows down, the potential energy of brake of entering the station, and is completely converted into electric energy input electrical network by regenerative braking.
Band gap below long 50 centimetres is also set before train traction locomotive and band electromotor compartment drivewheel
Iron pipe, the gap of iron pipe will near and alignment rail, iron pipe will connect with conduit, there is provision of resistor simultaneously, and collection wind fills
Put, conduit, if run into, the big rainy day, heavy snow sky, during icy road, just powers for resistor and makes traction locomotive and band electromotor
Car bottom produce a high-temperature region, the High Temperature Gas then resistor produced and the high pressure gas that produced by wind-drive device,
Blow on the track before adhesion wheel and adhesion wheel through conduit and iron pipe, so through high wind steam, conduct radiation, etc.
Comprehensive function just can make the water on rail and wheel, snow, ice, rapid evaporation, rail, wheel does not has train vibration influence after ice and snow
With sliding would not occur during regenerative braking and wriggle, such train under any vile weather can, security row at full capacity
Make.
Along Railway will arrange trains marshalling station in a certain distance, and the goods having an area of in 100 highways is all used
TEU (Twenty-foot Equivalent Unit) transports to marshalling yard, and then train cargo transport simultaneously to be placed on flat car container crane all with flat car
On, such highway build in railway together with after,Can be achieved with long-distance transport railway, the means of transportation of short-distance transport highway,
The most both can realize the most energy-conservation, additionally it is possible to can be round-the-clock under any vile weather, uninterruptedly
Transport.
2, the highway one-way road in 3 tracks is respectively built on the both sides of railway line
The extremely serious major traffic accidents caused due to automobile overload every year of highway in China transport overloading according to statistics
More than 50% is relevant with overload, overloads simultaneously and also can make pavement damage, bridge breaking, and the economic loss caused the most every year surpasses
Crossing more than 30,000,000,000 yuan, although national communication department effect very severe to overloading punishment is unsatisfactory, reason is individual
Other driver makes a desperate move for interests, does not stints and pays the cost of transportation safety, also needs when repairing highway pavement and bridge simultaneously
Suspending traffic and have a strong impact on the economic construction of country, how could solve the problems referred to above, I is thought be taked by research
Following measure;
First respectively build the highway one-way road in 3 tracks on the both sides of railway line, the travel direction of automobile is and phase
The travel direction of adjacent railway line train is identical.
If so after highway road pavement damage, first we can repair the highway of side, then with the 3 of opposite side
Track carries out Bidirectional transporting and thus need not suspend traffic, and just repairs the highway of opposite side after having repaired by same method,
The most thoroughly solve the problem that must suspend traffic in highway repair process.
Owing to have employed highway, railway, the means of transportation of driving alongside so needing in highway reparation, material, machine
Device, equipment ... wait and train can be utilized to transport to rapidly, work efficiency thus can be greatly improved, when shortening reparation
Between.
Have employed highway, railway, after the means of transportation of driving alongside just centered by trains marshalling station, public for circumference 100
Cargo container automobile car within transports to trains marshalling station, then arriving marshalling yard through train long-distance transport
In cargo container, directly transport to factory and enterprise with automobile car, thus achieve highway, railway can effectively be held in the mouth
The one-stop transport connect.
3, railway carriage all with flat car, fills the container of standard above,
Having three emphasis, 1. train cargo transport flat car in invention, 2. the container of transport goods unified standard, 3. exists
Along Railway arranges a marshalling yard at a certain distance.
The effect of above-mentioned design is, needs to transport for long-distance centered by trains marshalling station within circumference 100 kilometers
Goods, transport to trains marshalling station with truck after packing into the container, then load onto train flat car with crane and carry out long-distance
Transport, the most also to arrive train the container of marshalling yard, directly transport to factory and enterprise with truck through long-distance transport
Industry, this addresses the problem highway, railway, the deficiency being individually present in transport, it is achieved that long-distance transport railway, and short-distance transport is used
Highway, and achieve the transport of door-to-door between factory and factory, railway, highway, use the container of unified standard to transport
After defeated, overload automobile cannot propagate into conveyer chain, such overloading will disappear automatically, therefore highway, bridge, life-span just
Can significantly extend, vehicle accident also can be greatly lowered.
Need, illustratively owing to transporting the difference of goods, to need to design, greatly, in, little, 3 kinds of containers, to design simultaneously
3 kinds of container carriers support the use, and the be desirous of peace size of wooden handcart of concrete size adapts, and such as, a joint flat car can fill 1 joint
Van container, a joint flat car can fill 2 joint intermediate bulk containers, and a joint flat car can fill (4-8) joint baby container.
4, it is equipped with at each trains marshalling station, railway, highway relief car
Railway, highway relief car is the relief car travelled in railway line, and capital equipment includes, crane, hoist engine, weight
Type goods installs to the interim ramp on railway carriage, hydraulic test ... etc., if it occur that during major traffic accidents, relief car can
To arrive in from 2 railway lines simultaneously, the wherein crane handle of the relief car near highway side, minibus, goods, the wounded ... etc.
Load onto rapidly train to transport, just can be open to traffic after having cleared up the scene of the accident at once, if the scene of the accident, bulk transport car or
When goods weight too large crane cannot lift, between railway and highway, just put interim ramp, with hoist engine, hydraulic test,
Bulk transport car or goods are loaded onto train transport, be open to traffic after having cleared up the scene of the accident at once.
If highway generation pavement damage needs to repair, relief car can be arrived in, wherein from 2 railway lines simultaneously
Near the relief car crane handle of highway side, material of repairing the roads, equipment, machine etc. delivers to construction of the highway building site with crane, so
Highway reparation speed just can be greatly improved makes highway be open to traffic as early as possible.
5, in railway, the intersection of highway, build viaduct and realize barrier free accessibility
In the crossroad of highway He other highway, be by building viaduct through railway line, it is achieved mutually it
Between connection, if viaduct pass through enters when train enters marshalling yard, loaded and unloaded after goods through viaduct entrance
The centre position of highway, transports normally.
Below in conjunction with the accompanying drawings and specific embodiment, the present invention will be further described;
Fig. 1, the highway of driving alongside and railway line schematic diagram
Fig. 2, greatly, in, little, type container schematic diagram
Divider wall in the middle of Fig. 3, railway and highway
The high efficiency transportation of the present invention and rescue technique, be the most respective in order to solve highway and railway
Exist deficiency and design, it solving highway exists, the big rainy day, heavy snow sky, must close a road to traffic and repair during icy road
The problem that have to suspend traffic during damaged road surface, also solves railway simultaneously and cannot realize factory to door-to-door between factory
Transportation problem.Concrete technical scheme is;
Seeing Fig. 1, Fig. 2, Fig. 3, two different railway lines of travel direction 1 are built in the first centre at highway, make at a high speed
Highway 2 and railway line 1 become the means of transportation of driving alongside, simultaneously in order to reduce floor space and ensure transportation safety as far as possible,
The divider wall 3 of high 50 centimetres together with building with in the middle of railway at highway, can be with building highway in order to reduce cost divider wall 3
Civil engineering becomes, and width does not limit, and string train to configure 2 compartments saving axle driven electromotor, the effect of electromotor simultaneously
It is can be descending road surface, brake deceleration, the potential energy of brake of entering the station, it is completely converted into electric energy input electrical network by regenerative braking.
Along Railway 1 will arrange trains marshalling station in a certain distance, the goods having an area of in 100 highways, uses
Container 4.5.6 transports to marshalling yard by transport vehicle, and train freight damp compartment will be all with flat car simultaneously, then container
4.5.6 it is placed on flat car with crane, train is transported by transport vehicle through the goods transporting to marshalling yard simultaneously
To factory, thus achieve long-distance transport railway, the means of transportation of short-distance transport highway, simultaneously will be in railway line 1
The highway 2 in 3 tracks is respectively built on both sides, if first we can repair the public affairs of side after highway road pavement damage
Road, then carries out Bidirectional transporting with 3 tracks of opposite side and thus need not suspend traffic, just by same method after having repaired
Repair the highway 2 of opposite side, the most thoroughly solve the problem that must suspend traffic in highway repair process.
Railway, highway relief car is the relief car travelled in railway line 1, and capital equipment includes, crane, hoist engine,
Heavy goods installs to the ramp on railway carriage, hydraulic test ... etc., if it occur that during major traffic accidents, relief car is permissible
Arrive in from two railway lines 1, wherein near the relief car crane handle of highway 2 side, minibus, goods, the wounded simultaneously ...
Load onto train Deng rapidly to transport, if the bulk transport car of the scene of the accident or goods weight too large crane cannot lift, just
Between railway 1 and highway 2, put interim ramp, with hoist engine, hydraulic test, bulk transport car or goods are loaded onto train
Transport, be open to traffic after having cleared up the scene of the accident at once.
Claims (1)
1. high efficiency transportation and a rescue technique, is characterized in that;
1. two train vibration influence railway lines in opposite direction are built in the centre at highway, respectively build one 3 in the both sides of railway line
The highway one-way road in track, build with in the middle of highway in railway line simultaneously together with the isolation that do not limits of high 50 cm widths
Wall;
2. configure 2 joints on string train, carry out regenerative braking with the compartment of axle driven electrical power generators, descending road surface, stop
Car slows down, and the potential energy of brake of entering the station all changes into electric energy;Before train traction locomotive and band electromotor compartment drivewheel all
The iron pipe in long 50 centimetres of band gaps below is set, the gap of iron pipe will near and alignment rail, iron pipe will connect with conduit, with
Time there is provision of resistor, wind-drive device, conduit, if run into, the big rainy day, heavy snow sky, during icy road, with grid line be just
Resistor is powered and is made the car bottom of traction locomotive and band electromotor produce a high-temperature region, the high temperature then resistor produced
Gas and the high pressure gas produced by wind-drive device, blow to the track before adhesion wheel and adhesion wheel through conduit and iron pipe
On, make the water on rail and wheel, snow, ice, rapid evaporation, rail, wheel does not has train vibration influence and regenerative braking after ice and snow
Time sliding would not occur and wriggle, such train under any vile weather can, at full capacity safety exercise.
The most all arranging marshalling yard, train cargo transport, can root on flat car all with flat car
Fill according to needs, greatly, in, little, type container, then the goods within around marshalling yard 100 kilometers, transport with container carrier
Transported for long-distance by railway to marshalling yard, to use container through the container arriving marshalling yard of transporting for long-distance simultaneously
Enterprise is transported in transport vehicle, thus achieves long-distance transport railway, the one-stop means of transportation of short-distance transport highway, uses
After Container Transport, due to railway, highway uses the container that standard is unified, so the automobile of overload cannot be introduced into transport at all
Chain, such overloading will disappear automatically, therefore highway, and the life-span of bridge will significantly extend, and vehicle accident also can be big
The reduction of amplitude;
4. in each marshalling yard, it is equipped with breakdown train, has crane, hoist engine, the interim ramp of handling goods, hydraulic pressure above
Equipment, if it occur that just breakdown train is reached the scene of the accident during vehicle accident, uses crane handle, minibus, goods, and wounded etc. are fast
On quick-mounting, train is transported, if bulk transport car or goods weight too large crane cannot lift, just railway and highway it
Between put interim ramp, with hoist engine, hydraulic test, bulk transport car or goods are loaded onto train and transport, cleaning finish therefore
It is open to traffic behind scene at once;
5. the highway in 3 tracks is respectively built on the both sides of railway line, if can first repair after highway road pavement damage
The highway of multiple side, then carries out Bidirectional transporting with 3 tracks of opposite side and thus need not suspend traffic, and just uses after having repaired
Same method repairs the highway of opposite side, the most thoroughly solves the problem that must suspend traffic in highway repair process;
6. in the crossroad of highway He other highway, be by building viaduct through railway line, it is achieved each other
Connection, if viaduct pass through enters when train enters marshalling yard, loaded and unloaded after goods enter through viaduct high
The centre position of speed highway, transports normally.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610571178.0A CN106192636A (en) | 2016-07-20 | 2016-07-20 | High efficiency transportation and rescue technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610571178.0A CN106192636A (en) | 2016-07-20 | 2016-07-20 | High efficiency transportation and rescue technique |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106192636A true CN106192636A (en) | 2016-12-07 |
Family
ID=57494590
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610571178.0A Pending CN106192636A (en) | 2016-07-20 | 2016-07-20 | High efficiency transportation and rescue technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106192636A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107905088A (en) * | 2017-12-19 | 2018-04-13 | 中铁二院工程集团有限责任公司 | The same laminar combined bridge travelled in the same direction |
CN109532855A (en) * | 2017-09-22 | 2019-03-29 | 中车唐山机车车辆有限公司 | A kind of micro- rail fault car rescue mode and system |
CN114032756A (en) * | 2021-11-08 | 2022-02-11 | 腾达建设集团股份有限公司 | Three-dimensional traffic device based on overhead bridge |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1599830A (en) * | 1926-03-11 | 1926-09-14 | David R Mcginnis | Railway motor-mobile system |
WO2000001889A1 (en) * | 1998-07-01 | 2000-01-13 | Marko Jakara | Intersection with unhindered traffic flow |
CN201161589Y (en) * | 2008-02-28 | 2008-12-10 | 昆明中铁大型养路机械集团有限公司 | Movable synthetic maintenance vehicle |
CN102102315A (en) * | 2009-12-18 | 2011-06-22 | 许吉锭 | Method for constructing sleeper bolted elastic crossing |
CN201941785U (en) * | 2010-11-30 | 2011-08-24 | 南车成都机车车辆有限公司 | Wagon wrecking car transformed from passenger car |
CN103950452A (en) * | 2014-03-26 | 2014-07-30 | 李全瑞 | Multifunctional railway carriage |
CN203838862U (en) * | 2014-03-21 | 2014-09-17 | 张秀花 | Highway emergency rescue transporting system |
-
2016
- 2016-07-20 CN CN201610571178.0A patent/CN106192636A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1599830A (en) * | 1926-03-11 | 1926-09-14 | David R Mcginnis | Railway motor-mobile system |
WO2000001889A1 (en) * | 1998-07-01 | 2000-01-13 | Marko Jakara | Intersection with unhindered traffic flow |
CN201161589Y (en) * | 2008-02-28 | 2008-12-10 | 昆明中铁大型养路机械集团有限公司 | Movable synthetic maintenance vehicle |
CN102102315A (en) * | 2009-12-18 | 2011-06-22 | 许吉锭 | Method for constructing sleeper bolted elastic crossing |
CN201941785U (en) * | 2010-11-30 | 2011-08-24 | 南车成都机车车辆有限公司 | Wagon wrecking car transformed from passenger car |
CN203838862U (en) * | 2014-03-21 | 2014-09-17 | 张秀花 | Highway emergency rescue transporting system |
CN103950452A (en) * | 2014-03-26 | 2014-07-30 | 李全瑞 | Multifunctional railway carriage |
Non-Patent Citations (2)
Title |
---|
孙秋高等: "《物流设备应用与管理》", 31 March 2015, 浙江科学技术出版社 * |
蒋国泰等: "《中国旅游交通指南》", 31 December 1988, 中国旅游出版社 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109532855A (en) * | 2017-09-22 | 2019-03-29 | 中车唐山机车车辆有限公司 | A kind of micro- rail fault car rescue mode and system |
CN107905088A (en) * | 2017-12-19 | 2018-04-13 | 中铁二院工程集团有限责任公司 | The same laminar combined bridge travelled in the same direction |
CN107905088B (en) * | 2017-12-19 | 2023-06-23 | 中铁二院工程集团有限责任公司 | Co-layer highway and railway dual-purpose bridge running in same direction |
CN114032756A (en) * | 2021-11-08 | 2022-02-11 | 腾达建设集团股份有限公司 | Three-dimensional traffic device based on overhead bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2826729C (en) | Rail system for a freight transportation system | |
CN102730011B (en) | Monorail suspension type dual-power electric bus | |
CN201914251U (en) | Hanging type new energy-resource rail bus | |
CA2741315A1 (en) | Rail conveyance system | |
WO2021213344A1 (en) | Operation method and system for highway-railway combined transportation mode conversion at railway station and yard | |
JPH07166513A (en) | Long bridge and extra-long bridge provided with conveying system | |
CN102463997A (en) | Suspended type new energy rail bus | |
CN106192636A (en) | High efficiency transportation and rescue technique | |
CN201907505U (en) | Double-layered and two-way rail compatible green public transit | |
CN108773379A (en) | Super width iron cluster | |
CN104015732A (en) | Passenger car high-speed rail express system for solving world problem of urban traffic congestion | |
CN101775764B (en) | Suspending carrying traffic track | |
CN206486008U (en) | A kind of multimodal transport intercommunicating system | |
WO2019237737A1 (en) | Operation system and method for unloading from railway and waterway combined transportation railway harbor station to harbor district stacking yard | |
Shahooei et al. | Application of underground short-haul freight pipelines to large airports | |
CN102730004A (en) | Overhead type public traffic operation scheme | |
CN104890679A (en) | Transport system and transport method of composite tunnel | |
ES2341632B1 (en) | AUTOMATIC TRANSPORT SYSTEM OF GOODS, THROUGH ELECTRICAL PLATFORMS ON MONORRAIL, WITH STABILIZER AND HORIZONTAL POWER SOCKET. | |
CN106629414A (en) | Loading and unloading gantry cantilever crane for freight train depot for united transportation of railways and highways and loading and unloading method | |
CN207015096U (en) | Can quickly up and down road combined vehicle | |
CN202785375U (en) | Tunnel salvage crane | |
Chenglin et al. | Study on the development mode of urban underground logistics system | |
CN101259846A (en) | Intelligent traffic for combining highway and railway | |
CN201809682U (en) | Suspension carrying traffic track | |
CN1994795A (en) | An express freight method and apparatus thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161207 |
|
RJ01 | Rejection of invention patent application after publication |