CN103950452A - Multifunctional railway carriage - Google Patents

Multifunctional railway carriage Download PDF

Info

Publication number
CN103950452A
CN103950452A CN201410113583.9A CN201410113583A CN103950452A CN 103950452 A CN103950452 A CN 103950452A CN 201410113583 A CN201410113583 A CN 201410113583A CN 103950452 A CN103950452 A CN 103950452A
Authority
CN
China
Prior art keywords
train
railway carriage
multifunctional railway
multifunctional
regenerative brake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410113583.9A
Other languages
Chinese (zh)
Inventor
李全瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410113583.9A priority Critical patent/CN103950452A/en
Publication of CN103950452A publication Critical patent/CN103950452A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T30/00Transportation of goods or passengers via railways, e.g. energy recovery or reducing air resistance

Abstract

The invention relates to a railway carriage. The essential difference between the railway carriage and a traditional railway carriage is that the railway carriage is a carriage with the functions of electrical generation, energy saving and braking. When a train needs regenerative braking, the train drives at a constant and high speed through the working of a traction engine, then the regenerative braking is carried out by using an electric generator on the multifunctional carriage and converting the electric motor into an electric generator, and electricity generated by the regenerative braking is fed back to the power grid through a pantograph on the multifunctional carriage so as to supply power for other traction engines. When the train runs on the upgrading road surface with the maximum grade, the power of the engine can be increased through the working of the electric motor, so that normal operation of the train is guaranteed. When the train runs on the level road, electric motors on the multifunctional carriage can be stopped working completely, and only the traction engine works, so that normal operation of the train can be guaranteed.

Description

Multifunctional train compartment
Technical field
The present invention relates to a kind of railway carriage, it and traditional railway carriage have difference in essence, and it is that one has, and generating is energy-conservation, brake, and, there is significant role in the compartment of function to improving train conveying efficiency increase economic benefit.
Background technology
Train Regenerative Braking Technology, in the brake of train application very extensive, the advantage of its maximum is that the potential energy that train can be produced when the gradient road traveling changes into electric energy, then feeds back to electrical network by power transmission line.
Owing to there being the huge drop exceeding more than 5000m between the western and eastern of China, along with the development of railway construction, the mileage on railway gradient road surface can be more and more longer, this will become a huge regenerative resource, if we pass through Regenerative Braking Technology, the potential energy that train is produced on heavy grade road surface all changes into electric energy, and country will obtain a large amount of electric energy every year.
Train can produce automatic acceleration in the time of heavy grade road traveling, if (within 1 second, will automatically accelerate 0 on 20 ‰ heavy grade road surface, 69 kilometers), this has caused major hidden danger to the safety traffic of train, adopt after Regenerative Braking Technology, train just can be at full speed on long heavy down grade, safety, constant speed, operation. there is a defect in such brake modes, be exactly at sleety weather, wheel and track there will be sliding wet, if traction motor power is excessive, after changing into electrical generator, braking force will be excessive, while carrying out regenerative brake in this case, wheel can produce and slides and wriggle, when can becoming (polygonal) to cause locomotive running gear, long-term work rear wheel produces vibrations, cause gear case, the parts such as oil pressure damper damage too early.
We know that train is in the time of operation, and track has 3 kinds of forms, go up a slope, and level road, descending.The train power maximum that locomotive needs in the time of upward slope road traveling now, due to the configuration of (locomotive power) on present railway, all can be on the road of all fronts according to train, the design of can normally travelling when the gradient is maximum, such being designed to realizes locomotive energy-conservation manufactured obstacle because:
(1) the train power that locomotive needs in the time of flat pavement running is less, therefore with the locomotive power configuring now, there will be a large amount of zero load power consumptions in the time of flat pavement running, causes energy dissipation.
(2) train not only need not consume energy in the time of descending road traveling, but also will utilize brake to control the automatic acceleration that train produces, and the at this moment zero load of locomotive power consumption is larger.
(3) because train exists the problems referred to above, so Regenerative Braking Technology is also not universal at heavy grade pavement usage now, also dominate of traditional aerodynamic brake, cause the potential energy that can change in a large number electric energy, all change into heat energy having slatterned in vain by brake, because the locomotive power of configuration has caused too greatly train to exist, occurred a large amount of zero load power consumptions when level road and descending road traveling, therefore we must thoroughly address the above problem by technology innovation as early as possible simultaneously.
Summary of the invention
Use the prerequisite condition in multifunctional train compartment to comprise:
Road surface length exceedes 30 kilometers, track grade is 6 ‰ when above, hauling engine power supply grid and road surface to be reclaimed to electrical network, in the vertex on gradient road surface and the nadir on gradient road surface, disconnect with insulating material, must ensure that pantograph on train is wanted can trouble-free operation between 2 grid lines simultaneously, train is hauling engine power supply by large-sized battery pack in the time of heavy grade road traveling, ensure that train normally travels, then with the electrical generator on multifunctional railway carriage axletree with the electrical motor on compartment axletree is transformed into electrical generator carries out regenerative brake, the electricity that regenerative brake sends is by the pantograph on multifunctional railway carriage, deliver to the recovery grid line on gradient road surface, deliver to distribution substation for powering with electrical unit by power transmission line again.
Multifunctional railway carriage bottom surface is that flat board is put freight container above, unloads freight container, must be fully loaded while being loaded on new container, ensure that the total weight of multifunctional railway carriage is constant.
There are 4 axletrees in compartment, wherein be with 1 electrical generator with 2 axletrees are each, other 2 axletrees are each is with 1 electrical motor, the power of every electrical motor and electrical generator must be below 250kw, electrical motor, electrical generator, must (overall planning) can not there is the situation of phase mutual interference at work in the installation site of bogie truck.
Face under multifunctional railway carriage car, the wind-drive device of broadening formation is installed in windward side, suitable for reading will trying one's best greatly, end opening is as far as possible little, the connection suitable for reading of end opening and wind conveying pipe, and wind conveying pipe end opening is made oblong with insulation and high temperature material, intensification resistor is installed in the inside, air outlet will be arranged on the place near driving wheel, in the situation that allowing, as far as possible near track, on a joint multifunctional railway carriage, 8 wind-drive devices is installed.
Train is in the time of upward slope road traveling, and the electrical motor on compartment axletree will increase power for hauling engine.
In road surface length more than 30 kilometers, track grade is 6 ‰ when above, adopt regenerative brake, at this moment to grid line and recovery grid line be disconnected at the top on heavy grade road surface and bottom, motorcycle pantograph will depart from recovery grid line simultaneously, and adopting high power battery group is hauling engine power supply, the electricity that simultaneously compartment regenerative brake will be produced, deliver to recovery electrical network by the pantograph on multifunctional railway carriage, delivering to distribution substation by electric wire.Configuration multifunctional train compartment must pass through strict calculating, for example: the train that row 50 save, the power of hauling engine is 5000kw, if train needs 10000kw electrical generator to produce resistance while carrying out regenerative brake on 10 ‰ heavy grade road surface, can reach balance with the potential energy that gradient road surface produces, therefore because a joint multifunctional railway carriage is (250 × 4=1000) kw, so by calculate (1000kw × 10=10000kw) so train need to increase by 10 joint multifunctional railway carriages, then utilize the electrical generator on compartment and the electrical motor on compartment is transformed into electrical generator, carry out regenerative brake, the electricity that regenerative brake sends, deliver to recovery grid line through the pantograph on compartment, delivering to distribution substation by power transmission line, so just complete the work that potential energy is all changed into electric energy.
The power of the train traction locomotive that same row 50 save is 5000kw, if the resistance that needs 20000kw electrical generator to produce while carrying out regenerative brake on 20 ‰ heavy grade road surface, (1000kw × 20=20000kw) so train need to increase by 20 joint multifunctional railway carriages, the potential energy that just heavy grade road surface can be produced all changes into electric energy
(exceed more than 20 ‰ heavy grade road surfaces in the gradient, no matter increase how many joint multifunctional railway carriages, 4 axletrees on each compartment, all driving electric machines, train, in the time of return, is that hauling engine increases power by electrical motor work like this, the hill climbing ability of train, will improve 1 times)
Be less than 30 kilometers in road surface length, track grade below 6 ‰ time, when train will adopt regenerative brake, is by the work of hauling engine, train to be kept, at a high speed, constant speed, travels, then with the electrical generator on multifunctional railway carriage with electrical motor is transformed into electrical generator, jointly carry out regenerative brake, the electricity that regenerative brake produces, feeds back to electrical network by the pantograph on multifunctional railway carriage, for other hauling engine provides power supply.
Suppose the train that row 50 save, the power of hauling engine is 5000kw, if the resistance that needs 7000kw electrical generator to produce while carrying out regenerative brake on 5 ‰ gradient road surface, (1000kw × 7=7000kw) train need to increase by 7 joint multifunctional railway carriages so, just potential energy all can be changed into electric energy.
No matter for train increases how many joint multifunctional railway carriages, (its hauling engine power all need not increase) because of:
When train operation is during on upward slope maximum grade road surface, it can be that locomotive increases power by electrical motor work, just can ensure that train normally moves.
When train operation is during on upward slope light grade road surface, it can, with by for 50% electrical motor power supply on multifunctional railway carriage is that locomotive increases power, just can ensure that train normally moves.
When train operation is during at level road, it can allow the electrical motor on multifunctional railway carriage all quit work, and only uses hauling engine work, just can ensure that train normally moves.
Face under multifunctional railway carriage car, the wind-drive device of broadening formation is installed in windward side, suitable for reading will trying one's best greatly, end opening is as far as possible little, the connection suitable for reading of end opening and wind conveying pipe, wind conveying pipe end opening is made oblong with insulation and high temperature material, intensification resistor is installed in the inside, air outlet is as far as possible close track in the situation that allowing, one joint multifunctional railway carriage is installed 8 wind-drive devices, it only uses in sleet sky, because when sleet sky train carries out regenerative brake, can occur in orbit because humidity makes wheel, slide and wriggle, when brake wheel can become (polygonal) to cause locomotive running gear after long-term work, produce vibrations, cause gear case, the parts such as oil pressure damper damage too early, and install after wind-drive device and intensification resistor, the heat just by wind conveying pipe, resistor being produced if there is sleet sky blows to track, make the moisture rapid evaporation on track, so just can ensure on track forever dry, therefore when train carries out regenerative brake, wheel just there will not be and slides and crawl, wind-drive device is only installed in the position near driving wheel.
Train is in the time carrying out heavy haul transport, and multifunctional railway carriage will be placed on the midway location of train, like this can be by the electrical motor work on multifunctional railway carriage, and the bearing capacity that reduces hook just can thoroughly be eliminated the phenomenon of hook fracture.
Below in conjunction with accompanying drawing and specific embodiment, the present invention is made to further description.
Fig. 1: the structural representation that is multifunctional railway carriage
Fig. 2: be grid line, reclaim grid line, insulated wire schematic diagram
Fig. 3: be electrical generator, schematic diagram
Fig. 4 is electrical motor, schematic diagram
Fig. 5: be wind-drive device schematic diagram
Design philosophy of the present invention is, the potential energy that utilizes Regenerative Braking Technology that train is produced when the gradient road traveling, all changes into electric energy, and will all reclaim, and also will realize energy-conservation maximization by the power that reduces hauling engine simultaneously.Method is:
Referring to, Fig. 1, Fig. 2, Fig. 3, Fig. 4, if track grade is more than 6 ‰, when road surface length exceedes 30 kilometers, power supply grid 3 and road surface to be reclaimed to electrical network 4, in the vertex on gradient road surface and the nadir on gradient road surface, disconnect with insulated wire 5, must ensure that pantograph on train is wanted can trouble-free operation between 2 grid lines simultaneously, train is hauling engine power supply by large-sized battery pack in the time of heavy grade road traveling, ensure that train normally travels, then with the electrical generator 6 on multifunctional railway carriage 1 axletree with the electrical motor 7 on axletree is transformed into electrical generator carries out regenerative brake, electrical generator 6 on axletree and the power of electrical motor 7 must be below 250kw.
To determine to increase a few joint multifunctional railway carriages 1 according to the gradient size on heavy grade road surface, the resistance that standard produces while being the electrical generator generating of the potential energy that produces in the time of heavy grade road traveling of train and multifunctional railway carriage reaches balance, the electricity that regenerative brake sends is by the pantograph on multifunctional railway carriage 1, deliver to the recovery grid line 4 on gradient road surface, deliver to distribution substation for powering with electrical unit by power transmission line again, multifunctional railway carriage 1 bottom surface is above dull and stereotyped 2, to put freight container 11, if unload freight container 11, must load onto new fully loaded freight container simultaneously, the total weight that ensures multifunctional railway carriage is constant.
Referring to, Fig. 3, Fig. 4, be less than 30 kilometers in road surface length, track grade below 6 ‰ time, when train adopts regenerative brake, is by hauling engine work, train to be kept, at a high speed, constant speed, travels, and the potential energy simultaneously producing on gradient road surface according to train is how many, determine to increase a few joint multifunctional railway carriages, then utilize the electrical generator 6 on multifunctional railway carriage and electrical motor 7 is transformed into electrical generator, jointly carrying out regenerative brake, the electricity that regenerative brake produces, feed back to electrical network 3 by the pantograph on multifunctional railway carriage 1, for other hauling engine provides power supply.
Referring to, Fig. 4, no matter for train increases how many joint MPV (Multi-Purpose Vehicle) 1, (its hauling engine power all need not increase) because of:
When train operation is during on upward slope maximum grade road surface, it can, by powering for the whole electrical motors 7 on multifunctional railway carriage, be that locomotive increases power, ensures that train normally moves.
When train operation is during on upward slope light grade road surface, it can, by powering for 50% electrical motor 7 on multifunctional railway carriage, be that locomotive increases power, ensures that train normally moves.
When train operation is during at level road, it can allow the electrical motor 7 on multifunctional railway carriage all quit work, and only uses hauling engine work, just can ensure that train normally moves.
(exceed more than 20 ‰ heavy grade road surfaces in the gradient, no matter increase how many joint multifunctional railway carriages 1,4 axletrees on each compartment, all driving electric machines 7, train, in the time of return, is hauling engine increase power by electrical motor 7 work like this, the hill climbing ability of train, will improve 1 times)
Referring to, Fig. 5, face under multifunctional railway carriage car, the wind-drive device 8 of broadening formation is installed in windward side, suitable for reading will trying one's best greatly, end opening is as far as possible little, end opening and wind conveying pipe 9 connection suitable for reading, wind conveying pipe 9 end openings are made oblong with insulation and high temperature material, intensification resistor 10 is installed in the inside, and install after wind-drive device 8 and intensification resistor 10, just pass through defeated wind if there is sleet sky, the heat that 9 resistors 10 produce blows to track, make the moisture rapid evaporation on track, so just can ensure on track forever dry, therefore when train carries out regenerative brake, wheel just there will not be and slides and crawl.
Referring to, Fig. 1, Fig. 4, train is in the time carrying out heavy haul transport, and multifunctional railway carriage 1 will be placed on the midway location of train, can work by the electrical motor 7 on multifunctional railway carriage like this, and the bearing capacity that reduces hook just can thoroughly be eliminated the phenomenon of hook fracture.

Claims (2)

1. a multifunctional train compartment, its feature is:
1. while adopting regenerative brake, all gradients are more than 6 ‰, and length exceedes on 30 kilometers of above heavy grade road surfaces, all will be in the nadir of the vertex of the gradient and the gradient, grid line with reclaim grid line and disconnect with insulated wire, to ensure that pantograph can pass through smoothly between 2 electrical networks simultaneously;
2. multifunctional railway carriage bottom surface is dull and stereotyped, dull and stereotypedly puts freight container above, must load onto the freight container of filling equally goods after unloading freight container at once.Electrical motor on axletree, electrical generator, bogie truck, installation site must overall planning, between them, in train running, can not there is the situation of phase mutual interference.The power of electrical motor and electrical generator must be below 250kw;
3. at track grade more than 6 ‰, length exceedes on 30 kilometers of above heavy grade road surfaces, hauling engine is used large-capacity battery pack power supply instead, calculate the electrical generator of a joint multifunctional railway carriage and electrical motor is transformed into after electrical generator, the resistance that can produce while carrying out regenerative brake is how many, then calculate and need to increase a few joint multifunctional railway carriages, want to make the potential energy of heavy grade road surface generation and the resistance of regenerative brake generation to reach balance, the electricity finally regenerative brake being produced, deliver to recovery grid line by the pantograph on compartment, giving distribution substation with grid line;
4. exceed more than 20 ‰ heavy grade road surfaces in the gradient, the axletree on multifunctional railway carriage, all driving electric machines, train need to be in the time of the heavy grade road traveling going up a slope in the time of return like this, the hill climbing ability of train, just can improve 1 times);
5. below 6 ‰, on the gradient road surface of length below 30 kilometers, be to use locomotive traction train at track grade, at a high speed, constant speed, travels.Then calculate and need to increase a few joint multifunctional railway carriages, make the potential energy of train generation and the resistance of regenerative brake generation reach balance, while carrying out regenerative brake, the electricity of generation is by the pantograph on multifunctional railway carriage, directly feeds back to electrical network;
6. train is no matter increase how many joint multifunctional railway carriages, although load carrying ability increased, but the power of hauling engine need not increase because:
Train can be by the electrical motor work on compartment in the time going up a slope, and the power that increases hauling engine ensures that train normally moves;
The train electrical motor on multifunctional railway carriage and electrical generator in the time of flat pavement running all quit work, and use hauling engine work, just can ensure that train normally moves.
2. face under compartment car, installs wind-drive device, and while there is sleet sky, the heat just by wind conveying pipe, resistor being produced blows to track, makes the moisture rapid evaporation on track;
In the time that train carries out heavy haul transport, multifunctional railway carriage will be placed on the midway location of train, can disperse like this bearing capacity of hook, eliminates the hook phenomenon of rupture of hanging.
CN201410113583.9A 2014-03-26 2014-03-26 Multifunctional railway carriage Pending CN103950452A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410113583.9A CN103950452A (en) 2014-03-26 2014-03-26 Multifunctional railway carriage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410113583.9A CN103950452A (en) 2014-03-26 2014-03-26 Multifunctional railway carriage

Publications (1)

Publication Number Publication Date
CN103950452A true CN103950452A (en) 2014-07-30

Family

ID=51327857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410113583.9A Pending CN103950452A (en) 2014-03-26 2014-03-26 Multifunctional railway carriage

Country Status (1)

Country Link
CN (1) CN103950452A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192636A (en) * 2016-07-20 2016-12-07 李全瑞 High efficiency transportation and rescue technique
CN106240582A (en) * 2016-08-31 2016-12-21 李全瑞 The train multifunctional railway carriage that can generate electricity
CN107074260A (en) * 2014-08-22 2017-08-18 克诺尔-布莱姆斯轨道系统(英国)有限公司 Axle-driven generator for railway brake system
CN110155085A (en) * 2019-05-13 2019-08-23 李全瑞 Train is over long distances, heavy grade, the method for protecting on road surface

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2147697C1 (en) * 1997-09-12 2000-04-20 Казаков Владимир Михайлович Method and device for power generation by means of railway train using generator spinners
CN101003276A (en) * 2005-12-30 2007-07-25 兰德·莫顿有限公司 Axle-driven generator for railway carriages and the like
CN102882263A (en) * 2011-07-15 2013-01-16 三菱自动车工业株式会社 Regeneration control device of electrically powered vehicle
CN103326648A (en) * 2012-03-21 2013-09-25 株式会社电装 Power generation control device
CN103568851A (en) * 2012-08-09 2014-02-12 中国北车股份有限公司大连电力牵引研发中心 Regenerative braking electric energy absorbing device of railway vehicle, and railway vehicle

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2147697C1 (en) * 1997-09-12 2000-04-20 Казаков Владимир Михайлович Method and device for power generation by means of railway train using generator spinners
CN101003276A (en) * 2005-12-30 2007-07-25 兰德·莫顿有限公司 Axle-driven generator for railway carriages and the like
CN102882263A (en) * 2011-07-15 2013-01-16 三菱自动车工业株式会社 Regeneration control device of electrically powered vehicle
CN103326648A (en) * 2012-03-21 2013-09-25 株式会社电装 Power generation control device
CN103568851A (en) * 2012-08-09 2014-02-12 中国北车股份有限公司大连电力牵引研发中心 Regenerative braking electric energy absorbing device of railway vehicle, and railway vehicle

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107074260A (en) * 2014-08-22 2017-08-18 克诺尔-布莱姆斯轨道系统(英国)有限公司 Axle-driven generator for railway brake system
CN107074260B (en) * 2014-08-22 2020-04-17 克诺尔-布莱姆斯轨道系统(英国)有限公司 Axle generator for railway braking system
CN106192636A (en) * 2016-07-20 2016-12-07 李全瑞 High efficiency transportation and rescue technique
CN106240582A (en) * 2016-08-31 2016-12-21 李全瑞 The train multifunctional railway carriage that can generate electricity
CN110155085A (en) * 2019-05-13 2019-08-23 李全瑞 Train is over long distances, heavy grade, the method for protecting on road surface

Similar Documents

Publication Publication Date Title
Paraszczak et al. Electrification of loaders and trucks–a step towards more sustainable underground mining
US20200207377A1 (en) Railway power system and associated method
JP2018523447A (en) Motor vehicle equipment to increase power supply and reduce fuel demand
CN103879412A (en) Tramcar power system and control method
US20150032301A1 (en) Two tiered energy storage for a mobile vehicle
CN103950452A (en) Multifunctional railway carriage
CN111244982A (en) Capacity configuration scheme of rail transit ground type super capacitor energy storage system
US20200207376A1 (en) Power system and associated method
CN104024025A (en) Power hybrid integrated management system
CN102795117B (en) Electrobus
CN102050158A (en) Split-type electrocar and power trailer thereof
CN106671791A (en) Rail train power supply device and rail train
CN104129311A (en) Regenerative braking technique for trains (subway trains and light rail trains)
CN102064666B (en) Kinetic energy generator and application system of railway train
CN105172610A (en) Charging framework for electric vehicle and method
CN204956145U (en) Electricity framework is traded in filling of electric motor car
CN204915335U (en) Energy -saving electric automobile
CN101708743A (en) Power assisting device for transportation vehicle
CN202213508U (en) Mining explosion-proof lithium iron phosphate electric locomotive
CN106240582B (en) The train multifunctional railway carriage that can be generated electricity
CN109878338A (en) A kind of off highway vehicle electric transmission method and system
CN108177577A (en) Electric vehicle relief car
CN106121941B (en) The potential energy of subway train is become the method for electric energy
CN104002826A (en) Train with wide carriages
CN204526832U (en) In-vehicle tugboat power generation assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140730