CN106167078A - A kind of boats and ships and drilling platforms floating aid system and construction method - Google Patents

A kind of boats and ships and drilling platforms floating aid system and construction method Download PDF

Info

Publication number
CN106167078A
CN106167078A CN201610730612.5A CN201610730612A CN106167078A CN 106167078 A CN106167078 A CN 106167078A CN 201610730612 A CN201610730612 A CN 201610730612A CN 106167078 A CN106167078 A CN 106167078A
Authority
CN
China
Prior art keywords
floating
cell cube
flexible
hull
boats
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610730612.5A
Other languages
Chinese (zh)
Other versions
CN106167078B (en
Inventor
赵殿华
于广峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South Sea Shandong Air Bag Engineering Co Ltd
Original Assignee
South Sea Shandong Air Bag Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South Sea Shandong Air Bag Engineering Co Ltd filed Critical South Sea Shandong Air Bag Engineering Co Ltd
Priority to CN201610730612.5A priority Critical patent/CN106167078B/en
Publication of CN106167078A publication Critical patent/CN106167078A/en
Application granted granted Critical
Publication of CN106167078B publication Critical patent/CN106167078B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4413Floating drilling platforms, e.g. carrying water-oil separating devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of boats and ships and drilling platforms floating aid system and construction method thereof, including some Side by side groupings together help floating cell cube, each floating cell cube is helped to include two symmetrical and Flexible pontoons separately, all it is wound with on two Flexible pontoons and is woven into latticed noose, and connect between two nooses and have bottom between two Flexible pontoons and be woven into latticed band of revealing all the details, it is connected above between two nooses assisting suspender belt, each Flexible pontoon is provided with charging and discharging valve, and all Flexible pontoons connect jointly air-charging and air-discharging system.The invention has the beneficial effects as follows: the present invention is collapsible under not inflated condition, small in volume, convenient transport, easy for installation, can shorten construction period, floating drum is reusable, and Meteorological is low, and maintenance cost is low, improving control accuracy and efficiency, the reliability of control is high, promotes safety.

Description

A kind of boats and ships and drilling platforms floating aid system and construction method
Technical field
The present invention relates to a kind of boats and ships and drilling platforms floating aid system and construction method.
Background technology
Along with prosperity and the development of offshore oil cause of world's shipbuilding industry, the construction tonnage of large ship is increasing, Such as various bulk freighters, container ship etc., to meet the demand of bigger transport capacity, for the drilling platforms of marine petroleum development Apply the most increasing, including various jack-up units, semisubmersible platform, floating platform etc..
The deadweight that boats and ships and drilling platforms (hereinafter referred to as ship platform) are built is gradually increased, such as the packaging of ten tons Case ship, gross weight reach the semi-submersible type oil drilling platform etc. of 25000 tons, and the volume of hull is huger, up to more than 200 meters, width Reach more than 80 meter, the mode building the basic interior construction of employing dock of these ship platform, sail to sufferance quay or boat from dock Waters, road, carries out next step installation and test etc..Allowed that construction ability is limited and old-fashioned dock structure by dock itself The hysteresis quality impact of design, is frequently encountered due to ship platform draft in the construction of ship platform with during sailing More than navigation channel or the depth of water of dock, thus cause ship platform to bottom out or hull bottom with water-bed cannot sail less than safe distance or Arrive appointed place through shallow waters, have impact on the progress sailed and be further delivered for use of ship platform, at some Shipyard also occurred that boats and ships were sat stranded, hull bottom and with water-bed barrier collision thus damaged the painful accident of hull.
The method such issues that of solution has four kinds of methods:
The first uses the method digging deep stream, i.e. digs deeply by equipment such as dredgers by navigation channel, reaches the navigation degree of depth needed, This method construction period is long especially, expense is the highest, especially when digging deep to neritic province domain, by water-bed geologic structure Limiting relatively big, when running into large-scale hard reef, need to carry out underwater reef explosion, underwater cleaning cubic meter of stone amount is big, thus causes construction Safety, Cycle Length control and costly equivalent risk, its advantage is once and for all, once dig deep after maintain the cycle long.
Second method uses the method reducing boats and ships own wt, i.e. ship platform only to install after building thematic structure A part of equipment, reduces the hull platform weight sailed, thus reduces draft, arrive the waters of the enough depth of water after sailing Being further continued for carrying out installation and the debugging efforts in later stage, thus cause the secondary displacement of build the side, some mounting process is subject to The impact that shifts to place and become more loaded down with trivial details, the installation of some equipment is also carried out displacement, and installation and debugging progress is more limited System, thus cause the lengthening of construction period and the increase of mounting cost, unfavorable to the construction benefit improving project.This method Advantage is that marina can also build big ship, it is achieved the purpose that little material is big.
The third method is by increasing steel buoyancy tank generation buoyancy reduction draft on platform, thus crosses shallow water Region, this method is primarily adapted for use in sailing or transporting of drilling platforms.In practice, the expense phase of construction steel buoyancy tank is increased Working as costliness, the cycle installed and remove is long, spends in auxiliary equipment such as the time on large-scale floating crane and costly, and early stage is necessary Carrying out detailed design, the design & check workload of strength and stability is big, more numerous to fixing connection therein, assembling and disassembling Trivial, the structure of steel buoyancy tank casing is complicated, and the welding processing cycle is long, moreover buoyancy tank dead weight is relatively big, pacifies at dock or harbour Dress difficulty is big, crucial its provide help buoyancy the most extremely limited, when needing large-tonnage, internal structure stress is complicated, adds The risk of deformation fracture, simultaneously because steel buoyancy tank is Plate Welding body, it is desirable to have under water higher bubble-tight while Its case hardness is high, it is impossible to directly contacting with each other with hull, can only be welded on the corresponding position of hull, this results in dismounting side Face adds operation easier, and cutting further increases the operation restriction of diver the most under water, and hull once encountered by steel buoyancy tank, Cause outer peeling paint or ship skin stress deformation, it will cause the product of the problems such as unexpected additional maintenance cycle and expense Raw.This method does not the most have good advantage.
4th kind of method is to carry half latent barge to sail, and this method is suitable for the transport of the drilling platforms of distance, and it is excellent Point is simple to operate safe and reliable, is slid onto by platform after half latent barge is fixed and can sail, and the shortcoming of its maximum is fortune Defeated cost is the highest, uses half latent barge to need to arrange sailing date, and dynamic system bottom half latent barge, when navigation channel is the most shallow can not When meeting the draft of half latent barge navigation, this method is invalid equally, the risk navigated by water by force can cause barge and Ship platform the most stranded.
From above four kinds of methods it can be seen that be respectively arranged with pluses and minuses, mainly construction cost, cycle and the assembling and disassembling to project Operation easier effect different.In conjunction with above-mentioned four kinds of methods, from the root-cause analysis demand of problem, solve what shallow water sailed It is crucial that increase the buoyancy of hull, reduce the draft of hull, thus meet the depth requirements that sails in navigation channel.
Summary of the invention
For solving above technical deficiency, the invention provides one and be used conveniently and safely, maintenance cost is low, and control can The boats and ships high by property and drilling platforms floating aid system and construction method.
The present invention is achieved by the following measures:
A kind of boats and ships of the present invention and drilling platforms floating aid system, including some Side by side groupings together help floating cell cube, often Individual help floating cell cube to include two symmetrical and Flexible pontoons separately, two Flexible pontoons are all wound with and are woven into net Connect between the noose of trellis, and two nooses and have bottom between two Flexible pontoons and be woven into latticed revealing all the details Band, is connected above between two nooses assisting suspender belt, and each Flexible pontoon is provided with charging and discharging valve, all Flexible pontoons There is air-charging and air-discharging system common connection.
Above-mentioned air-charging and air-discharging system includes source of the gas, and the charging and discharging valve of each two Flexible pontoons helping floating cell cube is by dividing Pipeline connects a point of control valve, and described source of the gas is connected with each point of control valve respectively by main line.
Above-mentioned air-charging and air-discharging system includes source of the gas, and described source of the gas is connected by main line control valve group, described control valve group Being connected by the charging and discharging valve of branch pipeline with each Flexible pontoon, control valve group includes some solenoid electric valves, described electromagnetism Control valve is electrically connected with electrical control panel assembly.
The stage casing of above-mentioned Flexible pontoon is cylindrical, and Flexible pontoon two ends are provided with the end face of circular arc, described inflation/deflation Valve is arranged on end face center, and described noose includes the endless master tape being looped around on Flexible pontoon stage casing and is looped around Flexible pontoon Hoop auxiliary band on end face, described endless master tape and hoop auxiliary band connect has the longitudinal direction along Flexible pontoon longitudinal extension to assist Band, described in reveal all the details the horizontal kicking strap and longitudinal kicking strap, the ring on described horizontal kicking strap and two Flexible pontoons that band includes being connected Shape master tape one connects, and described endless master tape is provided with joining shackle, described endless master tape, hoop auxiliary band, longitudinally auxiliary Band, horizontal kicking strap and longitudinal kicking strap are flat.
Each Flexible pontoon top is provided with an auxiliary float, and described auxiliary float diameter is less than Flexible pontoon.
Above-mentioned control valve group also includes Pressure relief valve and air bleeding valve.
Above-mentioned boats and ships and the construction method of drilling platforms floating aid system, comprise the following steps:
Step 1, clears up hull, assembles and helps floating cell cube, floating cell cube entirety will be helped laterally to pull hull bottom into, or hang with loop wheel machine The installation site specified, left and right Flexible pontoon lays respectively at the left and right sides of hull and is arranged;
Step 2, is inflated floating drum, arranges control system, connects source of the gas, one by one to helping floating cell cube to be controlled debugging;
Step 3, opens a sluice gate dock is carried out water filling, when the depth of water reaches floating drum submergence about 50%, stops water filling, passes through inflation/deflation Helped floating cell cube is inflated by control system, controls aeration speed and suitably adjusts the position being inflated floating drum, opening a sluice gate Continuing dock is carried out water filling, water level reaches to help the depth of water of floating conditions dictate;
Step 4, uses power drive or towage mode to drive to ship along navigation channel specify waters, and this waters should meet dismounting and help floating Draft after system, then hull casts anchor, and to helping floating cell cube slowly to exit, deflation sequences is according to first four Each is helped floating cell cube slowly to exit by the symmetric mode in the middle of behind angle simultaneously, and the drinking water that hull slowly sinks to reaching work is deep Degree;
Step 5, after Flexible pontoon venting, auxiliary float makes Flexible pontoon be suspended in water, removes and is helped floating unit The auxiliary suspender belt and the pipeline of all connections on body top, each helps floating cell cube to reach free floating condition, departing from the bottom of hull Portion, is finally recovered to land and carries out inspection and maintenance.
Above-mentioned boats and ships and the construction method of drilling platforms floating aid system, comprise the following steps:
Step 1, assembles and helps floating cell cube, then uses towboat mode, and floating cell cube will be helped under water longitudinally to pull hull bottom into, left Right floating drum lays respectively at the left and right sides of hull;
Step 2, is arranged into deck in ship structure or other convenient position controlled by electrical control panel assembly, and one by one to helping floating unit Body is controlled debugging;
Step 3, tentatively inflates floating drum, helps floating cell cube to enter each according to the symmetric mode in the middle of behind first corner simultaneously Row slowly inflation, when the depth of water reaches floating drum submergence about 20%, connects auxiliary suspender belt and the joining shackle on top, and floating drum is tight Tight is bundled on hull;
Step 4, carries out second time slowly inflation by air-charging and air-discharging system to helped floating cell cube, according in the middle of behind first corner Symmetric mode, hull will float in the process, reach the draft of towage;When intrinsic pressure reach operating pressure require time, stop Only inflation, stably helps floating state;Again fasten each help floating cell cube top assist suspender belt temporarily, reach tension, help Floating state balance is stable;
Step 5, uses power drive or towage mode to drive to ship along navigation channel specify waters, and this waters should meet dismounting and help floating Draft after system, then hull casts anchor, and to helping floating cell cube slowly to exit, deflation sequences is according to first four Each is helped floating cell cube slowly to exit by the symmetric mode in the middle of behind angle simultaneously, and the drinking water that hull slowly sinks to reaching work is deep Degree;
Step 6, after Flexible pontoon venting, auxiliary float makes Flexible pontoon be suspended in water, removes and is helped floating unit The auxiliary suspender belt and the pipeline of all connections on body top, each helps floating cell cube to reach free floating condition, departing from the bottom of hull Portion, is finally recovered to land and carries out inspection and maintenance.
The invention has the beneficial effects as follows: 1) two floating drum bodies being symmetrically arranged, can realize helping the buoyancy of floating cell cube Balance controls, if a side float produces buoyancy more than opposite side, can be drawn in by the floating drum of opposite side, thus strengthen in water The buoyancy of opposite side, and floating in this side, reduces buoyancy, thus realize buoyancy adjustment to static equilibrium;
2) floating drum is Flexible pontoon, and insufflation gas amount determines the size of buoyancy, has preferable buoyancy size control characteristic;
3) floating drum is Flexible pontoon, not collapsible under inflated condition, small in volume, convenient transport, easy for installation, can shorten Construction period;4) with floating drum wall, ship outer casing contact area greatly, pressure is little, reduces the deformation of housing, effectively for latticed noose The anticorrosive coat of protection hull;5) installation requirement of different beam of hull it is suitable for by increasing the elongated strap in network-type noose; 6) floating drum is reusable, and Meteorological is low, and maintenance cost is low;7) the many groups of Parallel Control helping floating cell cube can be realized with long-range Controlling, improve control accuracy and efficiency, the reliability of control is high, promotes safety.
Accompanying drawing explanation
Fig. 1 is the structural representation of installment state of the present invention.
Fig. 2 is the perspective view that the present invention helps floating cell cube.
Fig. 3 is the side structure schematic diagram that the present invention helps floating cell cube.
Fig. 4 is the structural representation of independence inflation/deflation control mode of the present invention.
Fig. 5 is the structural representation of centralized control of the present invention.
Wherein: 10 help floating cell cube, 100 hulls, 50 air-charging and air-discharging systems, 20 horizontal kicking straps, 21 endless master tapes, and 22 is the most auxiliary Help band, 23 joining shackles, 24 hoop auxiliary bands, 26 longitudinal kicking straps, 27 auxiliary suspender belts, 30 Flexible pontoons, 30A auxiliary float, 31 Charging and discharging valve, 32 sources of the gas, 33 branch pipeline, 34 points of control valves, 35 main lines, 36 electrical control panel assemblies, 37 solenoid electric valves, 38 pressure-display devices, 39 Pressure relief valves, 40 control valve groups, 41 air bleeding valves.
Detailed description of the invention
Below in conjunction with the accompanying drawings the present invention is done further detailed description:
As shown in Figure 1, 2, 3, a kind of boats and ships of the present invention and drilling platforms floating aid system, including some Side by side groupings together Help floating cell cube 10, each help floating cell cube 10 to include two symmetrical and Flexible pontoons 30 separately, two flexible floatings All it is wound with on cylinder 30 and is woven into latticed noose, and between two nooses there be between two Flexible pontoons 30 connection Bottom and be woven into latticed band of revealing all the details, be connected above between two nooses auxiliary suspender belt 27, each Flexible pontoon 30 is equal Being provided with charging and discharging valve 31, all Flexible pontoons 30 connect jointly air-charging and air-discharging system 50.Air-charging and air-discharging system 50 uses two kinds Mode.
As shown in Figure 4, one is independent inflation/deflation control mode, and air-charging and air-discharging system 50 includes that source of the gas 32, each helping float list The charging and discharging valve 31 of two Flexible pontoons 30 of unit's body 10 is connected by branch pipeline 33 a point of control valve 34, and source of the gas 32 leads to Cross main line 35 to be connected with each point of control valve 34 respectively.
As it is shown in figure 5, another is centralized control, air-charging and air-discharging system 50 includes source of the gas 32, and source of the gas 32 is by main Pipeline 35 connects control valve group 40, and control valve group 40 is connected by the charging and discharging valve 31 of branch pipeline 33 with each Flexible pontoon 30 Connecing, control valve group 40 includes some solenoid electric valves 37, and solenoid electric valve 37 is electrically connected with electrical control panel assembly 36.Flexible floating The stage casing of cylinder 30 is cylindrical, and Flexible pontoon 30 two ends are provided with the end face of circular arc, and charging and discharging valve 31 is arranged in end face The heart, noose includes that the endless master tape 21 being looped around on Flexible pontoon 30 stage casing is auxiliary with the hoop being looped around on Flexible pontoon 30 end face Help band 24, endless master tape 21 and hoop auxiliary band 24 to connect and have the longitudinal auxiliary band 22 along Flexible pontoon 30 longitudinal extension, reveal all the details Band includes horizontal kicking strap 20 and longitudinal kicking strap 26, the endless master tape 21 on horizontal kicking strap 20 and two Flexible pontoons 30 being connected One connects, and endless master tape 21 is provided with joining shackle 23, endless master tape 21, hoop auxiliary band 24, longitudinal auxiliary band 22, horizontal stroke It is flat to kicking strap 20 and longitudinal kicking strap 26.Each Flexible pontoon 30 top is provided with an auxiliary float 30A, described Auxiliary float 30A diameter is less than Flexible pontoon 30.Control valve group 40 also includes Pressure relief valve 39 and air bleeding valve 41, there is also mounted Pressure-display device 38.
The step that the present invention installs at hull 100 is as follows:
1) cleaning hull 100:
Sharp objects, welding remaining piece bottom hull 100 are removed, avoids the sharp object puncture to floating drum cylinder as far as possible;
2) assembling of floating cell cube 10 is helped
The floating drum body do not inflated and network-type noose being installed, it is whole that joining shackle 23 forms that two floating drums link together Body structure, and the integrated inflation/deflation valve body at floating drum two ends is installed;The net outside auxiliary float 30A installation that each floating drum is configured Noose component, and be inflated by design pressure, then by shackle or suspender belt rigging, auxiliary float 30A is connected to main buoy On;
3) pull into and help floating cell cube 10
Floating cell cube 10 entirety will be helped laterally to pull hull bottom into, or hang the installation site specified with loop wheel machine, left and right floating drum is respectively The left and right sides being positioned at hull 100 is arranged;
4) floating drum is inflated
Connect each floating drum interim inflation/deflation pipeline, by air compressor machine source of the gas 32, floating drum is tentatively inflated, be inflated to preliminary After rigidity, connect auxiliary suspender belt 27 and the shackle on top, by the floating drum two side being bundled in hull 100 tightly, then tear open Except interim inflation/deflation pipeline;
5) repeat that other are installed and help floating cell cube 10
Specify position to repeat that other are installed according to above-mentioned steps at other and help floating cell cube 10;
6) control system is arranged
Install by the design requirement of integrated inflation/deflation control system, arrange connection inflation/deflation pipeline and pressure monitoring pipeline to controlling Platform, is arranged into hull 100 deck or other convenient positions controlled by control station;
7) debugging is controlled
Connect source of the gas 32, one by one to helping floating cell cube 10 to be controlled debugging, including remote controlled manner and emergent manually control Mode processed, queueing problem is to normal operating conditions;
8) dock water filling
Opening a sluice gate dock is carried out water filling, when the depth of water reaches floating drum submergence about 50%, stop water filling, now, floating drum provides preliminary Help buoyancy, net realizes closely revealing all the details and contacting at hull 100;
9) duty adjusts
By inflation/deflation control system, helped floating cell cube 10 is inflated, controls aeration speed and suitably adjustment is inflated The position of floating drum, when floating drum is intrinsic pressure reach operating pressure require time, stop inflation, stably help floating state;
10) fastening helps floating cell cube 10
Again fasten each interim auxiliary suspender belt 27 helping floating cell cube 10 top, reach tension, help floating state balance steady Fixed;
11) dock water filling again
Opening a sluice gate to continue dock is carried out water filling, water level reaches to help the depth of water of floating conditions dictate, and this process should be slow, and hull 100 exists Dock bottom will be floated off during this, reach the draft of towage off docking;
12) towage
Power drive or towage mode is used to drive to ship along navigation channel specify waters, after this waters should meet dismounting floating aid system Draft, then hull 100 casts anchor;
13) venting
To helping floating cell cube 10 slowly to exit, each is helped by deflation sequences according to the symmetric mode in the middle of behind first corner simultaneously Floating cell cube 10 is slowly exitted, and hull 100 slowly sinks to reaching the draft of work;
14) remove
After main buoy venting, the submerged because of deadweight, but owing to the auxiliary float 30A on top is connected on main buoy, thus Cause main buoy to be suspended in water, remove top auxiliary suspender belt 27 and the pipeline of all connections of all cell cubes the most again, often Individual floating cell cube 10 is helped to reach free floating condition, bottom hull 100;
15) reclaim
The recovery helping floating cell cube 10 has two ways, and a kind of is floating cell cube 10 will to be helped to haul out from the longitudinal direction of hull 100 one by one Come, use the mode such as towboat or hoist engine traction;Another kind of method is hull 100 navigation to be left this construction area, so The most just remain floating each group and help floating cell cube 10, then reclaim with small-sized barge etc.;
In the way of recovery can be lifted to boats and ships to use scene, it is possible to the mode of employing towage to shallow water area recycling, the former On-the-spot construction workload is big, and the equipment of use is many, and the equipment that the latter uses is few, uses canoe just can be entrained back into harbour etc. Shallow water area, lifts more convenient on the bank.
16) inspection and maintenance
After floating drum cell cube is recovered to land, launch one by one to check, including cylinder damage situations, net abrasion condition and charge valve The situation etc. of colliding with of body, and maintain item by item by norms of mainteaance, dry rear taxonomic revision FOLD AND PACK, in case repeating next time to make With.
The step that the present invention installs in drilling platforms or harbour is as follows:
The manner need to carry out installation and debugging in harbour, be particularly well-suited to harbour place conditional in the case of construct.
1) assembling of floating cell cube 10 is helped
On land or workboat deck, the floating drum body do not inflated and network-type noose being installed, joining shackle 23 is formed Bitubular integrative-structure, installs the integrated charging and discharging valve 31 at floating drum two ends and the inflation/deflation pipe-line system being connected;Auxiliary float After 30A inflation, connect auxiliary float 30A and to main buoy and fasten;
2) pull into and help floating cell cube 10
Using towboat mode, floating cell cube 10 will be helped under water longitudinally to pull hull bottom into, left and right floating drum lays respectively at hull 100 The left and right sides, relates to underwater construction, should observe the requirement of relevant underwater construction standard criterion;
3) repeat that other are installed and help floating cell cube 10
Repeat that other are installed according to above-mentioned steps in appointment position and help floating cell cube 10;
4) control system is arranged
Arrange and connect inflation/deflation pipeline and pressure monitoring pipeline to control station, control station is arranged into hull 100 deck or other The convenient position controlled
5) debugging is controlled
By control station one by one to helping floating cell cube 10 to be controlled debugging, including remote controlled manner and emergent Non-follow control Mode, queueing problem is to normal operating conditions;
6) inflation
Floating drum is tentatively inflated, helps floating cell cube 10 to delay each according to the symmetric mode in the middle of behind first corner simultaneously Trickle charge gas, when the depth of water reaches floating drum submergence about 20%, connects auxiliary suspender belt 27 and the shackle on top, by floating drum bundle tightly Tie up on hull 100;
7) duty adjusts
By inflation/deflation control system, helped floating cell cube 10 is carried out second time to inflate, control aeration speed, according to first four Symmetric mode in the middle of behind angle, this process should be slow, and hull 100 will float in the process, reach the draft of towage;When Intrinsic pressure reach operating pressure require time, stop inflation, stably help floating state;
8) fastening helps floating cell cube 10
Again fasten each interim auxiliary suspender belt 27 helping floating cell cube 10 top, reach tension, help floating state balance steady Fixed;
9) towage
Power drive or towage mode is used to drive to ship along navigation channel specify waters, after this waters should meet dismounting floating aid system Draft, then hull 100 casts anchor;
10) venting
To helping floating cell cube 10 slowly to exit, each is helped by deflation sequences according to the symmetric mode in the middle of behind first corner simultaneously Floating cell cube 10 is slowly exitted, and hull 100 slowly sinks to reaching the draft of work;
11) remove
After main buoy venting, the submerged because of deadweight, but owing to the auxiliary float 30A on top is connected on main buoy, thus Cause main buoy to be suspended in water, remove top auxiliary suspender belt 27 and the pipeline of all connections of all cell cubes the most again, often Individual floating cell cube 10 is helped to reach free floating condition, bottom hull 100;
12) reclaim
The recovery helping floating cell cube 10 has two ways, and a kind of is floating cell cube 10 will to be helped to haul out from the longitudinal direction of hull 100 one by one Come, use the mode such as towboat or hoist engine traction;Another kind of method is hull 100 navigation to be left this construction area, so The most just remain floating each group and help floating cell cube 10, then reclaim with small-sized barge etc.;
In the way of recovery can be lifted to boats and ships to use scene, it is possible to the mode of employing towage to shallow water area recycling, the former On-the-spot construction workload is big, and the equipment of use is many, and the equipment that the latter uses is few, uses canoe just can be entrained back into harbour etc. Shallow water area, lifts more convenient on the bank.
13) inspection and maintenance
After floating drum cell cube is recovered to land, launch one by one to check, including cylinder damage situations, net abrasion condition and charge valve The situation etc. of colliding with of body, and maintain item by item by norms of mainteaance, dry rear taxonomic revision FOLD AND PACK, in case repeating next time to make With.
The above is only the preferred implementation of this patent, it is noted that for the ordinary skill people of the art For Yuan, on the premise of without departing from the art of this patent principle, it is also possible to make some improvement and replacement, these improve and replace Also should be regarded as the protection domain of this patent.

Claims (8)

1. boats and ships and drilling platforms floating aid system, it is characterised in that: include some Side by side groupings together help floating unit Body, each helps floating cell cube to include two symmetrical and Flexible pontoons separately, and two Flexible pontoons are all wound with volume It is made between latticed noose, and two nooses connection have bottom between two Flexible pontoons and be woven into latticed Band of revealing all the details, be connected above between two nooses assist suspender belt, each Flexible pontoon is provided with charging and discharging valve, all soft Property floating drum connects jointly air-charging and air-discharging system.
Boats and ships and drilling platforms floating aid system the most according to claim 1, it is characterised in that: described air-charging and air-discharging system includes gas Source, the charging and discharging valve of each two Flexible pontoons helping floating cell cube is connected by branch pipeline a point of control valve, described Source of the gas is connected with each point of control valve respectively by main line.
Boats and ships and drilling platforms floating aid system the most according to claim 1, it is characterised in that: described air-charging and air-discharging system includes gas Source, described source of the gas is connected by main line control valve group, and described control valve group is filled by branch pipeline and each Flexible pontoon Venting valve connects, and control valve group includes that some solenoid electric valves, described solenoid electric valve are electrically connected with electrical control panel assembly.
Boats and ships and drilling platforms floating aid system the most according to claim 1, it is characterised in that: the stage casing of described Flexible pontoon is Cylinder, Flexible pontoon two ends are provided with the end face of circular arc, and described charging and discharging valve is arranged on end face center, described noose bag Including the endless master tape being looped around on Flexible pontoon stage casing and the hoop auxiliary band being looped around on Flexible pontoon end face, described annular is main Band and hoop auxiliary band connect the longitudinal auxiliary band along Flexible pontoon longitudinal extension, described in reveal all the details that band includes being connected horizontal Kicking strap and longitudinal kicking strap, the endless master tape one on described horizontal kicking strap and two Flexible pontoons connects, on described endless master tape Being provided with joining shackle, described endless master tape, hoop auxiliary band, longitudinal auxiliary band, horizontal kicking strap and longitudinal kicking strap are flat Shape.
Boats and ships and drilling platforms floating aid system the most according to claim 1, it is characterised in that: each Flexible pontoon top is all provided with Being equipped with an auxiliary float, described auxiliary float diameter is less than Flexible pontoon.
Boats and ships and drilling platforms floating aid system the most according to claim 3, it is characterised in that: described control valve group also includes pressure Power overflow valve and air bleeding valve.
7. boats and ships as claimed in claim 1 and the construction method of drilling platforms floating aid system, it is characterised in that include following Step:
Step 1, clears up hull, assembles and helps floating cell cube, floating cell cube entirety will be helped laterally to pull hull bottom into, or hang with loop wheel machine The installation site specified, left and right Flexible pontoon lays respectively at the left and right sides of hull and is arranged;
Step 2, is inflated floating drum, arranges control system, connects source of the gas, one by one to helping floating cell cube to be controlled debugging;
Step 3, opens a sluice gate dock is carried out water filling, when the depth of water reaches floating drum submergence about 50%, stops water filling, passes through inflation/deflation Helped floating cell cube is inflated by control system, controls aeration speed and suitably adjusts the position being inflated floating drum, opening a sluice gate Continuing dock is carried out water filling, water level reaches to help the depth of water of floating conditions dictate;
Step 4, uses power drive or towage mode to drive to ship along navigation channel specify waters, and this waters should meet dismounting and help floating Draft after system, then hull casts anchor, and to helping floating cell cube slowly to exit, deflation sequences is according to first four Each is helped floating cell cube slowly to exit by the symmetric mode in the middle of behind angle simultaneously, and the drinking water that hull slowly sinks to reaching work is deep Degree;
Step 5, after Flexible pontoon venting, auxiliary float makes Flexible pontoon be suspended in water, removes and is helped floating unit The auxiliary suspender belt and the pipeline of all connections on body top, each helps floating cell cube to reach free floating condition, departing from the bottom of hull Portion, is finally recovered to land and carries out inspection and maintenance.
8. boats and ships as claimed in claim 1 and the construction method of drilling platforms floating aid system, it is characterised in that include following Step:
Step 1, assembles and helps floating cell cube, then uses towboat mode, and floating cell cube will be helped under water longitudinally to pull hull bottom into, left Right floating drum lays respectively at the left and right sides of hull;
Step 2, is arranged into deck in ship structure or other convenient position controlled by electrical control panel assembly, and one by one to helping floating unit Body is controlled debugging;
Step 3, tentatively inflates floating drum, helps floating cell cube to enter each according to the symmetric mode in the middle of behind first corner simultaneously Row slowly inflation, when the depth of water reaches floating drum submergence about 20%, connects auxiliary suspender belt and the joining shackle on top, and floating drum is tight Tight is bundled on hull;
Step 4, carries out second time slowly inflation by air-charging and air-discharging system to helped floating cell cube, according in the middle of behind first corner Symmetric mode, hull will float in the process, reach the draft of towage;When intrinsic pressure reach operating pressure require time, stop Only inflation, stably helps floating state;Again fasten each help floating cell cube top assist suspender belt temporarily, reach tension, help Floating state balance is stable;
Step 5, uses power drive or towage mode to drive to ship along navigation channel specify waters, and this waters should meet dismounting and help floating Draft after system, then hull casts anchor, and to helping floating cell cube slowly to exit, deflation sequences is according to first four Each is helped floating cell cube slowly to exit by the symmetric mode in the middle of behind angle simultaneously, and the drinking water that hull slowly sinks to reaching work is deep Degree;
Step 6, after Flexible pontoon venting, auxiliary float makes Flexible pontoon be suspended in water, removes and is helped floating unit The auxiliary suspender belt and the pipeline of all connections on body top, each helps floating cell cube to reach free floating condition, departing from the bottom of hull Portion, is finally recovered to land and carries out inspection and maintenance.
CN201610730612.5A 2016-08-26 2016-08-26 A kind of ship and drilling platforms floating aid system and construction method Active CN106167078B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610730612.5A CN106167078B (en) 2016-08-26 2016-08-26 A kind of ship and drilling platforms floating aid system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610730612.5A CN106167078B (en) 2016-08-26 2016-08-26 A kind of ship and drilling platforms floating aid system and construction method

Publications (2)

Publication Number Publication Date
CN106167078A true CN106167078A (en) 2016-11-30
CN106167078B CN106167078B (en) 2018-09-18

Family

ID=57376042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610730612.5A Active CN106167078B (en) 2016-08-26 2016-08-26 A kind of ship and drilling platforms floating aid system and construction method

Country Status (1)

Country Link
CN (1) CN106167078B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108407996A (en) * 2018-02-09 2018-08-17 大连理工大学 A kind of novel modularized helping ship float facility and its application method
CN109094753A (en) * 2018-08-15 2018-12-28 招商局重工(江苏)有限公司 One kind supporting and lifting formula semi-submersible offshore engineering platform and undocks scheme
CN109178225A (en) * 2018-08-15 2019-01-11 招商局重工(江苏)有限公司 A kind of semi-submersible offshore engineering platform rod-pulling type undocks method
CN109178226A (en) * 2018-08-15 2019-01-11 招商局重工(江苏)有限公司 A method of reducing the drinking water of semi-submersible offshore engineering platform
CN111936382A (en) * 2018-02-19 2020-11-13 伊特里克公司 Semi-submersible drilling vessel for use in, for example, harsh environments
CN112810766A (en) * 2020-12-31 2021-05-18 烟台中集来福士海洋工程有限公司 Bottom-sitting type platform and self-floating and sinking-floating method thereof
CN113135363A (en) * 2021-04-22 2021-07-20 大连东软信息学院 Container stacking inflation floating device for marine logistics
CN113895570A (en) * 2021-09-16 2022-01-07 鲁东大学 Frame-type floating island with air bags, semi-submersible ship and semi-submersible ship control method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3675606A (en) * 1969-06-05 1972-07-11 Mitsubishi Heavy Ind Ltd Method of constructing marine float structures
FR2280544A1 (en) * 1974-07-31 1976-02-27 Superflexit Floating cradle for supporting barges clear of water - using reinforced polyester cradle and inflatable envelopes
GB2313345A (en) * 1996-05-23 1997-11-26 James Kenneth Dobson Dry docking pontoon for nuclear powered submarines
CN1932160A (en) * 2005-11-27 2007-03-21 苗德政 Component assembling construction auxiliary apparatus in hydraulic engineering and using method thereof
CN103963937A (en) * 2013-12-28 2014-08-06 山东南海气囊工程有限公司 Net cover structure of engineering air bag
CN104044712A (en) * 2014-06-25 2014-09-17 山东南海气囊工程有限公司 Method for salvaging sunken ship by adopting rubber air bag
CN204265212U (en) * 2014-12-03 2015-04-15 中国葛洲坝集团第六工程有限公司 A kind of floating drum for installing super-heavy component under water
CN205010440U (en) * 2015-08-07 2016-02-03 毛应吉 Steamer with system of saving oneself of turning on one's side

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3675606A (en) * 1969-06-05 1972-07-11 Mitsubishi Heavy Ind Ltd Method of constructing marine float structures
FR2280544A1 (en) * 1974-07-31 1976-02-27 Superflexit Floating cradle for supporting barges clear of water - using reinforced polyester cradle and inflatable envelopes
GB2313345A (en) * 1996-05-23 1997-11-26 James Kenneth Dobson Dry docking pontoon for nuclear powered submarines
CN1932160A (en) * 2005-11-27 2007-03-21 苗德政 Component assembling construction auxiliary apparatus in hydraulic engineering and using method thereof
CN103963937A (en) * 2013-12-28 2014-08-06 山东南海气囊工程有限公司 Net cover structure of engineering air bag
CN104044712A (en) * 2014-06-25 2014-09-17 山东南海气囊工程有限公司 Method for salvaging sunken ship by adopting rubber air bag
CN204265212U (en) * 2014-12-03 2015-04-15 中国葛洲坝集团第六工程有限公司 A kind of floating drum for installing super-heavy component under water
CN205010440U (en) * 2015-08-07 2016-02-03 毛应吉 Steamer with system of saving oneself of turning on one's side

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108407996A (en) * 2018-02-09 2018-08-17 大连理工大学 A kind of novel modularized helping ship float facility and its application method
CN111936382A (en) * 2018-02-19 2020-11-13 伊特里克公司 Semi-submersible drilling vessel for use in, for example, harsh environments
CN109094753A (en) * 2018-08-15 2018-12-28 招商局重工(江苏)有限公司 One kind supporting and lifting formula semi-submersible offshore engineering platform and undocks scheme
CN109178225A (en) * 2018-08-15 2019-01-11 招商局重工(江苏)有限公司 A kind of semi-submersible offshore engineering platform rod-pulling type undocks method
CN109178226A (en) * 2018-08-15 2019-01-11 招商局重工(江苏)有限公司 A method of reducing the drinking water of semi-submersible offshore engineering platform
CN112810766A (en) * 2020-12-31 2021-05-18 烟台中集来福士海洋工程有限公司 Bottom-sitting type platform and self-floating and sinking-floating method thereof
CN113135363A (en) * 2021-04-22 2021-07-20 大连东软信息学院 Container stacking inflation floating device for marine logistics
CN113135363B (en) * 2021-04-22 2022-09-13 大连东软信息学院 Container stacking inflation floating device for marine logistics
CN113895570A (en) * 2021-09-16 2022-01-07 鲁东大学 Frame-type floating island with air bags, semi-submersible ship and semi-submersible ship control method

Also Published As

Publication number Publication date
CN106167078B (en) 2018-09-18

Similar Documents

Publication Publication Date Title
CN106167078B (en) A kind of ship and drilling platforms floating aid system and construction method
US4495880A (en) Draft assisted delivery system
CN103738477A (en) Method for replacing upper anchor cable of mooring anchor legs
CN1642807B (en) Swing mooring pontoon
KR100397362B1 (en) Ships for the production and / or loading / unloading and transportation of hydrocarbons from offshore areas and for carrying out oil well operations
CN206231586U (en) A kind of sea situation high and by isolation floating body
CN106314707A (en) Gasbag type anti-sinking overturn-preventing device
CN205916302U (en) Boats and ships and drilling platform help superficial system
CN102424101B (en) Technology for launching ship with airbags
CN212388514U (en) Self-floating and submerging positioning and mounting device for steel frame by adopting air bag floating assistance
KR20140045132A (en) Side by side mooring system for floating marine structure and mooring method using the same
CN204802046U (en) Anti sinking prevents toppling gasbag device
CN205602065U (en) Anti anti -sway device that sinks of boats and ships
CN202175175U (en) Multipurpose anchor-handling tug supply vessel
CN2232394Y (en) Soft salvaging float for underwater sunken vessel
US6899049B2 (en) Apparatus and method of constructing offshore platforms
CN210712334U (en) Inflatable floating rope
US1368787A (en) Method for recovering sunken vessels
CN213784866U (en) Polyethylene fiber air bag for assisting marine culture net cage towing
CN113895570A (en) Frame-type floating island with air bags, semi-submersible ship and semi-submersible ship control method
CN108974269B (en) Hold in the palm ship raft
RU2479460C1 (en) Method of sunk ship surfacing and complex for surfacing and floating sunk submarines and other vessels
CN105129048A (en) Rotary-righting salvaging method for sunken ship and main equipment
CN2546327Y (en) Fast salvaging apparatus for sunken vessels
RU2648555C1 (en) Method for piloting floating craft in shallow water areas

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant