CN205916302U - Boats and ships and drilling platform help superficial system - Google Patents
Boats and ships and drilling platform help superficial system Download PDFInfo
- Publication number
- CN205916302U CN205916302U CN201620948397.1U CN201620948397U CN205916302U CN 205916302 U CN205916302 U CN 205916302U CN 201620948397 U CN201620948397 U CN 201620948397U CN 205916302 U CN205916302 U CN 205916302U
- Authority
- CN
- China
- Prior art keywords
- flexible
- floating
- pontoon
- ship
- air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a boats and ships and drilling platform help superficial system and construction method, including a plurality of put together side by side help superficial cell cube, every helps floats the cell cube and includes the flexible flotation pontoon of two bilateral symmetry and looks spaced, on two flexible flotation pontoons all the winding weave into latticed noose to being connected with between two noose and lieing in between two flexible flotation pontoons the bottom and weave into the latticed area of revealing all the details, be connected with supplementary suspender above between two noose, every flexible flotation pontoon all is provided with and fills the gassing valve, and all flexible flotation pontoons are connected with the gassing system of filling jointly. The beneficial effects of the utility model are that: the utility model discloses it is collapsible under vented condition not, small light in weight, convenient transportation, simple to operate can shorten construction cycle, flotation pontoon repeatedly usable, the expense that drops into is low, and maintenance cost is low, improves control accuracy and efficiency, and the reliability of control is high, promotes the security.
Description
Technical field
This utility model is related to a kind of ship and drilling platforms floating aid system.
Background technology
Prosperity with world's shipbuilding industry and the development of offshore oil cause, the construction tonnage of large ship is increasing,
As various bulk freighters, container ship etc., to meet the demand of bigger transport capacity, for the drilling platforms of marine petroleum development
Application is also increasing, including various jack-up units, semisubmersible platform, floating platform etc..
The deadweight that ship and drilling platforms (hereinafter referred to as ship platform) are built is gradually increased, such as the packaging of ten tons
Case ship, gross weight reach 25000 tons semi-submersible type oil drilling platform etc., and the volume of hull is huger, up to more than 200 meters, width
Reach more than 80 meter, by the way of the building of these ship platform substantially adopts construction in dock, sail to sufferance quay or boat from dock
Road waters, carries out installation and test of next step etc..Allowed that construction ability is limited and old-fashioned dock structure in itself by dock
The hysteresis quality impact of design, is frequently encountered due to ship platform draft in the construction of ship platform with during sailing
More than the depth of water in navigation channel or dock, thus lead to ship platform to bottom out or hull bottom with water-bed cannot sail less than safe distance or
Reach appointed place through shallow waters, have impact on the progress sailed and be further delivered for use of ship platform, some
Also ship and sat stranded, hull bottom with water-bed barrier collision thus damaging the painful accident of hull in shipyard.
The method of such issues that solution has four kinds of methods:
Depth is dug by equipment such as dredgers in navigation channel by the first method using digging deep stream, reaches the navigation of needs
Depth, this method construction period is especially long, expense is especially high, especially when carrying out digging deep to neritic province domain, by water-bed geology
The restriction of structure is larger, when running into large-scale hard reef, needs to carry out underwater reef explosion, and underwater cleaning cubic meter of stone amount is big, thus making
Become the safety of construction, Cycle Length to control and costly equivalent risk, its advantage is to put things right once and for all, after once digging depth, maintain the cycle
Long.
The method using reducing ship own wt for the second method, only installs after ship platform construction thematic structure
A part of equipment, reducing the hull platform weight sailed, thus reducing draft, reaching the waters of the enough depth of water after sailing
It is further continued for carrying out installation and the debugging efforts in later stage, thus causes the secondary displacement of build the side, some mounting process are subject to
The impact that shifts to place and become more loaded down with trivial details, the installation of some equipment is also carried out shifting, and installation and debugging progress is more limited
System, thus leading to the lengthening of construction period and the increase of mounting cost, unfavorable to the construction benefit improving project.This method
Advantage is that marina can also build big ship, realizes the big purpose of little material.
The third method is to produce buoyancy reduction draft by increasing steel buoyancy tank on platform, thus crossing shallow water
Region, this method is primarily adapted for use in sailing or transporting of drilling platforms.In practice, increase the expense phase building steel buoyancy tank
Work as costliness, the cycle installed and remove is long, spend in time in auxiliary equipment such as large-scale floating crane and costly, early stage is necessary
Carry out detailed design, the design & check workload of strength and stability is big, to therein be fixedly connected, assembling and disassembling more numerous
Trivial, the complex structure of steel buoyancy tank casing, the welding processing cycle is long, moreover buoyancy tank dead weight is larger, in dock or harbour peace
Dress difficulty is big, crucial its provide help buoyancy also extremely limited, when needing large-tonnage, internal structure stress is complicated, increased
The risk of deformation fracture, simultaneously because steel buoyancy tank be steel plate welding body it is desirable to have under water higher bubble-tight simultaneously
Its case hardness height, it is impossible to directly contact with each other with hull, can only be welded on the corresponding position of hull, this results in dismounting side
Face increased operation easier, and especially cutting further increases the operation restriction of diver under water, and steel buoyancy tank once encounters hull,
Cause outer peeling paint or ship skin stress deformation, it will cause the product of the problems such as unexpected additional maintenance cycle and expense
Raw.This method does not have good advantage substantially.
4th kind of method is to carry partly latent barge to sail, and this method is suitable for the transport of the drilling platforms of distance, and it is excellent
Point is simple to operate safe and reliable, and platform is slid onto after partly latent barge is fixed and can sail, and its maximum shortcoming is fortune
Defeated cost highest, needs to arrange sailing date using partly latent barge, and the dynamic system in partly latent barge bottom, when navigation channel is very shallow can not
Meet partly latent barge navigation draft when, this method is equally invalid, the risk navigated by water by force can lead to barge and
Ship platform jointly stranded.
Can be seen that from above four kinds of methods respectively has pluses and minuses, mainly to the construction cost of project, cycle and assembling and disassembling
Operation easier effect different.In conjunction with above-mentioned four kinds of methods, from the root-cause analysis demand of problem, solve what shallow water sailed
Key is to increase the buoyancy of hull, reduces the draft of hull, thus meeting the depth requirements that sail in navigation channel.
Content of the invention
For solving above technical deficiency, this utility model provides one kind and is used conveniently and safely, and maintenance cost is low, control
The high ship of reliability processed and drilling platforms floating aid system.
This utility model is realized by following measures:
A kind of ship of the present utility model and drilling platforms floating aid system, floating single including some Side by side groupings helping together
First body, each helps floating cell cube to include two symmetrical and Flexible pontoons separately, and two Flexible pontoons are all wound with
It is woven into latticed noose, and be connected between two Flexible pontoons bottom between two nooses and be woven into grid
The band of revealing all the details of shape, between two nooses, top is connected with auxiliary suspender belt, and each Flexible pontoon is provided with charging and discharging valve, owns
Flexible pontoon is connected with air-charging and air-discharging system jointly.
Above-mentioned air-charging and air-discharging system includes source of the gas, and each helps the charging and discharging valve of two Flexible pontoons of floating cell cube to pass through to divide
Pipeline is connected with a point of control valve, and described source of the gas is connected with each point of control valve respectively by main line.
Above-mentioned air-charging and air-discharging system includes source of the gas, and described source of the gas is connected with control valve group by main line, described control valve group
It is connected with the charging and discharging valve of each Flexible pontoon by branch pipeline, control valve group includes some solenoid electric valves, described electromagnetism
Control valve is electrically connected with electrical control panel assembly.
The stage casing of above-mentioned Flexible pontoon is cylinder, and Flexible pontoon two ends are provided with the end face of circular arc, described inflation/deflation
Valve is arranged on end face center, and described noose includes the endless master tape being looped around on Flexible pontoon stage casing and is looped around Flexible pontoon
Ring auxiliary band on end face, described endless master tape and ring auxiliary band are connected with the longitudinal direction auxiliary along Flexible pontoon longitudinal extension
Band, described band of revealing all the details includes the horizontal kicking strap that is connected and longitudinal direction kicking strap, the ring on described horizontal kicking strap and two Flexible pontoons
Shape master tape integrally connected, described endless master tape is provided with joining shackle, described endless master tape, ring auxiliary band, longitudinally auxiliary
Band, horizontal kicking strap and longitudinal kicking strap are flat.
Each Flexible pontoon top is provided with an auxiliary float, and described auxiliary float diameter is less than Flexible pontoon.
Above-mentioned control valve group also includes Pressure relief valve and air bleeding valve.
The beneficial effects of the utility model are: two floating drum bodies 1) being symmetrically arranged, and enable to help floating cell cube
Buoyant equilibrium controls, if a side float produces buoyancy more than opposite side, can draw in the floating drum of opposite side in water, thus
Increasing the buoyancy of opposite side, and float in this side, reducing buoyancy, thus realizing buoyancy adjustment to static equilibrium;
2) floating drum is Flexible pontoon, and insufflation gas amount determines the size of buoyancy, has preferable buoyancy size and controls spy
Property;
3) floating drum is Flexible pontoon, not foldable under inflated condition, small in volume, convenient transport, easy for installation, can
Shorten construction period;4) latticed noose is big with floating drum wall, ship outer casing contact area, and pressure is little, reduces the deformation of housing,
The anticorrosive coat of effective protection hull;5) installation being suitable for different beam of hulls by increasing the elongated strap in network-type noose will
Ask;6) floating drum is reusable, and Meteorological is low, and maintenance cost is low;7) can achieve multigroup Parallel Control helping floating cell cube and
Remotely control, improves control accuracy and efficiency, and the reliability of control is high, lifts safety.
Brief description
Fig. 1 is the structural representation of this utility model installment state.
Fig. 2 helps the perspective view of floating cell cube for this utility model.
Fig. 3 helps the side structure schematic diagram of floating cell cube for this utility model.
Fig. 4 is the structural representation of this utility model independence inflation/deflation control mode.
Fig. 5 is the structural representation of this utility model centralized control.
Wherein: 10 help floating cell cube, 100 hulls, 50 air-charging and air-discharging systems, 20 horizontal kicking straps, 21 endless master tapes,
22 longitudinal auxiliary bands, 23 joining shackles, 24 ring auxiliary bands, 26 longitudinal kicking straps, 27 auxiliary suspender belts, 30 flexible floatings
Cylinder, 30a auxiliary float, 31 charging and discharging valve, 32 sources of the gas, 33 branch pipeline, 34 points of control valves, 35 main lines,
36 electrical control panel assemblies, 37 solenoid electric valves, 38 pressure-display devices, 39 Pressure relief valves, 40 control valve groups,
41 air bleeding valves.
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is done with further detailed description:
As shown in Figure 1, 2, 3, a kind of ship of the present utility model and drilling platforms floating aid system, including some Side by side groupings
Together help floating cell cube 10, each helps floating cell cube 10 to include two symmetrical and Flexible pontoons 30 separately, two
All it is wound with individual Flexible pontoon 30 and is woven into latticed noose, and be connected with positioned at two flexible floatings between two nooses
Bottom and be woven into latticed band of revealing all the details between cylinder 30, between two nooses, top is connected with auxiliary suspender belt 27, each flexibility
Floating drum 30 is provided with charging and discharging valve 31, and all Flexible pontoons 30 are connected with air-charging and air-discharging system 50 jointly.Air-charging and air-discharging system 50
Using two ways.
As shown in figure 4, a kind of is independent inflation/deflation control mode, air-charging and air-discharging system 50 includes source of the gas 32, and each helps floating single
The charging and discharging valve 31 of two Flexible pontoons 30 of first body 10 is connected with a point of control valve 34 by branch pipeline 33, and source of the gas 32 leads to
Cross main line 35 to be connected with each point of control valve 34 respectively.
As shown in figure 5, another is centralized control, air-charging and air-discharging system 50 includes source of the gas 32, and source of the gas 32 passes through master
Pipeline 35 is connected with control valve group 40, and control valve group 40 is passed through branch pipeline 33 and connected with the charging and discharging valve 31 of each Flexible pontoon 30
Connect, control valve group 40 includes some solenoid electric valves 37, solenoid electric valve 37 is electrically connected with electrical control panel assembly 36.Flexible floating
The stage casing of cylinder 30 is cylinder, and Flexible pontoon 30 two ends are provided with the end face of circular arc, and charging and discharging valve 31 is arranged in end face
The heart, the endless master tape 21 that noose includes being looped around on Flexible pontoon 30 stage casing is auxiliary with the ring being looped around on Flexible pontoon 30 end face
Help band 24, endless master tape 21 and ring auxiliary band 24 to be connected with longitudinal auxiliary band 22 along Flexible pontoon 30 longitudinal extension, reveal all the details
The horizontal kicking strap 20 being connected with inclusion and longitudinal kicking strap 26, the endless master tape 21 on horizontal kicking strap 20 and two Flexible pontoons 30
Integrally connected, endless master tape 21 is provided with joining shackle 23, endless master tape 21, ring auxiliary band 24, longitudinal auxiliary band 22, horizontal stroke
It is flat to kicking strap 20 and longitudinal kicking strap 26.Each Flexible pontoon 30 top is provided with an auxiliary float 30a, described
Auxiliary float 30a diameter is less than Flexible pontoon 30.Control valve group 40 also includes Pressure relief valve 39 and air bleeding valve 41, there is also mounted
Pressure-display device 38.
The step that this utility model is installed in hull 100 is as follows:
1) clear up hull 100:
Hull 100 bottom sharp objects, welding remaining piece are removed, avoids the puncture to floating drum cylinder for the sharp object as far as possible;
2) help the assembling of floating cell cube 10
The floating drum do not inflated body and network-type noose are installed, joining shackle 23 forms two floating drums and links together
Overall structure, and the integrated inflation/deflation valve body at floating drum two ends is installed;The auxiliary float 30a that each floating drum is configured installs outside
Nets structure part, and be inflated by design pressure, then auxiliary float 30a be connected to by master by shackle or suspender belt rigging
On floating drum;
3) pull into and help floating cell cube 10
Floating cell cube 10 entirety will be helped laterally to pull hull bottom into, or hang specified installation site, left and right floating drum with loop wheel machine
The left and right sides being located at hull 100 respectively is arranged;
4) floating drum is inflated
Connect each floating drum interim charge and discharge air pipe, by air compressor machine source of the gas 32, floating drum is tentatively inflated, be inflated to
After preliminary rigidity, connect auxiliary suspender belt 27 and the shackle on top, by the floating drum two side being bundled in hull 100 tightly, so
After remove interim charge and discharge air pipe;
5) repeat other are installed and help floating cell cube 10
Repeat other are installed in other specified locations according to above-mentioned steps and help floating cell cube 10;
6) arrange control system
Install by the design requirement of integrated inflation/deflation control system, arrangement connects charge and discharge air pipe and pressure monitoring pipeline arrives
Control station, control station is arranged into hull 100 deck or other convenient positions controlling;
7) control debugging
Connect source of the gas 32, one by one to helping floating cell cube 10 to be controlled debugging, including remote controlled manner and emergent handss
Dynamic control mode, queueing problem is to normal operating conditions;
8) dock water filling
Open a sluice gate to carry out water filling to dock, when the depth of water reaches floating drum submergence 50% about, stop water filling, now, floating drum provides
Preliminary helps buoyancy, and net is realized closely revealing all the details in hull 100 and contacted;
9) working condition adjustment
By inflation/deflation control system, helped floating cell cube 10 is inflated, controls aeration speed and suitable adjustment quilt
The position of camel, when floating drum is intrinsic pressure reach operating pressure require when, stop inflation, stably help floating state;
10) fastening helps floating cell cube 10
Fasten the interim auxiliary suspender belt 27 that each helps floating cell cube 10 top again, reach tension, help floating state to put down
Weighing apparatus is stable;
11) dock water filling again
Open a sluice gate to continue to carry out water filling to dock, water level reaches the depth of water helping floating conditions dictate, this process should be slow, hull
100 will float off dock bottom in the process, reach the draft of towage off docking;
12) towage
Ship is driven to along navigation channel by specified waters using power drive or towage mode, this waters should meet dismounting and help floating system
Draft after system, then hull 100 cast anchor;
13) exit
To helping floating cell cube 10 slowly to be exitted, deflation sequences are according to middle symmetric mode behind first corner simultaneously to each
Individual help floating cell cube 10 slowly to be exitted, hull 100 slowly sinks to reaching the draft of work;
14) remove
After main buoy venting, the submerged because of deadweight, but because the auxiliary float 30a on top is connected on main buoy,
Thus leading to main buoy to be suspended in water, the top then removing all cell cubes again assists the pipe of suspender belt 27 and all connections
Road, each helps floating cell cube 10 to reach free floating condition, departing from hull 100 bottom;
15) reclaim
The recovery helping floating cell cube 10 has two ways, and a kind of is will to help the longitudinal direction from hull 100 for the floating cell cube 10 one by one
Haul out, using the mode such as towboat or elevator machine travel;Another kind of method is that hull 100 navigation is left this construction area
Domain, then just the remaining each group floating helps floating cell cube 10, is then reclaimed with small-sized barge etc.;
Recovery can may also be employed towage to the mode of shallow water area recycling in the way of being lifted to ship using scene,
The construction workload at the former scene is big, and the equipment of use is many, and the equipment that the latter uses is few, can be entrained back into code using canoe
First-class shallow water area, lifts more convenient on the bank.
16) inspection and maintenance
After floating drum cell cube is recovered to land, launch one by one to check, including cylinder damage situations, net abrasion condition with fill
Situation of colliding with of air valve body etc., and maintained item by item by norms of mainteaance, dry rear taxonomic revision FOLD AND PACK, in case weight next time
Multiple use.
The step that this utility model is installed in drilling platforms or harbour is as follows:
The manner need to carry out installation and debugging in harbour, is particularly well-suited to be applied in the case of harbour place is conditional
Work.
1) help the assembling of floating cell cube 10
On land or work boat deck, the floating drum do not inflated body and network-type noose are installed, joining shackle 23
Form bitubular integrative-structure, the integrated charging and discharging valve 31 at floating drum two ends and the inflation/deflation pipe-line system being connected are installed;Auxiliary
After floating drum 30a inflation, connect auxiliary float 30a and and fastened on main buoy;
2) pull into and help floating cell cube 10
Using towboat mode, floating cell cube 10 will be helped under water longitudinally to pull hull bottom into, left and right floating drum is located at hull respectively
100 left and right sides, is related to underwater construction, should observe the requirement of related underwater construction standard criterion;
3) repeat other are installed and help floating cell cube 10
Repeat other are installed in specified location according to above-mentioned steps and help floating cell cube 10;
4) arrange control system
Arrange and connect charge and discharge air pipe and pressure monitoring pipeline to control station, by control station be arranged into hull 100 deck or
Other convenient positions controlling
5) control debugging
By control station one by one to helping floating cell cube 10 to be controlled debugging, include remote controlled manner and emergent manual
Control mode, queueing problem is to normal operating conditions;
6) inflate
Floating drum is tentatively inflated, helps floating cell cube 10 to enter each according to the symmetric mode in the middle of behind first corner simultaneously
Row is slow to be inflated, and when the depth of water reaches floating drum submergence 20% about, connects auxiliary suspender belt 27 and the shackle on top, by floating drum tightly
Be bundled on hull 100;
7) working condition adjustment
Second inflation is carried out by inflation/deflation control system to helped floating cell cube 10, controls aeration speed, according to
Symmetric mode in the middle of behind first corner, this process should be slow, and hull 100 will float in the process, and the drinking water reaching towage is deep
Degree;When intrinsic pressure reach operating pressure require when, stop inflation, stably help floating state;
8) fastening helps floating cell cube 10
Fasten the interim auxiliary suspender belt 27 that each helps floating cell cube 10 top again, reach tension, help floating state to put down
Weighing apparatus is stable;
9) towage
Ship is driven to along navigation channel by specified waters using power drive or towage mode, this waters should meet dismounting and help floating system
Draft after system, then hull 100 cast anchor;
10) exit
To helping floating cell cube 10 slowly to be exitted, deflation sequences are according to middle symmetric mode behind first corner simultaneously to each
Individual help floating cell cube 10 slowly to be exitted, hull 100 slowly sinks to reaching the draft of work;
11) remove
After main buoy venting, the submerged because of deadweight, but because the auxiliary float 30a on top is connected on main buoy,
Thus leading to main buoy to be suspended in water, the top then removing all cell cubes again assists the pipe of suspender belt 27 and all connections
Road, each helps floating cell cube 10 to reach free floating condition, departing from hull 100 bottom;
12) reclaim
The recovery helping floating cell cube 10 has two ways, and a kind of is will to help the longitudinal direction from hull 100 for the floating cell cube 10 one by one
Haul out, using the mode such as towboat or elevator machine travel;Another kind of method is that hull 100 navigation is left this construction area
Domain, then just the remaining each group floating helps floating cell cube 10, is then reclaimed with small-sized barge etc.;
Recovery can may also be employed towage to the mode of shallow water area recycling in the way of being lifted to ship using scene,
The construction workload at the former scene is big, and the equipment of use is many, and the equipment that the latter uses is few, can be entrained back into code using canoe
First-class shallow water area, lifts more convenient on the bank.
13) inspection and maintenance
After floating drum cell cube is recovered to land, launch one by one to check, including cylinder damage situations, net abrasion condition with fill
Situation of colliding with of air valve body etc., and maintained item by item by norms of mainteaance, dry rear taxonomic revision FOLD AND PACK, in case weight next time
Multiple use.
The above is only the preferred implementation of this patent it is noted that ordinary skill people for the art
For member, on the premise of without departing from the art of this patent principle, some improvement can also be made and replace, these improve and replace
Also should be regarded as the protection domain of this patent.
Claims (6)
1. a kind of ship with drilling platforms floating aid system it is characterised in that: include some Side by side groupings together with help floating unit
Body, each helps floating cell cube to include two symmetrical and Flexible pontoons separately, and two Flexible pontoons are all wound with volume
It is made into latticed noose, and be connected between two Flexible pontoons bottom between two nooses and be woven into latticed
Band of revealing all the details, between two nooses top be connected with auxiliary suspender belt, each Flexible pontoon is provided with charging and discharging valve, Suo Yourou
Property floating drum is connected with air-charging and air-discharging system jointly.
2. according to claim 1 ship and drilling platforms floating aid system it is characterised in that: described air-charging and air-discharging system includes gas
Source, each helps the charging and discharging valve of two Flexible pontoons of floating cell cube to be connected with a point of control valve by branch pipeline, described
Source of the gas is connected with each point of control valve respectively by main line.
3. according to claim 1 ship and drilling platforms floating aid system it is characterised in that: described air-charging and air-discharging system includes gas
Source, described source of the gas is connected with control valve group by main line, and described control valve group passes through filling of branch pipeline and each Flexible pontoon
Venting valve connects, and control valve group includes some solenoid electric valves, and described solenoid electric valve is electrically connected with electrical control panel assembly.
4. according to claim 1 ship and drilling platforms floating aid system it is characterised in that: the stage casing of described Flexible pontoon is
Cylinder, Flexible pontoon two ends are provided with the end face of circular arc, and described charging and discharging valve is arranged on end face center, described noose bag
Include the endless master tape being looped around on Flexible pontoon stage casing and the ring auxiliary band being looped around on Flexible pontoon end face, described annular is main
Band and ring auxiliary band are connected with longitudinal auxiliary band along Flexible pontoon longitudinal extension, and it is horizontal that described band inclusion of revealing all the details is connected
Kicking strap and longitudinal kicking strap, the endless master tape integrally connected on described horizontal kicking strap and two Flexible pontoons, on described endless master tape
It is provided with joining shackle, described endless master tape, ring auxiliary band, longitudinal auxiliary band, horizontal kicking strap and longitudinal kicking strap are flat
Shape.
5. according to claim 1 ship and drilling platforms floating aid system it is characterised in that: each Flexible pontoon top is all provided with
It is equipped with an auxiliary float, described auxiliary float diameter is less than Flexible pontoon.
6. according to claim 3 ship and drilling platforms floating aid system it is characterised in that: described control valve group also includes pressing
Power overflow valve and air bleeding valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620948397.1U CN205916302U (en) | 2016-08-26 | 2016-08-26 | Boats and ships and drilling platform help superficial system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620948397.1U CN205916302U (en) | 2016-08-26 | 2016-08-26 | Boats and ships and drilling platform help superficial system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205916302U true CN205916302U (en) | 2017-02-01 |
Family
ID=57869110
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620948397.1U Expired - Fee Related CN205916302U (en) | 2016-08-26 | 2016-08-26 | Boats and ships and drilling platform help superficial system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205916302U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109094753A (en) * | 2018-08-15 | 2018-12-28 | 招商局重工(江苏)有限公司 | One kind supporting and lifting formula semi-submersible offshore engineering platform and undocks scheme |
RU2719650C1 (en) * | 2019-07-02 | 2020-04-21 | Общество с ограниченной ответственностью "ЛУКОЙЛ-Инжиниринг" (ООО "ЛУКОЙЛ-Инжиниринг") | Method for transportation of self-lifting floating drilling rig |
-
2016
- 2016-08-26 CN CN201620948397.1U patent/CN205916302U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109094753A (en) * | 2018-08-15 | 2018-12-28 | 招商局重工(江苏)有限公司 | One kind supporting and lifting formula semi-submersible offshore engineering platform and undocks scheme |
RU2719650C1 (en) * | 2019-07-02 | 2020-04-21 | Общество с ограниченной ответственностью "ЛУКОЙЛ-Инжиниринг" (ООО "ЛУКОЙЛ-Инжиниринг") | Method for transportation of self-lifting floating drilling rig |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106167078B (en) | A kind of ship and drilling platforms floating aid system and construction method | |
US4495880A (en) | Draft assisted delivery system | |
CN101356092B (en) | Mooring system | |
US6336419B1 (en) | Floating structure | |
MX2011002875A (en) | Method and apparatus for subsea installations. | |
CN103738477A (en) | Method for replacing upper anchor cable of mooring anchor legs | |
CN103422483B (en) | The method that the floating holder of shallow water jacket is installed | |
CN106882345B (en) | A kind of method of the water ship above and below floating building berth or carrying barge deck | |
CN212388514U (en) | Self-floating and submerging positioning and mounting device for steel frame by adopting air bag floating assistance | |
CN205916302U (en) | Boats and ships and drilling platform help superficial system | |
CN104097750B (en) | A kind of multi-functional repair and maintenance ship | |
CN106314707A (en) | Gasbag type anti-sinking overturn-preventing device | |
CN101259873A (en) | Fast simple method and component of salvaging large-scale wreck | |
CN108674595A (en) | The big deck plane carrying of sliceable type shallow draft is floating to refute and its longitudinal spliced method | |
CN108216502A (en) | A kind of pontoon bridge ro-ro transport system of open seashore | |
CN102424101B (en) | Technology for launching ship with airbags | |
CN204802046U (en) | Anti sinking prevents toppling gasbag device | |
CN2232394Y (en) | Soft salvaging float for underwater sunken vessel | |
CN210712334U (en) | Inflatable floating rope | |
US1368787A (en) | Method for recovering sunken vessels | |
CN105129048A (en) | Rotary-righting salvaging method for sunken ship and main equipment | |
CN113772044B (en) | Offshore single point mooring replacement maintenance method | |
CN213784866U (en) | Polyethylene fiber air bag for assisting marine culture net cage towing | |
CN1274664A (en) | Sunk boat salvaging method by steel cable buckles | |
RU2479460C1 (en) | Method of sunk ship surfacing and complex for surfacing and floating sunk submarines and other vessels |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170201 Termination date: 20190826 |