CN106128284A - Column foundation model and manufacture method with foundation bolt - Google Patents

Column foundation model and manufacture method with foundation bolt Download PDF

Info

Publication number
CN106128284A
CN106128284A CN201610725208.9A CN201610725208A CN106128284A CN 106128284 A CN106128284 A CN 106128284A CN 201610725208 A CN201610725208 A CN 201610725208A CN 106128284 A CN106128284 A CN 106128284A
Authority
CN
China
Prior art keywords
simulation
foundation bolt
foundation
column
suspension column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610725208.9A
Other languages
Chinese (zh)
Inventor
宋功业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Institute of Architectural Technology
Jiangsu Jianzhu Institute
Original Assignee
Jiangsu Institute of Architectural Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Institute of Architectural Technology filed Critical Jiangsu Institute of Architectural Technology
Priority to CN201610725208.9A priority Critical patent/CN106128284A/en
Publication of CN106128284A publication Critical patent/CN106128284A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • G09B25/04Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Foundations (AREA)

Abstract

It is to give training and design for carrying out aided education and the rural migrant worker for construction enterprises with the column foundation model of foundation bolt and manufacture method, belongs to vocational education facility field;With foundation bolt column foundation model by analog basis, simulation foundation bolt, simulation backing plate, simulation secondary grout layer, simulation suspension column with simulate post molecular;The lower half of simulation foundation bolt is arranged in analog basis, and the first half is connected with simulation suspension column;Simulation backing plate is in simulation secondary grout layer;Simulation suspension column is on simulation backing plate and simulation secondary grout layer, below simulation pillar;The top of simulation suspension column is connected with the bottom of simulation pillar;The invention has the beneficial effects as follows and make university students or rural migrant worker be imparted knowledge to students by model display, being configured with of the column foundation with foundation bolt is directly recognized, it is simple to understand.

Description

Column foundation model and manufacture method with foundation bolt
Technical field
The present invention is the column foundation model with foundation bolt and manufacture method, is for carrying out aided education and for constructing The rural migrant worker of enterprise gives training and designs, and belongs to vocational education facility field.
Background technology
Basis with foundation bolt is base form conventional in steel construction and steel and concrete structure;During foundation construction, typically exist Mounting foot bolt during installation foundation reinforcing bar;Installation foundation foundation bolt, will strictly control centrage and the axle on basis Line, the end face absolute altitude on basis, the anchor point of foundation bolt, the relative position of anchor bolt, the buried depth of anchor bolt, anchor bolt Top mark high;Pretty troublesome, work progress is particularly easy to make mistakes;For there is no the university students of practical experience, and have not been entered into work For making the rural migrant worker of state, it should be familiar with the structure of basis foundation bolt, but want to allow them understand and grasp basis lower margin The structure of bolt is really not easy;The Teaching in University of China's architectural engineering class adopts always and lectures is main teaching method, in recent years Although carrying out China Higher to have breakthrough in teaching with middle vocational education, have employed the Informalized teaching means such as multimedia, arranging Some Teaching Circumstances, but break away from the teaching model to lecture the most at all;For making education can catch up with China's economic development Paces, country decision-making transform a collection of application technology university, the teacher of these universities, facility are all according to elite formula training mode Arranging, want to press close to construction teaching, difficulty is the biggest;On the other hand, the issuing and implementation planned along with the industry 2025 of China, closely National over Nian strengthen the training request to rural migrant worker, and the inspection of enterprise in charge of construction is examined and puts more effort, but build Build construction enterprises and be difficult to the training that the basic foundation bolt of rural migrant worker is constructed by tissue, application technology university, School of High Profession Technology, middle duty The current facility of school can not meet the training request that the rural migrant worker being engaged in building industry constructs with foundation bolt base.
The column foundation model with foundation bolt that the present invention provides can solve these problems.
Summary of the invention
The specific practice of this programme is:
Use the column foundation model with foundation bolt as shown in Figure 1 by analog basis 1, simulation foundation bolt 2, simulation backing plate 3, simulation secondary grout layer 4, simulation suspension column 5 and simulation pillar 6 composition;The lower half of simulation foundation bolt 2 is arranged on simulation In basis 1, the first half is connected with simulation suspension column 5;Simulation backing plate 3 is in simulation secondary grout layer 4;Simulation suspension column 5 is in analog pad Above plate 3 and simulation secondary grout layer 4, below simulation pillar 6;The top of simulation suspension column 5 connects with the bottom of simulation pillar 6 Connect.
Analog basis 1 is rectangular blocks, and simulation foundation bolt 2, simulation backing plate 3, simulation secondary grout layer 4, mould are arranged at top Intend suspension column 5 and simulation pillar 6;It is internal that simulation foundation bolt 2 is fixedly arranged at analog basis 1.
Simulation foundation bolt 2 is made up of with simulation nut simulation screw rod;Simulation screw rod is the stem of lower bands bending Part, lower half and bending part are fixedly arranged at the inside of analog basis 1, and top is more than the top surface of analog basis 1;Simulation screw rod Main part vertical, bending part level;Simulation screw thread is arranged at the top of simulation screw rod, passes the simulation of analog basis 1 end face Screw rod is through the simulation secondary grout layer 4 two groups of simulation backing plates 3, and through the bolt hole of simulation suspension column 5, is simulating suspension column The top of 5 is connected with simulation nut by the simulation screw thread on simulation screw rod, and stretches out simulation nut.
Simulation backing plate 3 is arranged in simulation foundation bolt 2 both sides, supporting simulation suspension column 5, and simulation backing plate 3 is all arranged on mould Intend the inside of secondary grout layer 4.
Simulation secondary grout layer 4 is consolidation simulation backing plate 3, and connects analog basis 1 and the connection member of simulation suspension column 5, Simulation secondary grout layer 4, above analog basis 1, simulates the lower section of suspension column 5;The surrounding of simulation secondary grout layer 4 and simulation The periphery of suspension column 5 is concordant.
Simulation suspension column 5 is to connect simulation foundation bolt 2 and the parts of simulation pillar 6, solid with the part that simulation pillar 6 is connected Knot, the connection with simulation foundation bolt 2 is crimped by simulation nut.
The bottom of simulation pillar 6 consolidates with simulation suspension column 5;Simulation pillar 6 by simulation suspension column 5, simulation foundation bolt 2, Simulation backing plate 3, simulation secondary grout layer 4 and analog basis 1 connect, and form entirety.
Manufacture method with the column foundation model of foundation bolt is, first makes analog basis 1, and will simulate foundation bolt 2 accurately imbed wherein, check the simulation center of foundation bolt 2, relative position and cornerwise length, also simulate lower margin The top mark of bolt 2 is high;After meeting the requirements, simulation suspension column 5 and simulation pillar 6 are set, make simulation suspension column 5 simulate with simulation pillar 6 Consolidation, by the anchor (bolt) hole of simulation suspension column 5 through simulating on foundation bolt 2, at the simulation lower margin spiral shell of the bottom of simulation suspension column 5 The side of bolt 2 arranges two groups of simulation backing plates 3;After adjusting the perpendicularity of simulation pillar 6, the simulation of tightening simulation foundation bolt 2 Nut;Simulation secondary grout layer 4 is set again, then with the completing of column foundation model of foundation bolt.
The invention has the beneficial effects as follows and make university students or rural migrant worker be imparted knowledge to students by model display, the structure to basis foundation bolt Make directly understanding, it is simple to understand.
Accompanying drawing explanation
Fig. 1 is with the column foundation model schematic of foundation bolt.
In figure: 1-analog basis;2-simulates foundation bolt;3-simulates backing plate;4-simulates secondary grout layer;5-simulates post Foot;6-simulates pillar.
Detailed description of the invention
Embodiment
Certain university's designed, designed uses column foundation model with foundation bolt as shown in Figure 1 by analog basis 1, mould Intend foundation bolt 2, simulation backing plate 3, simulation secondary grout layer 4, simulation suspension column 5 and simulation pillar 6 composition;Simulation foundation bolt The lower half of 2 is arranged in analog basis 1, and the first half is connected with simulation suspension column 5;Simulation backing plate 3 is at simulation secondary grout layer 4 In;Simulation suspension column 5 is on simulation backing plate 3 and simulation secondary grout layer 4, below simulation pillar 6;The top of simulation suspension column 5 Portion is connected with the bottom of simulation pillar 6.
Analog basis 1 is rectangular blocks, and simulation foundation bolt 2, simulation backing plate 3, simulation secondary grout layer 4, mould are arranged at top Intend suspension column 5 and simulation pillar 6;It is internal that simulation foundation bolt 2 is fixedly arranged at analog basis 1.
Simulation foundation bolt 2 is made up of with simulation nut simulation screw rod;Simulation screw rod is the stem of lower bands bending Part, lower half and bending part are fixedly arranged at the inside of analog basis 1, and top is more than the top surface of analog basis 1;Simulation screw rod Main part vertical, bending part level;Simulation screw thread is arranged at the top of simulation screw rod, passes the simulation of analog basis 1 end face Screw rod is through the simulation secondary grout layer 4 two groups of simulation backing plates 3, and through the bolt hole of simulation suspension column 5, is simulating suspension column The top of 5 is connected with simulation nut by the simulation screw thread on simulation screw rod, and stretches out simulation nut.
Simulation backing plate 3 is arranged in simulation foundation bolt 2 both sides, supporting simulation suspension column 5, and simulation backing plate 3 is all arranged on mould Intend the inside of secondary grout layer 4.
Simulation secondary grout layer 4 is consolidation simulation backing plate 3, and connects analog basis 1 and the connection member of simulation suspension column 5, Simulation secondary grout layer 4, above analog basis 1, simulates the lower section of suspension column 5;The surrounding of simulation secondary grout layer 4 and simulation The periphery of suspension column 5 is concordant.
Simulation suspension column 5 is to connect simulation foundation bolt 2 and the parts of simulation pillar 6, solid with the part that simulation pillar 6 is connected Knot, the connection with simulation foundation bolt 2 is crimped by simulation nut.
The bottom of simulation pillar 6 consolidates with simulation suspension column 5;Simulation pillar 6 by simulation suspension column 5, simulation foundation bolt 2, Simulation backing plate 3, simulation secondary grout layer 4 and analog basis 1 connect, and form entirety.
Manufacture method with the column foundation model of foundation bolt is, first makes analog basis 1, and will simulate foundation bolt 2 accurately imbed wherein, check the simulation center of foundation bolt 2, relative position and cornerwise length, also simulate lower margin The top mark of bolt 2 is high;After meeting the requirements, simulation suspension column 5 and simulation pillar 6 are set, make simulation suspension column 5 simulate with simulation pillar 6 Consolidation, by the anchor (bolt) hole of simulation suspension column 5 through simulating on foundation bolt 2, at the simulation lower margin spiral shell of the bottom of simulation suspension column 5 The side of bolt 2 arranges two groups of simulation backing plates 3;After adjusting the perpendicularity of simulation pillar 6, the simulation of tightening simulation foundation bolt 2 Nut;Simulation secondary grout layer 4 is set again, then with the completing of column foundation model of foundation bolt.

Claims (8)

1. with the column foundation model of foundation bolt, it is characterized in that, by analog basis (1), simulation foundation bolt (2), analog pad Plate (3), simulation secondary grout layer (4), simulation suspension column (5) form with simulation pillar (6);The lower half of simulation foundation bolt (2) Portion is arranged in analog basis (1), and the first half is connected with simulation suspension column (5);Simulation backing plate (3) is in simulation secondary grout layer (4) In;Simulation suspension column (5) is on simulation backing plate (3) and simulation secondary grout layer (4), below simulation pillar (6);Simulation post The top of foot (5) is connected with the bottom of simulation pillar (6).
Column foundation model with foundation bolt the most according to claim 1, is characterized in that, analog basis (1) is rectangle Block, simulation foundation bolt (2), simulation backing plate (3), simulation secondary grout layer (4), simulation suspension column (5) and simulation post are arranged at top Son (6);It is internal that simulation foundation bolt (2) is fixedly arranged at analog basis (1).
Column foundation model with foundation bolt the most according to claim 1, is characterized in that, simulation foundation bolt (2) is It is made up of with simulation nut simulation screw rod;Simulation screw rod is the rod-like members of lower bands bending, lower half and bending part consolidation In the inside of analog basis (1), top is more than the top surface of analog basis (1);The main part of simulation screw rod is vertical, bending Part of horizontal;Simulation screw thread is arranged at the top of simulation screw rod, passes the simulation screw rod of analog basis (1) end face through two groups of analog pad Simulation secondary grout layer (4) between plate (3), and through the bolt hole of simulation suspension column (5), lead at the top of simulation suspension column (5) The simulation screw thread crossed on simulation screw rod is connected with simulation nut, and stretches out simulation nut.
Column foundation model with foundation bolt the most according to claim 1, is characterized in that, simulation backing plate (3) is arranged in Simulation foundation bolt (2) both sides, supporting simulation suspension column (5), simulation backing plate (3) is all arranged on simulation secondary grout layer (4) Internal.
Column foundation model with foundation bolt the most according to claim 1, is characterized in that, simulation secondary grout layer (4) It is consolidation simulation backing plate (3), and connects analog basis (1) and the connection member of simulation suspension column (5), simulation secondary grout layer (4) In the top of analog basis (1), the lower section of simulation suspension column (5);The surrounding of simulation secondary grout layer (4) and simulation suspension column (5) Periphery is concordant.
Column foundation model with foundation bolt the most according to claim 1, is characterized in that, simulation suspension column (5) is to connect Simulation foundation bolt (2) and the parts of simulation pillar (6), the partial consolidation being connected with simulation pillar (6), with simulation foundation bolt (2) connection is crimped by simulation nut.
Column foundation model with foundation bolt the most according to claim 1, is characterized in that, the bottom of simulation pillar (6) With simulation suspension column (5) consolidation;Simulation pillar (6) is by simulation suspension column (5), simulation foundation bolt (2), simulation backing plate (3), simulation Secondary grout layer (4) and analog basis (1) connect, and form entirety.
8. with the manufacture method of column foundation model of foundation bolt, it is characterized in that, first make analog basis (1), and will simulation Foundation bolt (2) accurately embedment wherein, checks center, relative position and cornerwise length of simulation foundation bolt (2), The top mark also simulating foundation bolt (2) is high;After meeting the requirements, simulation suspension column (5) and simulation pillar (6) are set, make simulation post Foot (5) consolidates with simulating pillar (6) simulation, by the anchor (bolt) hole of simulation suspension column (5) through simulating on foundation bolt (2), The side of the simulation foundation bolt (2) of the bottom of simulation suspension column (5) arranges two groups of simulations backing plate (3);Adjust simulation pillar (6) Perpendicularity after, the simulation nut of tightening simulation foundation bolt (2);
Simulation secondary grout layer (4) is set again, then with the completing of column foundation model of foundation bolt.
CN201610725208.9A 2016-08-26 2016-08-26 Column foundation model and manufacture method with foundation bolt Pending CN106128284A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610725208.9A CN106128284A (en) 2016-08-26 2016-08-26 Column foundation model and manufacture method with foundation bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610725208.9A CN106128284A (en) 2016-08-26 2016-08-26 Column foundation model and manufacture method with foundation bolt

Publications (1)

Publication Number Publication Date
CN106128284A true CN106128284A (en) 2016-11-16

Family

ID=57275000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610725208.9A Pending CN106128284A (en) 2016-08-26 2016-08-26 Column foundation model and manufacture method with foundation bolt

Country Status (1)

Country Link
CN (1) CN106128284A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193491A (en) * 2001-12-26 2003-07-09 Matsushita Environment Airconditioning Eng Co Ltd Method for mounting air conditioning equipment and the like in underground space
CN200975374Y (en) * 2006-12-04 2007-11-14 上海连成(集团)有限公司 Vertical type axial-flow pump anchor bolt
CN101725154A (en) * 2009-11-16 2010-06-09 天津二十冶建设有限公司 Method and device for installing and regulating light equipment and steel structure
CN203200914U (en) * 2013-04-10 2013-09-18 上海嘉实(集团)有限公司 Steel structure socle outward exposed connecting structure
CN103520925A (en) * 2013-10-12 2014-01-22 北京中冶设备研究设计总院有限公司 Roller coaster stand column structure and installation method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193491A (en) * 2001-12-26 2003-07-09 Matsushita Environment Airconditioning Eng Co Ltd Method for mounting air conditioning equipment and the like in underground space
CN200975374Y (en) * 2006-12-04 2007-11-14 上海连成(集团)有限公司 Vertical type axial-flow pump anchor bolt
CN101725154A (en) * 2009-11-16 2010-06-09 天津二十冶建设有限公司 Method and device for installing and regulating light equipment and steel structure
CN203200914U (en) * 2013-04-10 2013-09-18 上海嘉实(集团)有限公司 Steel structure socle outward exposed connecting structure
CN103520925A (en) * 2013-10-12 2014-01-22 北京中冶设备研究设计总院有限公司 Roller coaster stand column structure and installation method

Similar Documents

Publication Publication Date Title
CN204257101U (en) A kind of tunnel teaching experiment model
CN104464477B (en) Tunnel teaching experiment model
CN206741814U (en) Internal combustion engine assembly foundation skill training practical training stand
CN106128284A (en) Column foundation model and manufacture method with foundation bolt
CN106157794A (en) Column foundation model and preparation method with anchor bolt box
CN205177278U (en) Modular building foundation structure teaching mode
CN208848485U (en) Shear wall and raft foundation construction teaching facilities
CN107871441A (en) The multiple rows of reinforcement installation model of beam section
CN208873387U (en) A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid
CN106205353A (en) Building beam slab formwork model and manufacture method
CN204463523U (en) Notch cuttype isolated footing actual training device
CN106128280A (en) Brick masonry wall structural model and manufacture method
CN208848484U (en) Housing construction teaching facilities
CN205334860U (en) Phantom frame structure post girder segment point reinforcing bar spatial arrangement construction teaching mode
CN105469697A (en) Base and framework structure interconnecting part steel bar assignment construction teaching model
US10937335B2 (en) Introduced in sets of structural parts for composition of architectural didactic materials
CN214796485U (en) Be used for building engineering teaching to demonstrate teaching aid with wall body construction
CN205751332U (en) A kind of anchor pole mechanics effect apparatus for demonstrating
Lv et al. Study on BIM technology teaching under the background of three-dimensional design
CN108711354A (en) A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid
CN106205352A (en) Construction safety channel pattern and manufacture method
CN106057064A (en) Rigid plate ground structure model and manufacturing method
CN105931519A (en) Masonry project construction hazard source identification and experience area and use method thereof
CN106097875B (en) Concrete board constructions model and production method
CN106097876A (en) Board-like concrete stair structure model and manufacture method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116