CN107871441A - The multiple rows of reinforcement installation model of beam section - Google Patents

The multiple rows of reinforcement installation model of beam section Download PDF

Info

Publication number
CN107871441A
CN107871441A CN201711107971.6A CN201711107971A CN107871441A CN 107871441 A CN107871441 A CN 107871441A CN 201711107971 A CN201711107971 A CN 201711107971A CN 107871441 A CN107871441 A CN 107871441A
Authority
CN
China
Prior art keywords
reinforcement
placing
simulating
simulation
beam bottom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711107971.6A
Other languages
Chinese (zh)
Inventor
宋功业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711107971.6A priority Critical patent/CN107871441A/en
Publication of CN107871441A publication Critical patent/CN107871441A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • G09B25/04Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of buildings

Abstract

The present invention relates to a kind of multiple rows of reinforcement installation model of beam section, it is aided education is installed and to be that the rural migrant workers of construction enterprises gives training and designed to carry out beam steel, belongs to vocational education facility field;The multiple rows of reinforcement installation model of beam section by more placing of reinforcements of simulation beam section, simulation stirrup, simulation back spacer bar, simulating beam bottom spacer bar and simulating beam coagulation local soil type into;Simulation back one placing of reinforcement, simulation back two placing of reinforcement, the placing of reinforcement of simulating beam bottom two, the section of the row of simulating beam bottom one are all installed in the inside of simulation stirrup, and are connected with simulation stirrup;Separated between simulation back one placing of reinforcement, the simulation placing of reinforcement of back two with simulation back spacer bar;Separated between the placing of reinforcement of simulating beam bottom two, the row of simulating beam bottom one with simulating beam bottom spacer bar;All simulation reinforcing bar is all in simulating beam concrete.

Description

The multiple rows of reinforcement installation model of beam section
Technical field
The present invention is the multiple rows of reinforcement installation model of beam section, is to carry out beam steel installation aided education and being construction enterprise The rural migrant worker of industry gives training and designed, and belongs to vocational education facility field.
Background technology
Reinforced beam in architectural engineering is dimerous with concrete by reinforcing bar, and what concrete rose is resistant to The effect of compression, what reinforcing bar play a part of is resistant to tension;Position of the reinforcing bar in beam is to be pacified by designing after calculating Row, the correct of each reinforcement location is must assure that in work progress, just can guarantee that reinforcing steel bar bear can meet design requirement, otherwise by In the malposition of reinforcement installation, result in beam and destroyed in use because of unreasonable stress, just having causes room to fall room The possibility collapsed, therefore, the position of reinforcing bar is correctly put, be highly important during reinforcement installation.Set for beam section As long as single reinforcement installation when principal rod and stirrup are combined closely, for the beam section of more placing of reinforcements, ensure The correct of reinforcement location is not part nothing the matter;For the university student of no practical experience, and have not been entered into working condition For rural migrant worker, it should be familiar with the position of the multiple rows of reinforcement installation of beam section, but want to allow them to understand and to grasp beam section multiple rows of The position of reinforcement installation is also really not easy;The Teaching in University of China's architectural engineering class adopts the teaching method based on lecturing always, Although China Higher has breakthrough with middle vocational education in teaching in recent years, the Informalized teaching means such as multimedia are employed, There is provided some Teaching Circumstances, but the teaching pattern based on instruction is not broken away from all;To enable education to keep up with China's economy A collection of application technology university is transformed in the paces of development, national decision-making, and the teacher of these universities, facility are according to elite formula culture What pattern was set, want to press close to construction teaching, difficulty is very big;On the other hand, the promulgation planned with the industry 2025 in China is real Apply, country strengthens the training request to rural migrant worker in recent years, and the inspection examination to enterprise in charge of construction puts more effort, can It is the training for the multiple rows of reinforcement installation construction of beam section that enterprise in charge of construction is difficult tissue to rural migrant worker, application technology university, height The current facility of duty universities and colleges, middle vocational school can not meet the multiple rows of reinforcement installation construction of the rural migrant worker's beam section for being engaged in construction industry Training request.
The content of the invention
In order to solve the above-mentioned technical problem, the invention provides a kind of multiple rows of reinforcement installation model of beam section.
The present invention is achieved by the following technical solutions:A kind of multiple rows of reinforcement installation model of beam section, by simulation back One placing of reinforcement, simulation back two placing of reinforcement, the placing of reinforcement of simulating beam bottom two, the placing of reinforcement of simulating beam bottom one, simulation stirrup, simulation back Spacer bar, simulating beam bottom spacer bar and simulating beam coagulation local soil type into;The simulating beam concrete forms a geometric Framework, Stirrup installation is simulated in simulating beam concrete, simulation back one placing of reinforcement, simulates the placing of reinforcement of back two, the row's steel of simulating beam bottom two Muscle, the placing of reinforcement of simulating beam bottom one are horizontally arranged at the inside of simulation stirrup, and are connected with simulation stirrup;Simulate the row's steel of back one Muscle, simulation back two placing of reinforcement are separated between simulation stirrup top, two rows reinforcing bar with simulation back spacer bar, and Respectively with simulating back spacer bar vertical connection;The placing of reinforcement of simulating beam bottom two, the placing of reinforcement of simulating beam bottom one are located at simulation stirrup Bottom, separated with simulating beam bottom spacer bar between two placing of reinforcements, and be connected respectively with simulating beam bottom spacer bar;Simulate back Spacer bar is parallel with simulating beam bottom spacer bar.
Simulation back one placing of reinforcement, simulation back two placing of reinforcement, the placing of reinforcement of simulating beam bottom two, the row's steel of simulating beam bottom one Muscle is the more placing of reinforcements for simulating beam section arrangement, horizontal uniform more per placing of reinforcement.
The simulation stirrup is the rectangular ring being bent into by simulating straight reinforcing bar;Simulate one jiao of the both sides on stirrup top It is respectively equipped with the straight section reinforcing bar that two angles are 45 degree;.
The top margin of the simulation stirrup, base are intersected and connected with the simulation placing of reinforcement of back one, the row of simulating beam bottom one respectively; Two sides for simulating stirrup are intersected and connected with the simulation placing of reinforcement of back two, the placing of reinforcement of simulating beam bottom two respectively, make simulation back One placing of reinforcement, simulation back two placing of reinforcement, the placing of reinforcement of simulating beam bottom two, the row of simulating beam bottom one form an entirety.
The simulation back spacer bar, simulating beam bottom spacer bar are the simulation bar dowels of straight section;Simulate back positioning Reinforcing bar, the length of simulating beam bottom spacer bar are less than the width of simulating beam, and more than the width of simulation stirrup, its both ends stretches to mould Intend beam concrete.
The simulating beam concrete(8)It is to simulate the concrete poured after the reinforcement installation of simulation finishes acceptance(check).
The beneficial effects of the invention are as follows making university student or rural migrant worker be imparted knowledge to students by model display, the more placing of reinforcements of beam section are pacified There is direct understanding the position of dress, readily appreciates.
Brief description of the drawings
The multiple rows of reinforcement installation model schematic of Fig. 1 beam sections;
Fig. 2 simulates stirrup schematic diagram.
In figure, the 1- simulation placing of reinforcements of back one;2- simulates the placing of reinforcement of back two;The placing of reinforcement of 3- simulating beams bottom two;4- is simulated The row of beam bottom one;5- simulates stirrup;6- simulates back spacer bar;7- simulating beams bottom spacer bar;8- simulating beam concrete.
Embodiment
Embodiment 1
Certain university's designed, designed uses the multiple rows of reinforcement installation model of beam section as shown in Figure 1, by the placing of reinforcement of simulation back one 1st, the placing of reinforcement 2 of back two, the placing of reinforcement 3 of simulating beam bottom two, the row 4 of simulating beam bottom one, simulation stirrup 5, simulation back positioning steel are simulated Muscle 6, simulating beam bottom spacer bar 7 and simulating beam concrete eight composition;Simulate the placing of reinforcement 1 of back one, the simulation placing of reinforcement of back two 2nd, the placing of reinforcement 3 of simulating beam bottom two, the section of the row 4 of simulating beam bottom one are all installed in the inside for simulating stirrup 5, and with simulating stirrup 5 connections;Simulate between the placing of reinforcement 1 of back one, the simulation placing of reinforcement 2 of back two with vertical horizontally disposed simulation back positioning steel Muscle 6 separates;With vertical horizontally disposed simulating beam bottom spacer bar between the placing of reinforcement 3 of simulating beam bottom two, the row 4 of simulating beam bottom one 7 separate;It is parallel with simulating beam bottom spacer bar 7 to simulate back spacer bar 6, connects with other simulation reinforcing bar places of intersecting vertically Connect;Simulate the placing of reinforcement 1 of back one, simulation back two placing of reinforcement 2, the placing of reinforcement 3 of simulating beam bottom two, the row 4 of simulating beam bottom one, simulation hoop Muscle 5, simulation back spacer bar 6, simulating beam bottom spacer bar 7 are all in simulating beam concrete eight.
Simulation back one placing of reinforcement 1, simulation back two placing of reinforcement 2, the placing of reinforcement 3 of simulating beam bottom two, the row 4 of simulating beam bottom one are More placing of reinforcements of beam section arrangement are simulated, preferential recommendation uses 5 millimeters of diameter, and the iron wire that length is 320 millimeters makes;Simulating beam Push up a placing of reinforcement 1, simulation back two placing of reinforcement 2, the placing of reinforcement 3 of simulating beam bottom two, the row 4 of simulating beam bottom one are respectively arranged on simulation Top and bottom inside stirrup 5;The placing of reinforcement 1 of simulation back one and the simulation placing of reinforcement 2 of back two set up separately in simulation back positioning The both sides of reinforcing bar 6, intersect vertically and be connected with simulation back spacer bar 6;The placing of reinforcement 3 of simulating beam bottom two, the row 4 of simulating beam bottom one Set up separately in the both sides of simulating beam bottom spacer bar 7, intersect vertically and be connected with simulating beam bottom spacer bar 7.
Simulation stirrup 5 is the rectangular ring being bent into by simulating straight reinforcing bar;Simulate the top of stirrup 5 one jiao is provided with two The straight section reinforcing bar that angle is 135 degree;Simulate the preferential recommendation of stirrup 5 to make using a diameter of 3 millimeters of iron wire, simulation stirrup 5 encloses Into interior empty short side grow 100 millimeters, 200 millimeters of long side, two ends grow 70 millimeters simultaneously one jiao of intersection at joining position Each curve 135 degree;Simulate stirrup 5 and simulation back one placing of reinforcement 1, simulation back two placing of reinforcement 2, the placing of reinforcement of simulating beam bottom two 3rd, the row 4 of simulating beam bottom one intersects vertically, and is arranged on simulation back one placing of reinforcement 1, simulation back two placing of reinforcement 2, simulating beam bottom Two placing of reinforcements 3, the periphery of the row 4 of simulating beam bottom one, make the placing of reinforcement 1 of simulation back one, simulation back two placing of reinforcement 2, simulating beam bottom Two placing of reinforcements 3, the row 4 of simulating beam bottom one form entirety.
Simulation back spacer bar 6, simulating beam bottom spacer bar 7 are the simulation bar dowels of straight section, and preferential recommendation is using straight Footpath is that the iron wire that 3 mm lengths are 120 millimeters makes;Back spacer bar 6 is simulated in the simulation placing of reinforcement 1 of back one, simulating beam Between pushing up two placing of reinforcements 2, simulating beam bottom spacer bar 7 is between the placing of reinforcement 3 of simulating beam bottom two, the row 4 of simulating beam bottom one, vertical phase It is all connected with friendship.
Simulating beam concrete eight is to simulate the concrete poured, preferential recommendation after the reinforcement installation of simulation finishes acceptance(check) Using long 300 millimeters, wide 250 millimeters, thick 150 millimeters cystosepiment making.
The preparation method of the multiple rows of reinforcement installation model of beam section is, first using long 300 millimeters, wide 250 millimeters, the milli of thickness 150 The cystosepiment of rice makes simulating beam concrete eight, and the placing of reinforcement 1 of back one, simulation back will be simulated at the both ends of simulating beam concrete eight Two placing of reinforcements 2, the placing of reinforcement 3 of simulating beam bottom two, the row 4 of simulating beam bottom one, simulation stirrup 5, simulation back spacer bar 6, simulating beam The line positioning of the described point of bottom spacer bar 7;Will simulation back one placing of reinforcement 1, simulation back two placing of reinforcement 2, the row's steel of simulating beam bottom two Muscle 3, the row 4 of simulating beam bottom one are inserted in simulating beam concrete eight on anchor point, each exposed 10 millimeters of both ends, will simulation stirrup 5, Simulation back spacer bar 6, simulating beam bottom spacer bar 7 are placed on respective position, with No. 22 iron wires according to assembling reinforcement Method respective colligation is firm, that is, complete.

Claims (6)

1. the multiple rows of reinforcement installation model of beam section, it is characterized in that, by the placing of reinforcement of simulation back one(1), simulation the placing of reinforcement of back two (2), the placing of reinforcement of simulating beam bottom two(3), the placing of reinforcement of simulating beam bottom one(4), simulation stirrup(5), simulation back spacer bar(6)、 Simulating beam bottom spacer bar(7)With simulating beam concrete(8)Composition;The simulating beam concrete(8)A geometric Framework is formed, Simulate stirrup(5)It is installed on simulating beam concrete(8)It is interior, simulate the placing of reinforcement of back one(1), simulation the placing of reinforcement of back two(2), mould Intend the placing of reinforcement of beam bottom two(3), the placing of reinforcement of simulating beam bottom one(4)It is horizontally arranged at simulation stirrup(5)Inside, and with simulate stirrup (5)Connection;Simulate the placing of reinforcement of back one(1), simulation the placing of reinforcement of back two(2)Located at simulation stirrup(5)Top, two rows steel With simulation back spacer bar between muscle(6)Separate, and respectively with simulating back spacer bar(6)Vertical connection;Simulating beam bottom Two placing of reinforcements(3), the placing of reinforcement of simulating beam bottom one(4)Located at simulation stirrup(5)Bottom, positioned with simulating beam bottom between two placing of reinforcements Reinforcing bar(7)Separate, and respectively with simulating beam bottom spacer bar(7)Connection;Simulate back spacer bar(6)Positioned with simulating beam bottom Reinforcing bar(7)It is parallel.
2. the multiple rows of reinforcement installation model of beam section according to claim 1, it is characterized in that, simulate the placing of reinforcement of back one(1)、 Simulate the placing of reinforcement of back two(2), the placing of reinforcement of simulating beam bottom two(3), the placing of reinforcement of simulating beam bottom one(4)It is that simulation beam section is arranged More placing of reinforcements, it is horizontal uniform more per placing of reinforcement.
3. the multiple rows of reinforcement installation model of beam section according to claim 1, it is characterized in that, simulate stirrup(5)It is by simulating The rectangular ring that straight reinforcing bar is bent into;Simulate stirrup(5)It is 45 degree that one jiao of the both sides on top, which are respectively equipped with two angles, Straight section reinforcing bar.
4. the multiple rows of reinforcement installation model of beam section according to claim 1, it is characterized in that, simulate stirrup(5)Top margin, bottom Side is respectively with simulating the placing of reinforcement of back one(1), the row of simulating beam bottom one(4)Intersect and connect;Simulate stirrup(5)Two sides difference With simulating the placing of reinforcement of back two(2), the placing of reinforcement of simulating beam bottom two(3)Intersect and connect, make the placing of reinforcement of simulation back one(1), mould Intend the placing of reinforcement of back two(2), the placing of reinforcement of simulating beam bottom two(3), the row of simulating beam bottom one(4)Form an entirety.
5. the multiple rows of reinforcement installation model of beam section according to claim 1, it is characterized in that, simulate back spacer bar(6)、 Simulating beam bottom spacer bar(7)It is the simulation bar dowel of straight section;Simulate back spacer bar(6), simulating beam bottom spacer bar(7) Length be less than simulating beam width, more than simulation stirrup(5)Width, its both ends stretches to simulating beam concrete(8).
6. the multiple rows of reinforcement installation model of beam section according to claim 1, it is characterized in that, simulating beam concrete(8)It is mould The reinforcement installation of plan simulates the concrete poured after finishing acceptance(check).
CN201711107971.6A 2017-11-10 2017-11-10 The multiple rows of reinforcement installation model of beam section Withdrawn CN107871441A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711107971.6A CN107871441A (en) 2017-11-10 2017-11-10 The multiple rows of reinforcement installation model of beam section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711107971.6A CN107871441A (en) 2017-11-10 2017-11-10 The multiple rows of reinforcement installation model of beam section

Publications (1)

Publication Number Publication Date
CN107871441A true CN107871441A (en) 2018-04-03

Family

ID=61752650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711107971.6A Withdrawn CN107871441A (en) 2017-11-10 2017-11-10 The multiple rows of reinforcement installation model of beam section

Country Status (1)

Country Link
CN (1) CN107871441A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108053748A (en) * 2018-04-08 2018-05-18 宋功业 The multiple rows of reinforcement installation model of beam section and installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108053748A (en) * 2018-04-08 2018-05-18 宋功业 The multiple rows of reinforcement installation model of beam section and installation method

Similar Documents

Publication Publication Date Title
CN110532676A (en) A kind of BIM technology auxiliary more packing list rooms reinforcing bar and bellows positioning construction method
CN104464477B (en) Tunnel teaching experiment model
CN107871441A (en) The multiple rows of reinforcement installation model of beam section
Sampaio et al. Virtual Reality used as a learning technology: Visual simulation of the construction of a bridge deck
CN205334862U (en) Position reinforcing bar construction teaching mode of arranging is connected with frame construction in basis
CN108269479A (en) A kind of simulator of shallow foundation foundation failure
CN201251882Y (en) Reinforced concrete structural teaching model
CN108053748A (en) The multiple rows of reinforcement installation model of beam section and installation method
Guo et al. A Case Study of Thoroughly Integrated STEM PBL Course of Mechanics
CN106128280A (en) Brick masonry wall structural model and manufacture method
Sampaio et al. Visual simulation of Civil Engineering activities: Didactic virtual models
CN208873387U (en) A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid
CN212181791U (en) Settlement joint double-column foundation teaching training device
CN105469697A (en) Base and framework structure interconnecting part steel bar assignment construction teaching model
CN105469695A (en) Teaching model of simulating framework structure column beam node steel bar space assignment construction
CN206224896U (en) A kind of double rim of a cup steel building apparatus for demonstrating high
CN108711354A (en) A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid
CN205194198U (en) Simple and easy frame construction teaching mode
CN220895045U (en) Special wall body of assembled concrete wall body installation training and training platform
CN106128282A (en) Hand-dug pile foundation's model and manufacture method
CN106097876A (en) Board-like concrete stair structure model and manufacture method
CN214796485U (en) Be used for building engineering teaching to demonstrate teaching aid with wall body construction
Lv et al. Study on BIM technology teaching under the background of three-dimensional design
CN110211480A (en) A kind of long-span cablestayed bridges model applied to BIM teaching
CN204463684U (en) Cone-shaped footing actual training device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180403