CN106088927B - Door and window system and its installation method are integrated on prefabricated buildings PC components - Google Patents

Door and window system and its installation method are integrated on prefabricated buildings PC components Download PDF

Info

Publication number
CN106088927B
CN106088927B CN201610620544.7A CN201610620544A CN106088927B CN 106088927 B CN106088927 B CN 106088927B CN 201610620544 A CN201610620544 A CN 201610620544A CN 106088927 B CN106088927 B CN 106088927B
Authority
CN
China
Prior art keywords
door
connector
munnion
window system
horizontal frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610620544.7A
Other languages
Chinese (zh)
Other versions
CN106088927A (en
Inventor
何贤俊
楼璐
杨龙
程潘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
CSCEC Curtain Wall Co Ltd
China Construction Decoration Engineering Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
CSCEC Curtain Wall Co Ltd
China Construction Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, CSCEC Curtain Wall Co Ltd, China Construction Decoration Engineering Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201610620544.7A priority Critical patent/CN106088927B/en
Publication of CN106088927A publication Critical patent/CN106088927A/en
Application granted granted Critical
Publication of CN106088927B publication Critical patent/CN106088927B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/56Fastening frames to the border of openings or to similar contiguous frames
    • E06B1/60Fastening frames to the border of openings or to similar contiguous frames by mechanical means, e.g. anchoring means
    • E06B1/6015Anchoring means
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/56Fastening frames to the border of openings or to similar contiguous frames
    • E06B1/60Fastening frames to the border of openings or to similar contiguous frames by mechanical means, e.g. anchoring means
    • E06B1/6015Anchoring means
    • E06B1/6038Anchoring means specially adapted for being embedded in the wall
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/62Tightening or covering joints between the border of openings and the frame or between contiguous frames
    • E06B1/68Tightening or covering joints between the border of openings and the frame or between contiguous frames by profiled external parts

Abstract

The invention discloses door and window system is integrated on a kind of prefabricated buildings PC components, including sash, including munnion and horizontal frame;Prefabricated component including installing frame, is connected to the fixed part of installing frame and multiple adjusting bolts;First connector, one end are equipped with hanging groove with munnion cooperation clamping, the other end;Second connector, including jacking portion, and one end is fastened in the socket part in jacking portion with horizontal frame cooperation clamping, other end cooperation, by the way that prefabricated component and concrete wall is set to pour integrally, is respectively connected as one munnion and horizontal frame with prefabricated component by the 3rd connector and the 4th connector.It is poured by setting prefabricated component together with concrete, and the first connector and the second connector is set respectively to connect munnion and horizontal frame with prefabricated component, it is conducive to increase the leakproofness between sash and prefabricated component, and then adds the leakproofness between sash and wall.The present invention also provides the installation methods that door and window system is integrated on a kind of prefabricated buildings PC components.

Description

Door and window system and its installation method are integrated on prefabricated buildings PC components
Technical field
The present invention relates to a kind of door and window technology, more particularly, to integrated on a kind of prefabricated buildings PC components door and window system and Its installation method.
Background technology
At present, sash is mainly with two kinds of installation methods, and one kind is dry method installation, mainly by making a four side steel Auxiliary frame is fixed on window opening inner wall, then surrounding dress stone material or aluminium sheet, then door and window is fixed on by fastener on steel frame, week It encloses and plays fluid sealant processing, sealing effect is good, water resistance is high, but assembling is cumbersome, cost is higher, adjustable amount is small.It is another Kind is wet method installation, and sash is fixed on by upper wall piece on concrete wall, and foaming agent is used between wall and sash Filling, then closed up again with waterproof mortar, complete sash installation, it is easy to operate, be easy to grasp, cost it is relatively low, but It is that waterproof controllability is poor, cement mortar is easily accessible in cavity, it is difficult to clear up, surface be easy to cause material damage.
The content of the invention
The purpose of the utility model is to overcome above-mentioned technical deficiencies, propose that one kind can solve door and window peace in the prior art Fill complexity, poor controllability, integrated door and window system and its installation method on the prefabricated buildings PC components that water proofing property is low, of high cost.
To reach above-mentioned technical purpose, on the one hand technical scheme provides collects on a kind of prefabricated buildings PC components Into door and window system, including,
Sash, including the munnion being vertically arranged and horizontally disposed horizontal frame;
Prefabricated component, the installing frame including fitting in window opening inner wall, one end is connected to the installing frame outer wall, the other end prolongs Extend the in vivo fixed part of wall and be uniformly arranged along the installing frame length extending direction and respectively with the munnion and horizontal frame phase Corresponding multiple adjusting bolts;
First connector, its one end are formed with hanging sleeve in the adjusting bolt with munnion cooperation clamping, the other end Hanging groove;And
Second connector coordinates including the jacking portion being fixedly connected with the adjusting bolt and one end with the horizontal frame Clamping, other end cooperation are fastened in the socket part in the jacking portion.
Preferably, the prefabricated component further includes the cutting ferrule for being sheathed on the adjusting bolt, and the hanging groove hanging sleeve is in described On cutting ferrule.
Preferably, the munnion includes munnion main body and the first latch extended to form by the munnion main body end face And first seal, the first seal convexity, first seal convexity and the munnion master are provided in the first seal The first inserting groove is formed between body, first connector is provided with and first latch matched first close to middle part Card slot, first connector are inserted in away from the hanging groove one end fits in first inserting groove.
Preferably, first connector is equipped with the mounting part of hanging groove including one end and is hung down by the mounting part other end The plug division directly extended to form, first card slot are arranged on the relatively described mounting part one end in the plug division.
Preferably, the jacking portion is U-shaped, and its bottom is provided with the mounting hole for being sheathed on the cutting ferrule, the socket Portion one end is arranged to inverted U matched with the jacking portion and is fastened in jacking portion upper end.
Preferably, the horizontal frame includes horizontal frame main body and the second latch extended to form by the horizontal frame main body end face And second seal, the second seal convexity, second seal convexity and the horizontal frame master are provided in the second seal The second inserting groove is formed between body, the socket part is away from jacking portion one end and second latch and the second inserting groove It is engaged.
Preferably, seal groove is provided in the jacking portion, in the seal groove interference be embedded with a sealing element, it is described close Sealing protrudes from the seal groove notch and pushes against in the socket part.
Preferably, the fixed part includes one end perpendicular to the first fixed part of the installing frame outer wall and by described first The second fixed part that vertical first fixed part in fixed part free end extends to form.
Another aspect of the present invention also provides the installation method that door and window system is integrated on a kind of above-mentioned prefabricated buildings PC components, Include the following steps,
(1) prefabricated component cooperation is positioned in concreting mold, casting concrete carries out concrete wall maintenance;
(2) socket part of the first connector and the second connector is respectively cooperating with being connected to the munnion in sash and horizontal frame On, and door and window crimping, adhesive tape cooperation are installed on sash;
(3) jacking portion is correspondingly arranged in adjusting bolt;
(4) sash is built in installing frame, up and down adjustment sash, the hanging groove on the first connector is made to coordinate hanging sleeve In with the corresponding adjusting bolt of munnion, and socket part is made to be engaged socket with jacking portion;
(5) gap between sash and wall is sealed by fluid sealant.
Preferably, the amount of lap between the jacking portion and the socket part is 8~10mm.
Door and window system and its installation method are integrated on prefabricated buildings PC components of the present invention, by setting prefabricated component It is poured with together with concrete, and sets the first connector and the second connector that munnion and horizontal frame are connected one with prefabricated component respectively It rises, is conducive to increase the leakproofness between sash and prefabricated component, and then add the leakproofness between sash and wall, Its is easy to operate, water resistance is high, and reduces construction cost.
Description of the drawings
Fig. 1 is the attachment structure schematic diagram that door and window system is integrated on the prefabricated buildings PC components of the present invention;
Fig. 2 is the A-A direction views of Fig. 1 of the present invention;
Fig. 3 is the B-B direction view of Fig. 1 of the present invention;
Fig. 4 is the dimensional structure diagram of the first connector of the present invention.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, it is right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
~4 are please referred to Fig.1, integrating door and window system on the prefabricated buildings PC components of the present embodiment includes,
Sash 1, including the munnion 11 being vertically arranged and horizontally disposed horizontal frame 12;
Prefabricated component 2, the installing frame 21 including fitting in window opening inner wall, one end are connected to 21 outer wall of installing frame, another Fixed part 22 that one end is extended in wall 6 and be uniformly arranged along the 21 length extending direction of installing frame and respectively with it is described Munnion 11 and the corresponding multiple adjusting bolts 23 of horizontal frame 12;
First connector 3, its one end are formed with hanging sleeve in the adjusting bolt with the munnion 11 cooperation clamping, the other end 23 hanging groove 31a;And
Second connector 4, including the jacking portion 42 being fixedly connected with the adjusting bolt 23 and one end and the horizontal frame 12 cooperation clampings, other end cooperation are fastened in the socket part 41 in the jacking portion 42.
It is positioned in concreting mold specifically, prefabricated component 2 can coordinate, and is connected as one with concrete wall 6, It so that fixed part 22 is embedded in wall 6, is fitted in installing frame 21 on the inner wall of window opening, in order to the installation of sash 1.Its In, the adjusting bolt 23 in prefabricated component 2 can be arranged as required to, you can set before concreting, can also be poured in concrete It is set in maintenance processes after building, according to being set before concreting, then the screw cap end of adjusting bolt 23 is built in wall 6th, the end of thread is connected through the installing frame 21 and with a nut, is conducive to increase operation ease.Wherein, this implementation Example is preferably set in maintenance processes, summarizes damage adjusting bolt 23 to avoid casting process.
The quantity of adjusting bolt 23 is configured as needed, since munnion 11 is generally symmetrically arranged two, each Munnion 11 is corresponding with two adjusting bolts 23, to increase the stability of munnion 11;Corresponding horizontal frame 12 is also two, horizontal frame 12 general bases when setting go length to be configured, but each horizontal frame 12 is at least engaged with two adjusting bolts 23, to keep away Exempt to shake during use.
Cause in order to avoid the first connector 3 and the second connector 4 are directly contacted with the screw rod of adjusting bolt 23 on screw rod The damage of screw thread, prefabricated component 2 described in the present embodiment further include the cutting ferrule 5 for being sheathed on the adjusting bolt 23, and the hanging groove 31a Hanging sleeve is on the cutting ferrule 5, and cutting ferrule 5 can be embedded in installing frame 21 when setting, also directly one end abuts installing frame 21.
For the ease of the clamping of sash 1 and first connector 3, the second connector 4, munnion 11 includes described in the present embodiment Munnion main body 111 and the first latch 112 extended to form by 111 end face of munnion main body and first seal 113, institute State and the first seal convexity 114 be provided in first seal 113, first seal convexity 114 and the munnion main body 111 it Between be formed with the first inserting groove 11a, first connector 3 is provided with matched with first latch 112 close to middle part First card slot 32a, first connector 3 are inserted in away from the hanging groove 31a one end fits in the first inserting groove 11a. Specifically, the outer rim of the relatively outdoor end face of munnion main body 111 extends to form the first latch 112 to door and window hole inner wall, and munnion Vertical end face in relatively horizontal 12 one side of frame of the relatively outdoor end face of main body 111 extends to form first seal 113, this is first close Sealing 113 extends to form the first seal convexity 114 with respect to door and window hole inner wall one side, and the first seal convexity 114 may be configured as Two, fluid sealant 7 can be set to be sealed with door and window hole between two the first seal convexities 114.
Corresponding, for the cooperation clamping with munnion 11, first connector 3 includes the extension that one end is equipped with hanging groove 31a Socket part 31 and the plug division 32 formed is extended vertically by 31 other end of mounting part, the first card slot 32a is arranged on described insert Relatively described 31 one end of mounting part of socket part 32.Specifically, the first connector 3 is whole L-shaped, be provided on mounting part 31 notch to Under the hanging groove 31a that opens, hanging groove 31a may be configured as arc or rectangle, and the present embodiment is preferably arranged to rectangle.Plug division 32 is opposite to hang 31 one end of socket part is provided with the first card slot 32a, and the other end is inserted in the first inserting groove 11a.
Horizontal frame 12 described in the present embodiment includes horizontal frame main body 121 and is extended to form by horizontal 121 end face of frame main body Second latch 122 and second seal 123, are provided with the second seal convexity 124 in the second seal 123, and described second The second inserting groove 12a is formed between seal convexity 124 and the horizontal frame main body 121, the socket part 41 is away from the jacking 42 one end of portion is engaged with the 122 and second inserting groove 12a of the second latch, specifically mating connection structure and the first connector 3 is essentially identical, is not described in detail herein.
Wherein, the jacking portion 42 is U-shaped, and its bottom is provided with the mounting hole for being sheathed on the cutting ferrule 5, the socket 41 one end of portion is arranged to and the 42 matched inverted U of jacking portion and is fastened in 42 upper end of jacking portion.It is specifically, fixed Hole can be placed in adjusting bolt 23 or on cutting ferrule 5, and 23 one end of adjusting bolt is built in jacking portion 42.Socket part 41 is opposite to push up 42 one end of support portion is fastened in 42 upper end of jacking portion in inverted U and cooperation, and between the jacking portion 42 and the socket part 41 Amount of lap is 8~10mm, is preferably 9.5mm.
In order to increase the leakproofness that door and window system is integrated on the present embodiment prefabricated buildings PC components, the present embodiment is described Interference in seal groove 41a, the seal groove 41a is provided in jacking portion 42 and is embedded with a sealing element 8, the sealing element 8 protrudes In the seal groove 41a notches and push against in the socket part 41.It can be specifically respectively provided on U-shaped 42 liang of outside side walls in jacking portion Seal groove 41a, since outside side wall cooperation is connected to socket part 41, so as to be conducive to increase jacking portion 42 and socket part 41 it Between sealing effect.
And in order to increase the stability of fixed part 22, the fixed part 22 includes one end perpendicular to 21 outer wall of installing frame The first fixed part 221 and extended to form by vertical first fixed part 221 in 221 free end of the first fixed part second Fixed part 222.Fixed part 22 can be configured as needed, and the present embodiment is arranged to three.
The specific installation procedure that door and window system is integrated on the prefabricated buildings PC components of the present embodiment is as follows:
(1) prefabricated component cooperation is positioned in concreting mold, casting concrete carries out concrete wall maintenance; Wherein, the adjusting bolt in prefabricated component can be arranged as required to, you can before concreting set, also can be in concreting It is set in maintenance processes afterwards, according to being set before concreting, then the screw cap end of adjusting bolt is built in wall, screw thread End is connected through the installing frame and with a nut, is conducive to increase operation ease.And the present embodiment is preferably being supported It is set during shield, summarizes damage adjusting bolt to avoid casting process;
(2) socket part of the first connector and the second connector is respectively cooperating with being connected to the munnion in sash and horizontal frame On, and door and window crimping, adhesive tape cooperation are installed on sash;The connection tool of first connector and the second connector and sash Body is attached according to above-mentioned clamping structure;
(3) jacking portion is correspondingly arranged in adjusting bolt;Due in actual connection procedure, it is necessary to set cutting ferrule and locking screw Mother, therefore generally at fixed jacking portion, it is corresponding to be configured cutting ferrule and locking nut,
(4) sash is built in installing frame, up and down adjustment sash, the hanging groove on the first connector is made to coordinate hanging sleeve In with the corresponding adjusting bolt of munnion, and socket part is made to be engaged socket with jacking portion;
(5) gap between sash and wall is sealed by fluid sealant, fluid sealant preferably uses silicone seal Glue.In addition, it for the other processes during erection of doors and windows in the usual way, is not described in detail herein.
Door and window system and its installation method are integrated on prefabricated buildings PC components of the present invention, by setting prefabricated component It is poured with together with concrete, and sets the first connector and the second connector that munnion and horizontal frame are connected one with prefabricated component respectively It rises, is conducive to increase the leakproofness between sash and prefabricated component, and then add the leakproofness between sash and wall, Its is easy to operate, water resistance is high, and reduces construction cost.
The specific embodiment of present invention described above, is not intended to limit the scope of the present invention..Any basis The various other corresponding changes and deformation that the technical concept of the present invention is made, should be included in the guarantor of the claims in the present invention In the range of shield.

Claims (10)

1. door and window system is integrated on a kind of prefabricated buildings PC components, which is characterized in that including,
Sash, including the munnion being vertically arranged and horizontally disposed horizontal frame;
Prefabricated component, the installing frame including fitting in window opening inner wall, one end is connected to the installing frame outer wall, the other end extends to It the in vivo fixed part of wall and is uniformly arranged along the installing frame length extending direction and corresponding with the munnion and horizontal frame respectively Multiple adjusting bolts;
First connector, its one end are formed with hanging sleeve in the hanging groove of the adjusting bolt with munnion cooperation clamping, the other end; And
Second connector, be clamped including the jacking portion being fixedly connected with the adjusting bolt and one end with the horizontal frame cooperation, The other end coordinates the socket part for being fastened in the jacking portion.
2. door and window system is integrated on prefabricated buildings PC components according to claim 1, which is characterized in that the prefabricated component The cutting ferrule for being sheathed on the adjusting bolt is further included, and the hanging groove hanging sleeve is on the cutting ferrule.
3. door and window system is integrated on prefabricated buildings PC components according to claim 1 or 2, which is characterized in that described perpendicular The first latch and first seal that frame includes munnion main body and extended to form by the munnion main body end face, described first The first seal convexity is provided on sealing element, the first grafting is formed between first seal convexity and the munnion main body Slot, first connector are provided with and matched first card slot of first latch, first connector close to middle part It is inserted in away from the hanging groove one end fits in first inserting groove.
4. door and window system is integrated on prefabricated buildings PC components according to claim 3, which is characterized in that described first connects Fitting includes one end and is equipped with the mounting part of hanging groove and extends vertically the plug division formed by the mounting part other end, and described the One card slot is arranged on the relatively described mounting part one end in the plug division.
5. door and window system is integrated on prefabricated buildings PC components according to claim 4, which is characterized in that the jacking portion It is U-shaped, and its bottom is provided with the mounting hole for being sheathed on the cutting ferrule, described socket part one end is arranged to and jacking portion phase The inverted U of cooperation and it is fastened in jacking portion upper end.
6. door and window system is integrated on prefabricated buildings PC components according to claim 5, which is characterized in that the horizontal frame bag The second latch and second seal for including horizontal frame main body and being extended to form by the horizontal frame main body end face, second sealing The second seal convexity is provided on part, the second inserting groove, institute are formed between second seal convexity and the horizontal frame main body Socket part is stated to be engaged with second latch and the second inserting groove away from jacking portion one end.
7. door and window system is integrated on prefabricated buildings PC components according to claim 5 or 6, which is characterized in that the top Seal groove is provided in support portion, in the seal groove interference be embedded with a sealing element, the sealing element protrudes from the seal groove Notch is simultaneously pushed against in the socket part.
8. door and window system is integrated on prefabricated buildings PC components according to claim 7, which is characterized in that the fixed part Including one end perpendicular to the first fixed part of the installing frame outer wall and by the first fixed part free end vertical described first The second fixed part that fixed part extends to form.
9. a kind of installation method for integrating door and window system on prefabricated buildings PC components as described in claim 1~8 any one, It is characterised in that it includes following steps,
(1) prefabricated component cooperation is positioned in concreting mold, casting concrete carries out concrete wall maintenance;
(2) socket part of the first connector and the second connector is respectively cooperating with being connected on the munnion and horizontal frame of sash, And door and window crimping, adhesive tape cooperation are installed on sash;
(3) jacking portion is correspondingly arranged in adjusting bolt;
(4) sash is built in installing frame, up and down adjustment sash, make hanging groove on the first connector coordinate hanging sleeve in The corresponding adjusting bolt of munnion, and socket part is made to be engaged socket with jacking portion;
(5) gap between sash and wall is sealed by fluid sealant.
10. integrating the installation method of door and window system on prefabricated buildings PC components according to claim 9, feature exists In the amount of lap between the jacking portion and the socket part is 8~10mm.
CN201610620544.7A 2016-08-02 2016-08-02 Door and window system and its installation method are integrated on prefabricated buildings PC components Active CN106088927B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610620544.7A CN106088927B (en) 2016-08-02 2016-08-02 Door and window system and its installation method are integrated on prefabricated buildings PC components

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610620544.7A CN106088927B (en) 2016-08-02 2016-08-02 Door and window system and its installation method are integrated on prefabricated buildings PC components

Publications (2)

Publication Number Publication Date
CN106088927A CN106088927A (en) 2016-11-09
CN106088927B true CN106088927B (en) 2018-06-01

Family

ID=57480092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610620544.7A Active CN106088927B (en) 2016-08-02 2016-08-02 Door and window system and its installation method are integrated on prefabricated buildings PC components

Country Status (1)

Country Link
CN (1) CN106088927B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6933749B2 (en) * 2015-12-25 2021-09-08 文化シヤッター株式会社 Building material connecting device, its connecting structure and its connecting method
TWI627332B (en) * 2017-07-27 2018-06-21 承潔投資有限公司 Window Structure for Dry Construction Method
CN107939223A (en) * 2017-12-25 2018-04-20 清远欧派集成家居有限公司 Base mounting structure
CN109025277B (en) * 2018-08-28 2021-08-10 中建铝新材料成都有限公司 Auxiliary frame and pre-buried structure and method thereof
CN109162581B (en) * 2018-08-31 2023-12-22 广州建筑装饰集团有限公司 Assembled door and window and installation method thereof
WO2020248276A1 (en) * 2019-06-14 2020-12-17 胡永生 Door/window mounting structure for fabricated integrated building
CN111119660B (en) * 2019-12-30 2021-12-31 佛山市均林人防工程有限公司 High-strength door frame assembly module and installation method thereof
CN114132433B (en) * 2021-10-20 2023-03-28 英辉南方造船(广州番禺)有限公司 Hidden bolt type door and window and installation method thereof

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4135126C2 (en) * 1991-10-24 1994-09-22 Weru Ag Fastening device, in particular for fixed window glazing
CN2387242Y (en) * 1999-06-11 2000-07-12 高捍兵 Combined plastic-steel door and window
US7490442B1 (en) * 2004-07-27 2009-02-17 Feather Lite Innovations, Inc. Window system for concrete walls and associated method
DE202012007784U1 (en) * 2012-08-14 2013-11-18 Goldbeck Gmbh frame construction
CN103306574B (en) * 2013-06-09 2015-10-14 中国建筑第八工程局有限公司 The pre-buried installing and fixing method of assembled-type house PC prefabricated units window frame and structure
CN204343890U (en) * 2014-11-20 2015-05-20 江苏安唯赛伦声振测控科技有限公司 A kind of sound insulation factor use for laboratory sound proof window preburied frame
CN205918294U (en) * 2016-08-02 2017-02-01 武汉中建幕墙有限公司 Integrated window and door system on prefabricated building PC member

Also Published As

Publication number Publication date
CN106088927A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN106088927B (en) Door and window system and its installation method are integrated on prefabricated buildings PC components
CN103243890B (en) Heat insulating decorative board hanging fastener component and mounting process thereof
CN105350860B (en) The door and window and door and window integral installation method installed by spring catch nail type auxiliary frame
CN205918294U (en) Integrated window and door system on prefabricated building PC member
CN109750942A (en) A kind of the door and window pre-buried structure and its construction installation method of assembled architecture
CN206617026U (en) A kind of civic building door window frame structure
CN106760341B (en) Heat-insulation decorative hanging plate, heat-insulation decorative wall and production method of heat-insulation decorative wall
CN204571661U (en) Novel energy-saving door and window auxiliary frame
CN205558650U (en) Prevention of seepage water outer wall window mounting structure
CN204476179U (en) Auxiliary frame construction and installation fixture
CN204175124U (en) A kind of rear installed sliding sash
CN209556531U (en) A kind of plug-in Assembled enclosing wall of positive pin type arc bayonet connection
CN202731037U (en) Curtain wall framework structure
CN106223784A (en) The installation method of a kind of assembled door and window auxiliary frame and section bar component thereof
CN206646688U (en) A kind of grafting notch arrangement of curtain wall panel
CN206337765U (en) Insulation and decoration hanging plate and heat-preserving decorating wall
CN207017511U (en) A kind of ceramic plate curtain wall with splash guard installation connects system
CN110259329A (en) A kind of plastic-steel door and window installation method applied in door and window work
CN110445072B (en) Construction method of cable support
CN204571662U (en) Energy-saving door and window auxiliary frame
CN205172291U (en) Waterproof auxiliary frame for doors and window
TWI479073B (en) Combination device of window frame and building structure and its construction method
CN205078083U (en) Auxiliary frame for doors and windows
JP4258936B2 (en) Refurbished windows
CN204476177U (en) Door and window auxiliary frame construction and installation matching fixing part

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 430100 9 Lantau Peak five industrial park, Caidian, Wuhan, Hubei

Applicant after: CSCEC Wall Co., Ltd.

Applicant after: China Construction Decoration Engineering Co., Ltd.

Applicant after: China State Construction Corp.

Address before: 430100 9 Lantau Peak five industrial park, Caidian, Wuhan, Hubei

Applicant before: CHINA STATE CONSTRUCTION ENGINEERING WUHAN CURTAIN WALL CO., LTD.

Applicant before: China Construction Decoration Engineering Co., Ltd.

Applicant before: China State Construction Corp.

GR01 Patent grant
GR01 Patent grant