The content of the invention
The purpose of the utility model is to overcome above-mentioned technical deficiencies, propose that one kind can solve door and window peace in the prior art
Fill complexity, poor controllability, integrated door and window system and its installation method on the prefabricated buildings PC components that water proofing property is low, of high cost.
To reach above-mentioned technical purpose, on the one hand technical scheme provides collects on a kind of prefabricated buildings PC components
Into door and window system, including,
Sash, including the munnion being vertically arranged and horizontally disposed horizontal frame;
Prefabricated component, the installing frame including fitting in window opening inner wall, one end is connected to the installing frame outer wall, the other end prolongs
Extend the in vivo fixed part of wall and be uniformly arranged along the installing frame length extending direction and respectively with the munnion and horizontal frame phase
Corresponding multiple adjusting bolts;
First connector, its one end are formed with hanging sleeve in the adjusting bolt with munnion cooperation clamping, the other end
Hanging groove;And
Second connector coordinates including the jacking portion being fixedly connected with the adjusting bolt and one end with the horizontal frame
Clamping, other end cooperation are fastened in the socket part in the jacking portion.
Preferably, the prefabricated component further includes the cutting ferrule for being sheathed on the adjusting bolt, and the hanging groove hanging sleeve is in described
On cutting ferrule.
Preferably, the munnion includes munnion main body and the first latch extended to form by the munnion main body end face
And first seal, the first seal convexity, first seal convexity and the munnion master are provided in the first seal
The first inserting groove is formed between body, first connector is provided with and first latch matched first close to middle part
Card slot, first connector are inserted in away from the hanging groove one end fits in first inserting groove.
Preferably, first connector is equipped with the mounting part of hanging groove including one end and is hung down by the mounting part other end
The plug division directly extended to form, first card slot are arranged on the relatively described mounting part one end in the plug division.
Preferably, the jacking portion is U-shaped, and its bottom is provided with the mounting hole for being sheathed on the cutting ferrule, the socket
Portion one end is arranged to inverted U matched with the jacking portion and is fastened in jacking portion upper end.
Preferably, the horizontal frame includes horizontal frame main body and the second latch extended to form by the horizontal frame main body end face
And second seal, the second seal convexity, second seal convexity and the horizontal frame master are provided in the second seal
The second inserting groove is formed between body, the socket part is away from jacking portion one end and second latch and the second inserting groove
It is engaged.
Preferably, seal groove is provided in the jacking portion, in the seal groove interference be embedded with a sealing element, it is described close
Sealing protrudes from the seal groove notch and pushes against in the socket part.
Preferably, the fixed part includes one end perpendicular to the first fixed part of the installing frame outer wall and by described first
The second fixed part that vertical first fixed part in fixed part free end extends to form.
Another aspect of the present invention also provides the installation method that door and window system is integrated on a kind of above-mentioned prefabricated buildings PC components,
Include the following steps,
(1) prefabricated component cooperation is positioned in concreting mold, casting concrete carries out concrete wall maintenance;
(2) socket part of the first connector and the second connector is respectively cooperating with being connected to the munnion in sash and horizontal frame
On, and door and window crimping, adhesive tape cooperation are installed on sash;
(3) jacking portion is correspondingly arranged in adjusting bolt;
(4) sash is built in installing frame, up and down adjustment sash, the hanging groove on the first connector is made to coordinate hanging sleeve
In with the corresponding adjusting bolt of munnion, and socket part is made to be engaged socket with jacking portion;
(5) gap between sash and wall is sealed by fluid sealant.
Preferably, the amount of lap between the jacking portion and the socket part is 8~10mm.
Door and window system and its installation method are integrated on prefabricated buildings PC components of the present invention, by setting prefabricated component
It is poured with together with concrete, and sets the first connector and the second connector that munnion and horizontal frame are connected one with prefabricated component respectively
It rises, is conducive to increase the leakproofness between sash and prefabricated component, and then add the leakproofness between sash and wall,
Its is easy to operate, water resistance is high, and reduces construction cost.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, it is right
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
~4 are please referred to Fig.1, integrating door and window system on the prefabricated buildings PC components of the present embodiment includes,
Sash 1, including the munnion 11 being vertically arranged and horizontally disposed horizontal frame 12;
Prefabricated component 2, the installing frame 21 including fitting in window opening inner wall, one end are connected to 21 outer wall of installing frame, another
Fixed part 22 that one end is extended in wall 6 and be uniformly arranged along the 21 length extending direction of installing frame and respectively with it is described
Munnion 11 and the corresponding multiple adjusting bolts 23 of horizontal frame 12;
First connector 3, its one end are formed with hanging sleeve in the adjusting bolt with the munnion 11 cooperation clamping, the other end
23 hanging groove 31a;And
Second connector 4, including the jacking portion 42 being fixedly connected with the adjusting bolt 23 and one end and the horizontal frame
12 cooperation clampings, other end cooperation are fastened in the socket part 41 in the jacking portion 42.
It is positioned in concreting mold specifically, prefabricated component 2 can coordinate, and is connected as one with concrete wall 6,
It so that fixed part 22 is embedded in wall 6, is fitted in installing frame 21 on the inner wall of window opening, in order to the installation of sash 1.Its
In, the adjusting bolt 23 in prefabricated component 2 can be arranged as required to, you can set before concreting, can also be poured in concrete
It is set in maintenance processes after building, according to being set before concreting, then the screw cap end of adjusting bolt 23 is built in wall
6th, the end of thread is connected through the installing frame 21 and with a nut, is conducive to increase operation ease.Wherein, this implementation
Example is preferably set in maintenance processes, summarizes damage adjusting bolt 23 to avoid casting process.
The quantity of adjusting bolt 23 is configured as needed, since munnion 11 is generally symmetrically arranged two, each
Munnion 11 is corresponding with two adjusting bolts 23, to increase the stability of munnion 11;Corresponding horizontal frame 12 is also two, horizontal frame
12 general bases when setting go length to be configured, but each horizontal frame 12 is at least engaged with two adjusting bolts 23, to keep away
Exempt to shake during use.
Cause in order to avoid the first connector 3 and the second connector 4 are directly contacted with the screw rod of adjusting bolt 23 on screw rod
The damage of screw thread, prefabricated component 2 described in the present embodiment further include the cutting ferrule 5 for being sheathed on the adjusting bolt 23, and the hanging groove 31a
Hanging sleeve is on the cutting ferrule 5, and cutting ferrule 5 can be embedded in installing frame 21 when setting, also directly one end abuts installing frame 21.
For the ease of the clamping of sash 1 and first connector 3, the second connector 4, munnion 11 includes described in the present embodiment
Munnion main body 111 and the first latch 112 extended to form by 111 end face of munnion main body and first seal 113, institute
State and the first seal convexity 114 be provided in first seal 113, first seal convexity 114 and the munnion main body 111 it
Between be formed with the first inserting groove 11a, first connector 3 is provided with matched with first latch 112 close to middle part
First card slot 32a, first connector 3 are inserted in away from the hanging groove 31a one end fits in the first inserting groove 11a.
Specifically, the outer rim of the relatively outdoor end face of munnion main body 111 extends to form the first latch 112 to door and window hole inner wall, and munnion
Vertical end face in relatively horizontal 12 one side of frame of the relatively outdoor end face of main body 111 extends to form first seal 113, this is first close
Sealing 113 extends to form the first seal convexity 114 with respect to door and window hole inner wall one side, and the first seal convexity 114 may be configured as
Two, fluid sealant 7 can be set to be sealed with door and window hole between two the first seal convexities 114.
Corresponding, for the cooperation clamping with munnion 11, first connector 3 includes the extension that one end is equipped with hanging groove 31a
Socket part 31 and the plug division 32 formed is extended vertically by 31 other end of mounting part, the first card slot 32a is arranged on described insert
Relatively described 31 one end of mounting part of socket part 32.Specifically, the first connector 3 is whole L-shaped, be provided on mounting part 31 notch to
Under the hanging groove 31a that opens, hanging groove 31a may be configured as arc or rectangle, and the present embodiment is preferably arranged to rectangle.Plug division 32 is opposite to hang
31 one end of socket part is provided with the first card slot 32a, and the other end is inserted in the first inserting groove 11a.
Horizontal frame 12 described in the present embodiment includes horizontal frame main body 121 and is extended to form by horizontal 121 end face of frame main body
Second latch 122 and second seal 123, are provided with the second seal convexity 124 in the second seal 123, and described second
The second inserting groove 12a is formed between seal convexity 124 and the horizontal frame main body 121, the socket part 41 is away from the jacking
42 one end of portion is engaged with the 122 and second inserting groove 12a of the second latch, specifically mating connection structure and the first connector
3 is essentially identical, is not described in detail herein.
Wherein, the jacking portion 42 is U-shaped, and its bottom is provided with the mounting hole for being sheathed on the cutting ferrule 5, the socket
41 one end of portion is arranged to and the 42 matched inverted U of jacking portion and is fastened in 42 upper end of jacking portion.It is specifically, fixed
Hole can be placed in adjusting bolt 23 or on cutting ferrule 5, and 23 one end of adjusting bolt is built in jacking portion 42.Socket part 41 is opposite to push up
42 one end of support portion is fastened in 42 upper end of jacking portion in inverted U and cooperation, and between the jacking portion 42 and the socket part 41
Amount of lap is 8~10mm, is preferably 9.5mm.
In order to increase the leakproofness that door and window system is integrated on the present embodiment prefabricated buildings PC components, the present embodiment is described
Interference in seal groove 41a, the seal groove 41a is provided in jacking portion 42 and is embedded with a sealing element 8, the sealing element 8 protrudes
In the seal groove 41a notches and push against in the socket part 41.It can be specifically respectively provided on U-shaped 42 liang of outside side walls in jacking portion
Seal groove 41a, since outside side wall cooperation is connected to socket part 41, so as to be conducive to increase jacking portion 42 and socket part 41 it
Between sealing effect.
And in order to increase the stability of fixed part 22, the fixed part 22 includes one end perpendicular to 21 outer wall of installing frame
The first fixed part 221 and extended to form by vertical first fixed part 221 in 221 free end of the first fixed part second
Fixed part 222.Fixed part 22 can be configured as needed, and the present embodiment is arranged to three.
The specific installation procedure that door and window system is integrated on the prefabricated buildings PC components of the present embodiment is as follows:
(1) prefabricated component cooperation is positioned in concreting mold, casting concrete carries out concrete wall maintenance;
Wherein, the adjusting bolt in prefabricated component can be arranged as required to, you can before concreting set, also can be in concreting
It is set in maintenance processes afterwards, according to being set before concreting, then the screw cap end of adjusting bolt is built in wall, screw thread
End is connected through the installing frame and with a nut, is conducive to increase operation ease.And the present embodiment is preferably being supported
It is set during shield, summarizes damage adjusting bolt to avoid casting process;
(2) socket part of the first connector and the second connector is respectively cooperating with being connected to the munnion in sash and horizontal frame
On, and door and window crimping, adhesive tape cooperation are installed on sash;The connection tool of first connector and the second connector and sash
Body is attached according to above-mentioned clamping structure;
(3) jacking portion is correspondingly arranged in adjusting bolt;Due in actual connection procedure, it is necessary to set cutting ferrule and locking screw
Mother, therefore generally at fixed jacking portion, it is corresponding to be configured cutting ferrule and locking nut,
(4) sash is built in installing frame, up and down adjustment sash, the hanging groove on the first connector is made to coordinate hanging sleeve
In with the corresponding adjusting bolt of munnion, and socket part is made to be engaged socket with jacking portion;
(5) gap between sash and wall is sealed by fluid sealant, fluid sealant preferably uses silicone seal
Glue.In addition, it for the other processes during erection of doors and windows in the usual way, is not described in detail herein.
Door and window system and its installation method are integrated on prefabricated buildings PC components of the present invention, by setting prefabricated component
It is poured with together with concrete, and sets the first connector and the second connector that munnion and horizontal frame are connected one with prefabricated component respectively
It rises, is conducive to increase the leakproofness between sash and prefabricated component, and then add the leakproofness between sash and wall,
Its is easy to operate, water resistance is high, and reduces construction cost.
The specific embodiment of present invention described above, is not intended to limit the scope of the present invention..Any basis
The various other corresponding changes and deformation that the technical concept of the present invention is made, should be included in the guarantor of the claims in the present invention
In the range of shield.