CN205918294U - Integrated window and door system on prefabricated building PC member - Google Patents

Integrated window and door system on prefabricated building PC member Download PDF

Info

Publication number
CN205918294U
CN205918294U CN201620825033.4U CN201620825033U CN205918294U CN 205918294 U CN205918294 U CN 205918294U CN 201620825033 U CN201620825033 U CN 201620825033U CN 205918294 U CN205918294 U CN 205918294U
Authority
CN
China
Prior art keywords
munnion
groove
horizontal frame
seal
window system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620825033.4U
Other languages
Chinese (zh)
Inventor
何贤俊
楼璐
杨龙
程潘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China State Construction Engineering Wuhan Curtain Wall Co Ltd
China Construction Decoration Engineering Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China State Construction Engineering Wuhan Curtain Wall Co Ltd
China Construction Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China State Construction Engineering Wuhan Curtain Wall Co Ltd, China Construction Decoration Engineering Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201620825033.4U priority Critical patent/CN205918294U/en
Application granted granted Critical
Publication of CN205918294U publication Critical patent/CN205918294U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an integrated window and door system on the prefabricated building PC member, it includes, the door and window frame, it includes munnion and horizontal frame, the prefab including the installing frame, is connected in the fixed part of installing frame, and a plurality of adjusting bolt, first connecting piece, its one end are equipped with with munnion cooperation joint, the other end and hang the groove, the second connecting piece, it includes top support portion, and one end and horizontal frame cooperation joint, other end cooperation cutting ferrule an in portion of cup jointing of support portion, it pours an organic whole through setting up the prefab with concrete wall, is connected as an organic wholely with the prefab munnion and horizontal frame respectively through third connecting piece and fourth connecting piece. The utility model discloses an it pours with the concrete together to set up the prefab to setting up first connecting piece and second connecting piece and being connected munnion and horizontal frame together with the prefab respectively, it is favorable to increasing the leakproofness between door and window frame and the prefab, and then has increased the leakproofness between door and window frame and the wall body, its easy operation, waterproof performance height, and reduced construction cost.

Description

Integrated door and window system on prefabricated buildings pc component
Technical field
This utility model is related to a kind of door and window technology, especially relates to integrated door and window system on a kind of prefabricated buildings pc component System.
Background technology
At present, mainly with two kinds of installation methods, one kind is that dry method is installed to sash, and it mainly passes through to make four side steel Auxiliary frame is fixed on window opening inwall, then surrounding dress stone material or aluminium sheet, then door and window is fixed on steel frame by securing member, week Enclose and break fluid sealant and process, its good sealing effect, water resistance are high, but assembling is loaded down with trivial details, relatively costly, scalable amount is little.Another Planting is that wet method is installed, and sash is fixed on concrete wall by it by upper wall piece, adopts foaming agent between body of wall and sash Filling, is then closed up with waterproof mortar again, completes sash and installs, and it is easy and simple to handle, be easy to grasp, cost is relatively low, but It is that waterproof controllability is poor, cement mortar is easily accessible it is difficult to cleaning in cavity, and surface easily causes material damage.
Utility model content
The purpose of this utility model is to overcome above-mentioned technical deficiency, proposes one kind and can solve the problem that door and window peace in prior art Dress complexity, poor controllability, water proofing property are low, integrated door and window system on high cost prefabricated buildings pc component.
For reaching above-mentioned technical purpose, the technical solution of the utility model provides integrated on a kind of prefabricated buildings pc component Door and window system, including,
Sash, it includes the munnion being vertically arranged and horizontally disposed horizontal frame;
Prefabricated component, it includes fitting in the installing frame of window opening inwall, and one end is connected to described installing frame outer wall, the other end prolongs Extend the fixed part in body of wall, and be uniformly arranged along described installing frame length bearing of trend and respectively with described munnion and horizontal frame phase Corresponding multiple regulating bolt;
First connector, its one end is formed with hanging sleeve in described regulating bolt with described munnion cooperation clamping, the other end Hanging groove;And
Second connector, it includes the jacking portion being fixedly connected with described regulating bolt, and one end and described horizontal frame cooperation Clamping, other end cooperation are fastened in the socket part in described jacking portion.
Preferably, described prefabricated component also includes being sheathed on the cutting ferrule of described regulating bolt, and described hanging groove hanging sleeve is in described On cutting ferrule.
Preferably, described munnion includes munnion main body, and extends, by described munnion main body end face, the first latch being formed And first seal, described first seal is provided with the first seal convexity, described first seal convexity and described munnion master It is formed with the first inserting groove, described first connector is provided with, near middle part, first matching with described first latch between body Draw-in groove, described first connector is inserted in described first inserting groove away from described hanging groove one end fits.
Preferably, described first connector includes one end and is provided with the mounting part of hanging groove and is hung down by the described mounting part other end The straight Plug Division extending formation, described first draw-in groove is located at described Plug Division described mounting part one end relatively.
Preferably, described jacking portion is in u-shaped, and its bottom is provided with the fixing hole being sheathed on described cutting ferrule, described socket Portion one end is set to the inverted u shape being matched with described jacking portion and is fastened in described jacking portion upper end.
Preferably, described horizontal frame includes horizontal frame main body, and extends, by described horizontal frame main body end face, the second latch being formed And second seal, described second seal is provided with the second seal convexity, described second seal convexity and described horizontal frame master It is formed with the second inserting groove, described socket part is away from described jacking portion one end and described second latch and the second inserting groove between body Match.
Preferably, described jacking portion is provided with seal groove, interference in described seal groove is embedded with a sealing member, described close Sealing protrudes from described seal groove notch and pushes against in described socket part.
Preferably, described fixed part includes one end perpendicular to the first fixed part of described installing frame outer wall and by described first Vertically described first fixed part extends the second fixed part being formed to fixed part free end.
Integrated door and window system on prefabricated buildings pc component described in the utility model, it passes through to arrange prefabricated component and concrete Pour together, and the first connector is set and munnion and horizontal frame are connected with prefabricated component by the second connector respectively, it is favourable Sealing between increase sash and prefabricated component, and then increased the sealing between sash and body of wall, its operation letter Single, water resistance is high, and reduces construction cost.
Brief description
Fig. 1 is the attachment structure schematic diagram of integrated door and window system on prefabricated buildings pc component of the present utility model;
Fig. 2 is the a-a direction view of Fig. 1 of the present utility model;
Fig. 3 is the b-b direction view of Fig. 1 of the present utility model;
Fig. 4 is the perspective view of the first connector of the present utility model.
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage become more apparent, below in conjunction with accompanying drawing and enforcement Example, is further elaborated to this utility model.It should be appreciated that specific embodiment described herein is only in order to explain This utility model, is not used to limit this utility model.
Refer to Fig. 1~4, on the prefabricated buildings pc component of the present embodiment, integrated door and window system includes,
Sash 1, it includes the munnion 11 being vertically arranged and horizontally disposed horizontal frame 12;
Prefabricated component 2, it includes the installing frame 21 fitting in window opening inwall, and one end is connected to described installing frame 21 outer wall, another One end extends to the fixed part 22 in body of wall 6, and be uniformly arranged along described installing frame 21 length bearing of trend and respectively with described Munnion 11 and the corresponding multiple regulating bolts 23 of horizontal frame 12;
First connector 3, its one end is formed with hanging sleeve in described regulating bolt with described munnion 11 cooperation clamping, the other end 23 hanging groove 31a;And
Second connector 4, it includes the jacking portion 41 being fixedly connected with described regulating bolt 23, and one end and described horizontal frame 12 cooperation clampings, other end cooperation cutting ferrule 5 are in the socket part 42 in described jacking portion 41.
Specifically, prefabricated component 2 can coordinate and be positioned in concreting mould, and connects as one with concrete wall 6, Fixed part 22 is embedded in body of wall 6, is fitted in installing frame 21 on the inwall of window opening, in order to the installation of sash 1.Its In, the regulating bolt 23 in prefabricated component 2 can be arranged as required to, you can arrange before concreting, also can pour in concrete Arrange in maintenance processes after building, arrange according to before concreting, then the screw cap end of regulating bolt 23 is built in body of wall 6th, the end of thread is passed through described installing frame 21 and is connected with a nut screw connection, and it is conducive to increasing operation ease.Wherein, this enforcement Example is arranged preferably in maintenance processes, to avoid casting process to collect damage regulating bolt 23.
The quantity of regulating bolt 23 is configured as needed, because munnion 11 is generally symmetrically arranged two, each Munnion 11 is corresponding with two regulating bolts 23, the stability to increase munnion 11;Corresponding horizontal frame 12 is also two, horizontal frame It is typically based on length during 12 setting to be configured, but each horizontal frame 12 is at least matched with two regulating bolts 23, to keep away Shake during exempting to use.
Lead on screw rod in order to avoid the first connector 3 is directly contacted with the screw rod of regulating bolt 23 with the second connector 4 The damage of screw thread, prefabricated component 2 described in the present embodiment also includes being sheathed on the cutting ferrule 5 of described regulating bolt 23, and described hanging groove 31a Hanging sleeve, on described cutting ferrule 5, can be embedded in installing frame 21, also directly can abut installing frame 21 in one end during cutting ferrule 5 setting.
For the ease of the clamping of sash 1 and the first connector 3, the second connector 4, described in the present embodiment, munnion 11 includes Munnion main body 111, and the first latch 112 being formed and first seal 113, institute are extended by described munnion main body 111 end face State and the first seal convexity 114 be provided with first seal 113, described first seal convexity 114 and described munnion main body 111 it Between be formed with the first inserting groove 11a, described first connector 3 is provided near middle part and to be matched with described first latch 112 First draw-in groove 32a, described first connector 3 is inserted in described first inserting groove 11a away from described hanging groove 31a one end fits. Specifically, the outer rim of the relatively outdoor end face of munnion main body 111 extends to door and window hole inwall and forms the first latch 112, and munnion Relatively horizontal frame 12 side this end face vertical of the relatively outdoor end face of main body 111 extends and forms first seal 113, and this is first close Sealing 113 door and window hole inwall side relatively extends and forms the first seal convexity 114, and the first seal convexity 114 may be configured as Two, fluid sealant 7 and the sealing of door and window hole can be set between two the first seal convexities 114.
Corresponding, for the cooperation clamping with munnion 11, described first connector 3 includes the extension that one end is provided with hanging groove 31a Socket part 31 and extend vertically the Plug Division 32 being formed by described mounting part 31 other end, described first draw-in groove 32a inserts located at described Socket part 32 described mounting part 31 one end relatively.Specifically, the first connector 3 is overall is in l type, mounting part 31 is provided with notch to Under the hanging groove 31a that opens, hanging groove 31a may be configured as arc or rectangle, and the present embodiment is preferably arranged to rectangle.Plug Division 32 hangs relatively Socket part 31 one end is provided with the first draw-in groove 32a, and the other end is inserted in the first inserting groove 11a.
Horizontal frame 12 described in the present embodiment includes horizontal frame main body 121, and is extended by described horizontal frame main body 121 end face and to be formed Second latch 122 and second seal 123, described second seal 123 is provided with the second seal convexity 124, and described second It is formed with the second inserting groove 12a, described socket part 42 is away from described jacking between seal convexity 124 and described horizontal frame main body 121 Matched with described second latch 122 and the second inserting groove 12a in portion 41 one end, its be specifically connected structure and first connector 3 is essentially identical, and here is not described in detail.
Wherein, described jacking portion 41 is in u-shaped, and its bottom is provided with the fixing hole being sheathed on described cutting ferrule 5, described socket Portion 42 one end is set to the inverted u shape being matched with described jacking portion 41 and is fastened in described jacking portion 41 upper end.Specifically, fixing Hole can be placed in regulating bolt 23 or on cutting ferrule 5, and regulating bolt 23 one end is built in jacking portion 41.Socket part 42 is pushed up relatively Support portion 41 one end is in inverted u shape and coordinates and be fastened in jacking portion 41 upper end, and between described jacking portion 41 and described socket part 42 Amount of lap is 8~10mm, preferably 9.5mm.
In order to increase the sealing of integrated door and window system on the present embodiment prefabricated buildings pc component, the present embodiment is described Seal groove 41a is provided with jacking portion 41, interference in described seal groove 41a is embedded with a sealing member 8, described sealing member 8 projects In described seal groove 41a notch and push against in described socket part 42.Specifically can be respectively provided with 41 liang of u-shaped jacking portion outside side wall Seal groove 41a, because the cooperation of this outside side wall is connected to socket part 42, thus be conducive to increasing jacking portion 41 and socket part 42 it Between sealing effectiveness.
And in order to increase the stability of fixed part 22, described fixed part 22 includes one end perpendicular to described installing frame 21 outer wall The first fixed part 221 and by described first fixed part 221 free end, vertically described first fixed part 221 extends second being formed Fixed part 222.Fixed part 22 can be configured as needed, and the present embodiment is set to three.
On the prefabricated buildings pc component of the present embodiment, the concrete installation procedure of integrated door and window system is as follows:
(1) prefabricated component cooperation is positioned in concreting mould, casting concrete, carries out concrete wall maintenance; Wherein, the regulating bolt in prefabricated component can be arranged as required to, you can before concreting setting, also can be in concreting Arrange in maintenance processes afterwards, arrange according to before concreting, then the screw cap end of regulating bolt is built in body of wall, screw thread End is connected through described installing frame and with a nut screw connection, and it is conducive to increasing operation ease.And the present embodiment is preferably being supported Arrange during shield, to avoid casting process to collect damage regulating bolt;
(2) socket part of the first connector and the second connector is respectively cooperating with being connected to munnion and the horizontal frame in sash On, and door and window line ball, adhesive tape cooperation are installed on sash;First connector and the second connector are had with the connection of sash Body is attached according to above-mentioned interface arrangment;
(3) jacking portion is correspondingly arranged in regulating bolt;Due in actual connection procedure, needing to arrange cutting ferrule and locking screw Mother, therefore typically when fixing jacking portion, corresponding is configured cutting ferrule and locking nut,
(4) sash is built in installation inframe, up-down adjustment sash, makes the hanging groove on the first connector coordinate hanging sleeve In the regulating bolt corresponding with munnion, and socket part is made to match with jacking portion socket;
(5) pass through fluid sealant by the sealing gap between sash and body of wall, fluid sealant preferably employs silicone seal Glue.Additionally, for other operations during erection of doors and windows in the usual way, here is not described in detail.
Integrated door and window system on prefabricated buildings pc component described in the utility model, it passes through to arrange prefabricated component and concrete Pour together, and the first connector is set and munnion and horizontal frame are connected with prefabricated component by the second connector respectively, it is favourable Sealing between increase sash and prefabricated component, and then increased the sealing between sash and body of wall, its operation letter Single, water resistance is high, and reduces construction cost.
The above specific embodiment of the present utility model, does not constitute the restriction to this utility model protection domain. Any according to technology design of the present utility model made various other corresponding change with deformation, should be included in this practicality In new scope of the claims.

Claims (8)

1. on a kind of prefabricated buildings pc component integrated door and window system it is characterised in that include,
Sash, it includes the munnion being vertically arranged and horizontally disposed horizontal frame;
Prefabricated component, it includes fitting in the installing frame of window opening inwall, and one end is connected to described installing frame outer wall, the other end extends to Fixed part in body of wall, and be uniformly arranged along described installing frame length bearing of trend and corresponding with described munnion and horizontal frame respectively Multiple regulating bolts;
First connector, its one end is formed with hanging sleeve in the hanging groove of described regulating bolt with described munnion cooperation clamping, the other end; And
Second connector, it includes the jacking portion being fixedly connected with described regulating bolt, and one end and described horizontal frame cooperation clamping, Other end cooperation is fastened in the socket part in described jacking portion.
2. on prefabricated buildings pc component according to claim 1 integrated door and window system it is characterised in that described prefabricated component Also include being sheathed on the cutting ferrule of described regulating bolt, and described hanging groove hanging sleeve is on described cutting ferrule.
3. on prefabricated buildings pc component according to claim 1 and 2 integrated door and window system it is characterised in that described perpendicular Frame includes munnion main body, and extends the first latch being formed and first seal by described munnion main body end face, and described first First seal convexity is provided with sealing member, between described first seal convexity and described munnion main body, is formed with the first grafting Groove, described first connector is provided with the first draw-in groove matching with described first latch, described first connector near middle part It is inserted in described first inserting groove away from described hanging groove one end fits.
4. on prefabricated buildings pc component according to claim 3 integrated door and window system it is characterised in that described first even Fitting includes one end and is provided with the mounting part of hanging groove and extends vertically, by the described mounting part other end, the Plug Division being formed, and described One draw-in groove is located at described Plug Division described mounting part one end relatively.
5. on prefabricated buildings pc component according to claim 4 integrated door and window system it is characterised in that described jacking portion In u-shaped, and its bottom is provided with the fixing hole being sheathed on described cutting ferrule, and described socket part one end is set to and described jacking portion phase Cooperation inverted u shape and be fastened in described jacking portion upper end.
6. on prefabricated buildings pc component according to claim 5 integrated door and window system it is characterised in that described horizontal frame bag Include horizontal frame main body, and the second latch being formed and second seal, described second sealing are extended by described horizontal frame main body end face Second seal convexity is provided with part, between described second seal convexity and described horizontal frame main body, is formed with the second inserting groove, institute State socket part to match with described second latch and the second inserting groove away from described jacking portion one end.
7. on the prefabricated buildings pc component according to claim 5 or 6 integrated door and window system it is characterised in that described top Support is provided with seal groove in portion, and interference in described seal groove is embedded with a sealing member, and described sealing member protrudes from described seal groove Notch simultaneously pushes against in described socket part.
8. on prefabricated buildings pc component according to claim 7 integrated door and window system it is characterised in that described fixed part Including one end perpendicular to the first fixed part of described installing frame outer wall and by described first fixed part free end vertically described first Fixed part extends the second fixed part being formed.
CN201620825033.4U 2016-08-02 2016-08-02 Integrated window and door system on prefabricated building PC member Withdrawn - After Issue CN205918294U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620825033.4U CN205918294U (en) 2016-08-02 2016-08-02 Integrated window and door system on prefabricated building PC member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620825033.4U CN205918294U (en) 2016-08-02 2016-08-02 Integrated window and door system on prefabricated building PC member

Publications (1)

Publication Number Publication Date
CN205918294U true CN205918294U (en) 2017-02-01

Family

ID=57869997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620825033.4U Withdrawn - After Issue CN205918294U (en) 2016-08-02 2016-08-02 Integrated window and door system on prefabricated building PC member

Country Status (1)

Country Link
CN (1) CN205918294U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088927A (en) * 2016-08-02 2016-11-09 武汉中建幕墙有限公司 Integrated door and window system and installation method thereof on prefabricated buildings PC component

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088927A (en) * 2016-08-02 2016-11-09 武汉中建幕墙有限公司 Integrated door and window system and installation method thereof on prefabricated buildings PC component

Similar Documents

Publication Publication Date Title
CN106088927B (en) Door and window system and its installation method are integrated on prefabricated buildings PC components
CN206737222U (en) Cell cube section curtain wall installing device
CN103243890B (en) Heat insulating decorative board hanging fastener component and mounting process thereof
CN208792737U (en) For hanging the detachable connecting part of external platform hanging girder steel
CN205918294U (en) Integrated window and door system on prefabricated building PC member
CN105350860B (en) The door and window and door and window integral installation method installed by spring catch nail type auxiliary frame
CN207003902U (en) A kind of decorative panel suspension member and Side fascia
CN109750942A (en) A kind of the door and window pre-buried structure and its construction installation method of assembled architecture
CN210459667U (en) Open composite aluminum plate inlays construction system of window
CN216276959U (en) A scalable shutoff line box for construction of making level of wall
CN106760341B (en) Heat-insulation decorative hanging plate, heat-insulation decorative wall and production method of heat-insulation decorative wall
CN210264332U (en) Mounting structure of aluminum alloy door and window
CN206337765U (en) Insulation and decoration hanging plate and heat-preserving decorating wall
CN2228502Y (en) Light insulation wall plate
CN204476179U (en) Auxiliary frame construction and installation fixture
CN217924592U (en) Ultra-thin stone integrated plate installation connection structure of outer wall building
CN207377132U (en) A kind of construction safety protection supporting frame
CN207017511U (en) A kind of ceramic plate curtain wall with splash guard installation connects system
CN209211724U (en) Clay plate curtain wall hanging structure
CN205224955U (en) Outer windowsill drapes over one's shoulders water installation and uses its window
CN110445072B (en) Construction method of cable support
CN110905199A (en) Construction method of aluminum alloy formwork diagonal bracing device
CN204476177U (en) Door and window auxiliary frame construction and installation matching fixing part
CN209413066U (en) A kind of assembled curtain wall bottom closing-in structure
CN215213012U (en) Treat mounting structure between fixed frame and wall body

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170201

Effective date of abandoning: 20180601

AV01 Patent right actively abandoned