CN106049707A - Prefabricated wall body, prefabricated house building and construction method - Google Patents

Prefabricated wall body, prefabricated house building and construction method Download PDF

Info

Publication number
CN106049707A
CN106049707A CN201610437218.2A CN201610437218A CN106049707A CN 106049707 A CN106049707 A CN 106049707A CN 201610437218 A CN201610437218 A CN 201610437218A CN 106049707 A CN106049707 A CN 106049707A
Authority
CN
China
Prior art keywords
wall
plate
link slot
connection
wall board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610437218.2A
Other languages
Chinese (zh)
Other versions
CN106049707B (en
Inventor
黄昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN106049707A publication Critical patent/CN106049707A/en
Application granted granted Critical
Publication of CN106049707B publication Critical patent/CN106049707B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/612Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B2001/6195Connections for building structures in general of slab-shaped building elements with each other the slabs being connected at an angle, e.g. forming a corner

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A prefabricated wall body comprises a wallboard body. A plurality of vertical supporting connection steel tubes are arranged in the wallboard body. A prefabricated house building comprises a foundation, the wall bodies connected with the foundation and a roof assembly arranged on the wall bodies. A plurality of connection steel bars are arranged on the foundation. Through fast cooperation connection between the prefabricated wall body and connection wall bodies, the installation speed is high, labor is saved, the cost is reduced, and the connection strength is improved. In addition, the supporting connection steel tubes are additionally arranged in the wall body, the strength and bearing performance of the wall body are improved, and thus the structure of the wall body is optimized to a certain extent. Through a construction method provided by the invention, the assembling process of the building is quite simple and conveniently, and fast and convenient assembly is achieved.

Description

Prefabricated body of wall, prefabricated building construction and method of construction
Technical field:
The present invention relates to prefabricated body of wall.The invention still further relates to prefabricated building construction and the construction side in prefabricated house Method.
Background technology:
Existing prefabricated house, its body of wall is provided with multiple vertical installing hole, makes itself and house by connecting reinforcing bar Basis or floor grafting are connected, it is necessary to consider the load-bearing problem of body of wall building large-scale or high-story house when, if desired will Body of wall does and does greatly thick to promote its load-bearing property, so not only increases production cost, and makes to produce and under installation rate Fall, and not readily transportable.
Summary of the invention:
For improving the load-bearing property of body of wall in prior art, the invention provides prefabricated body of wall.Corresponding to this, the present invention Additionally provide prefabricated building construction and the method for construction of prefabricated building construction utilizing this body of wall quick assembling.
Prefabricated body of wall, including wall board body, is provided with some vertical support joint steel pipes in described wall board body.
Prefabricated building construction, including basis and the body of wall that basis connects, is located at the roof assembly above body of wall, described On the basis of be provided with some connection reinforcing bars, it is characterised in that described body of wall is described prefabricated body of wall.
The method of construction of prefabricated building construction, comprises the steps;
A, first complete the foundation construction in house;
B, by the vertical installing hole on body of wall with on the basis of connection reinforcing bar match by body of wall plug-in mounting on the basis of;
C, being connected with body of wall by body of wall, its connected mode includes;
C1, body of wall connect with body of wall " T-shaped ";The connection noose grafting of the first face wall plate body leading flank of traverse is entered another In the link slot of mutually isostructural wall board body end, in perpendicular joint bar is inserted to vertical jack and/or;
C2, body of wall connect with body of wall " yi word pattern ";The end of wall board body is connected noose and another mutually isostructural wallboard The end phase female connector of body connects, in perpendicular joint bar is inserted to vertical jack and/or;
C3, body of wall connect with body of wall " cross ";The connection noose grafting of the first face wall plate body leading flank of traverse is entered In the link slot of second mutually isostructural wall board body end, perpendicular joint bar is inserted in vertical jack, pours into a mould within connecting cavity Concrete grout;Adapter sleeve by the link slot of the 3rd mutually isostructural wall board body end Yu the first wall board body trailing flank of traverse Rope connects, and is inserted in vertical jack by perpendicular joint bar;
C4, body of wall connect with body of wall " L font ";By on the left of wall board body or the connection noose grafting of right flank enters the second face wall In the link slot of plate body end, perpendicular joint bar is inserted in vertical jack;
D, connecting plate is arranged on the adjacent supports connecting tube upper end of connected two bodies of wall, and by connecting plate with support connecting tube Upper steel plate welding, be installed on outside body of wall upper end and less than the position of connecting plate, lay steel plate and make outside body of wall Upper end flushes, and toward vertical installing hole and is connected cavity cast concrete grout with the hole on connecting plate by steel plate;
E, the vertical installing hole of floor is directed at the connection reinforcing bar stretched out from body of wall upper end make floor connect with body of wall and/ Or;
E1, the connection reinforcement welding that the floor being even connected connects the distribution of end mutual dislocation get up, then toward in connecting groove Cast concrete grout;
F, by the vertical installing hole on the first connecting plate of roof connecting plate and the second connecting plate with reach floor upper end Connection reinforcing bar aligned fit, the first connecting plate and the second connecting plate are installed above body of wall, toward the first connecting plate and second Cast concrete grout in the vertical installing hole of connecting plate;
G, on the first connecting plate and the second connecting plate, lay roof swash plate, and contiguous block is arranged on roof swash plate and the Make roof swash plate and the second connecting plate be connected in the connection draw-in groove of two connecting plates, contiguous block is arranged between adjacent roof swash plate Connect in draw-in groove and make adjacent roof swash plate be connected.
The embodiment of the present invention, is connected with quick-fit between connecting wall by prefabricated body of wall, and installation rate is fast and saves Manpower, reduces cost and improves bonding strength, additionally by having additional support joint steel pipe in body of wall, improve body of wall Intensity, load-bearing property, support joint steel pipe and can be used for reinforcing bar vertical and connect it can also be used to laterally connecting between body of wall and body of wall Connect, meanwhile, support joint steel pipe and be also used as to bear the vertical applied force of body of wall, support can be set according to the load-bearing environment of body of wall The quantity of joint steel pipe, relatively lightweight that the material of body of wall then can do and the overall stress that do not affects body of wall so that the knot of body of wall Structure has optimized, and can alleviate the weight of body of wall and can guarantee that the load-bearing property that body of wall has had, facilitating the transport of body of wall.
Accompanying drawing illustrates:
For the technical scheme being illustrated more clearly that in the embodiment of the present invention, in embodiment being described below required for make Accompanying drawing be briefly described, it should be apparent that, below describe in accompanying drawing be only some embodiments of the present invention, for From the point of view of those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other according to these accompanying drawings Accompanying drawing.
The structural representation of Fig. 1 prefabricated of the present invention body of wall;
Fig. 2 prefabricated of the present invention body of wall internal structure schematic diagram;
Fig. 3 prefabricated of the present invention body of wall and connecting wall attachment structure schematic diagram;
Fig. 4 body of wall of the present invention is connected floor map with body of wall L-type;
Fig. 5 body of wall of the present invention is T-shaped with body of wall is connected floor map;
Fig. 6 body of wall of the present invention is cross with body of wall is connected floor map;
Fig. 7 body of wall of the present invention is connected floor map with body of wall yi word pattern;
Fig. 8 prefabricated of the present invention body of wall and connecting structure of wall schematic diagram;
Fig. 9 is prefabricated building construction internal structure schematic diagram one;
Figure 10 is prefabricated building construction internal structure schematic diagram two;
Figure 11 is base plate and connecting structure of wall schematic diagram;
Figure 12 is floor and connecting structure of wall schematic diagram;
Figure 13 is floor and floor connection structure schematic diagram;
Figure 14 is the structural representation one of roof assembly;
Figure 15 is the structural representation two of roof assembly;
Figure 16 is prefabricated house architectural structure schematic diagram.
Detailed description of the invention:
In order to make technical problem solved by the invention, technical scheme and beneficial effect clearer, below in conjunction with Drawings and Examples, are further elaborated to the present invention.Should be appreciated that specific embodiment described herein is only used To explain the present invention, it is not intended to limit the present invention.
As shown in Figure 1 and Figure 2, prefabricated body of wall, including wall board body 1, in described wall board body, it is provided with some vertical supports Joint steel pipe 3.Being connected with quick-fit between connecting wall by prefabricated body of wall, installation rate is fast and saves manpower, reduces Cost and improve bonding strength, additionally by having additional support joint steel pipe in body of wall, improves the intensity of body of wall, bearing Can, support joint steel pipe and can be used for reinforcing bar vertical and connect it can also be used to lateral connection between body of wall and body of wall, meanwhile, Support joint steel pipe, also with being used as to bear the vertical applied force of body of wall, can arrange according to the load-bearing environment of body of wall and support joint steel pipe Quantity can arrange the quantity supporting joint steel pipe according to the load-bearing environment of body of wall so that the structure of body of wall has optimized, and can subtract The weight of light body of wall and can guarantee that the load-bearing property that body of wall has had, facilitates the transport of body of wall.
Further, depending on the load that in body of wall, the quantity body of wall of laying support joint steel pipe is to be born, pre-in body of wall The support joint steel pipe buried is in the installation process in house, and the connection reinforcing bar on base plate can be inserted in support joint steel pipe and fill Note concrete forms steel pipe column so that it is can bear structure stress.When steel pipe column constructs as main stress, the maintenance materials of body of wall Then can make lighter material, facilitate the transport of body of wall and reduce cost, becoming economically for outlet house can Energy.
Yet further, as shown in Figure 1 and Figure 2, described wall board body left end and/or right-hand member are provided with vertical link slot, described wall It is located at least at the link slot 201 in plate body 1 and is provided with described support joint steel pipe 3, be provided with the wall of identical connecting groove structure Plate body can form one each other by link slot docking and connect cavity, the connection between aspect wall board body and wall board body.
Further, as shown in Figure 1 and Figure 2, some connection nooses stretched out in link slot it are provided with at described link slot 4, described connection noose 4 overlaps the support joint steel pipe 3 being locked at link slot from top to bottom, and its external part at link slot is One annular running-on.The mutually isostructural wall board body of said two can make two wall board bodies be connected by connecting noose, two identical structures The link slot docking of wall board body end formed and connect cavity, connect the connection noose in cavity mutually in the shape that is vertically dislocatedly distributed Become a vertical jack, in inserting in vertical jack by a vertical joint bar, make two wall board bodies be connected.Described connection noose leads to 4 crosses one Steel cable clamp 403 is dead by being wrapped in the one end supported on joint steel pipe so that it is connect relatively reliable, safety.
The most further, as shown in Figure 1 and Figure 2, be provided with at the notch of described link slot be distributed from top to bottom some laterally The dowel arranged.
The most yet further, as shown in Figure 1 and Figure 2, the front side of described wall board body and/or rear side also are provided with link slot, described Being provided with some connection nooses being distributed from top to bottom in link slot, described connection noose overlaps from top to bottom and is locked in support joint steel pipe On, and reach in link slot wall board body, its external part is an annular running-on.
When said two wall board body is connected with each other, the front side of wall board body and/or the link slot of rear side and another wall board body end The link slot docking in portion is formed and connects cavity, connects the connection noose in cavity with dowel mutually in the formation that is vertically dislocatedly distributed One vertical jack, makes two wall board bodies be connected in inserting in vertical jack by a vertical joint bar.
Specifically, as shown in Figure 1 and Figure 2, be located at the link slot of existing body of wall the front side of body of wall near middle part compared with, have It is beneficial to improve the intensity of body of wall and improve the attachment structure of body of wall, improves the intensity of its junction, the body of wall of particularly more than 3 Connecting, existing wall connecting mode is, is combined by the connection end of 3 bodies of wall, makes it even by irrigating concrete grout Connect termination to be combined, contrast with existing connected mode, the connection that multiple bodies of wall can be connected by body of wall provided by the present invention End separately, can dock simultaneously at the link slot on the left side of body of wall or right side with another body of wall, by being located at the connection on front side of body of wall Noose and the 3rd piece of body of wall docking, it is achieved body of wall connects two-by-two, it is ensured that each connection position only connects two bodies of wall, is effectively improved The intensity of junction, it is ensured that firm between body of wall with body of wall is connected.
The most specifically, as it is shown in figure 1, be provided with connect noose link slot 401 degree of depth be described in be provided with dowel link slot The 1/5 to 1/3 of 201 degree of depth.
The most specifically, as shown in Figure 1, shown in Figure 5, described dowel 202 is U-shaped dowel, its opening direction and link slot phase Right, and the two ends of U-shaped dowel are located in wall board body, 3 to 5 times of a length of link slot degree of depth at its two ends.Make dowel Be connected more firm with between body of wall, bonding strength effectively promotes.
Further, as shown in Figure 1 and Figure 2, vertical grooved steel plate 204, described grooved steel plate it are provided with in described link slot 204 opening part both sides are provided with some screens 203 from top to bottom, and described dowel 202 is fastened in screens.Make dowel and wall Connecting more firm between plate body, bonding strength effectively promotes.
The most further, as shown in Figure 1 and Figure 2, described support connecting tube 3 includes the upper steel plate being located at wall board body 1 upper end 301, be located at the lower steel plate 302 of wall board body lower end be located at wall board body in and the steel pipe 303 that is connected with upper steel plate, lower steel plate, institute Being provided with the through hole of through upper steel plate and lower steel plate in stating steel pipe, the upper end, joint of described two connected wall board bodies is provided with a connection Steel plate 5.Effectively promote load-bearing property and the bonding strength of wall board body.
Yet further, as shown in Figure 9, Figure 10, when wall board body installation, on peripherally located wall board body, on it End face is also equipped with collar tie beam steel plate 502, and described collar tie beam steel plate 502 is carried out with being located in wall board body the upper steel plate supporting joint steel pipe Effectively welding makes the upper surface of wall board body keep flushing, convenient other house assemblies and guaranteed to the quality in house installed.
Further, as shown in Fig. 4, Fig. 5, Fig. 6, described wall board body 1 is in the junction near wall board body with wall board body Being additionally provided with assistant reinforcement muscle, described assistant reinforcement muscle includes the truss bars 7 be vertically located in the first wall board body and horizontal lacing wire 8.Described its cross section of horizontal lacing wire is S type, and the left side of horizontal lacing wire hooks on the left end of reinforcement, the right side of horizontal lacing wire hook in On the right-hand member of reinforcement, described truss bars is vertically arranged and the distribution triangular in shape in body of wall three perpendicular steel pipes, described Being provided with the joint steel pipe of Sawtooth connection between first steel pipe and the second steel pipe, described first steel pipe and the 3rd steel pipe the most also set Having the joint steel pipe that zigzag is distributed, the weight capacity being effectively improved body of wall is effectively improved and bonding strength.
Further, as shown in Figure 1 and Figure 2, described wall board body 1 is additionally provided with the vertical hole 101 running through its upper and lower end face. Facilitate the connection of wall board body and base plate.
The most yet further, as shown in Fig. 8 to Figure 16, present invention also offers prefabricated building construction, including basis 11, With the body of wall that basis connects, be located at the roof assembly 31 above body of wall, described basic 11 are provided with some connection reinforcing bars 111, institute Stating body of wall is described prefabricated body of wall.Utilize prefabricated body of wall, can quickly build house.
Specifically, as shown in Figures 4 to 7, it is provided with Leakproof strip at described body of wall and wall connecting, makes the connection between body of wall more Firm.
The most specifically, as shown in Figure 11 to Figure 16, above described body of wall and between roof assembly 31, it is additionally provided with floor 41, institute Stating floor and be provided with the vertical installing hole 101 of its upper/lower terminal through, the connection reinforcing bar 111 on described basic 11 is by running through Body of wall makes floor connect with body of wall with the vertical installing hole 101 on floor 41, and described connection reinforcing bar 111 runs through floor and reaches Connect with roof assembly 31 above floor 41.For providing convenient and firm structure connecting between wall board body and floor.
The most specifically, as shown in Figure 11, Figure 12, described floor 41 is provided with the floor being connected for floor 41 with floor 41 Attachment structure, described floor connection structure includes that being located at floor connects the dowel 411 on end and be located on floor connection end Flange 412, described two floors connect, and form a connecting groove 413, described dowel position above two flanges that its end that connects is relative Dowel in connecting groove and on two floors is dislocatedly distributed.There is provided conveniently for connecting between floor and floor and consolidate Structure.
Further, as shown in Figure 13, Figure 14, described roof assembly 31 includes that being located at the roof above floor 41 connects Plate, at least 2 roof swash plates 313 being located at above roof connecting plate, the lower end of described roof connecting plate also is provided with vertically installing Hole, described in reach above floor connect reinforcing bar extend into the vertical installing hole of roof connecting plate in make roof connecting plate and building Plate is connected.For providing convenient and firm structure connecting between floor and roof assembly.
Specifically, as shown in figure 14, described roof connecting plate includes being vertically arranged first above floor with ridge direction Connecting plate 311 and be set in parallel in the second connecting plate 312 above floor, described first connecting plate 311 and with ridge direction The upper end of two connecting plates 312 is equipped with the inclined-plane coordinated with roof swash plate 313, if the medial surface of described second connecting plate is provided with Dry connects a draw-in groove 314, and the inner side of described roof swash plate also is provided with several and connects draw-in groove 314, one part connect draw-in groove with The Connection Card slot fit of the inner side of the second connecting plate, another part connects draw-in groove and the company on another coupled roof swash plate Connect draw-in groove to match, in described connection draw-in groove, be provided with contiguous block 315.Convenient and firm knot is provided connecting between roof assembly Structure.
The method of construction of described prefabricated building construction, comprises the steps;
A, first complete the foundation construction in house;
B, matched body of wall plug-in mounting to base with the connection reinforcing bar 111 on basis 11 by vertical installing hole on body of wall 101 On plinth 11;
C, body of wall is connected with body of wall, including following connected mode;
C1, body of wall connect with body of wall " T-shaped ";Connection noose 4 grafting of wall board body 1 leading flank of traverse is entered another structure In the link slot of identical wall board body 1 end, in perpendicular joint bar 102 is inserted to vertical jack and/or;
C2, body of wall connect with body of wall " yi word pattern ";The end of wall board body 1 is connected the wall that noose 4 is identical with another structure The end phase female connector 4 of plate body 1 connects, perpendicular joint bar is inserted 102 in vertical jack and/or;
C3, body of wall connect with body of wall " cross ";The connection noose of wall board body 1 leading flank of traverse is inserted 4 accesses second In the link slot of block structure identical wall board body 1 end, perpendicular joint bar is inserted 102 in vertical jack, mixed toward cast in connecting cavity Solidifying soil paste;Adapter sleeve by the link slot of wall board body 1 end identical for the 3rd block structure Yu the first wall board body 1 trailing flank of traverse Rope 4 connects, perpendicular joint bar is inserted to vertical jack entoplasm and/or;
C4, body of wall connect with body of wall " L font ";Connection noose 4 grafting of wall board body 1 leading flank is entered wall board body 1 end Link slot in, vertical joint bar 102 is inserted to vertical jack and/or;
D, connecting plate 5 is arranged on adjacent supports connecting tube 3 upper end of connected two bodies of wall, and by connecting plate 5 and the company of support The upper steel plate 301 of adapter welds, be installed on outside body of wall upper end its less than the position of connecting plate, lay steel plate and make outside The upper end of body of wall flushes, and pours into a mould concrete grout by steel plate and the hole on connecting plate toward vertical installing hole with in being connected cavity;
E, the vertical installing hole of floor 41 is directed at the connection reinforcing bar 111 stretched out from body of wall upper end makes floor connect with body of wall And/or;
E1, the connection reinforcing bar 411 that the floor 41 being even connected connects the distribution of end mutual dislocation weld, more recessed toward connecting Cast concrete grout in groove;
F, by the vertical installing hole on the first connecting plate 311 of roof connecting plate and the second connecting plate 312 with reach building Connection reinforcing bar 111 aligned fit of plate upper end, installs the first connecting plate 311 and the second connecting plate 312 above body of wall, toward the Cast concrete grout in the vertical installing hole of a plate and the second connecting plate;
G, on the first connecting plate 311 and the second connecting plate 312, lay roof swash plate 313, and contiguous block 315 is arranged on Roof swash plate is connected with the second connecting plate 312 with making roof swash plate 313 in the connection draw-in groove 314 of sloping core version, is pacified by contiguous block 315 Adjacent roof swash plate is made to be connected in the connection draw-in groove 314 being contained between adjacent roof swash plate 313.
It is described above as combining one or more embodiments that particular content provides, does not assert that the present invention's is concrete real Execute and be confined to these explanations.All and the method for the present invention, structure etc. approximate, duplicate, or under present inventive concept premise Make some technology deduction or replace, all should be considered as protection scope of the present invention.

Claims (10)

1. prefabricated body of wall, including wall board body, it is characterised in that is provided with some vertical supports in described wall board body and connects steel Pipe.
Prefabricated body of wall the most according to claim 1, it is characterised in that described wall board body left end and/or right-hand member are provided with perpendicular It is located at least at link slot being provided with described support joint steel pipe in link slot, described wall board body.
Prefabricated body of wall the most according to claim 2, it is characterised in that at least set at the link slot of one end on described wall board body Having some connection nooses stretched out in link slot, described connection noose overlaps the support being locked at link slot even from top to bottom Connecing steel pipe, its external part at link slot is an annular running-on, and the mutually isostructural wall board body of said two can be by connecting noose Making two wall board bodies be connected, the link slot docking of two mutually isostructural wall board body ends is formed and connects cavity, connects in cavity Connect noose mutually at the formation one vertical jack that is vertically dislocatedly distributed, in inserting in vertical jack by a vertical joint bar, make two walls Plate body is connected.
Prefabricated body of wall the most according to claim 2, it is characterised in that be provided with from top to bottom at the notch of described link slot The dowel of some horizontally sets of distribution.
Prefabricated body of wall the most according to claim 4, it is characterised in that front side and/or the rear side of described wall board body also set There is link slot, in described link slot, be provided with some connection nooses being distributed from top to bottom, described connection noose lock set from top to bottom Supporting on joint steel pipe, and reaching in link slot wall board body, its external part is an annular running-on.
Prefabricated body of wall the most as claimed in any of claims 1 to 5, it is characterised in that described support connecting tube bag Include be located at wall board body upper end upper steel plate, be located at the lower steel plate of wall board body lower end and be located in wall board body and with upper steel plate, lower steel The steel pipe that plate is connected, is provided with the through hole of through upper steel plate and lower steel plate, connecting of described two connected wall board bodies in described steel pipe Upper end, place is provided with a junction steel plate.
Prefabricated body of wall the most according to claim 1, it is characterised in that be additionally provided with on described wall board body that to run through it upper and lower The vertical hole of end face.
8. prefabricated building construction, including basis and the body of wall that basis connects, is located at the roof assembly above body of wall, described base Plinth is provided with some connection reinforcing bars, it is characterised in that described body of wall is the prefabricated in claim 1 to 7 described in any one Body of wall.
Prefabricated building construction the most according to claim 8, it is characterised in that above described body of wall and between roof assembly Being additionally provided with floor, described floor is provided with the vertical hole of its upper/lower terminal through, described on the basis of connection reinforcing bar by running through Body of wall makes floor connect with body of wall with the vertical installing hole on floor, and described connection reinforcing bar runs through floor and reaches above floor Connect with roof assembly.
10. the method for construction in house described in any one in claim 8 to 9, it is characterised in that comprise the steps;
A, first complete the foundation construction in house;
B, by the vertical installing hole on body of wall with on the basis of connection reinforcing bar match by body of wall plug-in mounting on the basis of;
C, being connected with body of wall by body of wall, its connected mode includes;
C1, body of wall connect with body of wall " T-shaped ";The connection noose grafting of the first face wall plate body leading flank of traverse is entered another identical In the link slot of the wall board body end of structure, in perpendicular joint bar is inserted to vertical jack and/or;
C2, body of wall connect with body of wall " yi word pattern ";The end of wall board body is connected noose and another mutually isostructural wall board body End phase female connector connects, in perpendicular joint bar is inserted to vertical jack and/or;
C3, body of wall connect with body of wall " cross ";The connection noose grafting of the first face wall plate body leading flank of traverse is entered second In the link slot of mutually isostructural wall board body end, face, perpendicular joint bar is inserted in vertical jack, within connecting cavity, pours into a mould coagulation Soil paste;Connection noose phase by the link slot of the 3rd mutually isostructural wall board body end with the first wall board body trailing flank of traverse Connect, perpendicular joint bar is inserted in vertical jack;
C4, body of wall connect with body of wall " L font ";By on the left of wall board body or the connection noose grafting of right flank enters the second face wall plate body In the link slot of end, perpendicular joint bar is inserted in vertical jack;
D, connecting plate is arranged on the adjacent supports connecting tube upper end of connected two bodies of wall, and by connecting plate with support the upper of connecting tube Plate Welding, be installed on outside body of wall upper end and less than the position of connecting plate, lay steel plate and make the upper end of outside body of wall Flush, toward vertical installing hole and be connected cavity cast concrete grout with the hole on connecting plate by steel plate;
E, the vertical installing hole of floor is directed at the connection reinforcing bar stretched out from body of wall upper end make floor connect with body of wall and/or;
E1, the connection reinforcement welding that the floor being even connected connects the distribution of end mutual dislocation get up, then pour into a mould in connecting groove Concrete grout;
F, by the vertical installing hole on the first connecting plate of roof connecting plate and the second connecting plate and the company reaching floor upper end Connect reinforcing bar aligned fit, the first connecting plate and the second connecting plate are installed above body of wall, connect toward the first connecting plate and second Cast concrete grout in the vertical installing hole of plate;
G, on the first connecting plate and the second connecting plate, lay roof swash plate, and contiguous block is arranged on roof swash plate and the second company Make roof swash plate and the second connecting plate be connected in the connection draw-in groove of fishplate bar, contiguous block is arranged on the company between adjacent roof swash plate Adjacent roof swash plate is made to be connected in connecing draw-in groove.
CN201610437218.2A 2016-06-08 2016-06-16 Prefabricated wall, prefabricated building construction and method of construction Active CN106049707B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201620560442 2016-06-08
CN2016205604426 2016-06-08

Publications (2)

Publication Number Publication Date
CN106049707A true CN106049707A (en) 2016-10-26
CN106049707B CN106049707B (en) 2018-08-10

Family

ID=57167694

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201620586162.2U Active CN205894364U (en) 2016-06-08 2016-06-16 Prefabricated formula wall body and prefabricated formula housing construction
CN201610437218.2A Active CN106049707B (en) 2016-06-08 2016-06-16 Prefabricated wall, prefabricated building construction and method of construction

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201620586162.2U Active CN205894364U (en) 2016-06-08 2016-06-16 Prefabricated formula wall body and prefabricated formula housing construction

Country Status (1)

Country Link
CN (2) CN205894364U (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107190847A (en) * 2017-07-17 2017-09-22 广东草根民墅房屋制造有限公司 Prefabricated assembled light steel wallboard, building construction and its method of construction
CN107806207A (en) * 2017-11-27 2018-03-16 黄昆 The assembled architecture wall and building that steel construction is combined with concrete structure
CN107905385A (en) * 2017-11-27 2018-04-13 黄昆 The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure
CN108035433A (en) * 2018-01-14 2018-05-15 万华集成房屋(烟台)有限公司 Prefabricated house is built and its method of construction
CN108343192A (en) * 2018-02-09 2018-07-31 临沂大学 Concrete panel with heat preservation sandwich layer
CN108412080A (en) * 2018-02-12 2018-08-17 天津城建大学 Improve reinforcement connection structure, its construction method and the brick setting of brick setting globality
WO2019100797A1 (en) * 2017-11-27 2019-05-31 黄昆 Steel structure and concrete structure combination assembled type building wall body and building house
CN111764575A (en) * 2020-06-22 2020-10-13 坤茂建设集团有限公司 Composite environment-friendly prefabricated wallboard and construction method thereof
CN112144921A (en) * 2020-09-09 2020-12-29 湖南汇渠建筑科技有限公司 Prefabricated assembly type building
CN113216451A (en) * 2021-06-08 2021-08-06 青岛腾远设计事务所有限公司 Attached prefabricated shear wall and construction method thereof
CN113494125A (en) * 2020-04-08 2021-10-12 北京建筑大学 Prefabricated round hole plate wall shock insulation structure with through-type joint bars and mounting method thereof
CN113502941A (en) * 2021-07-23 2021-10-15 北京建筑大学 Connecting structure, building structure and preparation method of building structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3218463B2 (en) * 1999-04-06 2001-10-15 株式会社 応用企画 Refractively connected planar bodies
CN1464149A (en) * 2002-06-10 2003-12-31 俞鲲鹏 Novel villa style house construction and process of building
CN102535738A (en) * 2012-02-14 2012-07-04 黄昆 Prefabricated house wallboards, fully prefabricated house using wallboards, and installation method for fully prefabricated house
CN103790265A (en) * 2014-01-28 2014-05-14 江苏建筑职业技术学院 Method for manufacturing and assembling prefabricated concrete filled steel tube core column stiffening shear wall
CN104674989A (en) * 2015-03-02 2015-06-03 北京工业大学 Light steel engaged composite insulation lightweight wall assembly type combined shear wall and fabrication method
CN105317137A (en) * 2015-10-14 2016-02-10 史世英 Prefabricated wall, prefabricated wallboard, construction method of prefabricated wall and production method of prefabricated wallboard

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3218463B2 (en) * 1999-04-06 2001-10-15 株式会社 応用企画 Refractively connected planar bodies
CN1464149A (en) * 2002-06-10 2003-12-31 俞鲲鹏 Novel villa style house construction and process of building
CN102535738A (en) * 2012-02-14 2012-07-04 黄昆 Prefabricated house wallboards, fully prefabricated house using wallboards, and installation method for fully prefabricated house
CN103790265A (en) * 2014-01-28 2014-05-14 江苏建筑职业技术学院 Method for manufacturing and assembling prefabricated concrete filled steel tube core column stiffening shear wall
CN104674989A (en) * 2015-03-02 2015-06-03 北京工业大学 Light steel engaged composite insulation lightweight wall assembly type combined shear wall and fabrication method
CN105317137A (en) * 2015-10-14 2016-02-10 史世英 Prefabricated wall, prefabricated wallboard, construction method of prefabricated wall and production method of prefabricated wallboard

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107190847A (en) * 2017-07-17 2017-09-22 广东草根民墅房屋制造有限公司 Prefabricated assembled light steel wallboard, building construction and its method of construction
CN107806207A (en) * 2017-11-27 2018-03-16 黄昆 The assembled architecture wall and building that steel construction is combined with concrete structure
CN107905385A (en) * 2017-11-27 2018-04-13 黄昆 The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure
WO2019100797A1 (en) * 2017-11-27 2019-05-31 黄昆 Steel structure and concrete structure combination assembled type building wall body and building house
CN108035433A (en) * 2018-01-14 2018-05-15 万华集成房屋(烟台)有限公司 Prefabricated house is built and its method of construction
CN108343192A (en) * 2018-02-09 2018-07-31 临沂大学 Concrete panel with heat preservation sandwich layer
CN108412080A (en) * 2018-02-12 2018-08-17 天津城建大学 Improve reinforcement connection structure, its construction method and the brick setting of brick setting globality
CN113494125A (en) * 2020-04-08 2021-10-12 北京建筑大学 Prefabricated round hole plate wall shock insulation structure with through-type joint bars and mounting method thereof
CN111764575A (en) * 2020-06-22 2020-10-13 坤茂建设集团有限公司 Composite environment-friendly prefabricated wallboard and construction method thereof
CN112144921A (en) * 2020-09-09 2020-12-29 湖南汇渠建筑科技有限公司 Prefabricated assembly type building
CN113216451A (en) * 2021-06-08 2021-08-06 青岛腾远设计事务所有限公司 Attached prefabricated shear wall and construction method thereof
CN113502941A (en) * 2021-07-23 2021-10-15 北京建筑大学 Connecting structure, building structure and preparation method of building structure

Also Published As

Publication number Publication date
CN106049707B (en) 2018-08-10
CN205894364U (en) 2017-01-18

Similar Documents

Publication Publication Date Title
CN106049707A (en) Prefabricated wall body, prefabricated house building and construction method
CN103924505B (en) Use prefabricated steel-concrete combination T beam and the construction method of Wavelike steel webplate
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN105804241A (en) Single-layer prefabricated assembly type reinforced concrete beam-column joint
CN107299683B (en) Compound concrete-filled tubular column assembled docks node and connection method
CN105239765A (en) Foldable multifunctional overhanging unloading platform
CN106284988A (en) Oblique circular cylinder template and construction method thereof
CN107905385A (en) The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure
CN106801436A (en) A kind of construction method for overlapping assembled underground pipe gallery
CN106193402B (en) Girder truss integrated form flooring module and its installation method
CN103898834B (en) A kind of steel tube concrete combination beam and truss-like Sarasota cable-stayed bridge and construction method thereof
CN103603494B (en) A kind of ultra-thin steel truss sloping core construction method and formwork structure
CN207812741U (en) Pre-manufactured steel structure overlapped shear wall
CN112832368A (en) Quick construction process for cantilever beam at ultrahigh position
CN109424072B (en) Connecting joint for supporting reinforced concrete columns on steel beams and construction method
CN203769116U (en) Prefabricated through hole assembly type reinforced concrete shear wall
CN103216030A (en) Method for splicing and connecting precast reinforced concrete floor slabs within span
CN205617552U (en) Assembled integrated configuration
CN205604719U (en) Superelevation, jumbo size board structural template braced system that encorbelments
CN206956979U (en) A kind of Linear shear wall with fore-set
CN205677114U (en) Installation node for assembled inside casing light partition wall
CN104878863B (en) Construction method of light composite floor
CN203656365U (en) Combination-type transition cable leading cage based on cable leading towards lower bridge surface
CN205894350U (en) Prefabricated formula wall connection structure and utilize this connection structure's prefabricated formula housing construction
CN102418414A (en) Long-slab-span prefabricated beam floor formwork system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant