CN108412080A - Improve reinforcement connection structure, its construction method and the brick setting of brick setting globality - Google Patents

Improve reinforcement connection structure, its construction method and the brick setting of brick setting globality Download PDF

Info

Publication number
CN108412080A
CN108412080A CN201810144740.0A CN201810144740A CN108412080A CN 108412080 A CN108412080 A CN 108412080A CN 201810144740 A CN201810144740 A CN 201810144740A CN 108412080 A CN108412080 A CN 108412080A
Authority
CN
China
Prior art keywords
precast concrete
stick
connection structure
reinforcing bar
brick setting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810144740.0A
Other languages
Chinese (zh)
Inventor
杨新磊
吴汉臣
张建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Chengjian University
Original Assignee
Tianjin Chengjian University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Chengjian University filed Critical Tianjin Chengjian University
Priority to CN201810144740.0A priority Critical patent/CN108412080A/en
Publication of CN108412080A publication Critical patent/CN108412080A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/04Walls having neither cavities between, nor in, the solid elements
    • E04B2/06Walls having neither cavities between, nor in, the solid elements using elements having specially-designed means for stabilising the position
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

Improve reinforcement connection structure, its construction method and the brick setting of brick setting globality, reinforce connection structure transversely to be connected and composed by several intermediate the first precast concrete sticks and the second precast concrete stick of two, both ends, it docks to form closed chamber in adjacent two precast concretes stick end, the semi-annular shape end that intracavitary two is correspondingly connected with reinforcing bar overlaps up and down, prefabricated shearing-resistance blocks are inserted with, intracavitary has also poured pea gravel concreten obturator;The second precast concrete stick at both ends buries in such a way that two lengths of rebar ends are in bending build in the constructional column of both ends respectively.Construction method before S1 is built by laying bricks or stones, first spreads one layer of bed load slurry in common brick layer;S2 builds several the first precast concrete sticks and two the second precast concrete sticks according to fissure of displacement overlapping mode by laying bricks or stones;S3 serves as template using the part of precast concrete stick end notches both sides and pours pea gravel concreten into closed chamber.Brick setting feature has built one or more layers reinforcement connection structure by laying bricks or stones in being.Reinforce globality and splitting resistance that connection structure improves brick setting.

Description

Improve reinforcement connection structure, its construction method and the brick setting of brick setting globality
Technical field
The invention belongs to building structure field, more particularly to a kind of reinforcement connection structure improving brick setting globality, its Construction method and brick setting.
Background technology
Masonry structure is structural system a kind of ancient and with great potential, the multilayer room in China in China Occupy absolute leading position in room.Basis, inner-outer wall, column, lintel, roof system in the civil buildings such as house, office building and ground Ditch etc. can all be built with masonry structure.In the building of industrial factory building and reinforced concrete frame structure, masonry is often used To build enclosure wall by laying bricks or stones.Medium and small workshop and the buildings such as multilayered light industrial premises and cinema, dining room, warehouse, also widely Make the load-carrying members of wall body or column using masonry.
Brick setting in masonry structure is a kind of common building structure, and the cracking of masonry structure is also a kind of common , more scabrous architectural problems.The generation in crack is the common fault of masonry structure, cause masonry structure generate crack the reason of have Very much, such as temperature change, drying shrinkage, ground are uneven etc., and masonry structure can be made to generate crack.There is crack in masonry structure The overall stability of building, such as durability and shock resistance etc. can be reduced.The generation in crack not only influences the beauty of building, Also the normal use of building can be influenced, the serious building collapse that can occur causes personal injury, seriously threatens people's The security of the lives and property, it is exactly a slight crack to have the inducement of many serious accidents.So in sufficient understanding and clearly On the basis of the clear harm for recognizing Masonry Structure Crack, how to improve the globality of brick setting, prevent building tear into One step expands, and the safety of guarantee building is of great significance and is influenced.
Invention content
The present invention provides a kind of reinforcement improving brick setting globality to solve technical problem present in known technology Connection structure, its construction method and brick setting, which can be improved the globality of brick setting, can play and prevents from building The further widened effect of object crack;The construction method simple possible of the reinforcement connection structure;Using this reinforcement connection structure Globality and splitting resistance can be improved in brick setting.
The present invention is adopted the technical scheme that solve technical problem present in known technology:
A kind of reinforcement connection structure improving brick setting globality, it is characterised in that:Including the first precast concrete stick, Second precast concrete stick and prefabricated shearing-resistance blocks;The master of the main body and the second precast concrete block of first precast concrete stick Body is wide with common building block uniform thickness, and prefabricated shearing-resistance blocks are cylindrical-shaped structure;
The main body of first precast concrete stick is the flat block structure that both ends are each provided with a notch, prefabricated first The first connection reinforcing bar is formulated in concrete fin block main body, the both ends of the first connection reinforcing bar are in semi-annular shape and respectively from first The both ends indentation, there of precast concrete block main body is stretched out;
The main body of second precast concrete stick is that flat block structure jaggy is arranged in one end, in the second concrete It is formulated with the second connection reinforcing bar in native block main body, one end of the second connection reinforcing bar is in semi-annular shape and from the second concrete One end of setting notch is stretched out in native block main body, the other end of the second connection reinforcing bar be the open end that two lengths of rebar are constituted and The other end opposite with setting notch stretches out from the second precast concrete block main body;
The connection structure of reinforcing is by being arranged in several intermediate the first precast concrete sticks and being arranged at both ends Two the second precast concrete sticks transversely connect and compose, and form a skin of masonry, two adjacent precast concrete sticks End docking is respectively formed a closed chamber, and the two semi-annular shape ends for being correspondingly connected with reinforcing bar form overlap joint up and down in closed chamber, Overlapping part is fitted with the prefabricated shearing-resistance blocks, and pea gravel concreten obturator has been poured in closed chamber;The second of both ends is pre- The open end of second connection reinforcing bar of concrete stick processed is buried in such a way that the end of two lengths of rebar is in bending respectively builds in both ends Constructional column in.
Further:First connection reinforcing bar is in integrally long circular.
Further:It is each equipped in the first precast concrete block main body and in the second precast concrete block main body Stirrup and longitudinal steel wire, stirrup and longitudinal steel wire are linked together, and form framework of steel reinforcement structure.
A kind of construction method for the reinforcement connection structure improving brick setting globality, which is characterized in that reinforce connection structure Using the reinforcement connection structure of above-mentioned raising brick setting globality, construction procedure is:
S1 first spreads one layer of bed load slurry before building by laying bricks or stones in one layer of common brick layer of selection;
S2 after bed load slurry is completed, by several the first precast concrete sticks and positioned at two of both ends it is second prefabricated mixed Overlapped that mode is built by laying bricks or stones according to the fissure of displacement for solidifying soil stick;When building by laying bricks or stones, shape is docked in the end of adjacent two precast concretes stick At closed chamber, two in the same closed chamber semi-annular shape ends for being correspondingly connected with reinforcing bar will form overlap joint up and down, overlap Position be inserted into prefabricated shearing-resistance blocks, be connected with being formed;By the second connection steel on the second precast concrete stick at both ends Two lengths of rebar of the open end of muscle carry out left-right situs with the reinforcing bar in corresponding end constructional column, and the end of two lengths of rebar is bent It is anchored in constructional column;
S3 is waited after the completion of building by laying bricks or stones, and template is served as into closed chamber using the part of precast concrete stick end notches both sides Pea gravel concreten is poured, closed chamber is filled, so far completes the work progress of one layer of reinforcement connection structure.
A kind of brick setting, it is characterised in that:It is whole to build one or more layers above-mentioned raising brick setting by laying bricks or stones in brick setting The reinforcement connection structure of property.
The invention has the advantages and positive effects that:
1, connection structure proposed by the present invention of reinforcing connects the mutual of reinforcing bar by what is stretched out outside precast concrete both ends Overlap joint occlusion adds prefabricated shearing-resistance blocks overlapping to maintain the continuity of reinforcing bar horizontal force at occlusion, improves reinforcement and connects Structural integrity is connect, to enhance the shearing strength for reinforcing connection structure, when being cracked on masonry, crack occurrence to reinforcement Where connection structure when layer, effectively crackle can be inhibited further to expand;It will be close to constructional column side the second precast concrete item On block it is overhanging go out lengths of rebar end bending anchor in constructional column, further improve the globality of brick setting.
2, the construction method of this reinforcement connection structure, it is first prefabricated mixed in several the second precast concrete sticks and two After solidifying soil stick is built by laying bricks or stones, template is served as with the part of precast concrete stick end notches both sides, carries out pouring for pea gravel concreten It builds, has the advantages that construction is simple is feasible.
3, this brick masonry structure builds one or more layers above-mentioned reinforcement connection structure by laying bricks or stones by interior, is greatly improved brick The globality and splitting resistance of body.
Description of the drawings
Fig. 1 is the planar structure schematic diagram that the present invention reinforces connection structure;
Fig. 2 is the structural schematic diagram of brick setting of the present invention;
Fig. 3 is the planar structure schematic diagram of the first precast concrete stick of the invention;
Fig. 4 is the dimensional structure diagram of the first precast concrete stick of the invention;
Fig. 5 is the planar structure schematic diagram of the second precast concrete stick of the invention;
Fig. 6 is the dimensional structure diagram of the second precast concrete stick of the invention;
Fig. 7 is the dimensional structure diagram of the prefabricated shearing-resistance blocks of the present invention.
In figure:1, brick setting;1-1, common building block;1-2, constructional column;1-3, the first precast concrete stick;1-3-1, One pays concrete fin block main body in advance;1-3-2, the first connection reinforcing bar;1-3-3, the first stirrup;1-3-4, first longitudinal direction steel wire;1- 4, the second precast concrete stick;1-4-1, the second precast concrete block main body;1-4-2, the second connection reinforcing bar;1-4-3, Two stirrups;1-4-4, second longitudinal direction steel wire;1-5, prefabricated shearing-resistance blocks;1-5-1, metal reinforce web frame;1-5-1a, outer bending Portion;1-6, pea gravel concreten obturator.
Specific implementation mode
In order to further understand the content, features and effects of the present invention, the following examples are hereby given, and coordinate attached drawing Detailed description are as follows:
A kind of reinforcement connection structure improving brick setting globality, refers to Fig. 1-7, innovative point is:The reinforcement connects Binding structure is mainly made of three kinds of components:First precast concrete stick 1-3, the second precast concrete stick 1-4 and prefabricated anti- Block 1-5, the main body of the first precast concrete stick and the main body of the second precast concrete block are wide with common building block uniform thickness, Prefabricated shearing-resistance blocks are cylindrical-shaped structure.
The main body of above-mentioned first precast concrete stick is the flat block structure that both ends are each provided with a notch, and notch is excellent The square breach described in attached drawing are selected, the first connection reinforcing bar 1-3-2 is formulated on the first precast concrete block main body 1-3-1, The both ends of first connection reinforcing bar are stretched out in semi-annular shape and respectively from the both ends indentation, there of the first precast concrete block main body.
The main body of above-mentioned second precast concrete stick is that flat block structure jaggy is arranged in one end, and notch also synchronizes It is preferred that use square breach, it is formulated with the second connection reinforcing bar 1-4-2 on the second precast concrete block main body 1-4-1, second The one end for connecting reinforcing bar is in semi-annular shape and one end stretching of notch is arranged from the second precast concrete block main body, and second Connect reinforcing bar the other end be two lengths of rebar constitute open end and from the second precast concrete block main body with setting notch The opposite other end stretches out.
Above-mentioned reinforcement connection structure is by being arranged in several intermediate the first precast concrete sticks and being arranged at both ends Two the second precast concrete sticks transversely connect and compose, and form a skin of masonry, two adjacent precast concrete sticks End docks to form uniform closed chamber, and the two semi-annular shape ends for being correspondingly connected with reinforcing bar form overlap joint up and down in closed chamber, Overlapping part is fitted with the prefabricated shearing-resistance blocks, and pea gravel concreten obturator 1-6 has been poured in closed chamber.The second of both ends The open end of second connection reinforcing bar of precast concrete stick is buried in such a way that the end of two lengths of rebar is in bending respectively builds in two In the constructional column at end.It is formed for the two semi-annular shape ends for being correspondingly connected with reinforcing bar in the above-mentioned closed chamber of realization and is overlapped up and down, two kinds Two external parts for being correspondingly connected with reinforcing bar on precast concrete stick, especially the first precast concrete stick will ensure certain Difference in height in the same plane, is applied in this way, after just can guarantee that multiple precast concrete sticks are transversely built by laying bricks or stones with facilitating to build by laying bricks or stones Work.
Above-mentioned first connection reinforcing bar is further preferably in integrally long circular, i.e., the first connection reinforcing bar is oval cricoid closes Close bar construction.
It is each equipped in above-mentioned first precast concrete block main body and in above-mentioned second precast concrete block main body Stirrup and longitudinal steel wire, stirrup and longitudinal steel wire are linked together, and are formed framework of steel reinforcement structure, are enhanced precast concrete stick Shear behavior is conducive to improve the globality of brick setting.The above-mentioned stirrup being formulated in the first precast concrete main body and longitudinal steel Silk is respectively the first stirrup 1-3-3 and first longitudinal direction steel wire 1-3-4, is formulated in stirrup in the second precast concrete main body and vertical It is respectively the second stirrup 1-4-3 and second longitudinal direction steel wire 1-4-4 to steel wire.
Above-mentioned prefabricated shearing-resistance blocks are precast concrete shearing resistance block structure, are formulated in cylinder in precast concrete shearing-resistance blocks The metal of shape reinforces web frame 1-5-1, and the lower end that metal reinforces web frame is provided with outer bending part 1-5-1a, and outer bending part plays Enhance the effect of anchoring.This prefabricated shearing resistance block structure improves the shear resistance of precast concrete stick connection.
A kind of construction method for the reinforcement connection structure improving brick setting globality, innovative point are:Reinforce connection structure Using the above structure, construction procedure is:
S1 first spreads one layer of bed load slurry before building by laying bricks or stones in one layer of common brick layer of selection;
S2 is after bed load slurry is completed, and according to brick setting width, selects several the first precast concrete sticks and two the Two precast concrete sticks, according to the fissure of displacement overlapped mode, by several first precast concretes build by laying bricks or stones successively in centre position, Two the second precast concrete sticks are built by laying bricks or stones respectively in end positions;When building by laying bricks or stones, the end of adjacent two precast concretes stick Docking forms closed chamber, and the semi-annular shape end that two in same closed chamber are correspondingly connected with reinforcing bar will form overlap joint up and down, Overlapped, prefabricated shearing-resistance blocks are inserted at position, are connected with being formed;On the second precast concrete stick at both ends Reinforcing bar in two lengths of rebar and the corresponding end constructional column of the open end of two connection reinforcing bars carries out left-right situs, and by two lengths of rebar End bending is anchored in constructional column.Closely knit, building block and precast concrete stick are contacted note that must assure that in building process Want smooth vertical and horizontal, mortar is full.
S3 is waited after the completion of building by laying bricks or stones, and template is served as into closed chamber using the part of precast concrete stick end notches both sides Pea gravel concreten is poured, closed chamber is filled, so far completes the work progress of one layer of reinforcement connection structure.
A kind of brick setting, innovative point are:Build one or more layers above-mentioned reinforcement connection structure by laying bricks or stones in brick setting 1. Brick setting other parts it is identical as existing brick masonry structure, i.e., brick setting main part is taken by common building block 1-1 according to the fissure of displacement The mode connect is built by laying bricks or stones, and the both ends of brick setting main part have been the constructional column 1-2 of booster action.
The reinforcement connection structure overall structure of the present invention is simple, is mainly used for general industry Civil structure and has antidetonation It is required that building structure in.
The foregoing is only a preferred embodiment of the present invention, however it is not limited to the present invention, for those skilled in the art For member, the present invention can have any change or variation.All any modifications within the spirit and principle of invention, made, etc. Valence is replaced, and is improved, be should be included within invention protection domain.

Claims (5)

1. a kind of reinforcement connection structure improving brick setting globality, it is characterised in that:Including the first precast concrete stick, Two precast concrete sticks and prefabricated shearing-resistance blocks;The main body of the main body and the second precast concrete block of first precast concrete stick Wide with common building block uniform thickness, prefabricated shearing-resistance blocks are cylindrical-shaped structure;
The main body of first precast concrete stick is the flat block structure that both ends are each provided with a notch, in the first concrete It is formulated with the first connection reinforcing bar in native block main body, the both ends of the first connection reinforcing bar are in semi-annular shape and prefabricated from first respectively The both ends indentation, there of concrete fin block main body is stretched out;
The main body of second precast concrete stick is that flat block structure jaggy is arranged in one end, in the second precast concrete item It is formulated with the second connection reinforcing bar in block main body, one end of the second connection reinforcing bar is in semi-annular shape and from the second precast concrete item One end that notch is arranged in block main body is stretched out, and the other end of the second connection reinforcing bar is the open end that two lengths of rebar are constituted and from the The other end opposite with setting notch stretches out in two precast concrete block main bodies;
The connection structure of reinforcing is by being arranged in several intermediate the first precast concrete sticks and two at both ends being arranged Second precast concrete stick transversely connects and composes, and forms a skin of masonry, two adjacent precast concrete stick ends Docking is respectively formed a closed chamber, and the two semi-annular shape ends for being correspondingly connected with reinforcing bar form overlap joint up and down in closed chamber, are overlapping Position is fitted with the prefabricated shearing-resistance blocks, and pea gravel concreten obturator has been poured in closed chamber;The second of both ends is prefabricated mixed The structure built in both ends is buried in such a way that the end of two lengths of rebar is in bending in the open end of second connection reinforcing bar of solidifying soil stick respectively It makes in column.
2. the reinforcement connection structure according to claim 1 for improving brick setting globality, it is characterised in that:First connection steel Muscle is in integrally long circular.
3. the reinforcement connection structure according to claim 1 for improving brick setting globality, it is characterised in that:It is prefabricated first Stirrup and longitudinal steel wire, stirrup and longitudinal steel are each equipped in concrete fin block main body and in the second precast concrete block main body Silk is linked together, and forms framework of steel reinforcement structure.
4. a kind of construction method for the reinforcement connection structure improving brick setting globality, which is characterized in that reinforce connection structure and adopt With the reinforcement connection structure of any raising brick setting globalities of claim 1-3, construction procedure is:
S1 first spreads one layer of bed load slurry before building by laying bricks or stones in one layer of common brick layer of selection;
S2 is after bed load slurry is completed, by several the first precast concrete sticks and positioned at two second precast concretes at both ends Overlapped that mode is built by laying bricks or stones according to the fissure of displacement for stick;When building by laying bricks or stones, the end of adjacent two precast concretes stick, which docks to be formed, to be closed Chamber is closed, two in the same closed chamber semi-annular shape ends for being correspondingly connected with reinforcing bar will form overlap joint up and down, in overlapped portion Prefabricated shearing-resistance blocks are inserted into position, are connected with being formed;By the second connection reinforcing bar on the second precast concrete stick at both ends Two lengths of rebar of open end carry out left-right situs with the reinforcing bar in corresponding end constructional column, and the end of two lengths of rebar is bent and is anchored In constructional column;
S3 waits after the completion of building by laying bricks or stones, and serving as template into closed chamber using the part of precast concrete stick end notches both sides pours Pea gravel concreten is filled closed chamber, so far completes the work progress of one layer of reinforcement connection structure.
5. a kind of brick setting, it is characterised in that:Any described one or more layers of the requirement 1-3 that has the right is built by laying bricks or stones in brick setting to carry The reinforcement connection structure of high brick setting globality.
CN201810144740.0A 2018-02-12 2018-02-12 Improve reinforcement connection structure, its construction method and the brick setting of brick setting globality Pending CN108412080A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810144740.0A CN108412080A (en) 2018-02-12 2018-02-12 Improve reinforcement connection structure, its construction method and the brick setting of brick setting globality

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810144740.0A CN108412080A (en) 2018-02-12 2018-02-12 Improve reinforcement connection structure, its construction method and the brick setting of brick setting globality

Publications (1)

Publication Number Publication Date
CN108412080A true CN108412080A (en) 2018-08-17

Family

ID=63128445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810144740.0A Pending CN108412080A (en) 2018-02-12 2018-02-12 Improve reinforcement connection structure, its construction method and the brick setting of brick setting globality

Country Status (1)

Country Link
CN (1) CN108412080A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110763822A (en) * 2019-10-31 2020-02-07 江苏科技大学 Experimental method and experimental device for recycling solidified dredged soil of river channel
CN111794554A (en) * 2020-08-06 2020-10-20 天津城建大学 Novel brick masonry wall reinforcing technology

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001279685A (en) * 2000-04-03 2001-10-10 Hitachi Chem Co Ltd Formwork for corner, separator, and formwork system
CN103806546A (en) * 2014-03-12 2014-05-21 初明进 Connection method of precast reinforced concrete slabs
CN104005494A (en) * 2014-06-10 2014-08-27 东南大学 Prefabricated shear wall dry-wet mixed vertical connecting joint structure
CN104294962A (en) * 2014-09-21 2015-01-21 山东农业大学 Method for manufacturing pre-placed recycled aggregate grouted concrete energy-saving and heat-preservation building block and wall system
CN104532964A (en) * 2015-01-13 2015-04-22 济南轨道交通集团有限公司 Building beam-column joint connecting structure and process
CN204531066U (en) * 2015-03-23 2015-08-05 河北联合大学 Assembly concrete-filled steel tube shear wall splits assembled syndeton
CN204626707U (en) * 2015-04-15 2015-09-09 吴方华 A kind of wall-wall horizontal connecting node of exempting from the connection of formwork erection steel plate with stem stem
CN106049707A (en) * 2016-06-08 2016-10-26 黄昆 Prefabricated wall body, prefabricated house building and construction method
CN107542212A (en) * 2017-09-14 2018-01-05 赵东昕 A kind of Prefabricated porous plate being connected and attaching method thereof
CN207934246U (en) * 2018-02-12 2018-10-02 天津城建大学 Improve the reinforcement connection structure and brick masonry structure of brick setting globality

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001279685A (en) * 2000-04-03 2001-10-10 Hitachi Chem Co Ltd Formwork for corner, separator, and formwork system
CN103806546A (en) * 2014-03-12 2014-05-21 初明进 Connection method of precast reinforced concrete slabs
CN104005494A (en) * 2014-06-10 2014-08-27 东南大学 Prefabricated shear wall dry-wet mixed vertical connecting joint structure
CN104294962A (en) * 2014-09-21 2015-01-21 山东农业大学 Method for manufacturing pre-placed recycled aggregate grouted concrete energy-saving and heat-preservation building block and wall system
CN104532964A (en) * 2015-01-13 2015-04-22 济南轨道交通集团有限公司 Building beam-column joint connecting structure and process
CN204531066U (en) * 2015-03-23 2015-08-05 河北联合大学 Assembly concrete-filled steel tube shear wall splits assembled syndeton
CN204626707U (en) * 2015-04-15 2015-09-09 吴方华 A kind of wall-wall horizontal connecting node of exempting from the connection of formwork erection steel plate with stem stem
CN106049707A (en) * 2016-06-08 2016-10-26 黄昆 Prefabricated wall body, prefabricated house building and construction method
CN107542212A (en) * 2017-09-14 2018-01-05 赵东昕 A kind of Prefabricated porous plate being connected and attaching method thereof
CN207934246U (en) * 2018-02-12 2018-10-02 天津城建大学 Improve the reinforcement connection structure and brick masonry structure of brick setting globality

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110763822A (en) * 2019-10-31 2020-02-07 江苏科技大学 Experimental method and experimental device for recycling solidified dredged soil of river channel
CN111794554A (en) * 2020-08-06 2020-10-20 天津城建大学 Novel brick masonry wall reinforcing technology

Similar Documents

Publication Publication Date Title
CN205242706U (en) Cast -in -place constructional column of infilled wall and wall body synchronous construction structure between high -rise outer eaves window
CN204676609U (en) The reinforced waterproof construction of a kind of basement bottom plate rear pouring tape
CN101041981A (en) Reinforcing bars building block short-limb masonry shear wall structure
CN103195259B (en) Method for reinforcing concrete structure by foam concrete prefabricated slab
CN203213340U (en) Reinforced masonry wall
CN103953114A (en) Steel frame-reinforced masonry shear wall composite structure and construction method thereof
CN203821591U (en) Steel frame-reinforcement brickwork shear wall combined structure
CN103485281A (en) Construction method of assembly-type external transverse prestressed hollow plate bridge
CN105275096A (en) Prefabricated pieced two-way slab construction method
CN108412080A (en) Improve reinforcement connection structure, its construction method and the brick setting of brick setting globality
CN110644662A (en) Prefabricated flat slab composite slab based on stress and splitting method thereof
CN106401052A (en) Prefabricated prestressed hollow slab and preparing method thereof
CN113898102A (en) Ribbed concrete laminated slab
CN207934246U (en) Improve the reinforcement connection structure and brick masonry structure of brick setting globality
CN105155690A (en) Connection node of precast slabs and construction method for spliced precast slabs
CN204804129U (en) Prefabricated concrete floor entirely for building
CN204676607U (en) Poured band of outer wall of basement plugging structure
CN203905526U (en) Building body mortar joint reinforcing structure
CN204174614U (en) Flap shape pretensioning prestressed concrete pile
CN207525960U (en) Easy connect band shear key reinforced concrete slab structure
CN101831921A (en) Construction method of expansive concrete
Davis et al. Sharanam: Case Study of a 15 Meter Span Earthen Conical Vault
CN211714180U (en) Assembled concrete frame structure
CN209742151U (en) fiber reinforcement masonry structure
CN106592814A (en) Integrally cast demolding-free self-thermal insulation wall and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication