CN103806546A
CN103806546A CN201410089046.5A CN201410089046A CN103806546A CN 103806546 A CN103806546 A CN 103806546A CN 201410089046 A CN201410089046 A CN 201410089046A CN 103806546 A CN103806546 A CN 103806546A
Authority
CN
China
Prior art keywords
precast concrete
concrete plank
transverse reinforcement
reinforced concrete
attachment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410089046.5A
Other languages
Chinese (zh)
Other versions
CN103806546B (en
Inventor
初明进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410089046.5A priority Critical patent/CN103806546B/en
Publication of CN103806546A publication Critical patent/CN103806546A/en
Application granted granted Critical
Publication of CN103806546B publication Critical patent/CN103806546B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a connection method of precast reinforced concrete slabs, and belongs to the technical field of building structures. The connection method is characterized in that reinforcing steel bars which are fully anchored and of which exposed parts are in a shape of a half ring are embedded on lateral sides of the precast reinforced concrete slabs, transverse reinforcing steel bars are hung on the reinforcing steel bars in the shape of the half ring, and lapped in a reserved gap among the precast reinforced concrete slabs; a template is arranged at the lower part of the reserved gap, the precast reinforced concrete slabs are connected as a whole by pouring concrete in the reserved gap; or the template is arranged at the lower part of the reserved gap, and the concrete is poured in the reserved gap and at the upper parts of the precast reinforced concrete slabs to form a precast concrete composite slab. The connection method disclosed by the invention can improve the integrity of an assembled monolithic concrete structure and promote the development of building industrialization.

Description

A kind of method of attachment of precast concrete plank
Technical field
The invention belongs to building structure technology field, relate in particular to a kind of method of attachment of the precast concrete plank for fabricated assembly overall concrete structure.
Background technology
Precast concrete is to be applicable to industrialized form of structure, is the direction of housing industrialization development.Joint's connection fabrication in precast concrete between prefabricated units has determined integrality performance of the structure.Existing precast concrete node is generally the weak link of structure, has affected stress performance, and work progress is comparatively complicated.
Summary of the invention
The invention provides the method for attachment of a kind of easy construction, precast concrete plank that stress performance is good.The method of attachment of the precast concrete plank that the present invention proposes can improve the globality of assembled monolithic concrete structure, improves the performance of building structure, improves industrialization of construction industry level.
The method of attachment of the precast concrete plank that the present invention proposes is characterised in that, described precast concrete plank side is embedded with abundant anchoring, exposed portions serve is Semicircular reinforcing bar, on described semicircular reinforcing bar, hang with transverse reinforcement, transverse reinforcement can move, rotate on semicircular reinforcing bar like this, freely adjust position, facilitate precast concrete plank transportation, lifting, facilitate transverse reinforcement location; Transverse reinforcement is concentrated and is hung on semicircular reinforcing bar in factory or building site, reduces job site steel project; After precast concrete plank installation in position, preset clearance inside lap by transverse reinforcement between precast concrete plank, fixing, installs template in preset clearance bottom, and in preset clearance, precast concrete plank is linked to be entirety by concreting; Or install template in preset clearance bottom, in preset clearance, form precast concrete superimposed sheet with precast concrete plank top concreting.Transverse reinforcement is connected reliably with semicircular reinforcing bar, guarantees that transverse reinforcement gives full play to intensity.
The method of attachment of precast concrete plank that the present invention proposes is characterised in that, described transverse reinforcement end upwards bends 90 ., or bending 135 ., or other angles, can increase the anchorage length of transverse reinforcement in rear pouring concrete, increase the connection integrity between precast concrete plank.In order further to improve the connection integrity of precast concrete plank, in described transverse reinforcement corner, longitudinal reinforcement is set.
The method of attachment of precast concrete plank that the present invention proposes is characterised in that, described precast concrete plank side has transverse concave groove, and described transverse reinforcement is at transverse concave groove place, or described transverse reinforcement is in the projection between transverse concave groove.By transverse concave groove is set, connection integrity between pouring concrete and precast concrete after can improving between precast concrete plank, and the lap length of transverse reinforcement some at transverse concave groove place, reduce preset clearance, thereby reduce template amount.
The method of attachment that the present invention proposes can be used for reference the connection for body of wall.
Technical characterstic of the present invention and advantage.
(1) transverse reinforcement of the present invention hangs over precast concrete plank side, and position is freely adjusted in translation within the specific limits, rotation, facilitates transportation, the installation of precast concrete plank, facilitates reinforcing bar location, connection etc. between precast concrete plank.
(2) there is transverse concave groove precast concrete plank of the present invention side, improves the binding ability of new-old concrete.
(3) transverse reinforcement of the present invention is linked on precast concrete plank in factory, and the part reinforced bar engineering of job site is transferred to factory, improves industrialization of construction industry level.
Accompanying drawing explanation
Fig. 1 is a kind of embodiment schematic diagram of the present invention.
Fig. 2 is another kind of embodiment schematic diagram of the present invention.
Fig. 3 is another kind of embodiment schematic diagram of the present invention.
Fig. 4 is a kind of embodiment schematic diagram of precast concrete plank in the embodiment of the present invention.
Fig. 5 is the another kind of embodiment schematic diagram of precast concrete plank in the embodiment of the present invention.
Fig. 6 is the another kind of embodiment schematic diagram of precast concrete plank in the embodiment of the present invention.
Fig. 7 is the another kind of embodiment schematic diagram of precast concrete plank in the embodiment of the present invention.
Fig. 8 is the another kind of embodiment schematic diagram of precast concrete plank in the embodiment of the present invention.
Mark implication in accompanying drawing is: rear pouring concrete 6 longitudinal reinforcements of 1 precast concrete plank 2 semicircular reinforcing bar 3 transverse reinforcement 4 transverse concave groove 5.
The specific embodiment
Below in conjunction with drawings and Examples, the method for attachment of precast concrete plank of the present invention is described in detail.
A kind of embodiment of the method for attachment of the precast concrete plank that the present invention proposes, as Fig. 1, precast concrete plank 1 side is embedded with abundant anchoring, exposed portions serve is Semicircular reinforcing bar 2, on described semicircular reinforcing bar 2, hang with transverse reinforcement 3, transverse reinforcement 3 is connected reliably with semicircular reinforcing bar 2, guarantees that transverse reinforcement gives full play to intensity.Transverse reinforcement can move, rotate on semicircular reinforcing bar, freely adjusts position, facilitates precast concrete plank transportation, lifting, facilitates transverse reinforcement location; Transverse reinforcement is hanging in factory on semicircular reinforcing bar, reduces job site steel project.After precast concrete plank 1 installation in position, preset clearance inside lap by transverse reinforcement 3 between precast concrete plank, fixing, installs template in preset clearance bottom, and in preset clearance, precast concrete plank is linked to be entirety by concreting 5.The another kind of embodiment of the precast concrete plank method of attachment that the present invention proposes as Fig. 2, forms precast concrete superimposed sheet with precast concrete plank 1 top concreting in preset clearance.
Fig. 1 schematic diagram turns over turnback can obtain another embodiment of the present invention, and the Semicircular reinforcing bar 2 of precast concrete plank 1 is arranged on the position near precast concrete plank 1 epithelium.This embodiment can be used for floor and bears the connection in hogging moment region.
In a kind of embodiment of the method for attachment of the precast concrete plank that the present invention proposes, described transverse reinforcement 3 ends upwards bend 90 ., as Fig. 1 or Fig. 2 or Fig. 3.Or described transverse reinforcement 3 ends upwards bend 135 ., or other angles, can increase the anchorage length of transverse reinforcement in rear pouring concrete, increase the connection integrity between precast concrete plank.In order further to improve the connection integrity of precast concrete plank, in described transverse reinforcement corner, longitudinal reinforcement 6 is set, as Fig. 3.
In the method for attachment of the precast concrete plank that the present invention proposes, there is one or more transverse concave groove 4 precast concrete plank 1 side, connection integrity between pouring concrete and precast concrete after can improving between precast concrete plank, and the overlap joint area part of transverse reinforcement is at transverse concave groove place, reduce preset clearance, reduce template amount.Described transverse reinforcement 3 is at transverse concave groove place, and as Fig. 4, Fig. 6, or described transverse reinforcement 3 is in the projection between transverse concave groove, as Fig. 5.Fig. 8 is the embodiment schematic diagram that precast concrete plank 1 side does not have transverse concave groove.
In the method for attachment of the precast concrete plank that the present invention proposes, other transverse reinforcements are stretched out in precast concrete plank 1 side, as Fig. 7, can further increase the connection integrity between precast concrete plank.

Claims (4)

1. the method for attachment of a precast concrete plank, it is characterized in that described precast concrete plank side is embedded with abundant anchoring, exposed portions serve is Semicircular reinforcing bar, on described semicircular reinforcing bar, hang with transverse reinforcement, the preset clearance overlap joint of described transverse reinforcement between precast concrete plank; Install template in preset clearance bottom, in preset clearance, precast concrete plank is linked to be entirety by concreting; Or install template in preset clearance bottom, in preset clearance, form precast concrete superimposed sheet with precast concrete plank top concreting.
2. the method for attachment of precast concrete plank according to claim 1, is characterized in that, described transverse reinforcement end upwards bends 90 .
3. the method for attachment of precast concrete plank according to claim 1 and 2, is characterized in that, described transverse reinforcement corner arranges longitudinal reinforcement.
4. the method for attachment of precast concrete plank according to claim 1, is characterized in that, described precast concrete plank side has transverse concave groove, and described transverse reinforcement is at transverse concave groove place, or described transverse reinforcement is in the projection between transverse concave groove.
CN201410089046.5A 2014-03-12 2014-03-12 A kind of method of attachment of precast concrete plank Active CN103806546B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410089046.5A CN103806546B (en) 2014-03-12 2014-03-12 A kind of method of attachment of precast concrete plank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410089046.5A CN103806546B (en) 2014-03-12 2014-03-12 A kind of method of attachment of precast concrete plank

Publications (2)

Publication Number Publication Date
CN103806546A true CN103806546A (en) 2014-05-21
CN103806546B CN103806546B (en) 2015-11-18

Family

ID=50703892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410089046.5A Active CN103806546B (en) 2014-03-12 2014-03-12 A kind of method of attachment of precast concrete plank

Country Status (1)

Country Link
CN (1) CN103806546B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088321A (en) * 2016-07-29 2016-11-09 初明进 A kind of precast reinforced concrete structure
CN106088433A (en) * 2016-08-17 2016-11-09 四川省建筑科学研究院 A kind of novel bidirectional stress superimposed sheet and construction method thereof
CN106121052A (en) * 2016-08-31 2016-11-16 初明进 A kind of precast reinforced concrete structure method of attachment
CN106223481A (en) * 2016-07-29 2016-12-14 初明进 A kind of precast concrete method of attachment
CN106245757A (en) * 2016-08-31 2016-12-21 初明进 A kind of precast reinforced concrete structure method of attachment
CN106284785A (en) * 2016-10-27 2017-01-04 沈阳建筑大学 A kind of reserved last-cost joint assembled integral reinforced concrete floor
CN106639097A (en) * 2016-10-09 2017-05-10 北京崇建工程有限公司 Construction method for cast-in-situ reinforced concrete floor and floor structure
CN107020696A (en) * 2017-05-24 2017-08-08 深圳市鹏城建筑集团有限公司 A kind of processing method of the precast slab with plane built-in fitting
CN107700728A (en) * 2017-09-30 2018-02-16 沈阳建筑大学 Easy connect band shear key reinforced concrete slab structure and connection method
CN107905423A (en) * 2017-10-23 2018-04-13 华侨大学 A kind of assembly concrete floor and its construction method
CN108086482A (en) * 2016-11-23 2018-05-29 北京清华同衡规划设计研究院有限公司 Precast wall body with active connection and with its building system
CN108086589A (en) * 2016-11-23 2018-05-29 北京清华同衡规划设计研究院有限公司 Precast wall body, prefabricated unit body, building system and its construction method
CN108343184A (en) * 2018-02-02 2018-07-31 广州市第二市政工程有限公司 The floor construction method that tongue and groove hollow pre-fabricated panels and well word Cast-in-situ Beam are combined
CN108412080A (en) * 2018-02-12 2018-08-17 天津城建大学 Improve reinforcement connection structure, its construction method and the brick setting of brick setting globality
CN109441151A (en) * 2018-12-19 2019-03-08 有利华建材(惠州)有限公司 Prefabricated toilet and its construction and installation method
CN111502040A (en) * 2020-04-15 2020-08-07 广西建工集团第五建筑工程有限责任公司 Occlusion type laminated slab cast-in-place crossbeam member, casting mold and construction method thereof
CN111502263A (en) * 2020-04-15 2020-08-07 广西建工集团第五建筑工程有限责任公司 Cast-in-place crossbeam component of prefabricated building leak protection thick liquid pours mould

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223482A (en) * 2016-07-29 2016-12-14 初明进 A kind of precast reinforced concrete structure method of attachment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2751675A1 (en) * 1996-07-24 1998-01-30 Samflo PREFABRICATED CONCRETE ELEMENT FOR THE CONSTRUCTION OF A VENEERED WALL ART WORK
CN101881049A (en) * 2010-06-12 2010-11-10 黑龙江宇辉新型建筑材料有限公司 Horizontal annular steel bar connecting component for precast concrete components and construction method
CN102296754A (en) * 2011-05-19 2011-12-28 黑龙江宇辉新型建筑材料有限公司 Precast member horizontal steel reinforcement jointing element and jointing construction method
CN202450676U (en) * 2012-03-06 2012-09-26 黑龙江宇辉新型建筑材料有限公司 Composite slabs connected by using steel reinforcing bar 180-degree bending anchors and spiral bars in one span
CN102720272A (en) * 2012-06-29 2012-10-10 初明进 Embedded column type prefabricated part connection node and manufacturing method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2751675A1 (en) * 1996-07-24 1998-01-30 Samflo PREFABRICATED CONCRETE ELEMENT FOR THE CONSTRUCTION OF A VENEERED WALL ART WORK
CN101881049A (en) * 2010-06-12 2010-11-10 黑龙江宇辉新型建筑材料有限公司 Horizontal annular steel bar connecting component for precast concrete components and construction method
CN102296754A (en) * 2011-05-19 2011-12-28 黑龙江宇辉新型建筑材料有限公司 Precast member horizontal steel reinforcement jointing element and jointing construction method
CN202450676U (en) * 2012-03-06 2012-09-26 黑龙江宇辉新型建筑材料有限公司 Composite slabs connected by using steel reinforcing bar 180-degree bending anchors and spiral bars in one span
CN102720272A (en) * 2012-06-29 2012-10-10 初明进 Embedded column type prefabricated part connection node and manufacturing method thereof

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223481A (en) * 2016-07-29 2016-12-14 初明进 A kind of precast concrete method of attachment
CN106088321A (en) * 2016-07-29 2016-11-09 初明进 A kind of precast reinforced concrete structure
CN106088433A (en) * 2016-08-17 2016-11-09 四川省建筑科学研究院 A kind of novel bidirectional stress superimposed sheet and construction method thereof
CN106121052A (en) * 2016-08-31 2016-11-16 初明进 A kind of precast reinforced concrete structure method of attachment
CN106245757A (en) * 2016-08-31 2016-12-21 初明进 A kind of precast reinforced concrete structure method of attachment
CN106639097A (en) * 2016-10-09 2017-05-10 北京崇建工程有限公司 Construction method for cast-in-situ reinforced concrete floor and floor structure
CN106284785A (en) * 2016-10-27 2017-01-04 沈阳建筑大学 A kind of reserved last-cost joint assembled integral reinforced concrete floor
CN108086482A (en) * 2016-11-23 2018-05-29 北京清华同衡规划设计研究院有限公司 Precast wall body with active connection and with its building system
CN108086589A (en) * 2016-11-23 2018-05-29 北京清华同衡规划设计研究院有限公司 Precast wall body, prefabricated unit body, building system and its construction method
CN107020696A (en) * 2017-05-24 2017-08-08 深圳市鹏城建筑集团有限公司 A kind of processing method of the precast slab with plane built-in fitting
CN107700728A (en) * 2017-09-30 2018-02-16 沈阳建筑大学 Easy connect band shear key reinforced concrete slab structure and connection method
CN107905423A (en) * 2017-10-23 2018-04-13 华侨大学 A kind of assembly concrete floor and its construction method
CN108343184A (en) * 2018-02-02 2018-07-31 广州市第二市政工程有限公司 The floor construction method that tongue and groove hollow pre-fabricated panels and well word Cast-in-situ Beam are combined
CN108412080A (en) * 2018-02-12 2018-08-17 天津城建大学 Improve reinforcement connection structure, its construction method and the brick setting of brick setting globality
CN109441151A (en) * 2018-12-19 2019-03-08 有利华建材(惠州)有限公司 Prefabricated toilet and its construction and installation method
CN111502040A (en) * 2020-04-15 2020-08-07 广西建工集团第五建筑工程有限责任公司 Occlusion type laminated slab cast-in-place crossbeam member, casting mold and construction method thereof
CN111502263A (en) * 2020-04-15 2020-08-07 广西建工集团第五建筑工程有限责任公司 Cast-in-place crossbeam component of prefabricated building leak protection thick liquid pours mould

Also Published As

Publication number Publication date
CN103806546B (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN103806546B (en) A kind of method of attachment of precast concrete plank
CN103850352B (en) A kind of method of attachment of precast plate
CN104652654B (en) Assembled shear wall structure
KR101314081B1 (en) Retaining wall and upeer structure connection method for rahmen structure
CN104775553A (en) Novel L-shaped edge member for superimposed slab shear walls and connecting method for novel L-shaped edge member
CN103741810B (en) Method for horizontally connecting precast concrete members
CN105569224A (en) Concrete-filled steel tube edge restraint overlapping integrated shear wall and preparing and installation methods thereof
CN101839061A (en) Cast-in-place concrete arc outer wall single-side formwork system and construction method thereof
CN105604208B (en) A kind of precast shear wall using cast-in-place connection type
CN103741811B (en) Sleeper formula precast reinforced concrete structure node
CN102251669A (en) Construction method for cylindrical thin-walled concrete wall template
CN103924686A (en) Connection method of steel plate-concrete composite shear wall and composite floor
CN103741809B (en) The method of attachment of sleeper formula prefabricated units
CN103806539B (en) A kind of method of attachment of precast rc slab
CN113006321B (en) Construction method for connecting joints between combined precast concrete wall bodies
CN106638671A (en) High and low bin assembling integrated utility tunnel or draining canal
CN210976328U (en) Secondary structure capable of being assembled for construction
CN103669720A (en) Precast beam and reinforced concrete structure with tenon anchor system
CN205712204U (en) A kind of multiple waterstop and waterproof construction thereof
CN208396179U (en) A kind of prefabricated cantilever stair
CN105735467A (en) Connecting device and method for PC (prefabricated concrete) beam and column joints
CN105821908A (en) Multiple water stop belt, waterproof structure and construction method of waterproof structure
CN103572884B (en) A kind of hollow precast concrete member
CN204804129U (en) Prefabricated concrete floor entirely for building
CN106193120A (en) Basement is encorbelmented, and base plate is inverse makees structure and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant