CN103806546B - A kind of method of attachment of precast concrete plank - Google Patents
A kind of method of attachment of precast concrete plank Download PDFInfo
- Publication number
- CN103806546B CN103806546B CN201410089046.5A CN201410089046A CN103806546B CN 103806546 B CN103806546 B CN 103806546B CN 201410089046 A CN201410089046 A CN 201410089046A CN 103806546 B CN103806546 B CN 103806546B
- Authority
- CN
- China
- Prior art keywords
- precast concrete
- concrete plank
- preset clearance
- transverse reinforcement
- attachment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Precast concrete plank method of attachment of the present invention, belongs to building structure technology field; It is characterized in that described precast concrete plank side is embedded with abundant anchoring, exposed portion is Semicircular reinforcing bar, described semicircular reinforcing bar hangs with transverse reinforcement, the preset clearance overlap joint of described transverse reinforcement between precast concrete plank; Install template in preset clearance bottom, in preset clearance, precast concrete plank is linked to be entirety by concreting; Or install template in preset clearance bottom, in preset clearance, form precast concrete superimposed sheet with precast concrete plank top concreting.The present invention can improve the globality of assembled monolithic concrete structure, improves the performance of building structure, promotes the development of industrialization of construction industry.
Description
Technical field
The invention belongs to building structure technology field, particularly relate to a kind of method of attachment of the precast concrete plank for fabricated assembly overall concrete structure.
Background technology
Precast concrete is applicable industrialized form of structure, is the direction of housing industrialization development.Joint's connection fabrication in precast concrete between prefabricated units determines integrality performance of the structure.Existing precast concrete node is generally the weak link of structure, have impact on stress performance, and work progress is comparatively complicated.
Summary of the invention
The invention provides the method for attachment of a kind of easy construction, precast concrete plank that stress performance is good.The method of attachment of the precast concrete plank that the present invention proposes can improve the globality of assembled monolithic concrete structure, improves the performance of building structure, improves industrialization of construction industry level.
The feature of the method for attachment of the precast concrete plank that the present invention proposes is, described precast concrete plank side is embedded with abundant anchoring, exposed portion is Semicircular reinforcing bar, described semicircular reinforcing bar hangs with transverse reinforcement, such transverse reinforcement can move, rotate on semicircular reinforcing bar, freely adjust position, facilitate precast concrete plank to transport, lift, facilitate transverse reinforcement to locate; Transverse reinforcement is concentrated in factory or building site and is hung on semicircular reinforcing bar, reduces job site steel project; After precast concrete plank installation in position, by the preset clearance inside lap of transverse reinforcement between precast concrete plank, fix, install template in preset clearance bottom, in preset clearance, precast concrete plank is linked to be entirety by concreting; Or install template in preset clearance bottom, in preset clearance, form precast concrete superimposed sheet with precast concrete plank top concreting.Transverse reinforcement and semicircular bar connecting reliably, ensure that transverse reinforcement gives full play to intensity.
The feature of the method for attachment of the precast concrete plank that the present invention proposes is, described transverse reinforcement end upwards bends 90
., or bending 135
., or other angles, the anchorage length of transverse reinforcement in rear pouring concrete can be increased, increase the connection integrity between precast concrete plank.In order to improve the connection integrity of precast concrete plank further, longitudinal reinforcement is set in described transverse reinforcement corner.
The feature of method of attachment of the precast concrete plank that the present invention proposes is, described precast concrete plank side has transverse concave groove, described transverse reinforcement at transverse concave groove place, or in the projection of described transverse reinforcement between transverse concave groove.By arranging transverse concave groove, connection integrity between pouring concrete and precast concrete after can improving between precast concrete plank, and the lap length of transverse reinforcement some at transverse concave groove place, reduce preset clearance, thus reduce template amount.
The method of attachment that the present invention proposes can use for reference the connection for body of wall.
Technical characterstic of the present invention and advantage.
(1) transverse reinforcement of the present invention hangs over precast concrete plank side, can translation within the specific limits, rotation, freely adjust position, facilitate the transport of precast concrete plank, installation, facilitate that the reinforcing bar between precast concrete plank is located, connection etc.
(2) there is transverse concave groove precast concrete plank side of the present invention, improves the binding ability of new-old concrete.
(3) transverse reinforcement of the present invention is linked on precast concrete plank in factory, and the part reinforced bar engineering of job site is transferred to factory, improves industrialization of construction industry level.
Accompanying drawing explanation
Fig. 1 is a kind of embodiment schematic diagram of the present invention.
Fig. 2 is another kind of embodiment schematic diagram of the present invention.
Fig. 3 is another kind of embodiment schematic diagram of the present invention.
Fig. 4 is a kind of embodiment schematic diagram of precast concrete plank in the embodiment of the present invention.
Fig. 5 is the another kind of embodiment schematic diagram of precast concrete plank in the embodiment of the present invention.
Fig. 6 is the another kind of embodiment schematic diagram of precast concrete plank in the embodiment of the present invention.
Fig. 7 is the another kind of embodiment schematic diagram of precast concrete plank in the embodiment of the present invention.
Fig. 8 is the another kind of embodiment schematic diagram of precast concrete plank in the embodiment of the present invention.
Mark implication in accompanying drawing is: pouring concrete 6 longitudinal reinforcement after 1 precast concrete plank 2 semicircular reinforcing bar 3 transverse reinforcement 4 transverse concave groove 5.
Detailed description of the invention
Below in conjunction with drawings and Examples, the method for attachment of precast concrete plank of the present invention is described in detail.
A kind of embodiment of the method for attachment of the precast concrete plank that the present invention proposes, as Fig. 1, precast concrete plank 1 side is embedded with abundant anchoring, exposed portion is Semicircular reinforcing bar 2, described semicircular reinforcing bar 2 hangs with transverse reinforcement 3, transverse reinforcement 3 is connected reliably with semicircular reinforcing bar 2, ensures that transverse reinforcement gives full play to intensity.Transverse reinforcement can move, rotate on semicircular reinforcing bar, freely adjusts position, facilitates precast concrete plank to transport, lifts, facilitate transverse reinforcement to locate; Transverse reinforcement is hanging on semicircular reinforcing bar in factory, reduce job site steel project.After precast concrete plank 1 installation in position, by the preset clearance inside lap of transverse reinforcement 3 between precast concrete plank, fix, install template in preset clearance bottom, in preset clearance, precast concrete plank is linked to be entirety by concreting 5.The another kind of embodiment of the precast concrete plank method of attachment that the present invention proposes, as Fig. 2, forms precast concrete superimposed sheet with precast concrete plank 1 top concreting in preset clearance.
Fig. 1 schematic diagram turns over turnback can obtain another embodiment of the present invention, and namely the Semicircular reinforcing bar 2 of precast concrete plank 1 is arranged on the position near precast concrete plank 1 epithelium.This embodiment can be used for the connection that floor bears hogging moment region.
In a kind of embodiment of the method for attachment of the precast concrete plank that the present invention proposes, described transverse reinforcement 3 end upwards bends 90
., as Fig. 1 or Fig. 2 or Fig. 3.Or described transverse reinforcement 3 end upwards bends 135
., or other angles, the anchorage length of transverse reinforcement in rear pouring concrete can be increased, increase the connection integrity between precast concrete plank.In order to improve the connection integrity of precast concrete plank further, in described transverse reinforcement corner, longitudinal reinforcement 6 is set, as Fig. 3.
In the method for attachment of the precast concrete plank that the present invention proposes, there is one or more transverse concave groove 4 precast concrete plank 1 side, connection integrity between pouring concrete and precast concrete after can improving between precast concrete plank, and the overlapping regions part of transverse reinforcement is at transverse concave groove place, reduce preset clearance, reduce template amount.Described transverse reinforcement 3 at transverse concave groove place, as Fig. 4, Fig. 6, or in the projection of described transverse reinforcement 3 between transverse concave groove, as Fig. 5.Fig. 8 is the embodiment schematic diagram that precast concrete plank 1 side does not have transverse concave groove.
In the method for attachment of the precast concrete plank that the present invention proposes, other transverse reinforcements are stretched out in precast concrete plank 1 side, as Fig. 7, can increase the connection integrity between precast concrete plank further.
Claims (4)
1. the method for attachment of a precast concrete plank, it is characterized in that described precast concrete plank side is embedded with abundant anchoring, exposed portion is Semicircular reinforcing bar, described Semicircular reinforcing bar hangs with transverse reinforcement, the preset clearance overlap joint of described transverse reinforcement between precast concrete plank; Install template in preset clearance bottom, in preset clearance, precast concrete plank is linked to be entirety by concreting; Or install template in preset clearance bottom, in preset clearance, form precast concrete superimposed sheet with precast concrete plank top concreting.
2. the method for attachment of precast concrete plank according to claim 1, is characterized in that, described transverse reinforcement end upwards 90-degree bent.
3. the method for attachment of precast concrete plank according to claim 1 and 2, is characterized in that, described transverse reinforcement corner arranges longitudinal reinforcement.
4. the method for attachment of precast concrete plank according to claim 1, is characterized in that, described precast concrete plank side has transverse concave groove, described transverse reinforcement at transverse concave groove place, or in the projection of described transverse reinforcement between transverse concave groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410089046.5A CN103806546B (en) | 2014-03-12 | 2014-03-12 | A kind of method of attachment of precast concrete plank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410089046.5A CN103806546B (en) | 2014-03-12 | 2014-03-12 | A kind of method of attachment of precast concrete plank |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103806546A CN103806546A (en) | 2014-05-21 |
CN103806546B true CN103806546B (en) | 2015-11-18 |
Family
ID=50703892
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410089046.5A Active CN103806546B (en) | 2014-03-12 | 2014-03-12 | A kind of method of attachment of precast concrete plank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103806546B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106223482A (en) * | 2016-07-29 | 2016-12-14 | 初明进 | A kind of precast reinforced concrete structure method of attachment |
Families Citing this family (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088321A (en) * | 2016-07-29 | 2016-11-09 | 初明进 | A kind of precast reinforced concrete structure |
CN106223481A (en) * | 2016-07-29 | 2016-12-14 | 初明进 | A kind of precast concrete method of attachment |
CN106088433B (en) * | 2016-08-17 | 2019-03-12 | 四川省建筑科学研究院 | A kind of bidirectional stress superimposed sheet and its construction method |
CN106245757A (en) * | 2016-08-31 | 2016-12-21 | 初明进 | A kind of precast reinforced concrete structure method of attachment |
CN106121052A (en) * | 2016-08-31 | 2016-11-16 | 初明进 | A kind of precast reinforced concrete structure method of attachment |
CN106639097B (en) * | 2016-10-09 | 2019-02-19 | 北京崇建工程有限公司 | A kind of construction method and floor construction of in-situ reinforced concrete slab |
CN106284785A (en) * | 2016-10-27 | 2017-01-04 | 沈阳建筑大学 | A kind of reserved last-cost joint assembled integral reinforced concrete floor |
CN108086482A (en) * | 2016-11-23 | 2018-05-29 | 北京清华同衡规划设计研究院有限公司 | Precast wall body with active connection and with its building system |
CN108086589A (en) * | 2016-11-23 | 2018-05-29 | 北京清华同衡规划设计研究院有限公司 | Precast wall body, prefabricated unit body, building system and its construction method |
CN107020696A (en) * | 2017-05-24 | 2017-08-08 | 深圳市鹏城建筑集团有限公司 | A kind of processing method of the precast slab with plane built-in fitting |
CN107700728A (en) * | 2017-09-30 | 2018-02-16 | 沈阳建筑大学 | Easy connect band shear key reinforced concrete slab structure and connection method |
CN107905423A (en) * | 2017-10-23 | 2018-04-13 | 华侨大学 | A kind of assembly concrete floor and its construction method |
CN108343184A (en) * | 2018-02-02 | 2018-07-31 | 广州市第二市政工程有限公司 | The floor construction method that tongue and groove hollow pre-fabricated panels and well word Cast-in-situ Beam are combined |
CN108412080A (en) * | 2018-02-12 | 2018-08-17 | 天津城建大学 | Improve reinforcement connection structure, its construction method and the brick setting of brick setting globality |
CN109441151A (en) * | 2018-12-19 | 2019-03-08 | 有利华建材(惠州)有限公司 | Prefabricated toilet and its construction and installation method |
CN111502040A (en) * | 2020-04-15 | 2020-08-07 | 广西建工集团第五建筑工程有限责任公司 | Occlusion type laminated slab cast-in-place crossbeam member, casting mold and construction method thereof |
CN111502263A (en) * | 2020-04-15 | 2020-08-07 | 广西建工集团第五建筑工程有限责任公司 | Cast-in-place crossbeam component of prefabricated building leak protection thick liquid pours mould |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2751675A1 (en) * | 1996-07-24 | 1998-01-30 | Samflo | PREFABRICATED CONCRETE ELEMENT FOR THE CONSTRUCTION OF A VENEERED WALL ART WORK |
CN101881049A (en) * | 2010-06-12 | 2010-11-10 | 黑龙江宇辉新型建筑材料有限公司 | Horizontal annular steel bar connecting component for precast concrete components and construction method |
CN102296754A (en) * | 2011-05-19 | 2011-12-28 | 黑龙江宇辉新型建筑材料有限公司 | Precast member horizontal steel reinforcement jointing element and jointing construction method |
CN202450676U (en) * | 2012-03-06 | 2012-09-26 | 黑龙江宇辉新型建筑材料有限公司 | Composite slabs connected by using steel reinforcing bar 180-degree bending anchors and spiral bars in one span |
CN102720272A (en) * | 2012-06-29 | 2012-10-10 | 初明进 | Embedded column type prefabricated part connection node and manufacturing method thereof |
-
2014
- 2014-03-12 CN CN201410089046.5A patent/CN103806546B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2751675A1 (en) * | 1996-07-24 | 1998-01-30 | Samflo | PREFABRICATED CONCRETE ELEMENT FOR THE CONSTRUCTION OF A VENEERED WALL ART WORK |
CN101881049A (en) * | 2010-06-12 | 2010-11-10 | 黑龙江宇辉新型建筑材料有限公司 | Horizontal annular steel bar connecting component for precast concrete components and construction method |
CN102296754A (en) * | 2011-05-19 | 2011-12-28 | 黑龙江宇辉新型建筑材料有限公司 | Precast member horizontal steel reinforcement jointing element and jointing construction method |
CN202450676U (en) * | 2012-03-06 | 2012-09-26 | 黑龙江宇辉新型建筑材料有限公司 | Composite slabs connected by using steel reinforcing bar 180-degree bending anchors and spiral bars in one span |
CN102720272A (en) * | 2012-06-29 | 2012-10-10 | 初明进 | Embedded column type prefabricated part connection node and manufacturing method thereof |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106223482A (en) * | 2016-07-29 | 2016-12-14 | 初明进 | A kind of precast reinforced concrete structure method of attachment |
Also Published As
Publication number | Publication date |
---|---|
CN103806546A (en) | 2014-05-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103806546B (en) | A kind of method of attachment of precast concrete plank | |
CN103850352B (en) | A kind of method of attachment of precast plate | |
CN104775553A (en) | Novel L-shaped edge member for superimposed slab shear walls and connecting method for novel L-shaped edge member | |
CN101839061A (en) | Unilateral formwork erecting system of cast-in-site concrete arc outer wall body and construction method thereof | |
CN103741810B (en) | Method for horizontally connecting precast concrete members | |
CN103741811B (en) | Sleeper formula precast reinforced concrete structure node | |
CN102251669A (en) | Construction method for cylindrical thin-walled concrete wall template | |
CN105544796A (en) | Prefabricated assembly type shear wall and butt joint method thereof | |
CN106906984A (en) | A kind of prefabricated assembled steel reinforced concrete framework elevator shaft structure and its construction method | |
CN204876199U (en) | Restraint overlap joint structure is concentrated to precast shear wall vertical reinforcement | |
CN105019606A (en) | Precast concrete unit steel bar grouting connecting piece and connecting method | |
CN103741809B (en) | The method of attachment of sleeper formula prefabricated units | |
CN104775555B (en) | A kind of T-shaped composite plate shear wall edge member and attaching method thereof | |
CN203947498U (en) | Poured band of outer wall of basement wall Side Template | |
CN105735467A (en) | Connecting device and method for PC (prefabricated concrete) beam and column joints | |
CN107060084A (en) | Prefabricated constructional column attachment structure and attaching method thereof | |
CN207553287U (en) | A kind of sill bolt plate precast wall body and its connecting node with laminated floor slab | |
CN103572884B (en) | A kind of hollow precast concrete member | |
CN103806539B (en) | A kind of method of attachment of precast rc slab | |
CN104929279A (en) | Pre-cast shear wall vertical rebar centralized restraint lap joint construction | |
CN204551824U (en) | A kind of Novel L-shaped overlaid plate type shear wall edge member | |
CN102635239A (en) | Method for anchoring welding wire-mesh reinforcement on floorslab bottom into support | |
CN103806537B (en) | The method of attachment of sleeper formula precast unit | |
CN203795611U (en) | Connecting joints of precast slabs | |
CN106320589A (en) | Roof assembling method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |