CN107060084A - Prefabricated constructional column attachment structure and attaching method thereof - Google Patents

Prefabricated constructional column attachment structure and attaching method thereof Download PDF

Info

Publication number
CN107060084A
CN107060084A CN201710481592.7A CN201710481592A CN107060084A CN 107060084 A CN107060084 A CN 107060084A CN 201710481592 A CN201710481592 A CN 201710481592A CN 107060084 A CN107060084 A CN 107060084A
Authority
CN
China
Prior art keywords
post
reinforcing bar
superstructure
infrastructure
constructional column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710481592.7A
Other languages
Chinese (zh)
Inventor
吴亚峰
杨晓艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710481592.7A priority Critical patent/CN107060084A/en
Publication of CN107060084A publication Critical patent/CN107060084A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • E04B1/215Connections specially adapted therefor comprising metallic plates or parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to the technical field of construction, a kind of prefabricated constructional column attachment structure and attaching method thereof, including step (1) are disclosed:The reinforcing bar for stretching out its end face is embedded with the top structure and polycrystalline substance of floor;Step (2):Prefabricated superstructure post and infrastructure post are distinguished by factory;Step (3):It will be fixed using lifting mode between polycrystalline substance and infrastructure post by reinforcing bar slurry anchor connection mode;Step (4):Using lifting mode by between superstructure post horizontal sliding to top structure and infrastructure post;Step (5):Pass mould is carried out on position corresponding with the projection and groove positioned at the superstructure post two ends respectively, and the cement mortar of label identical with the concrete strength of superstructure post is poured in the template for closing mould, solve existing constructional column quality and be not readily reachable by the problem of acceptance criteria, technique fall behind, molding effect is poor and implements slow speed and high construction cost.

Description

Prefabricated constructional column attachment structure and attaching method thereof
Technical field
The present invention relates to technical field of building construction, in particular it relates to a kind of prefabricated constructional column attachment structure and its connection Method.
Background technology
In the predetermined portion of masonry house wall, by constructional reinforcement, and it is suitable by the construction of placing concrete post after first building a wall The concrete column that sequence is made, commonly referred to as concrete-constituted pile, abbreviation constructional column.Constructional column is important in brick-and-concrete buildingses Concrete component.To improve the anti-seismic performance of tier building masonry structure, code requirement appropriate site should be set in the masonry in house Reinforced column is simultaneously connected with collar tie beam, and the common stability for strengthening building, this reinforced column is generally thus referred to as Constructional column.Constructional column is primarily not to undertake vertical load, but for resisting the lateral loads such as shearing, antidetonation.From construction Angle says that constructional column will be with collar tie beam grade beam, foundation beam one-piece casting.There is horizontal connecting lacing wire to connect in Structural Engineering with brick wall body Connect.If constructional column will be connected in building, structures centre position with distributing reinforcement.
Existing constructional column is primarily present following problem substantially by the way of cast-in-place:
1st, because by the way of cast-in-place, construction cannot be guaranteed, quality is not readily reachable by acceptance criteria;
2nd, technique falls behind, and molding effect is poor, has influence on overall aesthetics;
3rd, need to carry out the welding of reinforcing bar at the scene and close cast-in-place after mould, implementation speed is slow and construction cost is high.
The content of the invention
In order to solve the above technical problems, the invention provides prefabricated constructional column connection method with reach improve construction technology, Improve the quality standard of constructional column and reduce the purpose of construction cost, solve existing constructional column quality and be not readily reachable by and test The problem of receipts standard, technique fall behind, molding effect is poor and implement slow speed and high construction cost.
In order to realize above-mentioned technique effect, technical scheme provided by the present invention is:Prefabricated constructional column attachment structure, including Prefabricated superstructure post and infrastructure post, one end of the superstructure post is provided with projection, and raised both sides are extended with The pre- reinforcing bar A being embedded in inside superstructure post, the other end offers groove corresponding with the reinforcing bar A respectively and groove runs through In on the two relative side of superstructure post;One end of the infrastructure post is extended with the reinforcing bar B in pre-buried portion in the inner, and steel Muscle B is corresponding with the reinforcing bar A in the groove, and the other end is embedded with bellows corresponding with reinforcing bar B respectively.
Further, the groove is set to rectangular through slot.
Further, the both sides of the superstructure post and infrastructure post are set to horse tooth trough structure.
Further, the projection is set to rectangular preiection.
Further, the infrastructure post is provided with the grouting mouthful being connected with bellows.
The invention also discloses prefabricated constructional column connection method, this method comprises the following steps:
Step (1):The reinforcing bar for stretching out its end face is embedded with the top structure and polycrystalline substance of floor;
Step (2):The prefabricated superstructure post as described in claim 1-5 any one and bottom are distinguished by factory Constructional column;
Step (3):The pre-buried bellows of infrastructure column end is inserted in step from top to bottom using lifting mode (1) it is solid by reinforcing bar slurry anchor connection mode between polycrystalline substance and infrastructure post outside the pre-buried reinforcing bar of polycrystalline substance in It is fixed;
Step (4):Using lifting mode by between superstructure post horizontal sliding to top structure and infrastructure post, make Reinforcing bar A in cage structure post one end groove is corresponding with the reinforcing bar B of infrastructure column end and is welded to connect, superstructure post The reinforcing bar A of the other end projection both sides is corresponding with the reinforcing bar that top structure is reserved and is welded to connect;
Step (5):Carried out on position corresponding with the projection and groove positioned at the superstructure post two ends respectively Guan Mo, and poured in the template for closing mould the cement mortar of label identical with the concrete strength of superstructure post.
Further, the reinforcing bar slurry anchor connection mode in the step (3) is by the way that the reinforcing bar of polycrystalline substance end is inserted To the pre-buried bellows interior of infrastructure column end, and respectively, the reinforcing bar B phases with bellows interior are close to, then to bellows Internal joints cement slurry.
Further, closed in the step (5) after mould to pour shape identical with the outer shape of superstructure post.
Further, the pre-buried reinforcing bar of top structure in the step (1) and the reinforcing bar A phases of superstructure column end Correspondence, the pre-buried reinforcing bar of polycrystalline substance is corresponding with the reinforcing bar B of infrastructure column end.
Compared to prior art, the beneficial effects of the invention are as follows:
1. the superstructure post of the application and infrastructure post be carried out in advance in factory it is prefabricated, relative to cast-in-place Constructional column has better quality, enables to reach the building acceptance criteria of country;
2. the connected mode of anchor is starched between the infrastructure post and polycrystalline substance of the application by reinforcing bar, and superstructure post It is connected respectively between top structure and infrastructure post by the way of reinforcement welding, whole work progress is using the side lifted Formula, its difficulty of construction is small, save manual labor, has relative to prior art and implements speed faster;
3. after superstructure post installation, the projection and groove at its two ends are subjected to pass mould respectively and poured, is made whole Constructional column has overall outward appearance degree, and realizes good stability and intensity.
Brief description of the drawings
Fig. 1 is the mounting structure schematic diagram of the prefabricated constructional column attachment structure that the present invention is provided and attaching method thereof;
Fig. 2 is the front view of the prefabricated constructional column attachment structure that the present invention is provided and attaching method thereof;
Fig. 3 is Fig. 2 partial enlarged drawing.
Embodiment
The present invention is further described in detail with reference to specific embodiment, following word is intended to indicate that this hair Protection domain that is bright, being not intended to limit the present invention.
As shown in Figure 1, Figure 2 and Figure 3, the present invention can be implemented as follows, a kind of prefabricated constructional column attachment structure, bag Prefabricated superstructure post 1 and infrastructure post 2 is included, one end of the superstructure post 1 forms and be similar to provided with projection 3 The structure of convex shape, the both sides of projection 3 are extended with the pre- reinforcing bar A4 being embedded in inside superstructure post 1, and reinforcing bar A4 is located at projection 3 Both sides, be easy to reinforcing bar A4 welding, the other end offers groove 6 corresponding with the reinforcing bar A4 respectively and groove 6 runs through In on the two relative side of superstructure post 1, the reinforcing bar A4 other end is located at the inside of groove 6, is easy to superstructure post 1 with After cage structure post 2 is spliced, reinforcing bar A4 being welded to connect between the two with reinforcing bar B5;Stretch one end of the infrastructure post 2 Go out the reinforcing bar B5 for having pre-buried portion in the inner, and reinforcing bar B5 is corresponding with the reinforcing bar A4 in the groove 6, the other end is embedded with The bellows 7 corresponding with reinforcing bar B5 respectively, reinforcing bar B5 is located in described bellows 7.Wherein, the He of superstructure post 1 The both sides of infrastructure post 2 are set to horse tooth trough structure, and this structure is easy to after superstructure post 1 and the splicing of infrastructure post 2, energy It is enough to be bonded between wall.
As preferred, above-mentioned groove 6 is set to rectangular through slot 6, described raised 3 are set to rectangular preiection 3, rectangular preiection 3 end face is in contact with the top structure 9 of the top of superstructure post 1.
The infrastructure post 2 is provided with the grouting mouthful being connected with bellows 7, and grouting mouth is easy into bellows 7 Portion carries out joints cement slurry, as preferred, and grouting mouth is provided with two, and one of them is for into bellows 7 Poured, another is used to observe and test whether by bellows 7 pour filling.
The invention also discloses prefabricated constructional column connection method, this method comprises the following steps:
Step (1):The reinforcing bar for stretching out its end face is reserved with the top structure 9 of floor, in the polycrystalline substance 8 of floor Portion is equally also embedded with the reinforcing bar for stretching out its end face;Described reinforcing bar be respectively used to superstructure post 1 and infrastructure post 2 it Between connection, so as to realize the integral construction of constructional column.
Step (2):The prefabricated superstructure post 1 as described in claim 1-5 any one and bottom are distinguished by factory Constructional column 2;The quality standard of country can be reached by the superstructure post 1 and infrastructure post 2 of prefabrication.
Step (3):The bellows 7 of the end of infrastructure post 2 is inserted in step (1) from top to bottom using lifting mode Outside the pre-buried reinforcing bar of middle polycrystalline substance 8, fixed between polycrystalline substance 8 and infrastructure post 2 by reinforcing bar slurry anchor connection mode; So as to realize being fixedly connected between infrastructure post 2 and polycrystalline substance 8.
Step (4):Using lifting mode by the horizontal sliding of superstructure post 1 between top structure 9 and infrastructure post 2 (i.e. Superstructure post 1 is set to be caught in the reinforcing bar between top structure 9 and infrastructure post 2, and in the end groove 6 of superstructure post 1 A4 just with the reinforcing bar B5 opposite positions of the end of infrastructure post 2), make the reinforcing bar in the one end groove 6 of superstructure post 1 A4 is corresponding with the reinforcing bar B5 of the end of infrastructure post 2 and is welded to connect, the steel of the other end of superstructure post 13 both sides of projection Muscle A4 is corresponding with the reinforcing bar that top structure 9 is reserved and is welded to connect;
Step (5):On position corresponding with the projection 3 and groove 6 positioned at the two ends of superstructure post 1 respectively Pass mould is carried out, and is poured in the template for closing mould the cement mortar of label identical with the concrete strength of superstructure post 1.
Reinforcing bar slurry anchor connection mode in the step (3) by the reinforcing bar of the end of polycrystalline substance 8 by being inserted into bottom structure Make inside the pre-buried bellows 7 in the end of post 2, and be close to respectively with the reinforcing bar B5 phases inside bellows 7, then poured into bellows 7 Build cement mortar (being poured by the grouting mouthful on infrastructure post 2).
Closed in the step (5) after mould to pour shape identical with the outer shape of superstructure post 1, after Guan Mo is poured The exposed reinforcing bar A4 in raised 3 both sides of the end of superstructure post 1 is coated, by the groove 6 of the other end of superstructure post 1 Progress, which is poured, fills out envelope, so as to reach that the monnolithic case of superstructure post 1 is consistent, forms a complete superstructure post 1 It is overall.
The pre-buried reinforcing bar of top structure 9 in the step (1) is corresponding with the reinforcing bar A4 of the end of superstructure post 1, protects Beam pre-buried reinforcing bar in card portion can be realized between top structure 9 and superstructure post 1 between reinforcing bar A4 by being welded to connect Connection;The pre-buried reinforcing bar of polycrystalline substance 8 is corresponding with the reinforcing bar B5 of the end of infrastructure post 2, it is ensured that reinforcing bar B5 can be with bottom The pre-buried reinforcing bar of structure 8 is mutually close to, and is connected by way of reinforcing bar starches anchor, so as to realize polycrystalline substance 8 and infrastructure Connection between post 2.
Any one skilled in the art the invention discloses technical scope in, can readily occur in change or Replace, should all be included within the scope of the present invention.Therefore, protection scope of the present invention should be with the guarantor described in claim Shield scope is defined.

Claims (9)

1. a kind of prefabricated constructional column attachment structure, it is characterised in that described including prefabricated superstructure post and infrastructure post One end of superstructure post is provided with projection, and raised both sides are extended with the pre- reinforcing bar A being embedded in inside superstructure post, the other end Offer groove corresponding with the reinforcing bar A respectively and groove is through on the two relative side of superstructure post;Under described One end of cage structure post is extended with the reinforcing bar B in pre-buried portion in the inner, and reinforcing bar B is corresponding with the reinforcing bar A in the groove, The other end is embedded with bellows corresponding with reinforcing bar B respectively.
2. prefabricated constructional column attachment structure according to claim 1, it is characterised in that the groove is set to rectangular through slot.
3. prefabricated constructional column attachment structure according to claim 1, it is characterised in that the superstructure post and bottom structure The both sides for making post are set to horse tooth trough structure.
4. prefabricated constructional column attachment structure according to claim 1, it is characterised in that the projection is set to rectangular preiection.
5. prefabricated constructional column attachment structure according to claim 1, it is characterised in that the infrastructure post be provided with The grouting mouthful that bellows is connected.
6. a kind of prefabricated constructional column connection method, it is characterised in that this method comprises the following steps:
Step (1):The reinforcing bar for stretching out its end face is embedded with the top structure and polycrystalline substance of floor;
Step (2):Prefabricated superstructure post and infrastructure as described in claim 1-5 any one is distinguished by factory Post;
Step (3):The pre-buried bellows of infrastructure column end is inserted in into step (1) from top to bottom using lifting mode The pre-buried reinforcing bar of polycrystalline substance outside, fixed between polycrystalline substance and infrastructure post by reinforcing bar slurry anchor connection mode;
Step (4):Using lifting mode by between superstructure post horizontal sliding to top structure and infrastructure post, make top structure Make the reinforcing bar A in post one end groove corresponding with the reinforcing bar B of infrastructure column end and be welded to connect, superstructure post is another The reinforcing bar A of end bosses both sides is corresponding with the reinforcing bar that top structure is reserved and is welded to connect;
Step (5):Closed on position corresponding with the projection and groove positioned at the superstructure post two ends respectively Mould, and poured in the template for closing mould the cement mortar of label identical with the concrete strength of superstructure post.
7. prefabricated constructional column connection method according to claim 6, it is characterised in that the reinforcing bar slurry in the step (3) Anchor connected mode by the reinforcing bar of polycrystalline substance end by being inserted into the pre-buried bellows interior of infrastructure column end, and difference It is close to, then is starched to the inside joints cement of bellows with the reinforcing bar B phases of bellows interior.
8. prefabricated constructional column connection method according to claim 6, it is characterised in that closed in the step (5) after mould Pour shape identical with the outer shape of superstructure post.
9. prefabricated constructional column connection method according to claim 6, it is characterised in that the top knot in the step (1) The pre-buried reinforcing bar of structure is corresponding with the reinforcing bar A of superstructure column end, the pre-buried reinforcing bar of polycrystalline substance and infrastructure column end Reinforcing bar B it is corresponding.
CN201710481592.7A 2017-06-22 2017-06-22 Prefabricated constructional column attachment structure and attaching method thereof Pending CN107060084A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710481592.7A CN107060084A (en) 2017-06-22 2017-06-22 Prefabricated constructional column attachment structure and attaching method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710481592.7A CN107060084A (en) 2017-06-22 2017-06-22 Prefabricated constructional column attachment structure and attaching method thereof

Publications (1)

Publication Number Publication Date
CN107060084A true CN107060084A (en) 2017-08-18

Family

ID=59594942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710481592.7A Pending CN107060084A (en) 2017-06-22 2017-06-22 Prefabricated constructional column attachment structure and attaching method thereof

Country Status (1)

Country Link
CN (1) CN107060084A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288263A (en) * 2017-08-21 2017-10-24 中冶建工集团有限公司 The construction method of prefabricated constructional column
CN108104372A (en) * 2018-02-05 2018-06-01 天津城建大学 For the precast combined constructional column and construction method of masonry structure
CN109723187A (en) * 2019-01-07 2019-05-07 中国十七冶集团有限公司 A kind of large area lightweight aggregate buttress installation method
CN113089883A (en) * 2021-03-04 2021-07-09 中国建筑第八工程局有限公司 Prefabricated constructional column assembling structure and method for building block wall
CN116025109A (en) * 2023-03-16 2023-04-28 中建八局第四建设有限公司 Constructional column and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000160687A (en) * 1998-12-01 2000-06-13 Fujita Corp Construction method for composite structure and precast concrete column
CN102493439A (en) * 2011-11-25 2012-06-13 唐瑞文 Building fundamental pile constructional element
CN102561600A (en) * 2011-12-27 2012-07-11 上海利物宝建筑科技有限公司 Steel bar splicing sleeve
CN203440993U (en) * 2013-09-13 2014-02-19 山东科技大学 Connection joint of prefabricated reinforced concrete beam
CN103741881A (en) * 2013-12-12 2014-04-23 王睿敏 Fabricated frame column and construction method
CN105155725A (en) * 2015-06-25 2015-12-16 李彦斌 Construction method of novel structural column for frame-structured T-shaped filled walls
CN204876554U (en) * 2015-08-03 2015-12-16 中冶建工集团有限公司 Outer wall middle part constructional column mould shell mounting structure
CN106284689A (en) * 2016-08-31 2017-01-04 浙江舜江建设集团有限公司 A kind of fabricated assembly overall special-shaped column structure and connection construction method thereof
CN206859402U (en) * 2017-06-22 2018-01-09 吴亚峰 Prefabricated constructional column attachment structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000160687A (en) * 1998-12-01 2000-06-13 Fujita Corp Construction method for composite structure and precast concrete column
CN102493439A (en) * 2011-11-25 2012-06-13 唐瑞文 Building fundamental pile constructional element
CN102561600A (en) * 2011-12-27 2012-07-11 上海利物宝建筑科技有限公司 Steel bar splicing sleeve
CN203440993U (en) * 2013-09-13 2014-02-19 山东科技大学 Connection joint of prefabricated reinforced concrete beam
CN103741881A (en) * 2013-12-12 2014-04-23 王睿敏 Fabricated frame column and construction method
CN105155725A (en) * 2015-06-25 2015-12-16 李彦斌 Construction method of novel structural column for frame-structured T-shaped filled walls
CN204876554U (en) * 2015-08-03 2015-12-16 中冶建工集团有限公司 Outer wall middle part constructional column mould shell mounting structure
CN106284689A (en) * 2016-08-31 2017-01-04 浙江舜江建设集团有限公司 A kind of fabricated assembly overall special-shaped column structure and connection construction method thereof
CN206859402U (en) * 2017-06-22 2018-01-09 吴亚峰 Prefabricated constructional column attachment structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288263A (en) * 2017-08-21 2017-10-24 中冶建工集团有限公司 The construction method of prefabricated constructional column
CN108104372A (en) * 2018-02-05 2018-06-01 天津城建大学 For the precast combined constructional column and construction method of masonry structure
CN109723187A (en) * 2019-01-07 2019-05-07 中国十七冶集团有限公司 A kind of large area lightweight aggregate buttress installation method
CN113089883A (en) * 2021-03-04 2021-07-09 中国建筑第八工程局有限公司 Prefabricated constructional column assembling structure and method for building block wall
CN116025109A (en) * 2023-03-16 2023-04-28 中建八局第四建设有限公司 Constructional column and construction method thereof

Similar Documents

Publication Publication Date Title
CN107060084A (en) Prefabricated constructional column attachment structure and attaching method thereof
CN107044177A (en) A kind of assembly concrete shear wall fractionation, assembled attachment structure and connection method
CN107100290A (en) A kind of prefabricated shear wall and overlapping plate node
ITTO950923A1 (en) STRUCTURE OF AN UNDERGROUND WORKS, PARTICULARLY FOR THE RELIATION OF TUNNELS, SUBWAYS, GARAGES OR SIMILAR, ITS PROCEDURE OF
CN107023121A (en) A kind of reinforcing bar grout sleeve connected for prefabricated concrete structure ductility
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN205474893U (en) Four component double -hinged reinforced concrete box -type passage of assembled
CN106894587A (en) Precast stair connection method
CN107675610A (en) A kind of construction and the practice of the connection of precast assembly bridge pier section
CN209227831U (en) Wall and floor connection structure and assembled arthitecutral structure system
CN108867935A (en) L shape connecting structure of wall and assembled arthitecutral structure system
CN106968381A (en) With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection
CN107338801B (en) Prestressing force assembled Complex retaining wall structure and construction method
CN106245817A (en) A kind of fabricated shear wall vertical connection structure and installation method thereof
CN107090908B (en) A kind of vertical prefabricated components joint connecting method
CN206174195U (en) Assembled concrete shear force wall split, assemble connection structure
CN105839818A (en) Integral concrete prefabricated wallboard free of lateral die assembly as well as assembling structure and assembling method thereof
CN105544796A (en) Prefabricated assembly type shear wall and butt joint method thereof
CN205742642U (en) One exempts from the concrete prefabricated wallboard of side form assembled integral and splicing structure thereof
CN212175458U (en) Prefabricated bent cap and track traffic elevated station hall layer frame thereof
CN108708452A (en) The U-shaped integral prefabricated window member that floats, assembled float window joint structure and its construction method
CN106703190A (en) Prefabricating beam column joint structure containing prestressing pore path and construction method thereof
CN208632986U (en) A kind of rectangular channel structure of precast assembly
CN208650333U (en) A kind of compound Coupled Shear Wall structure of assembled integral steel reinforced concrete frame support
CN106087881B (en) A kind of precast concrete box-structure and cast-in-place concrete convolution Sluice Pier structure and its construction technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818