Reinforcing bars building block short-limb masonry shear wall structure Download PDFInfo
- Publication number
- CN101041981A CN101041981A CN 200710072160 CN200710072160A CN101041981A CN 101041981 A CN101041981 A CN 101041981A CN 200710072160 CN200710072160 CN 200710072160 CN 200710072160 A CN200710072160 A CN 200710072160A CN 101041981 A CN101041981 A CN 101041981A
- Authority
- CN
- China
- Prior art keywords
- concrete
- horizontal
- limb
- wall structure
- building block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
本发明提供的是一种配筋砌块短肢砌体剪力墙结构。它是由设置在基础或楼板上的预留锚筋、用混凝土空心砌块砌成并浇筑灌芯混凝土的墙体和混凝土连梁组成的,是墙肢的肢厚比控制在5~8的装配整体式承重墙体结构,在混凝土砌块的水平凹槽内和水平灰缝内设置有水平钢筋,在混凝土砌块孔洞中设置有竖向钢筋,横向筋和竖向筋组成纵横向钢筋网,并在竖向孔洞和水平凹槽内浇筑灌芯混凝土。本发明具有施工速度快、节省钢筋、不用模板、节省工程成本的优势,同时避免了结构上材料收缩裂缝和温度裂缝的出现,并较大幅度提高了结构的安全性能和抗震能力。
The invention provides a short-leg masonry shear wall structure with reinforced blocks. It is composed of reserved anchor bars set on the foundation or floor, walls made of concrete hollow blocks and poured with core concrete, and concrete connecting beams. The thickness ratio of the wall limbs is controlled at 5-8. Assembling an integral load-bearing wall structure, horizontal steel bars are set in the horizontal grooves of the concrete blocks and in the horizontal mortar joints, vertical steel bars are set in the holes of the concrete blocks, and the horizontal bars and vertical bars form a vertical and horizontal steel mesh , and pouring core concrete in vertical holes and horizontal grooves. The invention has the advantages of fast construction speed, saving steel bars, no formwork, and saving engineering costs, while avoiding the occurrence of material shrinkage cracks and temperature cracks on the structure, and greatly improving the safety performance and earthquake resistance of the structure.
Description
一、技术领域1. Technical field
本发明涉及的是一种建筑物的承重墙体结构。The invention relates to a bearing wall structure of a building.
二、背景技术2. Background technology
随着国家降低能耗和可持续发展战略的实施,建筑中用来承重的粘土实心砖材料被大范围禁止使用,作为替代建筑材料混凝土空心砌块成为未来发展的重点,但普通混凝土砌块砌体的裂缝问题和成本问题成为其替代粘土实心砖墙体的明显缺点,并一度受到建设商的抵制。在这种情况下,发展新型承重受力体系,从根本上解决裂缝和建设成本问题成为目前急需解决的结构关键技术。With the implementation of the national strategy of reducing energy consumption and sustainable development, the use of clay solid bricks for load-bearing in buildings has been banned on a large scale. As an alternative building material, concrete hollow blocks have become the focus of future development, but ordinary concrete blocks The crack problem and cost problem of the body became the obvious disadvantage of replacing the clay solid brick wall, and was once resisted by the builder. Under such circumstances, the development of a new type of load-bearing system to fundamentally solve the problems of cracks and construction costs has become a key structural technology that needs to be solved urgently.
三、发明内容3. Contents of the invention
本发明的目的在于提供一种施工速度快、节省钢筋、不用模板、节省工程成本,能避免结构上出现材料收缩裂缝和温度裂缝现象的配筋砌块短肢砌体剪力墙结构。The object of the present invention is to provide a short-leg masonry shear wall structure with reinforced blocks, which has fast construction speed, saves steel bars, does not need templates, saves engineering costs, and can avoid material shrinkage cracks and temperature cracks in the structure.
本发明的目的是这样实现的:它是由设置在基础或楼板上的预留锚筋、用混凝土空心砌块砌成并浇筑灌芯混凝土的墙体和混凝土连梁组成的,墙肢的肢厚比控制在5~8的装配整体式承重墙体结构,在混凝土砌块的水平凹槽内和水平灰缝内设置有水平钢筋,在混凝土砌块孔洞中设置有竖向钢筋,横向筋和竖向筋组成纵横向钢筋网,并在竖向孔洞和水平凹槽内浇筑灌芯混凝土。The object of the present invention is achieved like this: it is made up of the reserved anchor bar that is arranged on the foundation or the slab, the wall that is built with concrete hollow blocks and pours the core concrete and the concrete connecting beam, the limb of the wall Assembled integral load-bearing wall structure with a thickness ratio of 5 to 8, horizontal steel bars are arranged in the horizontal grooves of the concrete blocks and the horizontal mortar joints, and vertical steel bars, transverse bars and The vertical reinforcement forms a vertical and horizontal reinforcement mesh, and pours core concrete in the vertical holes and horizontal grooves.
本发明还可以包括这样一些结构特征:The present invention can also include such structural features:
1、在孔洞内浇筑有灌芯混凝土。1. Pouring core concrete in the hole.
2、混凝土连梁中布设有与墙体钢筋网相连的钢筋。2. The concrete connecting beams are equipped with steel bars connected with the wall reinforcement mesh.
3、所述的混凝土空心砌块是孔洞率不低于40%的双孔砌块。3. The concrete hollow block is a double-hole block with a porosity not lower than 40%.
4、所述的墙体是肢厚比在5~8之间的墙体。4. The wall is a wall with a thickness ratio of 5-8.
5、所述的墙体的截面形状可以是“一”字型、“T”字型、“L”型或“十”字型。5. The cross-sectional shape of the wall can be "one", "T", "L" or "ten".
本发明将砌块砌筑的砌体施工特征和现浇混凝土施工特征相结合,形成了配筋砌块短肢砌体剪力墙承重构件,与钢筋混凝土楼盖结合,形成新型承重结构体系,为建设多层及小高层房屋开创了全新的一种新型结构体系,该体系的显著特点是采用孔洞率不低于40%的双孔砌块砌筑成墙体,并在孔洞内配筋和浇筑混凝土,形成的肢厚比在5~8之间的装配整体式墙体,其截面形状可以是“一”字型、“T”字型、“L”型、“十”字型等方便的形状。本发明具有施工速度快、节省钢筋、不用模板、节省工程成本的优势,同时避免了结构上出现材料收缩裂缝和温度裂缝的出现,并较大幅度提高了结构的安全性能和抗震能力。The present invention combines the masonry construction characteristics of block masonry with the construction characteristics of cast-in-place concrete to form a load-bearing member of a short-leg masonry shear wall with reinforced blocks, which is combined with a reinforced concrete floor to form a new load-bearing structure system. It has created a brand-new new structural system for the construction of multi-storey and small high-rise buildings. The remarkable feature of this system is that the walls are built with double-hole blocks with a porosity of not less than 40%, and the reinforcement and Pour concrete to form an assembled monolithic wall with a limb thickness ratio between 5 and 8, and its cross-sectional shape can be "one", "T", "L", "ten", etc. shape. The invention has the advantages of fast construction speed, saving steel bars, no formwork, and saving engineering costs, while avoiding the occurrence of material shrinkage cracks and temperature cracks on the structure, and greatly improving the safety performance and earthquake resistance of the structure.
四、附图说明4. Description of drawings
附图是本发明的墙体配筋及结构示意图。Accompanying drawing is wall reinforcement and structural representation of the present invention.
五、具体实施方式5. Specific implementation
下面结合附图举例对本发明作更详细的描述:The present invention is described in more detail below in conjunction with accompanying drawing example:
配筋砌块短肢砌体剪力墙结构组成包括由设置在基础或楼板上预留锚筋1、用砌筑混凝土空心砌块砌成的墙体2和混凝土连梁3,在混凝土砌块的水平凹槽内和水平灰缝内设置有水平钢筋4,在混凝土砌块孔洞中设置有竖向钢筋5,横向筋和竖向筋相互连接组成纵横向钢筋网。在孔洞内浇筑有专用灌芯混凝土。混凝土连梁中布设有与墙体钢筋网相连的钢筋。所述的混凝土空心砌块是孔洞率不低于40%的双孔砌块。所述的墙体是肢厚比在5~8之间的墙体。所述的墙体的截面形状可以是“一”字型、“T”字型、“L”型或“十”字型。The short-leg masonry shear wall structure with reinforced blocks consists of anchor bars 1 reserved on the foundation or floor, walls 2 made of masonry concrete hollow blocks, and concrete connecting beams 3. Horizontal steel bars 4 are arranged in the horizontal grooves and horizontal mortar joints, vertical steel bars 5 are arranged in the concrete block holes, and the horizontal bars and vertical bars are connected to each other to form a vertical and horizontal steel mesh. A special core-filling concrete is poured in the hole. Reinforcement bars connected with the wall reinforcement mesh are arranged in the concrete connecting beams. The concrete hollow block is a double-hole block with a porosity not lower than 40%. The wall body is a wall body with limb thickness ratio between 5-8. The cross-sectional shape of the wall can be "one", "T", "L" or "ten".
本发明的施工顺序为:1、在基础或楼板上预留锚筋;2、砌筑混凝土空心砌块墙体,同时在水平凹槽内和水平灰缝内设置水平钢筋;3、放置竖向钢筋,形成纵横向钢筋网;4、在孔洞内浇筑专用灌芯混凝土;5、安装连梁和圈梁模板,绑扎钢筋,浇筑混凝土;6、拆除模板,形成配筋砌块短肢砌体剪力墙结构受力体系。The construction sequence of the present invention is: 1. Reserve anchor bars on the foundation or floor; 2. Build concrete hollow block walls, and set horizontal steel bars in horizontal grooves and horizontal mortar joints at the same time; 3. Place vertical 4. Pour special core concrete in the hole; 5. Install the coupling beam and ring beam formwork, bind the steel bars, and pour concrete; 6. Remove the formwork to form the reinforced block short-leg masonry shears The force system of the force wall structure.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200710072160 CN101041981A (en) | 2007-04-30 | 2007-04-30 | Reinforcing bars building block short-limb masonry shear wall structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200710072160 CN101041981A (en) | 2007-04-30 | 2007-04-30 | Reinforcing bars building block short-limb masonry shear wall structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN101041981A true CN101041981A (en) | 2007-09-26 |
Family
ID=38807752
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 200710072160 Pending CN101041981A (en) | 2007-04-30 | 2007-04-30 | Reinforcing bars building block short-limb masonry shear wall structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101041981A (en) |
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101812880A (en) * | 2010-04-07 | 2010-08-25 | 湖南大学 | Multi-rowcore cast-in-place concrete heat-preservation shear wall |
| CN101818584A (en) * | 2010-04-29 | 2010-09-01 | 王智鑫 | Heat preservation, lightning protection and earthquake proofing house |
| CN101818528A (en) * | 2010-04-07 | 2010-09-01 | 湖南大学 | Repairable reinforced building block wall system and construction method thereof |
| CN101831970A (en) * | 2010-02-10 | 2010-09-15 | 黄靓 | Integrally assembled wallboard wall and construction method thereof |
| CN102155059A (en) * | 2010-11-29 | 2011-08-17 | 黄靓 | Multi-row hole thermal insulation building block reinforcing bar masonry wall system |
| CN102561551A (en) * | 2012-01-10 | 2012-07-11 | 湖南大学 | Thick wall and construction method thereof |
| CN103046669A (en) * | 2012-12-10 | 2013-04-17 | 北京工业大学 | Prefabricated high strength reinforced concrete shear wall with low strength energy dissipation strip and fabrication method |
| CN104251039A (en) * | 2013-06-29 | 2014-12-31 | 清华大学 | Steel-reinforced concrete-steel beam mixed connecting beam and construction method thereof |
| CN105239698A (en) * | 2015-06-17 | 2016-01-13 | 盐城工学院 | Jointless brick wall and building method thereof |
| CN106930439A (en) * | 2015-12-29 | 2017-07-07 | 浙江大学城市学院 | Masonry post shears wall lacing wire structure |
| CN108104367A (en) * | 2017-11-27 | 2018-06-01 | 深圳大学 | A kind of doubly-linked beam and its construction method |
| CN109809591A (en) * | 2019-02-19 | 2019-05-28 | 深圳市建筑设计研究总院有限公司 | Modular Hospital Sewage Treatment station |
| CN111485665A (en) * | 2019-01-25 | 2020-08-04 | 河南天久装配式建筑有限公司 | Structure of light sandwich concrete masonry for cold area and construction method |
| CN111576880A (en) * | 2020-05-11 | 2020-08-25 | 武汉理工大学 | Assembling construction method for connecting beam of windowing hole superposed shear wall |
| CN111851734A (en) * | 2020-08-26 | 2020-10-30 | 华北水利水电大学 | Reinforced concrete short-leg shear wall-reinforced masonry composite structure and its construction method |
-
2007
- 2007-04-30 CN CN 200710072160 patent/CN101041981A/en active Pending
Cited By (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101831970A (en) * | 2010-02-10 | 2010-09-15 | 黄靓 | Integrally assembled wallboard wall and construction method thereof |
| CN101812880A (en) * | 2010-04-07 | 2010-08-25 | 湖南大学 | Multi-rowcore cast-in-place concrete heat-preservation shear wall |
| CN101818528A (en) * | 2010-04-07 | 2010-09-01 | 湖南大学 | Repairable reinforced building block wall system and construction method thereof |
| CN101818584A (en) * | 2010-04-29 | 2010-09-01 | 王智鑫 | Heat preservation, lightning protection and earthquake proofing house |
| CN102155059A (en) * | 2010-11-29 | 2011-08-17 | 黄靓 | Multi-row hole thermal insulation building block reinforcing bar masonry wall system |
| CN102561551A (en) * | 2012-01-10 | 2012-07-11 | 湖南大学 | Thick wall and construction method thereof |
| CN103046669B (en) * | 2012-12-10 | 2015-04-29 | 北京工业大学 | Prefabricated high strength reinforced concrete shear wall with low strength energy dissipation strip and fabrication method |
| CN103046669A (en) * | 2012-12-10 | 2013-04-17 | 北京工业大学 | Prefabricated high strength reinforced concrete shear wall with low strength energy dissipation strip and fabrication method |
| CN104251039A (en) * | 2013-06-29 | 2014-12-31 | 清华大学 | Steel-reinforced concrete-steel beam mixed connecting beam and construction method thereof |
| CN105239698A (en) * | 2015-06-17 | 2016-01-13 | 盐城工学院 | Jointless brick wall and building method thereof |
| CN106930439A (en) * | 2015-12-29 | 2017-07-07 | 浙江大学城市学院 | Masonry post shears wall lacing wire structure |
| CN108104367A (en) * | 2017-11-27 | 2018-06-01 | 深圳大学 | A kind of doubly-linked beam and its construction method |
| CN108104367B (en) * | 2017-11-27 | 2023-09-22 | 深圳大学 | A kind of double connecting beam and its construction method |
| CN111485665A (en) * | 2019-01-25 | 2020-08-04 | 河南天久装配式建筑有限公司 | Structure of light sandwich concrete masonry for cold area and construction method |
| CN109809591A (en) * | 2019-02-19 | 2019-05-28 | 深圳市建筑设计研究总院有限公司 | Modular Hospital Sewage Treatment station |
| CN109809591B (en) * | 2019-02-19 | 2024-05-31 | 深圳市建筑设计研究总院有限公司 | Modular hospital sewage treatment station |
| CN111576880A (en) * | 2020-05-11 | 2020-08-25 | 武汉理工大学 | Assembling construction method for connecting beam of windowing hole superposed shear wall |
| CN111576880B (en) * | 2020-05-11 | 2021-09-03 | 武汉理工大学 | Assembling construction method for connecting beam of windowing hole superposed shear wall |
| CN111851734A (en) * | 2020-08-26 | 2020-10-30 | 华北水利水电大学 | Reinforced concrete short-leg shear wall-reinforced masonry composite structure and its construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101041981A (en) | Reinforcing bars building block short-limb masonry shear wall structure | |
| CN202559569U (en) | Assembled monolithic self-insulation hidden dense rib light superposed floor slab | |
| CN104453093B (en) | Prefabricated steel reinforced concrete beam with transversal high-strength concrete clapboard, and construction method | |
| CN104594561A (en) | Prefabricated reinforced concrete column with high-performance concrete frame and construction method | |
| CN205046685U (en) | External heated board of prefabricated masonry wall | |
| CN104594556A (en) | Prefabricated type steel reinforced concrete beam with transverse steel partition boards and construction method | |
| CN102168460A (en) | Aerated concrete block masonry composite wall reinforced with embedded reinforcements and borehole core columns | |
| CN104652705A (en) | Prefabricated and assembly type steel reinforced concrete column with high-performance concrete frame and construction method | |
| CN108018972A (en) | Full precast floor slab and laminated floor slab combining structure, making and assembly method | |
| CN208056422U (en) | A kind of profiled sheet-raw bamboo-concrete combined floor | |
| CN217027753U (en) | New truss structure | |
| CN1079130C (en) | Construction method of 3D architeccture system for house building | |
| CN107476475A (en) | A kind of new Prefabricated stacking floor and its manufacture method based on UHPC | |
| CN106401052A (en) | Prefabricated prestressed hollow slab and preparing method thereof | |
| CN201485965U (en) | A new type of energy-saving building structure | |
| CN210685110U (en) | Assembled novel bidirectional ribbed profiled steel sheet composite floor | |
| CN205224271U (en) | Mortise type concrete superposed beam cross connection structure | |
| CN108374516A (en) | A kind of profiled sheet-raw bamboo-concrete combined floor and its manufacturing method | |
| CN104047381B (en) | Assembled integral rare-reinforcement concrete shear wall structure | |
| CN106193450A (en) | High-energy-consumption concrete coupling beam with built-in mild steel | |
| CN218894248U (en) | Assembled light steel combined steel wire net rack mortar-perlite-polyphenyl composite shear wall | |
| CN201485994U (en) | A new type of energy-saving composite load-bearing wall | |
| CN114658141B (en) | T-shaped constructional column and independent foundation connection structure of assembled composite wallboard and manufacturing method | |
| CN206189724U (en) | Empty core plate of precast prestressed | |
| CN212772881U (en) | Light-duty building structure of rapid Assembly formula |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
| WD01 | Invention patent application deemed withdrawn after publication |