CN106013787A - 现浇混凝土梁模板工具式加固体系及其施工工艺 - Google Patents

现浇混凝土梁模板工具式加固体系及其施工工艺 Download PDF

Info

Publication number
CN106013787A
CN106013787A CN201610538985.2A CN201610538985A CN106013787A CN 106013787 A CN106013787 A CN 106013787A CN 201610538985 A CN201610538985 A CN 201610538985A CN 106013787 A CN106013787 A CN 106013787A
Authority
CN
China
Prior art keywords
template
side template
cast
formwork
inner corner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610538985.2A
Other languages
English (en)
Other versions
CN106013787B (zh
Inventor
孟庆华
白超
吴明
刘永利
张国贤
柳续龙
王贤
姜现
王炳琛
席海跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd Dalian Branch
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201610538985.2A priority Critical patent/CN106013787B/zh
Publication of CN106013787A publication Critical patent/CN106013787A/zh
Application granted granted Critical
Publication of CN106013787B publication Critical patent/CN106013787B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明属于建筑施工领域,现浇混凝土梁模板工具式加固体系施工工艺,提出了现浇混凝土梁模板工具式加固体系,包括梁底模板、楼板模板、梁侧模板、主龙骨及次龙骨,梁底模板和梁侧模板组成的阳角处设置有阳角加固装置,梁侧模板与楼板模板组成的阴角处设置有阴角加固装置,梁侧模板采用梁模板夹具紧固,梁模板夹具为U型结构,梁模板夹具的两块侧板上部的对应位置处设置有对拉螺栓。其施工工艺包括:1)测量、放线,搭设脚手架;2)梁底模板安装;3)钢筋龙骨绑扎;4)梁侧模板安装;5)阳角定型化加固施工;6)阴角拼缝处加固施工;7) 梁模板夹具加固施工。本发明适用于混凝土梁模板施工,工艺简单,操作方便,节省材料,可多次周转使用。

Description

现浇混凝土梁模板工具式加固体系及其施工工艺
技术领域
本发明属于建筑施工领域,涉及现浇混凝土结构施工中梁模板加固体系施工工艺。
背景技术
目前,在建筑施工模板工程加固体系中,现浇混凝土梁模板加固大多采用传统的零散构件现场组合的加固方式,存在操作繁琐,阴阳角成型质量差,加固时间长、成本高的缺点。
发明内容
本发明的目的是解决上述问题,提供一种现浇混凝土梁模板工具式加固体系施工工艺,工艺简单,操作方便,可以有效解决传统模板加固体系中的缺点。
本发明为实现上述目的所采用的技术方案是:提出了现浇混凝土梁模板工具式加固体系,包括梁底模板、楼板模板、梁侧模板、主龙骨及次龙骨,梁底模板和梁侧模板组成的阳角处设置有阳角加固装置,梁侧模板与楼板模板组成的阴角处设置有阴角加固装置,梁侧模板采用梁模板夹具紧固,所述梁模板夹具为U型结构,梁模板夹具的两块侧板上部的对应位置处设置有对拉螺栓,对拉螺栓用于拉结紧固梁侧模板。
所述阳角加固装置为两根互相垂直固定的木方,梁底模板和梁侧模板组成的阳角置于两根木方组成的阴角内。
所述阳角加固装置的两根木方采用螺栓间隔固定,螺栓的间隔为0.5m~1.5m。
所述阴角加固装置为一根木方,木方置于梁侧模板与楼板模板组成的阴角处,且木方与楼板模板通过铁钉间隔固定,铁钉的间隔为0.5m~1m。
所述梁模板夹具沿现浇混凝土梁的长度方向间隔分布,每隔0.5m~1.5m设置有一个梁模板夹具。
所述梁侧模板之间设置有顶模棍。
现浇混凝土梁模板工具式加固体系的施工工艺,包括以下步骤:
1)准备工作:测量、放线,搭设脚手架;
2)梁底次龙骨及梁底模板安装:搭设混凝土梁支撑架体,安装混凝土梁梁底次龙骨及梁底模板,支撑架体将梁底次龙骨与梁底模板紧固;
3)钢筋绑扎;
4)梁侧模板及梁侧次龙骨安装:钢筋绑扎完毕后安装梁侧模板,安装好梁侧模板后,在梁侧模板外侧安装梁侧次龙骨;
5)阳角定型化加固施工:采用阳角加固装置加固梁底模板和梁侧模板组成的阳角,具体为:将两根木方相互垂直放置并使用螺栓使其成为一个整体,利用两根木方相互构成的阴角加固梁底模板和梁侧模板组成的阳角,然后采用主龙骨及支撑架体将阳角加固装置、梁底次龙骨及梁底模板紧固;
6)阴角拼缝处加固施工:采用阴角加固装置加固梁侧模板与楼板模板组成的阴角,具体为:在梁侧模板与楼板模板组成的阴角处放置一根木方,楼板模板通过长铁钉与木方固定,然后采用主龙骨及支撑架体将阴角加固装置、次龙骨及楼板模板紧固;
7) 梁模板夹具加固施工:安装U型的梁模板夹具,梁模板夹具安装于梁侧次龙骨外侧,采用对拉螺栓及梁侧模板之间的顶模棍将梁侧模板紧固,对拉螺栓位于梁侧模板之间的螺杆上套装有PVC管,便于混凝土凝固后对拉螺栓取出周转使用。
所述木方的横截面尺寸为40mm×90mm,木方长度与现浇混凝土梁等长。
本发明采用工具式的模板加固体系替代了传统的零散构件模板加固体系,梁模板的阳角及阴角分别采用了阳角加固装置及阴角加固装置来加固,克服了传统工艺中阴阳角成型质量差的缺点;本发明中的梁侧模板采用工具式的梁模板夹具进行紧固,克服了传统工艺中繁杂的侧模加固工序,本发明适用于混凝土梁模板施工,工艺简单、操作方便、节省材料,可多次周转使用。
附图说明
图1为本发明的结构示意图;
图2为阳角加固装置示意图;
图3为阴角拼缝处加固示意图;
图4为本发明中的梁模板夹具结构示意图。
图中:1-主龙骨,2-梁模板夹具,3-阳角加固装置,4-次龙骨,5-对拉螺栓,6-木方,7-楼板模板,8-顶模棍,9-长铁钉,10-PVC管,11-梁侧模板,12-梁底模板。
具体实施方式
下面结合附图对本发明进行详细说明。
如图1所示的现浇混凝土梁模板工具式加固体系,包括梁底模板12、楼板模板7、梁侧模板11、主龙骨1及次龙骨4,梁底模板12和梁侧模板11组成的阳角处设置有阳角加固装置3(见图2 ),阳角加固装置3为两根互相垂直固定的木方6,阳角加固装置3的两根木方采用对拉螺栓5间隔固定,对拉螺栓5的间隔为0.5m~1.5m,梁底模板12和梁侧模板11组成的阳角置于两根木方6组成的阴角内。梁侧模板11与楼板模板7组成的阴角处设置有阴角加固装置,阴角加固装置为一根木方6,木方6置于梁侧模板11与楼板模板7组成的阴角处,且木方6与楼板模板7通过长铁钉9间隔固定(见图3),长铁钉9的间隔为0.5m~1m。梁侧模板11采用梁模板夹具2紧固连接,如图4所示,梁模板夹具2是由两根竖向木方和一根横向木方组成,两根竖向木方与横向木方通过长铁钉9固定连接形成U形夹具,夹具的两根竖向木方上端对应位置处开设有对拉螺栓孔,梁侧模板通过对拉螺栓5紧固,梁模板夹具2沿现浇混凝土梁的长度方向间隔分布,每隔0.5~1.5m设置有一个梁模板夹具2。
现浇混凝土梁模板工具式加固体系的施工工艺流程为:测量、放线→脚手架搭设→混凝土梁底部模板安装→钢筋龙骨绑扎→混凝土梁梁侧模板安装→阴、阳角加固→混凝土梁模板夹具安装→校正检查、加固。具体包括以下步骤:
1)准备工作:测量、放线,搭设脚手架;
2)梁底次龙骨及梁底模板安装:搭设混凝土梁支撑架体,安装混凝土梁梁底次龙骨及梁底模板12,支撑架体将梁底次龙骨与梁底模板12紧固;
3)钢筋绑扎;
4)梁侧模板及梁侧次龙骨安装:钢筋绑扎完毕后安装梁侧模板,安装好梁侧模板后,在梁侧模板外侧安装梁侧次龙骨;
5)阳角定型化加固施工:采用阳角加固装置2加固梁底模板12和梁侧模板11组成的阳角,具体为:将两根木方6相互垂直放置并使用螺栓使其成为一个整体,利用两根木方6相互构成的阴角加固梁底模板和梁侧模板组成的阳角,然后采用主龙骨1及支撑架体将阳角加固装置3、梁侧次龙骨及梁底模板12紧固;
6)阴角拼缝处加固施工:采用阴角加固装置加固梁侧模板与楼板模板组成的阴角,具体为在梁侧模板11与楼板模板7组成的阴角处放置一根木方6,楼板模板7通过长铁钉9与木方6固定,然后采用主龙骨1及支撑架体将阴角加固装置、次龙骨4及楼板模板7紧固;
7) 梁模板夹具加固施工:安装U型的梁模板夹具2,U型结构的梁侧板位于梁侧次龙骨外侧,采用对拉螺栓5及梁侧模板之间的顶模棍8将梁侧模板11紧固,最后调整梁模板垂直度,在混凝土浇筑前进行最后检查,对拉螺栓位于梁侧模板之间的螺杆上套装有PVC管10,便于混凝土凝固后对拉螺栓可以取出周转使用。
其中,主龙骨采用∅48mm×3.5mm双圆钢管,次龙骨采用40mm×40mm×2.5mm方钢管;木方6的横截面尺寸为40mm×90mm,木方长度与现浇混凝土梁等长;现浇混凝土梁模板预先按施工方案预留对拉螺栓孔。

Claims (8)

1.现浇混凝土梁模板工具式加固体系,包括梁底模板、楼板模板、梁侧模板、主龙骨及次龙骨,其特征在于:梁底模板和梁侧模板组成的阳角处设置有阳角加固装置,梁侧模板与楼板模板组成的阴角处设置有阴角加固装置,梁侧模板采用梁模板夹具紧固,所述梁模板夹具为U型结构,梁模板夹具的两块侧板上部的对应位置处设置有对拉螺栓,对拉螺栓用于拉结紧固梁侧模板。
2.根据权利要求1所述的现浇混凝土梁模板工具式加固体系,其特征在于:所述阳角加固装置为两根互相垂直固定的木方,梁底模板和梁侧模板组成的阳角置于两根木方组成的阴角内。
3.根据权利要求2所述的现浇混凝土梁模板工具式加固体系,其特征在于:所述阳角加固装置的两根木方采用螺栓间隔固定,螺栓的间隔为0.5m~1.5m。
4.根据权利要求1所述的现浇混凝土梁模板工具式加固体系,其特征在于:所述阴角加固装置为一根木方,木方置于梁侧模板与楼板模板组成的阴角处,且木方与楼板模板通过铁钉间隔固定,铁钉的间隔为0.5m~1m。
5.根据权利要求1所述的现浇混凝土梁模板工具式加固体系,其特征在于:所述梁模板夹具沿现浇混凝土梁的长度方向间隔分布,每隔0.5m~1.5m设置有一个梁模板夹具。
6.根据权利要求1所述的现浇混凝土梁模板工具式加固体系,其特征在于:所述梁侧模板之间设置有顶模棍。
7.根据权利要求1-6任一所述的现浇混凝土梁模板工具式加固体系的施工工艺,其特征在于,包括以下步骤:
1)准备工作:测量、放线,搭设脚手架;
2)梁底次龙骨及梁底模板安装:搭设混凝土梁支撑架体,安装混凝土梁梁底次龙骨及梁底模板,支撑架体将梁底次龙骨与梁底模板紧固;
3)钢筋绑扎;
4)梁侧模板及梁侧次龙骨安装:钢筋绑扎完毕后安装梁侧模板,安装好梁侧模板后,在梁侧模板外侧安装梁侧次龙骨;
5)阳角定型化加固施工:采用阳角加固装置加固梁底模板和梁侧模板组成的阳角,具体为:将两根木方相互垂直放置并使用螺栓使其成为一个整体,利用两根木方相互构成的阴角加固梁底模板和梁侧模板组成的阳角,然后采用主龙骨及支撑架体将阳角加固装置、梁底次龙骨及梁底模板紧固;
6)阴角拼缝处加固施工:采用阴角加固装置加固梁侧模板与楼板模板组成的阴角,具体为:在梁侧模板与楼板模板组成的阴角处放置一根木方,楼板模板通过长铁钉与木方固定,然后采用主龙骨及支撑架体将阴角加固装置、次龙骨及楼板模板紧固;
7) 梁模板夹具加固施工:安装U型的梁模板夹具,梁模板夹具安装于梁侧次龙骨外侧,采用对拉螺栓及梁侧模板之间的顶模棍将梁侧模板紧固,对拉螺栓位于梁侧模板之间的螺杆上套装有PVC管,便于混凝土凝固后对拉螺栓取出周转使用。
8.根据权利要求7所述的现浇混凝土梁模板工具式加固体系施工工艺,其特征在于:所述木方的横截面尺寸为40mm×90mm,木方长度与现浇混凝土梁等长。
CN201610538985.2A 2016-07-11 2016-07-11 现浇混凝土梁模板工具式加固体系及其施工工艺 Active CN106013787B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610538985.2A CN106013787B (zh) 2016-07-11 2016-07-11 现浇混凝土梁模板工具式加固体系及其施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610538985.2A CN106013787B (zh) 2016-07-11 2016-07-11 现浇混凝土梁模板工具式加固体系及其施工工艺

Publications (2)

Publication Number Publication Date
CN106013787A true CN106013787A (zh) 2016-10-12
CN106013787B CN106013787B (zh) 2018-09-04

Family

ID=57109161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610538985.2A Active CN106013787B (zh) 2016-07-11 2016-07-11 现浇混凝土梁模板工具式加固体系及其施工工艺

Country Status (1)

Country Link
CN (1) CN106013787B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869519A (zh) * 2017-04-01 2017-06-20 福建省建筑科学研究院 一种用于混凝土构件加固的模板系统
CN107514134A (zh) * 2017-08-31 2017-12-26 中建四局第六建筑工程有限公司 一种弧形模板加固方法
CN107762146A (zh) * 2017-09-29 2018-03-06 上海二十冶建设有限公司 建筑结构中梁结构的可调模板应用方法
CN108331342A (zh) * 2018-05-15 2018-07-27 中国建筑第二工程局有限公司 一种圆弧梁的模板体系及其施工方法
CN109372185A (zh) * 2018-12-11 2019-02-22 中清大装配式建筑有限公司 一种建筑用快装免拆梁模板构造及施工方法
CN110388047A (zh) * 2019-02-15 2019-10-29 浙江中益建材科技有限公司 一种混凝土木框模板体系
CN110857588A (zh) * 2018-08-23 2020-03-03 五冶集团上海有限公司 一种混凝土剪力墙阴阳角模板加固方法
CN111236631A (zh) * 2020-02-09 2020-06-05 山西四建集团有限公司 一种半圆形混凝土顶板建筑支护结构
CN115288434A (zh) * 2022-09-15 2022-11-04 中国二十二冶集团有限公司 双梁结构支模加固体系及其施工方法
CN115370136A (zh) * 2022-08-23 2022-11-22 中国二十冶集团有限公司 一种梁侧模板的加固结构及加固方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0533492A (ja) * 1991-08-02 1993-02-09 Toda Constr Co Ltd 型枠装置
CN201526158U (zh) * 2009-09-14 2010-07-14 北京建工一建工程建设有限公司 梁模板专用卡具
CN202012196U (zh) * 2011-03-07 2011-10-19 中建三局建设工程股份有限公司 梁侧模u型加固装置
CN202324613U (zh) * 2011-11-07 2012-07-11 四川省第三建筑工程公司 梁模板加固夹具
CN104481144A (zh) * 2014-12-10 2015-04-01 山东天齐置业集团股份有限公司 直插盘销式模板支架梁底支模体系及施工方法
CN104563485A (zh) * 2013-10-10 2015-04-29 浙江信得宝建筑新型材料有限公司 一种建筑支模体系
CN104594628A (zh) * 2015-01-07 2015-05-06 福建工程学院 现浇混凝土梁板结构模板支撑体系与施工方法
CN205840322U (zh) * 2016-07-11 2016-12-28 中国建筑第八工程局有限公司 现浇混凝土梁模板工具式加固体系

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0533492A (ja) * 1991-08-02 1993-02-09 Toda Constr Co Ltd 型枠装置
CN201526158U (zh) * 2009-09-14 2010-07-14 北京建工一建工程建设有限公司 梁模板专用卡具
CN202012196U (zh) * 2011-03-07 2011-10-19 中建三局建设工程股份有限公司 梁侧模u型加固装置
CN202324613U (zh) * 2011-11-07 2012-07-11 四川省第三建筑工程公司 梁模板加固夹具
CN104563485A (zh) * 2013-10-10 2015-04-29 浙江信得宝建筑新型材料有限公司 一种建筑支模体系
CN104481144A (zh) * 2014-12-10 2015-04-01 山东天齐置业集团股份有限公司 直插盘销式模板支架梁底支模体系及施工方法
CN104594628A (zh) * 2015-01-07 2015-05-06 福建工程学院 现浇混凝土梁板结构模板支撑体系与施工方法
CN205840322U (zh) * 2016-07-11 2016-12-28 中国建筑第八工程局有限公司 现浇混凝土梁模板工具式加固体系

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869519A (zh) * 2017-04-01 2017-06-20 福建省建筑科学研究院 一种用于混凝土构件加固的模板系统
CN106869519B (zh) * 2017-04-01 2023-12-22 福建省建科工程技术有限公司 一种用于混凝土构件加固的模板系统
CN107514134A (zh) * 2017-08-31 2017-12-26 中建四局第六建筑工程有限公司 一种弧形模板加固方法
CN107762146A (zh) * 2017-09-29 2018-03-06 上海二十冶建设有限公司 建筑结构中梁结构的可调模板应用方法
CN108331342A (zh) * 2018-05-15 2018-07-27 中国建筑第二工程局有限公司 一种圆弧梁的模板体系及其施工方法
CN110857588A (zh) * 2018-08-23 2020-03-03 五冶集团上海有限公司 一种混凝土剪力墙阴阳角模板加固方法
CN109372185A (zh) * 2018-12-11 2019-02-22 中清大装配式建筑有限公司 一种建筑用快装免拆梁模板构造及施工方法
CN110388047A (zh) * 2019-02-15 2019-10-29 浙江中益建材科技有限公司 一种混凝土木框模板体系
CN111236631A (zh) * 2020-02-09 2020-06-05 山西四建集团有限公司 一种半圆形混凝土顶板建筑支护结构
CN111236631B (zh) * 2020-02-09 2022-02-11 山西四建集团有限公司 一种半圆形混凝土顶板建筑支护结构
CN115370136A (zh) * 2022-08-23 2022-11-22 中国二十冶集团有限公司 一种梁侧模板的加固结构及加固方法
CN115288434A (zh) * 2022-09-15 2022-11-04 中国二十二冶集团有限公司 双梁结构支模加固体系及其施工方法

Also Published As

Publication number Publication date
CN106013787B (zh) 2018-09-04

Similar Documents

Publication Publication Date Title
CN106013787A (zh) 现浇混凝土梁模板工具式加固体系及其施工工艺
CN205840322U (zh) 现浇混凝土梁模板工具式加固体系
CN103161309A (zh) 狭窄变形缝内侧模板安装施工方法
CN112796514A (zh) 一种砌体转角构造柱模板定型加固装置及施工方法
CN110630011A (zh) 一种用于变形缝处双剪力墙的模板加固体系及其施工方法
CN210976588U (zh) 一种用于变形缝处双剪力墙的模板加固体系
CN210195269U (zh) 一种用于装配式钢结构建筑叠合板楼面的无立杆支撑系统
CN203320960U (zh) 钢制楼板外侧模板支架
CN118007829A (zh) 一种结构转换层处型钢抗震单元及安装方法
CN112302209B (zh) 钢与混凝土剪力墙混合结构及其制作方法
CN202467187U (zh) 可调工具式空调板模板支架
CN111877752B (zh) 一种建筑模板的加固系统及其施工方法
CN102155095B (zh) 大型冶金工业厂房钢骨混凝土钢筋的布置方法
CN205171999U (zh) 剪力墙狭窄伸缩缝模板
CN218061031U (zh) 一种免拆模梁、板的安装加固装置
CN203361641U (zh) 现浇楼梯的组合式钢模板
CN207727981U (zh) 一种预制预应力节点核心区木模板
CN112627510A (zh) 结构变形缝同步施工模板加固装置及施工方法
CN209468674U (zh) 一种箱梁内模标准段用铝合金模板系统
CN210289158U (zh) 叠合板与梁或墙连接的临时支托装置
JP2014101654A (ja) コンクリートの補強構造及び補強方法
CN102691409A (zh) 一种hr重型门架与钢筋砼临时柱联合支模装置及施工方法
CN215717185U (zh) 一种建筑用梁板、墙板接头结构
CN109457591A (zh) 一种箱梁内模标准段用铝合金模板系统及其施工方法
CN107905525B (zh) 一种木模板可回收式u型轻钢龙骨支撑体系及其安装方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230511

Address after: No.235, 237, Golgi Road, Shahekou District, Dalian, Liaoning, 116021

Patentee after: DALIAN BRANCH OF CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Corp.,Ltd.

Address before: 200135 No. 1568, Century Avenue, Pudong New Area, Shanghai

Patentee before: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd.

TR01 Transfer of patent right