CN102691409A - 一种hr重型门架与钢筋砼临时柱联合支模装置及施工方法 - Google Patents
一种hr重型门架与钢筋砼临时柱联合支模装置及施工方法 Download PDFInfo
- Publication number
- CN102691409A CN102691409A CN2012101906758A CN201210190675A CN102691409A CN 102691409 A CN102691409 A CN 102691409A CN 2012101906758 A CN2012101906758 A CN 2012101906758A CN 201210190675 A CN201210190675 A CN 201210190675A CN 102691409 A CN102691409 A CN 102691409A
- Authority
- CN
- China
- Prior art keywords
- door frame
- reinforced concrete
- heavy
- post
- heavy door
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
一种HR重型门架与钢筋砼临时柱联合支模装置及施工方法,属于建筑施工模板支架施工技术领域。联合支模架装置主要由以下结构组成:HR重型门架(1);临时钢筋混凝土柱(2);槽钢托梁(3);可调托座(4);调节杆(5);门型架(6);交叉拉杆(7);水平加固钢管(8);模板(9);方木(10);扣件式抱箍(11);基础加固脚手架(12)。超高超重大跨度现浇钢筋混凝土结构梁板部位采用HR重型门架(1),大跨度梁上托柱和后浇带下的竖向支撑采用临时钢筋混凝土柱(2)。本装置荷载传递路线明确,满足结构设计对大跨度支模体系的强度、刚度和稳定性要求,施工方法成熟,搭设灵活,效率高,安全经济。
Description
一、技术领域
一种HR重型门架与钢筋砼临时柱联合支模装置及施工方法,属于建筑施工模板支架施工技术领域。
二、背景技术
目前大部分工程在现浇结构模板支架中仅仅采用传统的扣件式钢管脚手架、承插型盘扣式钢管脚手架或门式脚手架。
随着建筑业的迅猛发展,建筑设计的造型千姿百态,结构设计也越来越复杂,单一的模板支架已经渐渐不能满足施工现场的需求。模板支架是指现浇结构,如梁、板、柱等混凝土浇筑时的一种模具装置,在混凝土浇筑前搭设,等到成型后拆除的一种施工方法。近几年来,高空、大跨度结构越来越多,其梁板支模体系设计、施工、架体材料也在不断创新、完善和发展,但对于高空、大跨结构(如带转换层高层建筑结构、连体结构),其部分区域结构荷载很大或结构设计对支模架变形有特殊要求,而采用常用架体材料或单一架体材料不能满足结构设计对架体的要求。
扣件式钢管支架在工地现场运用的比较普遍,但是扣件式钢管操作比较复杂,施工现场很难规范,现场很多脚手架事故调查报告中都提及倒塌原因为。承插型盘扣式钢管支架是一种较为新型的模板支架系统,操作十分简易,但是立杆间距、步距都是按照模数设置的,很难根据实际情况微调。
三、发明内容
本发明要解决的技术问题是:提供一种克服现有技术存在的问题,能有效地解决超高、超重、大跨度的结构梁、板承重支撑架设计施工难、整体安全稳定性差等问题的HR重型门架与钢筋砼临时结构柱联合支模装置。
本发明解决其技术问题所采用的技术方案是:一种HR重型门架与钢筋砼临时柱联合支模装置及施工方法,其特征在于:超高超重大跨度现浇钢筋砼结构梁板部位采用HR重型门架(1),大跨度梁上托柱和后浇带下的竖向支撑采用临时钢筋砼柱(2);HR重型门架(1)由槽钢托梁(3)、可调托座(4)、调节杆(5)、门型架(6)、交叉拉杆(7)组成;临时钢筋砼柱(2)与HR重型门架(1)之间采用扣件式抱箍(11)加固连接。
HR重型门架(1)宽1000mm,主立杆采用 大口径钢管;HR重型门架(1)之间采用交叉拉杆(7)与水平加固钢管(8)连接;水平加固钢管(8)采用 钢管,在模板支架的中间每2步通长连续设置,并采用扣件与门架扣牢;槽钢托梁(3)采用10号槽钢,垂直于梁轴线放置,方木(10)作为平行于梁轴线的水平杆,排布间距不大于300mm 并均匀布置,方木(10)上直接铺设模板(9)。
临时钢筋砼柱(2)作为上部集中荷载的支承,在柱顶设置500mm高的钢箱柱封顶,柱顶与梁板底采用橡胶板隔离,防止拆除时产生冲击荷载;临时钢筋砼柱(2)与HR重型门架(1)之间采用扣件式抱箍(11)作刚性侧向约束,扣件式抱箍(11)按沿柱子竖向每3900mm设置一道。
HR重型门架与钢筋砼临时结构柱联合支模装置荷载传递路线明确,方便设计,适用于各种平面和竖向结构布局形式,可以满足结构设计对大跨度支模体系的强度、刚度和稳定性要求,安全经济,并可费用优化。
HR重型门架需符合《建筑施工门式钢管脚手架安全技术规范》JGJ128相关要求,钢筋砼临时结构柱需符合《混凝土结构设计规范》GB50010和《混凝土结构工程施工质量验收规范》GB50204相关要求。
具体施工方法:
a、熟悉图纸并选择支模架方案,建模计算;
b、施工准备,定位放线;
c、临时钢筋砼柱(2)浇筑,HR重型门架(1)搭设;
d、主体结构施工;
e、符合结构设计要求后,支撑架拆除。
与现有技术相比,本发明所具有的有益效果是:一种HR重型门架与钢筋砼临时柱联合支模装置及施工方法具有足够的力学强度、刚度和稳定性,工作安全可靠。HR重型门架(1)比传统的钢管扣件支模架设计更科学,结构尺寸更标准,整体构架可靠性好,承载能力大,搭设灵活性强,施工效率高;整体构架垂直方向通过可调托座(4)、调节杆(5)调节所需施工高度,调节灵活,充分满足各种高度现浇工程的要求,其安全性能可靠,是解决超高、超重、大跨度结构施工的只要保证。临时钢筋砼柱(2)既能减少支撑结构跨度,又充分利用了混凝土受压性能好的特性,且整体性能好,成本较低,确保了施工安全。
四、附图说明
附图1:HR重型门架与钢筋砼临时柱联合支模装置剖面详图;
附图2:钢筋砼临时柱与HR重型门架联接节点详图;
附图3:HR重型门架示意图;
附图4:HR重型门架上部节点详图。
五、具体实施方式
下面结合附图对本发明HR重型门架与钢筋砼临时柱联合支模装置及施工方法做进一步说明:
参照附图1:
该HR重型门架与钢筋砼临时柱联合支模装置及施工方法由HR重型门架(1)、临时钢筋砼柱(2)、槽钢托梁(3)、可调托座(4)、调节杆(5)、门型架(6)、交叉拉杆(7)、水平加固钢管(8)、模板(9)、方木(10)、扣件式抱箍(11)、基础加固脚手架(12)及其他辅助部分组成。
参照附图2:
该HHR重型门架与钢筋砼临时柱联合支模装置及施工方法中钢筋砼临时结构柱(2)采用 钢管与HR重型门架(1)进行扣件式连接作刚性侧向约束,每隔3900mm设置一道扣件式抱箍(11),扣件式抱箍(11)与水平加固钢管(8)之间用扣件进行连接。
参照附图3:
HR重型门架(1)由可调托座(4)、调节杆(5)、门型架(6)、交叉拉杆(7)及其他辅助部分组成,整体构架垂直方向通过可调托座(4)、调节杆(5)调节所需施工高度。
参照附图4:
HR重型门架(1)支模架上部依次为模板(9)、方木(10)、槽钢托梁(3)、可调托座(4)、调节杆(5)、门型架(6)组成。
实践证明,HR重型门架与钢筋砼临时结构柱联合支模装置具有足够的力学强度、刚度和稳定性,整体构架可靠性好;搭设灵活性强,施工效率高;调节灵活,充分满足各种高度现浇工程的要求;既能减少支撑结构跨度,又充分利用了混凝土受压性能好的特性,且整体性能好,成本较低,确保了施工安全。
Claims (3)
1.一种HR重型门架与钢筋砼临时柱联合支模装置及施工方法,其特征在于:超高超重大跨度现浇钢筋混凝土结构梁板部位采用HR重型门架(1),大跨度梁上托柱和后浇带下的竖向支撑采用临时钢筋混凝土柱(2);HR重型门架(1)由槽钢托梁(3)、可调托座(4)、调节杆(5)、门型架(6)、交叉拉杆(7)组成;临时钢筋混凝土柱(2)与HR重型门架(1)之间采用扣件式抱箍(11)加固连接。
3.根据权利要求1所述的一种HR重型门架与钢筋砼临时柱联合支模装置及施工方法,其特征在于:临时钢筋混凝土柱(2)作为上部集中荷载的支承,在柱顶设置500mm高的钢箱柱封顶,柱顶与梁板底采用橡胶板隔离,防止拆除时产生冲击荷载;临时钢筋混凝土柱(2)与HR重型门架(1)之间采用扣件式抱箍(11)作刚性侧向约束,扣件式抱箍(11)按沿柱子竖向每3900mm设置一道。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101906758A CN102691409A (zh) | 2012-06-07 | 2012-06-07 | 一种hr重型门架与钢筋砼临时柱联合支模装置及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101906758A CN102691409A (zh) | 2012-06-07 | 2012-06-07 | 一种hr重型门架与钢筋砼临时柱联合支模装置及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102691409A true CN102691409A (zh) | 2012-09-26 |
Family
ID=46857133
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012101906758A Pending CN102691409A (zh) | 2012-06-07 | 2012-06-07 | 一种hr重型门架与钢筋砼临时柱联合支模装置及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102691409A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103806648A (zh) * | 2013-12-11 | 2014-05-21 | 成都佳美嘉科技有限公司 | 钢筋支模架 |
CN110219460A (zh) * | 2019-06-19 | 2019-09-10 | 银广厦集团有限公司 | 一种外箍整体拉结式圆柱框架梁施工方法 |
CN111411770A (zh) * | 2019-01-07 | 2020-07-14 | 中天建设集团有限公司 | 一种单元式胎架滑移支撑架 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2707887Y (zh) * | 2004-06-11 | 2005-07-06 | 王大展 | 脚手架 |
KR20070092460A (ko) * | 2006-03-10 | 2007-09-13 | 주식회사 퍼스폼 | 보 시스템 거푸집 및 이를 이용한 철근콘크리트 구조물의시공방법 |
CN201991215U (zh) * | 2011-01-19 | 2011-09-28 | 阳江市奇正建筑五金有限公司 | 门架式高支撑模板脚手架 |
CN202596161U (zh) * | 2012-06-07 | 2012-12-12 | 浙江城建建设集团有限公司 | 一种hr重型门架与钢筋混凝土临时结构柱联合支模装置 |
-
2012
- 2012-06-07 CN CN2012101906758A patent/CN102691409A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2707887Y (zh) * | 2004-06-11 | 2005-07-06 | 王大展 | 脚手架 |
KR20070092460A (ko) * | 2006-03-10 | 2007-09-13 | 주식회사 퍼스폼 | 보 시스템 거푸집 및 이를 이용한 철근콘크리트 구조물의시공방법 |
CN201991215U (zh) * | 2011-01-19 | 2011-09-28 | 阳江市奇正建筑五金有限公司 | 门架式高支撑模板脚手架 |
CN202596161U (zh) * | 2012-06-07 | 2012-12-12 | 浙江城建建设集团有限公司 | 一种hr重型门架与钢筋混凝土临时结构柱联合支模装置 |
Non-Patent Citations (1)
Title |
---|
住房和城乡建设部工程质量安全监管司,中国建筑业协会: "《土木建筑国家级工法汇编(2005-2006年度)中》", 31 May 2009, article "超高超重大跨度结构HR重型门架与钢筋混凝土临时结构联合支模架设计与施工工法", pages: 1828 - 1837 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103806648A (zh) * | 2013-12-11 | 2014-05-21 | 成都佳美嘉科技有限公司 | 钢筋支模架 |
CN111411770A (zh) * | 2019-01-07 | 2020-07-14 | 中天建设集团有限公司 | 一种单元式胎架滑移支撑架 |
CN110219460A (zh) * | 2019-06-19 | 2019-09-10 | 银广厦集团有限公司 | 一种外箍整体拉结式圆柱框架梁施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9016025B2 (en) | Constructing method for concrete cylinder of construction steel bar of high-rise steel structure | |
CN102392536B (zh) | 大跨度悬空通廊式模板支撑体系施工方法 | |
CN108265885B (zh) | 高大非正交大倾角异型混凝土斜柱的施工方法 | |
CN103306208A (zh) | 1.6次抛物线形新型四柱板式空心变截面高墩爬模方法 | |
CN104480922B (zh) | 空间桁架支模系统及其施工方法 | |
CN103669865A (zh) | 定型支架楼梯施工方法 | |
CN106013781A (zh) | 反吊模板的楼板支撑施工方法及施工装置 | |
CN201924289U (zh) | 一种高墩大跨度连续刚构桥0号块托架结构 | |
CN111364508A (zh) | 一种大型地下综合管廊无外模墙板内支撑加固方法 | |
CN103485574B (zh) | 一种造粒塔塔顶钢筋混凝土结构施工方法 | |
CN111962675A (zh) | 大跨度异形现浇钢筋混凝土空腹桁架施工方法 | |
CN108265749A (zh) | 一种用于市政综合管廊的组合式钢模板及使用方法 | |
CN202596161U (zh) | 一种hr重型门架与钢筋混凝土临时结构柱联合支模装置 | |
CN103122691A (zh) | 塔吊标准节支承高空支模钢平台结构及施工方法 | |
CN102322140B (zh) | 大跨度挑檐模板支撑施工方法 | |
CN102691409A (zh) | 一种hr重型门架与钢筋砼临时柱联合支模装置及施工方法 | |
CN207700680U (zh) | 一种屋面板吊模 | |
CN102767378B (zh) | 排架施工隧道双柱式洞门方法 | |
CN112227218A (zh) | 一种应用在清水砼的不锈钢木结合模板及其制作方法 | |
CN204960300U (zh) | 钢筋桁架楼板及现场绑扎楼板的钢筋桁架模板 | |
CN102312563A (zh) | 大跨度、超层高结构外脚手架连墙方法 | |
CN205077686U (zh) | 基于免拆模板的密肋梁板施工结构 | |
CN204510813U (zh) | 一种新型框架梁梁下l型挂板结构 | |
CN205857697U (zh) | 反吊模板的楼板支撑施工装置 | |
CN102418417B (zh) | 大板跨现浇梁密肋楼板早拆模板支模体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120926 |