CN106004886A - Track traffic track connection station wire distribution system and operation method thereof - Google Patents

Track traffic track connection station wire distribution system and operation method thereof Download PDF

Info

Publication number
CN106004886A
CN106004886A CN201610377932.7A CN201610377932A CN106004886A CN 106004886 A CN106004886 A CN 106004886A CN 201610377932 A CN201610377932 A CN 201610377932A CN 106004886 A CN106004886 A CN 106004886A
Authority
CN
China
Prior art keywords
track
line
platform
down direction
main track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610377932.7A
Other languages
Chinese (zh)
Other versions
CN106004886B (en
Inventor
徐瑰麟
赵强
张华龙
阙伟
李彦
高华
黄丽
唐勋
臧向
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201610377932.7A priority Critical patent/CN106004886B/en
Publication of CN106004886A publication Critical patent/CN106004886A/en
Application granted granted Critical
Publication of CN106004886B publication Critical patent/CN106004886B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B1/00General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems
    • B61B1/02General arrangement of stations and platforms including protection devices for the passengers

Abstract

The invention discloses a track traffic track connection station wire distribution system and an operation method thereof. The track traffic track connection station wire distribution system comprises a double-island platform composed of a first platform and a second platform and further comprises a parking lot arranged on one side of the double-island platform. A first up direction track main line and a first down direction track main line of a first line are arranged on the two sides of the first platform. A second up direction track main line and a second down direction track main line of a second line are arranged on the two sides of the second platform. A track connection station design problem caused by taking through operation and segment field co-location construction into consideration in line segmental operation is solved, the three functions of exit and entry segment track connection of a vehicle, vehicle turn-back operation in two directions and through operation of the vehicle serving as a middle station are achieved, and the two-way turn-back capacity is effectively improved.

Description

A kind of track traffic transition station distributing system and operation method thereof
Technical field
The present invention relates to city rail traffic route distribution field, in particular to a kind of track traffic Transition station distributing system and operation method thereof.
Background technology
In recent years, along with track traffic increases in each metropolitan fast development, gauze length Rapidly, circuit is gradually extended toward suburb from inner city, defines the extension line of urban line. Urban district and suburb section line sectionalizing operation need to be there is in circuit according to the operation of passenger flow feature rationalization With the probability of through operation, distribution design also needs to meet the requirement of two kinds of operation modes.It addition, Rolling stock section's land used condition is more and more difficult, the more situation co-located construction in twolink section field occur, Distribution pattern be it is also proposed new requirement.
The scheme only resting on turn back line currently for this type of rail traffic station distribution pattern is ground On studying carefully, common are: before using station, turn back (such as Fig. 1), two lines use station by single branch-cut bridge for two lines After turn back (such as Fig. 2), before two line stations behind single branch-cut bridge and station double crossover turn back and deposit (such as Fig. 3), Before two line stations, double crossover is turned back patterns such as (such as Fig. 4).
Wherein, two lines before using station single branch-cut bridges turn back the distribution type of (such as Fig. 1) through driving Calculating turning-back capacity is not enough, do not reach system capability 30 right/requirement of h, and from operation security From the standpoint of do not possess two line segmentations and hold concurrently the condition of through operation;
Two lines use mono-main track of distribution type line B and the circuit of turn back after standing (such as Fig. 2) There is grade separation relation in two main tracks of A, at circuit B station to double crossover, distance is longer, vehicle Empty race, apart from long, reduces efficiency of turning back, and calculates turning-back capacity through driving and does not reaches system energy Power 30 is right/requirement of h, and circuit grade separation causes circuit line style poor;
Before before two line stations, behind single branch-cut bridge and station, double crossover is turned back and is deposited (such as Fig. 3) and two line stations Double crossover is turned back (such as Fig. 4) two kinds of distribution types, considers based on secure context, friendship before stand The fork domestic expert advice of branch-cut bridge is only capable of utilizing monolateral turning back, and calculates turning-back capacity through driving and does not reaches System capability 30 is right/requirement of h.
Above-mentioned four kinds of distribution types all do not consider two-way switchback station and the co-located construction in rolling stock section field and The vehicle section that comes in and goes out integrates with the setting of function related layouts, thus consider vehicle two-way turn back, The co-located construction in part of path field, the transition station distributing system design of reserved through operation condition are one The problem needing to solve.
Summary of the invention
Present invention aim to the rail providing a kind of reciprocal time turning-back capacity short, two-way big Road traffic transition station distributing system, additionally provide one meet vehicle come in and go out section integrate with, two sides To vehicle turn back operation and the operation method as intermediate station three kinds of functions of through operation.
For achieving the above object, a kind of track traffic transition station distributing system designed by the present invention, Including the double-island type platform being made up of the first platform and the second platform, it also includes being arranged on twin islet The parking lot of formula platform side, described first platform is arranged distant from parking lot, described second station Platform is arranged close to parking lot;The both sides of described first platform are respectively arranged with the of first line One up direction track main track and the first down direction track main track, the both sides of described second platform It is respectively arranged with the second up direction track main track and the second down direction track of the second circuit Main track;
Wherein, described parking lot connects the near the side of first line by the first discrepancy section line First down direction track main track of one circuit, described first down direction track main track is by the One single branch-cut bridge connects the first up direction track main track;Described parking lot is near the one of the second circuit Side connects the second down direction track main track of the second circuit by the second section line that comes in and goes out, and described the Two down direction track main tracks connect the second up direction track main track by the 3rd single branch-cut bridge;
First up direction track main track of described first line connects the by the first interconnection Second up direction track main track of two circuits, the second down direction track of described second circuit Main track connects the first down direction track main track of first line by the second interconnection.
Further, second single branch-cut bridge, described first stop it are additionally provided with before the station of described first platform First pair of parking turn back line it is provided with behind the station of platform;The 4th it is additionally provided with single before the station of described second platform Branch-cut bridge, is provided with second pair of parking turn back line behind the station of described second platform.
Further, the described first circuit coming in and going out section line is provided with and once stopped for vehicle First safety line;Described second circuit coming in and going out section line is provided with the once stopped for vehicle Two safety lines.
A kind of method utilizing above-mentioned track traffic transition station distributing system to run, including first The operation method of circuit, its operation method includes:
1) dispatch a car process: vehicle from parking lot near the side of first line by the first discrepancy Section line enters the first down direction track main track of first line, starts operation;
2) exhumation process: vehicle enters the first platform along the first up direction track main track and stops, First pair of parking turn back line, then entrance the first down direction track main track of turning back is entered after the proteges of the powerful who stay with their benefactions like parasites, Upper visitor's tailing edge the first down direction track main track rolls away from;Subsequent vehicle is rolled over as procedure described above Return operation;
3) return the vehicle to the garage and knock off process: vehicle travels along the first up direction track main track, single by first Branch-cut bridge enters the first down direction track main track, then enters parking lot through the first discrepancy section line, complete One-tenth returns the vehicle to the garage and knock off.
Further, described step 2) in, when the initial stage dispatch a car logarithm less than 24 pairs time can Using mode of turning back before standing, vehicle travels along the first up direction track main track, single by second Branch-cut bridge proceeds to the first down direction track main track, after entering visitor objective under the first platform, upper, vehicle Reversely roll away from along the first down direction track main track.
Further, the operation method of described track traffic transition station distributing system also includes The operation method of two circuits, its operation method includes:
1) dispatch a car process: vehicle from parking lot near the side of the second circuit by the second discrepancy Section line enters the second down direction track main track of the second circuit, then is proceeded to by the 3rd single branch-cut bridge Second up direction track main track, starts operation;
2) exhumation process: vehicle enters the second platform along the second down direction track main track and stops, Second pair of parking turn back line, then entrance the second up direction track main track of turning back is entered after the proteges of the powerful who stay with their benefactions like parasites, Upper visitor's tailing edge the second up direction track main track rolls away from;Subsequent vehicle is rolled over as procedure described above Return operation;
3) return the vehicle to the garage and knock off process: vehicle travels along the second down direction track main track, goes out through second The section of entering line enters parking lot, completes to return the vehicle to the garage and knock off.
Yet further, described step 2) in, when the initial stage dispatch a car logarithm less than 24 pairs time Turning back before can using station mode, vehicle travels along the second down direction track main track, by the 4th Single branch-cut bridge proceeds to the second up direction track main track, after entering visitor objective under the second platform, upper, car Reversely roll away from along the second up direction track main track.
Further, the operation method of described track traffic transition station distributing system also includes Through operation method between first line and the second circuit, described first line and the second circuit it Between through operation method include the through operation method of up direction and the through operation side of down direction Method;Wherein, the through operation method of described up direction is as follows: vehicle is along the first of first line Up direction track main track travels, after entering visitor objective under the first platform, upper, then through first Winding thread proceeds to the second up direction track main track of the second circuit and travels, it is achieved passing through of up direction Logical operation;The through operation method of described down direction is as follows: vehicle is along second time of the second circuit Line direction track main track travels, after entering visitor objective under the second platform, upper, then through the second contact Line proceeds to the second down direction track main track of first line and travels, it is achieved down direction through Run.
Compared with prior art, present invention have the advantage that
One, after the first line of the present invention and the second circuit all use station, pair turn back line are turned back, Meet line sectionalizing operation turning-back capacity requirement, and turning-back capacity all can reach 30 right/h,;
Its two, the co-located construction in the parking lot of the present invention and station, both can realize come in and go out section function, Again can intensive land used, it is achieved resource-sharing;
Its three, the present invention is by arranging the first interconnection, the second interconnection, it is possible to achieve first Through operation between circuit and the second circuit.
Accompanying drawing explanation
Fig. 1 is single branch-cut bridge turn back line schematic diagram before existing station;
Fig. 2 is double crossover turn back line schematic diagram behind existing station;
Fig. 3 is double crossover deposit turn back line schematic diagram behind single branch-cut bridge and station before existing station;
Fig. 4 is double crossover turn back line schematic diagram before existing station;
Fig. 5 is the structural representation of the present invention a kind of track traffic transition station distributing system;
Fig. 6 is that first line of the present invention and the second circuit are dispatched a car the schematic diagram of process;
Fig. 7 is first line of the present invention and the schematic diagram of the second line turning-back process;
Fig. 8 is that first line of the present invention and the second circuit return the vehicle to the garage and knock off the schematic diagram of process;
Fig. 9 is the schematic diagram of through running between first line of the present invention and the second circuit;
Wherein: 1-the first platform, 2-the second platform, 3-double-island type platform, 4-parking lot, 5- First line, 5.1-the first up direction track main track, 5.2-the first down direction track main track, 6-the second circuit, 6.1-the second up direction track main track, 6.2-the second down direction track main track, 7.1-first section of discrepancy line, 7.2-second section of discrepancy line, the single branch-cut bridge of 8.1-first, 8.2-second are single The single branch-cut bridge of branch-cut bridge, 8.3-the 3rd, 8.4-the 4th single branch-cut bridge, 9.1-first couple of parking turn back line, 9.2- Second couple of parking turn back line, 10.1-the first interconnection, 10.2-the second interconnection, 11.1-first Safety line, 11.2-the second safety line.
Detailed description of the invention
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
A kind of track traffic transition station distributing system includes by the first platform 1 and second platform 2 constitute double-island type platform 3, it also includes being arranged on double-island type platform 3 The parking lot 4 of side, described first platform 1 is arranged distant from parking lot 4, described second station Platform 2 is arranged close to parking lot 4;The both sides of described first platform 1 are respectively arranged with First Line First up direction track main track 5.1 and the first down direction track main track 5.2, the institute on road 5 The both sides stating the second platform 2 are respectively arranged with the second up direction track main track of the second circuit 6 6.1 and the second down direction track main track 6.2;
Wherein, the first discrepancy section line is passed through in described parking lot 4 near the side of first line 5 7.1 the first down direction track main tracks 5.2 connecting first line 5, described first down direction Track main track 5.2 connects the first up direction track main track 5.1 by first single branch-cut bridge 8.1;Institute Second single branch-cut bridge 8.2 it is additionally provided with, behind the station of described first platform 1 before stating the station of the first platform 1 It is provided with first pair of parking turn back line 9.1;Described parking lot 4 is logical near the side of the second circuit 6 Cross the second discrepancy section line 7.2 and connect the second down direction track main track 6.2 of the second circuit 6, Described second down direction track main track 6.2 connects the second up side by the 3rd single branch-cut bridge 8.3 To track main track 6.1;The 4th single branch-cut bridge 8.4 it is additionally provided with before the station of described second platform 2, described Second pair of parking turn back line 9.2 it is provided with behind the station of the second platform 2;
First up direction track main track 5.1 of described first line 5 is by the first interconnection 10.1 the second up direction track main tracks 6.1 connecting the second circuit 6, described second circuit 6 The second down direction track main track 6.2 connect first line 5 by the second interconnection 10.2 First down direction track main track 5.2.
In the present embodiment, the described first circuit coming in and going out section line 7.1 is provided with for vehicle one The first safety line 11.1 that degree stops;Described second come in and go out section line 7.2 circuit be provided with for The second safety line 11.2 that vehicle once stopped.
As can be seen from figures 6 to 8, the side that the track traffic transition station distributing system of the present embodiment runs Method, including the operation method of first line 5, its operation method includes:
1) dispatch a car process: vehicle from parking lot 4 near the side of first line 5 by first The section line 7.1 that comes in and goes out enters the first down direction track main track 5.2 of first line 5, starts fortune Battalion;
2) exhumation process: vehicle enters the first platform along the first up direction track main track 5.1 1 stops, and enters first pair of parking turn back line 9.1, then entrance the first descending side that turns back after the proteges of the powerful who stay with their benefactions like parasites To track main track 5.2, upper visitor's tailing edge the first down direction track main track 5.2 rolls away from;Follow-up car Carry out turning back operation as procedure described above;
3) return the vehicle to the garage and knock off process: vehicle travels along the first up direction track main track 5.1, by One single branch-cut bridge 8.1 enters the first down direction track main track 5.2, then through the first discrepancy section line 7.1 Enter parking lot 4, complete to return the vehicle to the garage and knock off.
In technique scheme, described step 2) in, dispatch a car logarithm less than 24 when the initial stage Pair time can use station before turn back mode, vehicle travels along the first up direction track main track 5.1, Proceed to the first down direction track main track 5.2 by second single branch-cut bridge 8.2, enter the first platform 1 After lower visitor, upper visitor, vehicle reversely rolls away from along the first down direction track main track 5.2.
As can be seen from figures 6 to 8, the operation side of the track traffic transition station distributing system of the present embodiment Method, also includes the operation method of the second circuit 6, and its operation method includes:
1) dispatch a car process: vehicle from parking lot 4 near the side of the second circuit 6 by second The section line 7.2 that comes in and goes out enters the second down direction track main track 6.2 of the second circuit 6, then passes through 3rd single branch-cut bridge 8.3 proceeds to the second up direction track main track 6.1, starts operation;
2) exhumation process: vehicle enters the second platform along the second down direction track main track 6.2 2 stop, and enter second pair of parking turn back line 9.2, then entrance the second up side that turns back after the proteges of the powerful who stay with their benefactions like parasites To track main track 6.1, upper visitor's tailing edge the second up direction track main track 6.1 rolls away from;Follow-up car Carry out turning back operation as procedure described above;
3) return the vehicle to the garage and knock off process: vehicle travels along the second down direction track main track 6.2, Jing Guo Two discrepancy section lines a kind of 7.2 enter parking lot one 4, complete to return the vehicle to the garage and knock off.
In technique scheme, described step 2) in, dispatch a car logarithm less than 24 when the initial stage Pair time can use station before turn back mode, vehicle is along a kind of 6.2 row of the second down direction track main track Sail, proceed to the second up direction track main track one 6.1 by the 4th single branch-cut bridge one 8.4, After entering the second platform a kind of 2 times visitors, upper visitors, vehicle is reversely along the second up direction track just Line one 6.1 is rolled away from.
As it is shown in figure 9, the operation method of track traffic transition station distributing system also includes first Through operation method between circuit a kind of 5 and the second circuit one 6, described first line is a kind of 5 and second through operation methods between circuit one 6 include the through operation method of up direction and The through operation method of down direction;Wherein, the through operation method of up direction is as follows: vehicle edge The first up direction track main track a kind of 5.1 of first line a kind of 5 travels, and enters first stop After platform a kind of 1 time visitor, upper visitor, then proceed to the second circuit through the first interconnection one 10.1 The second up direction track main track a kind of 6.1 of a kind of 6 travels, it is achieved up direction through Run;The through operation method of down direction is as follows: vehicle is along second time of the second circuit a kind of 6 Line direction track main track a kind of 6.2 travels, after entering the second platform a kind of 2 times visitors, upper visitors, The second down direction rail of first line a kind of 5 is proceeded to again through the second interconnection a kind of 10.2 Road main track a kind of 5.2 travels, it is achieved the through operation of down direction.
The above, the only detailed description of the invention of the present invention, it is noted that any familiar Those skilled in the art in disclosed technical scope, the change that can readily occur in Or replace, all should contain within protection scope of the present invention.

Claims (8)

1. a track traffic transition station distributing system, including by the first platform (1) and second The double-island type platform (3) that platform (2) is constituted, it is characterised in that: also include being arranged on twin islet The parking lot (4) of formula platform (3) side, described first platform (1) and parking lot (4) Being arranged distant from, described second platform (2) is arranged close to parking lot (4);Described first stop The both sides of platform (1) are respectively arranged with the first up direction track main track (5.1) of first line (5) With the first down direction track main track (5.2), the both sides of described second platform (2) set respectively It is equipped with the second up direction track main track (6.1) and the second down direction of the second circuit (6) Track main track (6.2);
Wherein, described parking lot (4) come in and go out by first near the side of first line (5) Section line (7.1) connects the first down direction track main track (5.2) of first line (5), institute State the first down direction track main track (5.2) to be connected on first by first single branch-cut bridge (8.1) Line direction track main track (5.1);Described parking lot (4) is near the side of the second circuit (6) Just the second down direction track of the second circuit (6) is being connected by the second discrepancy section line (7.2) Line (6.2), described second down direction track main track (6.2) is by the 3rd single branch-cut bridge (8.3) Connect the second up direction track main track (6.1);
First up direction track main track (5.1) of described first line (5) passes through first Winding thread (10.1) connects the second up direction track main track (6.1) of the second circuit (6), institute State the second down direction track main track (6.2) of the second circuit (6) by the second interconnection (10.2) Connect the first down direction track main track (5.2) of first line (5).
Track traffic transition station distributing system the most according to claim 1, its feature exists In: it is additionally provided with second single branch-cut bridge (8.2) before the station of described first platform (1), described first First pair of parking turn back line (9.1) it is provided with behind the station of platform (1);Described second platform (2) Station before be additionally provided with the 4th single branch-cut bridge (8.4), be provided with the behind the station of described second platform (2) Two pairs of parking turn back line (9.2).
Track traffic transition station distributing system the most according to claim 1, its feature exists In: the described first circuit coming in and going out section line (7.1) is provided with the once stopped for vehicle One safety line (11.1);Described second circuit coming in and going out section line (7.2) is provided with for vehicle The second safety line (11.2) once stopped.
4. the track traffic transition station distributing system fortune that one kind utilizes described in claim 2 or 3 The method of row, it is characterised in that include the operation method of first line (5), its operation side Method includes:
1) dispatch a car process: vehicle leads near the side of first line (5) from parking lot (4) Cross the first discrepancy section line (7.1) and enter the first down direction track main track of first line (5) (5.2), start operation;
2) exhumation process: vehicle enters first stop along the first up direction track main track (5.1) Platform (1) is stopped, and enters first pair of parking turn back line (9.1), then entrance the of turning back after the proteges of the powerful who stay with their benefactions like parasites One down direction track main track (5.2), upper visitor's tailing edge the first down direction track main track (5.2) Roll away from;Subsequent vehicle is carried out turning back operation as procedure described above;
3) return the vehicle to the garage and knock off process: vehicle travels along the first up direction track main track (5.1), passes through First single branch-cut bridge (8.1) enters the first down direction track main track (5.2), then comes in and goes out through first Section line (7.1) enters parking lot (4), completes to return the vehicle to the garage and knock off.
The operation method of track traffic transition station distributing system the most according to claim 4, It is characterized in that, described step 2) in, can adopt when the initial stage dispatches a car when logarithm is less than 24 pairs By mode of turning back before station, vehicle travels along the first up direction track main track (5.1), passes through Second single branch-cut bridge (8.2) proceeds to the first down direction track main track (5.2), enters the first platform (1), under after visitor objective, upper, vehicle reversely rolls away from along the first down direction track main track (5.2).
The operation method of track traffic transition station distributing system the most according to claim 4, It is characterized in that, also including the operation method of the second circuit (6), its operation method includes:
1) dispatch a car process: vehicle leads near the side of the second circuit (6) from parking lot (4) Cross the second discrepancy section line (7.2) and enter the second down direction track main track of the second circuit (6) (6.2), then the second up direction track main track (6.1) is proceeded to by the 3rd single branch-cut bridge (8.3), Start operation;
2) exhumation process: vehicle enters second station along the second down direction track main track (6.2) Platform (2) is stopped, and enters second pair of parking turn back line (9.2), then entrance the of turning back after the proteges of the powerful who stay with their benefactions like parasites Two up directions track main track (6.1), upper visitor's tailing edge the second up direction track main track (6.1) Roll away from;Subsequent vehicle is carried out turning back operation as procedure described above;
3) return the vehicle to the garage and knock off process: vehicle travels along the second down direction track main track (6.2), pass through Second discrepancy section line (7.2) enters parking lot (4), completes to return the vehicle to the garage and knock off.
The method that track traffic transition station distributing system the most according to claim 6 runs, It is characterized in that, described step 2) in, can adopt when the initial stage dispatches a car when logarithm is less than 24 pairs By mode of turning back before station, vehicle travels along the second down direction track main track (6.2), passes through 4th single branch-cut bridge (8.4) proceeds to the second up direction track main track (6.1), enters the second platform (2), under after visitor objective, upper, vehicle reversely rolls away from along the second up direction track main track (6.1).
The operation method of track traffic transition station distributing system the most according to claim 4, It is characterized in that, also include through operation side between first line (5) and the second circuit (6) Method, between described first line (5) and the second circuit (6), through operation method includes up The through operation method in direction and the through operation method of down direction;Wherein, described up direction passes through Logical operation method is as follows: vehicle is along the first up direction track main track (5.1) of first line (5) Travel, enter under the first platform (1) after visitor objective, upper, then through the first interconnection (10.1) The second up direction track main track (6.1) proceeding to the second circuit (6) travels, it is achieved up The through operation in direction;The through operation method of described down direction is as follows: vehicle is along the second circuit (6) the second down direction track main track (6.2) travels, and enters under the second platform (2) After visitor objective, upper, then proceed to the second of first line (5) through the second interconnection (10.2) Down direction track main track (5.2) travels, it is achieved the through operation of down direction.
CN201610377932.7A 2016-05-31 2016-05-31 A kind of track traffic transition station distributing system and its operation method Active CN106004886B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610377932.7A CN106004886B (en) 2016-05-31 2016-05-31 A kind of track traffic transition station distributing system and its operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610377932.7A CN106004886B (en) 2016-05-31 2016-05-31 A kind of track traffic transition station distributing system and its operation method

Publications (2)

Publication Number Publication Date
CN106004886A true CN106004886A (en) 2016-10-12
CN106004886B CN106004886B (en) 2018-04-17

Family

ID=57092859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610377932.7A Active CN106004886B (en) 2016-05-31 2016-05-31 A kind of track traffic transition station distributing system and its operation method

Country Status (1)

Country Link
CN (1) CN106004886B (en)

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107128315A (en) * 2017-06-27 2017-09-05 中铁第四勘察设计院集团有限公司 The arrangement of main line and branch line and the track traffic for having the structure integrate with station
CN107139936A (en) * 2017-05-24 2017-09-08 中铁第四勘察设计院集团有限公司 It is a kind of to be turned back cable architecture using the interval track traffic turned back
CN107542477A (en) * 2017-08-16 2018-01-05 中铁隧道勘测设计院有限公司 A kind of subway distribution of the threaded list road of single hole shield space four combination
CN107585166A (en) * 2017-09-19 2018-01-16 中铁第四勘察设计院集团有限公司 A kind of track traffic turn back line arrangement
CN107715456A (en) * 2017-11-10 2018-02-23 中山市金马科技娱乐设备股份有限公司 A kind of multiple station system of the flat push type of recreation facility
CN108275162A (en) * 2018-03-09 2018-07-13 上海市隧道工程轨道交通设计研究院 One kind being used for Mountainous City underground overtaking station track structure and its application process
CN108382402A (en) * 2018-03-12 2018-08-10 中铁第四勘察设计院集团有限公司 Charge platform systems construction at a kind of intelligence rail electric car first and last end
CN108639067A (en) * 2018-06-22 2018-10-12 中铁第四勘察设计院集团有限公司 A kind of rail traffic side island combines the station structure that integrates with
CN108891423A (en) * 2018-07-27 2018-11-27 中铁第四勘察设计院集团有限公司 A kind of track circuit structure of reserved branch line condition
CN108944954A (en) * 2018-06-27 2018-12-07 中铁第四勘察设计院集团有限公司 A kind of intelligence rail train discrepancy vehicle base line system
CN109131364A (en) * 2018-09-21 2019-01-04 中铁第四勘察设计院集团有限公司 A kind of intelligence gauge lines structural system
CN109229110A (en) * 2018-11-15 2019-01-18 中铁第六勘察设计院集团有限公司 A kind of subway line structure and its application scheme using three main track of twin islet
CN110386168A (en) * 2018-04-19 2019-10-29 上海申通地铁集团有限公司 The control method and system that train is turned back
CN110539754A (en) * 2019-10-11 2019-12-06 中铁第六勘察设计院集团有限公司 Arrangement structure for connecting rails in parallel between turnout and field section for urban rail transit
CN110836065A (en) * 2019-11-11 2020-02-25 通号城市轨道交通技术有限公司 Platform shielding door linkage control method and device
CN110861655A (en) * 2019-11-29 2020-03-06 中铁第四勘察设计院集团有限公司 Rail transit cross-over station with through and sectional operation and operation method thereof
CN111297392A (en) * 2020-04-02 2020-06-19 青岛大学附属医院 Image radiology department infant chest radiography auxiliary device
CN111634296A (en) * 2020-06-28 2020-09-08 中铁第四勘察设计院集团有限公司 Straddle type monorail wiring system and operation method
CN112664013A (en) * 2020-12-11 2021-04-16 交控科技股份有限公司 Rail transit vehicle parking lot system
CN112660163A (en) * 2019-10-16 2021-04-16 无锡市轨道建设设计咨询有限公司 Double-track traffic line shared vehicle section wiring form and double-island platform thereof
CN112874539A (en) * 2021-03-26 2021-06-01 中铁第六勘察设计院集团有限公司 Urban area rail bilateral station with functions of crossing, parking and turning back
CN112874540A (en) * 2021-03-26 2021-06-01 中铁第六勘察设计院集团有限公司 Urban area track single-island station with crossing, parking and turning-back functions
CN108891423B (en) * 2018-07-27 2024-04-19 中铁第四勘察设计院集团有限公司 Track line structure of reserved branch line condition

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3889603A (en) * 1973-08-20 1975-06-17 Japan National Railway Double loop track system for railway freightyard and freight station
WO1996018534A1 (en) * 1994-12-14 1996-06-20 Norbert Krichler Structurally and functionally connected devices for the accelerated loading and unloading of long distance road trains accompanied by drivers
CN101402366A (en) * 2008-11-24 2009-04-08 中铁二院工程集团有限责任公司 Pneumatic effect releasing facilities for underground bus stop of high-speed railway
CN201951455U (en) * 2010-08-26 2011-08-31 中铁二院工程集团有限责任公司 Same platform transfer station of inter-city passenger line and urban railway line
CN102501852A (en) * 2011-11-21 2012-06-20 铁道第三勘察设计院集团有限公司 Layout structure for integration of train depot and junction station of urban rail
CN104742913A (en) * 2013-12-27 2015-07-01 王冠军 System and method for realizing station-front turning-back of urban rail transit

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3889603A (en) * 1973-08-20 1975-06-17 Japan National Railway Double loop track system for railway freightyard and freight station
WO1996018534A1 (en) * 1994-12-14 1996-06-20 Norbert Krichler Structurally and functionally connected devices for the accelerated loading and unloading of long distance road trains accompanied by drivers
CN101402366A (en) * 2008-11-24 2009-04-08 中铁二院工程集团有限责任公司 Pneumatic effect releasing facilities for underground bus stop of high-speed railway
CN201951455U (en) * 2010-08-26 2011-08-31 中铁二院工程集团有限责任公司 Same platform transfer station of inter-city passenger line and urban railway line
CN102501852A (en) * 2011-11-21 2012-06-20 铁道第三勘察设计院集团有限公司 Layout structure for integration of train depot and junction station of urban rail
CN104742913A (en) * 2013-12-27 2015-07-01 王冠军 System and method for realizing station-front turning-back of urban rail transit

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107139936A (en) * 2017-05-24 2017-09-08 中铁第四勘察设计院集团有限公司 It is a kind of to be turned back cable architecture using the interval track traffic turned back
CN107128315A (en) * 2017-06-27 2017-09-05 中铁第四勘察设计院集团有限公司 The arrangement of main line and branch line and the track traffic for having the structure integrate with station
CN107542477A (en) * 2017-08-16 2018-01-05 中铁隧道勘测设计院有限公司 A kind of subway distribution of the threaded list road of single hole shield space four combination
CN107585166B (en) * 2017-09-19 2024-02-20 中铁第四勘察设计院集团有限公司 Rail transit turn-back line arrangement structure
CN107585166A (en) * 2017-09-19 2018-01-16 中铁第四勘察设计院集团有限公司 A kind of track traffic turn back line arrangement
CN107715456A (en) * 2017-11-10 2018-02-23 中山市金马科技娱乐设备股份有限公司 A kind of multiple station system of the flat push type of recreation facility
CN108275162A (en) * 2018-03-09 2018-07-13 上海市隧道工程轨道交通设计研究院 One kind being used for Mountainous City underground overtaking station track structure and its application process
CN108382402A (en) * 2018-03-12 2018-08-10 中铁第四勘察设计院集团有限公司 Charge platform systems construction at a kind of intelligence rail electric car first and last end
CN108382402B (en) * 2018-03-12 2023-12-29 中铁第四勘察设计院集团有限公司 Intelligent tramcar head and tail end charging station system structure
CN110386168A (en) * 2018-04-19 2019-10-29 上海申通地铁集团有限公司 The control method and system that train is turned back
CN108639067A (en) * 2018-06-22 2018-10-12 中铁第四勘察设计院集团有限公司 A kind of rail traffic side island combines the station structure that integrates with
CN108639067B (en) * 2018-06-22 2023-05-16 中铁第四勘察设计院集团有限公司 Rail traffic side island combined rail connecting station structure
CN108944954B (en) * 2018-06-27 2023-08-01 中铁第四勘察设计院集团有限公司 Intelligent rail train in-out vehicle base line system
CN108944954A (en) * 2018-06-27 2018-12-07 中铁第四勘察设计院集团有限公司 A kind of intelligence rail train discrepancy vehicle base line system
CN108891423B (en) * 2018-07-27 2024-04-19 中铁第四勘察设计院集团有限公司 Track line structure of reserved branch line condition
CN108891423A (en) * 2018-07-27 2018-11-27 中铁第四勘察设计院集团有限公司 A kind of track circuit structure of reserved branch line condition
CN109131364A (en) * 2018-09-21 2019-01-04 中铁第四勘察设计院集团有限公司 A kind of intelligence gauge lines structural system
CN109131364B (en) * 2018-09-21 2023-09-26 中铁第四勘察设计院集团有限公司 Intelligent track line structure system
CN109229110A (en) * 2018-11-15 2019-01-18 中铁第六勘察设计院集团有限公司 A kind of subway line structure and its application scheme using three main track of twin islet
CN109229110B (en) * 2018-11-15 2024-02-09 中铁第六勘察设计院集团有限公司 Subway line structure adopting double-island three-positive line and application scheme thereof
CN110539754A (en) * 2019-10-11 2019-12-06 中铁第六勘察设计院集团有限公司 Arrangement structure for connecting rails in parallel between turnout and field section for urban rail transit
CN112660163A (en) * 2019-10-16 2021-04-16 无锡市轨道建设设计咨询有限公司 Double-track traffic line shared vehicle section wiring form and double-island platform thereof
CN112660163B (en) * 2019-10-16 2023-05-16 无锡市轨道建设设计咨询有限公司 Double-track traffic line shared vehicle section wiring form and double-island platform thereof
CN110836065A (en) * 2019-11-11 2020-02-25 通号城市轨道交通技术有限公司 Platform shielding door linkage control method and device
CN110861655A (en) * 2019-11-29 2020-03-06 中铁第四勘察设计院集团有限公司 Rail transit cross-over station with through and sectional operation and operation method thereof
CN111297392A (en) * 2020-04-02 2020-06-19 青岛大学附属医院 Image radiology department infant chest radiography auxiliary device
CN111634296A (en) * 2020-06-28 2020-09-08 中铁第四勘察设计院集团有限公司 Straddle type monorail wiring system and operation method
CN112664013A (en) * 2020-12-11 2021-04-16 交控科技股份有限公司 Rail transit vehicle parking lot system
CN112874540A (en) * 2021-03-26 2021-06-01 中铁第六勘察设计院集团有限公司 Urban area track single-island station with crossing, parking and turning-back functions
CN112874539A (en) * 2021-03-26 2021-06-01 中铁第六勘察设计院集团有限公司 Urban area rail bilateral station with functions of crossing, parking and turning back

Also Published As

Publication number Publication date
CN106004886B (en) 2018-04-17

Similar Documents

Publication Publication Date Title
CN106004886A (en) Track traffic track connection station wire distribution system and operation method thereof
CN106864464A (en) Personal suspension type double track road is double dynamical to automatically control railway traffic system
CN105957376A (en) No-signal intersection vehicle passing guiding system and method in cooperative vehicle infrastructure environment
CN116884099A (en) Automatic ticket vending and checking system
CN102002900B (en) Bus rapid transit system
WO2007124740A1 (en) Active rail transport system
CN101992782A (en) Urban unmanned electronic railcar taxi traffic system
CN106043315A (en) Flowing railway station, track network matched with flowing railway station and combination system of flowing railway station and track network
CN107585166B (en) Rail transit turn-back line arrangement structure
CN102248959A (en) Successively-turned crossway and circulating line/network
CN105041022A (en) City road intelligent type multifunctional stereo garage
CN101550667B (en) Control method of integrated setting of on-board and off-board stop station of bus and taxi
CN105926379A (en) Monorail traffic overhead section overhauling passage and application method thereof
CN201932156U (en) Overhead and underground transmission belt public traffic system
CN102146649A (en) Public traffic method
CN101864710A (en) Annular flyover for straight movement and large-radius turning at crossroad
CN201850804U (en) Bidirectional inner lane parking lot
CN207809379U (en) A kind of rail traffic is turned back trajectory arrangement
CN108340925A (en) A kind of intelligence rail train ground Station System structure
CN102039900A (en) Telpher type urban public transport system
CN101942789A (en) Bus station suitable for multiple buses to stop and setting method thereof
CN107139936A (en) It is a kind of to be turned back cable architecture using the interval track traffic turned back
CN107128315A (en) The arrangement of main line and branch line and the track traffic for having the structure integrate with station
CN211685059U (en) Station arrangement structure of tramcar
CN207931716U (en) A kind of intelligence rail train ground Station System structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant