CN106004886A - Track traffic track connection station wire distribution system and operation method thereof - Google Patents
Track traffic track connection station wire distribution system and operation method thereof Download PDFInfo
- Publication number
- CN106004886A CN106004886A CN201610377932.7A CN201610377932A CN106004886A CN 106004886 A CN106004886 A CN 106004886A CN 201610377932 A CN201610377932 A CN 201610377932A CN 106004886 A CN106004886 A CN 106004886A
- Authority
- CN
- China
- Prior art keywords
- track
- line
- platform
- down direction
- main track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B1/00—General arrangement of stations, platforms, or sidings; Railway networks; Rail vehicle marshalling systems
- B61B1/02—General arrangement of stations and platforms including protection devices for the passengers
Abstract
The invention discloses a track traffic track connection station wire distribution system and an operation method thereof. The track traffic track connection station wire distribution system comprises a double-island platform composed of a first platform and a second platform and further comprises a parking lot arranged on one side of the double-island platform. A first up direction track main line and a first down direction track main line of a first line are arranged on the two sides of the first platform. A second up direction track main line and a second down direction track main line of a second line are arranged on the two sides of the second platform. A track connection station design problem caused by taking through operation and segment field co-location construction into consideration in line segmental operation is solved, the three functions of exit and entry segment track connection of a vehicle, vehicle turn-back operation in two directions and through operation of the vehicle serving as a middle station are achieved, and the two-way turn-back capacity is effectively improved.
Description
Technical field
The present invention relates to city rail traffic route distribution field, in particular to a kind of track traffic
Transition station distributing system and operation method thereof.
Background technology
In recent years, along with track traffic increases in each metropolitan fast development, gauze length
Rapidly, circuit is gradually extended toward suburb from inner city, defines the extension line of urban line.
Urban district and suburb section line sectionalizing operation need to be there is in circuit according to the operation of passenger flow feature rationalization
With the probability of through operation, distribution design also needs to meet the requirement of two kinds of operation modes.It addition,
Rolling stock section's land used condition is more and more difficult, the more situation co-located construction in twolink section field occur,
Distribution pattern be it is also proposed new requirement.
The scheme only resting on turn back line currently for this type of rail traffic station distribution pattern is ground
On studying carefully, common are: before using station, turn back (such as Fig. 1), two lines use station by single branch-cut bridge for two lines
After turn back (such as Fig. 2), before two line stations behind single branch-cut bridge and station double crossover turn back and deposit (such as Fig. 3),
Before two line stations, double crossover is turned back patterns such as (such as Fig. 4).
Wherein, two lines before using station single branch-cut bridges turn back the distribution type of (such as Fig. 1) through driving
Calculating turning-back capacity is not enough, do not reach system capability 30 right/requirement of h, and from operation security
From the standpoint of do not possess two line segmentations and hold concurrently the condition of through operation;
Two lines use mono-main track of distribution type line B and the circuit of turn back after standing (such as Fig. 2)
There is grade separation relation in two main tracks of A, at circuit B station to double crossover, distance is longer, vehicle
Empty race, apart from long, reduces efficiency of turning back, and calculates turning-back capacity through driving and does not reaches system energy
Power 30 is right/requirement of h, and circuit grade separation causes circuit line style poor;
Before before two line stations, behind single branch-cut bridge and station, double crossover is turned back and is deposited (such as Fig. 3) and two line stations
Double crossover is turned back (such as Fig. 4) two kinds of distribution types, considers based on secure context, friendship before stand
The fork domestic expert advice of branch-cut bridge is only capable of utilizing monolateral turning back, and calculates turning-back capacity through driving and does not reaches
System capability 30 is right/requirement of h.
Above-mentioned four kinds of distribution types all do not consider two-way switchback station and the co-located construction in rolling stock section field and
The vehicle section that comes in and goes out integrates with the setting of function related layouts, thus consider vehicle two-way turn back,
The co-located construction in part of path field, the transition station distributing system design of reserved through operation condition are one
The problem needing to solve.
Summary of the invention
Present invention aim to the rail providing a kind of reciprocal time turning-back capacity short, two-way big
Road traffic transition station distributing system, additionally provide one meet vehicle come in and go out section integrate with, two sides
To vehicle turn back operation and the operation method as intermediate station three kinds of functions of through operation.
For achieving the above object, a kind of track traffic transition station distributing system designed by the present invention,
Including the double-island type platform being made up of the first platform and the second platform, it also includes being arranged on twin islet
The parking lot of formula platform side, described first platform is arranged distant from parking lot, described second station
Platform is arranged close to parking lot;The both sides of described first platform are respectively arranged with the of first line
One up direction track main track and the first down direction track main track, the both sides of described second platform
It is respectively arranged with the second up direction track main track and the second down direction track of the second circuit
Main track;
Wherein, described parking lot connects the near the side of first line by the first discrepancy section line
First down direction track main track of one circuit, described first down direction track main track is by the
One single branch-cut bridge connects the first up direction track main track;Described parking lot is near the one of the second circuit
Side connects the second down direction track main track of the second circuit by the second section line that comes in and goes out, and described the
Two down direction track main tracks connect the second up direction track main track by the 3rd single branch-cut bridge;
First up direction track main track of described first line connects the by the first interconnection
Second up direction track main track of two circuits, the second down direction track of described second circuit
Main track connects the first down direction track main track of first line by the second interconnection.
Further, second single branch-cut bridge, described first stop it are additionally provided with before the station of described first platform
First pair of parking turn back line it is provided with behind the station of platform;The 4th it is additionally provided with single before the station of described second platform
Branch-cut bridge, is provided with second pair of parking turn back line behind the station of described second platform.
Further, the described first circuit coming in and going out section line is provided with and once stopped for vehicle
First safety line;Described second circuit coming in and going out section line is provided with the once stopped for vehicle
Two safety lines.
A kind of method utilizing above-mentioned track traffic transition station distributing system to run, including first
The operation method of circuit, its operation method includes:
1) dispatch a car process: vehicle from parking lot near the side of first line by the first discrepancy
Section line enters the first down direction track main track of first line, starts operation;
2) exhumation process: vehicle enters the first platform along the first up direction track main track and stops,
First pair of parking turn back line, then entrance the first down direction track main track of turning back is entered after the proteges of the powerful who stay with their benefactions like parasites,
Upper visitor's tailing edge the first down direction track main track rolls away from;Subsequent vehicle is rolled over as procedure described above
Return operation;
3) return the vehicle to the garage and knock off process: vehicle travels along the first up direction track main track, single by first
Branch-cut bridge enters the first down direction track main track, then enters parking lot through the first discrepancy section line, complete
One-tenth returns the vehicle to the garage and knock off.
Further, described step 2) in, when the initial stage dispatch a car logarithm less than 24 pairs time can
Using mode of turning back before standing, vehicle travels along the first up direction track main track, single by second
Branch-cut bridge proceeds to the first down direction track main track, after entering visitor objective under the first platform, upper, vehicle
Reversely roll away from along the first down direction track main track.
Further, the operation method of described track traffic transition station distributing system also includes
The operation method of two circuits, its operation method includes:
1) dispatch a car process: vehicle from parking lot near the side of the second circuit by the second discrepancy
Section line enters the second down direction track main track of the second circuit, then is proceeded to by the 3rd single branch-cut bridge
Second up direction track main track, starts operation;
2) exhumation process: vehicle enters the second platform along the second down direction track main track and stops,
Second pair of parking turn back line, then entrance the second up direction track main track of turning back is entered after the proteges of the powerful who stay with their benefactions like parasites,
Upper visitor's tailing edge the second up direction track main track rolls away from;Subsequent vehicle is rolled over as procedure described above
Return operation;
3) return the vehicle to the garage and knock off process: vehicle travels along the second down direction track main track, goes out through second
The section of entering line enters parking lot, completes to return the vehicle to the garage and knock off.
Yet further, described step 2) in, when the initial stage dispatch a car logarithm less than 24 pairs time
Turning back before can using station mode, vehicle travels along the second down direction track main track, by the 4th
Single branch-cut bridge proceeds to the second up direction track main track, after entering visitor objective under the second platform, upper, car
Reversely roll away from along the second up direction track main track.
Further, the operation method of described track traffic transition station distributing system also includes
Through operation method between first line and the second circuit, described first line and the second circuit it
Between through operation method include the through operation method of up direction and the through operation side of down direction
Method;Wherein, the through operation method of described up direction is as follows: vehicle is along the first of first line
Up direction track main track travels, after entering visitor objective under the first platform, upper, then through first
Winding thread proceeds to the second up direction track main track of the second circuit and travels, it is achieved passing through of up direction
Logical operation;The through operation method of described down direction is as follows: vehicle is along second time of the second circuit
Line direction track main track travels, after entering visitor objective under the second platform, upper, then through the second contact
Line proceeds to the second down direction track main track of first line and travels, it is achieved down direction through
Run.
Compared with prior art, present invention have the advantage that
One, after the first line of the present invention and the second circuit all use station, pair turn back line are turned back,
Meet line sectionalizing operation turning-back capacity requirement, and turning-back capacity all can reach 30 right/h,;
Its two, the co-located construction in the parking lot of the present invention and station, both can realize come in and go out section function,
Again can intensive land used, it is achieved resource-sharing;
Its three, the present invention is by arranging the first interconnection, the second interconnection, it is possible to achieve first
Through operation between circuit and the second circuit.
Accompanying drawing explanation
Fig. 1 is single branch-cut bridge turn back line schematic diagram before existing station;
Fig. 2 is double crossover turn back line schematic diagram behind existing station;
Fig. 3 is double crossover deposit turn back line schematic diagram behind single branch-cut bridge and station before existing station;
Fig. 4 is double crossover turn back line schematic diagram before existing station;
Fig. 5 is the structural representation of the present invention a kind of track traffic transition station distributing system;
Fig. 6 is that first line of the present invention and the second circuit are dispatched a car the schematic diagram of process;
Fig. 7 is first line of the present invention and the schematic diagram of the second line turning-back process;
Fig. 8 is that first line of the present invention and the second circuit return the vehicle to the garage and knock off the schematic diagram of process;
Fig. 9 is the schematic diagram of through running between first line of the present invention and the second circuit;
Wherein: 1-the first platform, 2-the second platform, 3-double-island type platform, 4-parking lot, 5-
First line, 5.1-the first up direction track main track, 5.2-the first down direction track main track,
6-the second circuit, 6.1-the second up direction track main track, 6.2-the second down direction track main track,
7.1-first section of discrepancy line, 7.2-second section of discrepancy line, the single branch-cut bridge of 8.1-first, 8.2-second are single
The single branch-cut bridge of branch-cut bridge, 8.3-the 3rd, 8.4-the 4th single branch-cut bridge, 9.1-first couple of parking turn back line, 9.2-
Second couple of parking turn back line, 10.1-the first interconnection, 10.2-the second interconnection, 11.1-first
Safety line, 11.2-the second safety line.
Detailed description of the invention
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
A kind of track traffic transition station distributing system includes by the first platform
1 and second platform 2 constitute double-island type platform 3, it also includes being arranged on double-island type platform 3
The parking lot 4 of side, described first platform 1 is arranged distant from parking lot 4, described second station
Platform 2 is arranged close to parking lot 4;The both sides of described first platform 1 are respectively arranged with First Line
First up direction track main track 5.1 and the first down direction track main track 5.2, the institute on road 5
The both sides stating the second platform 2 are respectively arranged with the second up direction track main track of the second circuit 6
6.1 and the second down direction track main track 6.2;
Wherein, the first discrepancy section line is passed through in described parking lot 4 near the side of first line 5
7.1 the first down direction track main tracks 5.2 connecting first line 5, described first down direction
Track main track 5.2 connects the first up direction track main track 5.1 by first single branch-cut bridge 8.1;Institute
Second single branch-cut bridge 8.2 it is additionally provided with, behind the station of described first platform 1 before stating the station of the first platform 1
It is provided with first pair of parking turn back line 9.1;Described parking lot 4 is logical near the side of the second circuit 6
Cross the second discrepancy section line 7.2 and connect the second down direction track main track 6.2 of the second circuit 6,
Described second down direction track main track 6.2 connects the second up side by the 3rd single branch-cut bridge 8.3
To track main track 6.1;The 4th single branch-cut bridge 8.4 it is additionally provided with before the station of described second platform 2, described
Second pair of parking turn back line 9.2 it is provided with behind the station of the second platform 2;
First up direction track main track 5.1 of described first line 5 is by the first interconnection
10.1 the second up direction track main tracks 6.1 connecting the second circuit 6, described second circuit 6
The second down direction track main track 6.2 connect first line 5 by the second interconnection 10.2
First down direction track main track 5.2.
In the present embodiment, the described first circuit coming in and going out section line 7.1 is provided with for vehicle one
The first safety line 11.1 that degree stops;Described second come in and go out section line 7.2 circuit be provided with for
The second safety line 11.2 that vehicle once stopped.
As can be seen from figures 6 to 8, the side that the track traffic transition station distributing system of the present embodiment runs
Method, including the operation method of first line 5, its operation method includes:
1) dispatch a car process: vehicle from parking lot 4 near the side of first line 5 by first
The section line 7.1 that comes in and goes out enters the first down direction track main track 5.2 of first line 5, starts fortune
Battalion;
2) exhumation process: vehicle enters the first platform along the first up direction track main track 5.1
1 stops, and enters first pair of parking turn back line 9.1, then entrance the first descending side that turns back after the proteges of the powerful who stay with their benefactions like parasites
To track main track 5.2, upper visitor's tailing edge the first down direction track main track 5.2 rolls away from;Follow-up car
Carry out turning back operation as procedure described above;
3) return the vehicle to the garage and knock off process: vehicle travels along the first up direction track main track 5.1, by
One single branch-cut bridge 8.1 enters the first down direction track main track 5.2, then through the first discrepancy section line 7.1
Enter parking lot 4, complete to return the vehicle to the garage and knock off.
In technique scheme, described step 2) in, dispatch a car logarithm less than 24 when the initial stage
Pair time can use station before turn back mode, vehicle travels along the first up direction track main track 5.1,
Proceed to the first down direction track main track 5.2 by second single branch-cut bridge 8.2, enter the first platform 1
After lower visitor, upper visitor, vehicle reversely rolls away from along the first down direction track main track 5.2.
As can be seen from figures 6 to 8, the operation side of the track traffic transition station distributing system of the present embodiment
Method, also includes the operation method of the second circuit 6, and its operation method includes:
1) dispatch a car process: vehicle from parking lot 4 near the side of the second circuit 6 by second
The section line 7.2 that comes in and goes out enters the second down direction track main track 6.2 of the second circuit 6, then passes through
3rd single branch-cut bridge 8.3 proceeds to the second up direction track main track 6.1, starts operation;
2) exhumation process: vehicle enters the second platform along the second down direction track main track 6.2
2 stop, and enter second pair of parking turn back line 9.2, then entrance the second up side that turns back after the proteges of the powerful who stay with their benefactions like parasites
To track main track 6.1, upper visitor's tailing edge the second up direction track main track 6.1 rolls away from;Follow-up car
Carry out turning back operation as procedure described above;
3) return the vehicle to the garage and knock off process: vehicle travels along the second down direction track main track 6.2, Jing Guo
Two discrepancy section lines a kind of 7.2 enter parking lot one 4, complete to return the vehicle to the garage and knock off.
In technique scheme, described step 2) in, dispatch a car logarithm less than 24 when the initial stage
Pair time can use station before turn back mode, vehicle is along a kind of 6.2 row of the second down direction track main track
Sail, proceed to the second up direction track main track one 6.1 by the 4th single branch-cut bridge one 8.4,
After entering the second platform a kind of 2 times visitors, upper visitors, vehicle is reversely along the second up direction track just
Line one 6.1 is rolled away from.
As it is shown in figure 9, the operation method of track traffic transition station distributing system also includes first
Through operation method between circuit a kind of 5 and the second circuit one 6, described first line is a kind of
5 and second through operation methods between circuit one 6 include the through operation method of up direction and
The through operation method of down direction;Wherein, the through operation method of up direction is as follows: vehicle edge
The first up direction track main track a kind of 5.1 of first line a kind of 5 travels, and enters first stop
After platform a kind of 1 time visitor, upper visitor, then proceed to the second circuit through the first interconnection one 10.1
The second up direction track main track a kind of 6.1 of a kind of 6 travels, it is achieved up direction through
Run;The through operation method of down direction is as follows: vehicle is along second time of the second circuit a kind of 6
Line direction track main track a kind of 6.2 travels, after entering the second platform a kind of 2 times visitors, upper visitors,
The second down direction rail of first line a kind of 5 is proceeded to again through the second interconnection a kind of 10.2
Road main track a kind of 5.2 travels, it is achieved the through operation of down direction.
The above, the only detailed description of the invention of the present invention, it is noted that any familiar
Those skilled in the art in disclosed technical scope, the change that can readily occur in
Or replace, all should contain within protection scope of the present invention.
Claims (8)
1. a track traffic transition station distributing system, including by the first platform (1) and second
The double-island type platform (3) that platform (2) is constituted, it is characterised in that: also include being arranged on twin islet
The parking lot (4) of formula platform (3) side, described first platform (1) and parking lot (4)
Being arranged distant from, described second platform (2) is arranged close to parking lot (4);Described first stop
The both sides of platform (1) are respectively arranged with the first up direction track main track (5.1) of first line (5)
With the first down direction track main track (5.2), the both sides of described second platform (2) set respectively
It is equipped with the second up direction track main track (6.1) and the second down direction of the second circuit (6)
Track main track (6.2);
Wherein, described parking lot (4) come in and go out by first near the side of first line (5)
Section line (7.1) connects the first down direction track main track (5.2) of first line (5), institute
State the first down direction track main track (5.2) to be connected on first by first single branch-cut bridge (8.1)
Line direction track main track (5.1);Described parking lot (4) is near the side of the second circuit (6)
Just the second down direction track of the second circuit (6) is being connected by the second discrepancy section line (7.2)
Line (6.2), described second down direction track main track (6.2) is by the 3rd single branch-cut bridge (8.3)
Connect the second up direction track main track (6.1);
First up direction track main track (5.1) of described first line (5) passes through first
Winding thread (10.1) connects the second up direction track main track (6.1) of the second circuit (6), institute
State the second down direction track main track (6.2) of the second circuit (6) by the second interconnection (10.2)
Connect the first down direction track main track (5.2) of first line (5).
Track traffic transition station distributing system the most according to claim 1, its feature exists
In: it is additionally provided with second single branch-cut bridge (8.2) before the station of described first platform (1), described first
First pair of parking turn back line (9.1) it is provided with behind the station of platform (1);Described second platform (2)
Station before be additionally provided with the 4th single branch-cut bridge (8.4), be provided with the behind the station of described second platform (2)
Two pairs of parking turn back line (9.2).
Track traffic transition station distributing system the most according to claim 1, its feature exists
In: the described first circuit coming in and going out section line (7.1) is provided with the once stopped for vehicle
One safety line (11.1);Described second circuit coming in and going out section line (7.2) is provided with for vehicle
The second safety line (11.2) once stopped.
4. the track traffic transition station distributing system fortune that one kind utilizes described in claim 2 or 3
The method of row, it is characterised in that include the operation method of first line (5), its operation side
Method includes:
1) dispatch a car process: vehicle leads near the side of first line (5) from parking lot (4)
Cross the first discrepancy section line (7.1) and enter the first down direction track main track of first line (5)
(5.2), start operation;
2) exhumation process: vehicle enters first stop along the first up direction track main track (5.1)
Platform (1) is stopped, and enters first pair of parking turn back line (9.1), then entrance the of turning back after the proteges of the powerful who stay with their benefactions like parasites
One down direction track main track (5.2), upper visitor's tailing edge the first down direction track main track (5.2)
Roll away from;Subsequent vehicle is carried out turning back operation as procedure described above;
3) return the vehicle to the garage and knock off process: vehicle travels along the first up direction track main track (5.1), passes through
First single branch-cut bridge (8.1) enters the first down direction track main track (5.2), then comes in and goes out through first
Section line (7.1) enters parking lot (4), completes to return the vehicle to the garage and knock off.
The operation method of track traffic transition station distributing system the most according to claim 4,
It is characterized in that, described step 2) in, can adopt when the initial stage dispatches a car when logarithm is less than 24 pairs
By mode of turning back before station, vehicle travels along the first up direction track main track (5.1), passes through
Second single branch-cut bridge (8.2) proceeds to the first down direction track main track (5.2), enters the first platform
(1), under after visitor objective, upper, vehicle reversely rolls away from along the first down direction track main track (5.2).
The operation method of track traffic transition station distributing system the most according to claim 4,
It is characterized in that, also including the operation method of the second circuit (6), its operation method includes:
1) dispatch a car process: vehicle leads near the side of the second circuit (6) from parking lot (4)
Cross the second discrepancy section line (7.2) and enter the second down direction track main track of the second circuit (6)
(6.2), then the second up direction track main track (6.1) is proceeded to by the 3rd single branch-cut bridge (8.3),
Start operation;
2) exhumation process: vehicle enters second station along the second down direction track main track (6.2)
Platform (2) is stopped, and enters second pair of parking turn back line (9.2), then entrance the of turning back after the proteges of the powerful who stay with their benefactions like parasites
Two up directions track main track (6.1), upper visitor's tailing edge the second up direction track main track (6.1)
Roll away from;Subsequent vehicle is carried out turning back operation as procedure described above;
3) return the vehicle to the garage and knock off process: vehicle travels along the second down direction track main track (6.2), pass through
Second discrepancy section line (7.2) enters parking lot (4), completes to return the vehicle to the garage and knock off.
The method that track traffic transition station distributing system the most according to claim 6 runs,
It is characterized in that, described step 2) in, can adopt when the initial stage dispatches a car when logarithm is less than 24 pairs
By mode of turning back before station, vehicle travels along the second down direction track main track (6.2), passes through
4th single branch-cut bridge (8.4) proceeds to the second up direction track main track (6.1), enters the second platform
(2), under after visitor objective, upper, vehicle reversely rolls away from along the second up direction track main track (6.1).
The operation method of track traffic transition station distributing system the most according to claim 4,
It is characterized in that, also include through operation side between first line (5) and the second circuit (6)
Method, between described first line (5) and the second circuit (6), through operation method includes up
The through operation method in direction and the through operation method of down direction;Wherein, described up direction passes through
Logical operation method is as follows: vehicle is along the first up direction track main track (5.1) of first line (5)
Travel, enter under the first platform (1) after visitor objective, upper, then through the first interconnection (10.1)
The second up direction track main track (6.1) proceeding to the second circuit (6) travels, it is achieved up
The through operation in direction;The through operation method of described down direction is as follows: vehicle is along the second circuit
(6) the second down direction track main track (6.2) travels, and enters under the second platform (2)
After visitor objective, upper, then proceed to the second of first line (5) through the second interconnection (10.2)
Down direction track main track (5.2) travels, it is achieved the through operation of down direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610377932.7A CN106004886B (en) | 2016-05-31 | 2016-05-31 | A kind of track traffic transition station distributing system and its operation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610377932.7A CN106004886B (en) | 2016-05-31 | 2016-05-31 | A kind of track traffic transition station distributing system and its operation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106004886A true CN106004886A (en) | 2016-10-12 |
CN106004886B CN106004886B (en) | 2018-04-17 |
Family
ID=57092859
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610377932.7A Active CN106004886B (en) | 2016-05-31 | 2016-05-31 | A kind of track traffic transition station distributing system and its operation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106004886B (en) |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107128315A (en) * | 2017-06-27 | 2017-09-05 | 中铁第四勘察设计院集团有限公司 | The arrangement of main line and branch line and the track traffic for having the structure integrate with station |
CN107139936A (en) * | 2017-05-24 | 2017-09-08 | 中铁第四勘察设计院集团有限公司 | It is a kind of to be turned back cable architecture using the interval track traffic turned back |
CN107542477A (en) * | 2017-08-16 | 2018-01-05 | 中铁隧道勘测设计院有限公司 | A kind of subway distribution of the threaded list road of single hole shield space four combination |
CN107585166A (en) * | 2017-09-19 | 2018-01-16 | 中铁第四勘察设计院集团有限公司 | A kind of track traffic turn back line arrangement |
CN107715456A (en) * | 2017-11-10 | 2018-02-23 | 中山市金马科技娱乐设备股份有限公司 | A kind of multiple station system of the flat push type of recreation facility |
CN108275162A (en) * | 2018-03-09 | 2018-07-13 | 上海市隧道工程轨道交通设计研究院 | One kind being used for Mountainous City underground overtaking station track structure and its application process |
CN108382402A (en) * | 2018-03-12 | 2018-08-10 | 中铁第四勘察设计院集团有限公司 | Charge platform systems construction at a kind of intelligence rail electric car first and last end |
CN108639067A (en) * | 2018-06-22 | 2018-10-12 | 中铁第四勘察设计院集团有限公司 | A kind of rail traffic side island combines the station structure that integrates with |
CN108891423A (en) * | 2018-07-27 | 2018-11-27 | 中铁第四勘察设计院集团有限公司 | A kind of track circuit structure of reserved branch line condition |
CN108944954A (en) * | 2018-06-27 | 2018-12-07 | 中铁第四勘察设计院集团有限公司 | A kind of intelligence rail train discrepancy vehicle base line system |
CN109131364A (en) * | 2018-09-21 | 2019-01-04 | 中铁第四勘察设计院集团有限公司 | A kind of intelligence gauge lines structural system |
CN109229110A (en) * | 2018-11-15 | 2019-01-18 | 中铁第六勘察设计院集团有限公司 | A kind of subway line structure and its application scheme using three main track of twin islet |
CN110386168A (en) * | 2018-04-19 | 2019-10-29 | 上海申通地铁集团有限公司 | The control method and system that train is turned back |
CN110539754A (en) * | 2019-10-11 | 2019-12-06 | 中铁第六勘察设计院集团有限公司 | Arrangement structure for connecting rails in parallel between turnout and field section for urban rail transit |
CN110836065A (en) * | 2019-11-11 | 2020-02-25 | 通号城市轨道交通技术有限公司 | Platform shielding door linkage control method and device |
CN110861655A (en) * | 2019-11-29 | 2020-03-06 | 中铁第四勘察设计院集团有限公司 | Rail transit cross-over station with through and sectional operation and operation method thereof |
CN111297392A (en) * | 2020-04-02 | 2020-06-19 | 青岛大学附属医院 | Image radiology department infant chest radiography auxiliary device |
CN111634296A (en) * | 2020-06-28 | 2020-09-08 | 中铁第四勘察设计院集团有限公司 | Straddle type monorail wiring system and operation method |
CN112664013A (en) * | 2020-12-11 | 2021-04-16 | 交控科技股份有限公司 | Rail transit vehicle parking lot system |
CN112660163A (en) * | 2019-10-16 | 2021-04-16 | 无锡市轨道建设设计咨询有限公司 | Double-track traffic line shared vehicle section wiring form and double-island platform thereof |
CN112874539A (en) * | 2021-03-26 | 2021-06-01 | 中铁第六勘察设计院集团有限公司 | Urban area rail bilateral station with functions of crossing, parking and turning back |
CN112874540A (en) * | 2021-03-26 | 2021-06-01 | 中铁第六勘察设计院集团有限公司 | Urban area track single-island station with crossing, parking and turning-back functions |
CN108891423B (en) * | 2018-07-27 | 2024-04-19 | 中铁第四勘察设计院集团有限公司 | Track line structure of reserved branch line condition |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3889603A (en) * | 1973-08-20 | 1975-06-17 | Japan National Railway | Double loop track system for railway freightyard and freight station |
WO1996018534A1 (en) * | 1994-12-14 | 1996-06-20 | Norbert Krichler | Structurally and functionally connected devices for the accelerated loading and unloading of long distance road trains accompanied by drivers |
CN101402366A (en) * | 2008-11-24 | 2009-04-08 | 中铁二院工程集团有限责任公司 | Pneumatic effect releasing facilities for underground bus stop of high-speed railway |
CN201951455U (en) * | 2010-08-26 | 2011-08-31 | 中铁二院工程集团有限责任公司 | Same platform transfer station of inter-city passenger line and urban railway line |
CN102501852A (en) * | 2011-11-21 | 2012-06-20 | 铁道第三勘察设计院集团有限公司 | Layout structure for integration of train depot and junction station of urban rail |
CN104742913A (en) * | 2013-12-27 | 2015-07-01 | 王冠军 | System and method for realizing station-front turning-back of urban rail transit |
-
2016
- 2016-05-31 CN CN201610377932.7A patent/CN106004886B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3889603A (en) * | 1973-08-20 | 1975-06-17 | Japan National Railway | Double loop track system for railway freightyard and freight station |
WO1996018534A1 (en) * | 1994-12-14 | 1996-06-20 | Norbert Krichler | Structurally and functionally connected devices for the accelerated loading and unloading of long distance road trains accompanied by drivers |
CN101402366A (en) * | 2008-11-24 | 2009-04-08 | 中铁二院工程集团有限责任公司 | Pneumatic effect releasing facilities for underground bus stop of high-speed railway |
CN201951455U (en) * | 2010-08-26 | 2011-08-31 | 中铁二院工程集团有限责任公司 | Same platform transfer station of inter-city passenger line and urban railway line |
CN102501852A (en) * | 2011-11-21 | 2012-06-20 | 铁道第三勘察设计院集团有限公司 | Layout structure for integration of train depot and junction station of urban rail |
CN104742913A (en) * | 2013-12-27 | 2015-07-01 | 王冠军 | System and method for realizing station-front turning-back of urban rail transit |
Cited By (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107139936A (en) * | 2017-05-24 | 2017-09-08 | 中铁第四勘察设计院集团有限公司 | It is a kind of to be turned back cable architecture using the interval track traffic turned back |
CN107128315A (en) * | 2017-06-27 | 2017-09-05 | 中铁第四勘察设计院集团有限公司 | The arrangement of main line and branch line and the track traffic for having the structure integrate with station |
CN107542477A (en) * | 2017-08-16 | 2018-01-05 | 中铁隧道勘测设计院有限公司 | A kind of subway distribution of the threaded list road of single hole shield space four combination |
CN107585166B (en) * | 2017-09-19 | 2024-02-20 | 中铁第四勘察设计院集团有限公司 | Rail transit turn-back line arrangement structure |
CN107585166A (en) * | 2017-09-19 | 2018-01-16 | 中铁第四勘察设计院集团有限公司 | A kind of track traffic turn back line arrangement |
CN107715456A (en) * | 2017-11-10 | 2018-02-23 | 中山市金马科技娱乐设备股份有限公司 | A kind of multiple station system of the flat push type of recreation facility |
CN108275162A (en) * | 2018-03-09 | 2018-07-13 | 上海市隧道工程轨道交通设计研究院 | One kind being used for Mountainous City underground overtaking station track structure and its application process |
CN108382402A (en) * | 2018-03-12 | 2018-08-10 | 中铁第四勘察设计院集团有限公司 | Charge platform systems construction at a kind of intelligence rail electric car first and last end |
CN108382402B (en) * | 2018-03-12 | 2023-12-29 | 中铁第四勘察设计院集团有限公司 | Intelligent tramcar head and tail end charging station system structure |
CN110386168A (en) * | 2018-04-19 | 2019-10-29 | 上海申通地铁集团有限公司 | The control method and system that train is turned back |
CN108639067A (en) * | 2018-06-22 | 2018-10-12 | 中铁第四勘察设计院集团有限公司 | A kind of rail traffic side island combines the station structure that integrates with |
CN108639067B (en) * | 2018-06-22 | 2023-05-16 | 中铁第四勘察设计院集团有限公司 | Rail traffic side island combined rail connecting station structure |
CN108944954B (en) * | 2018-06-27 | 2023-08-01 | 中铁第四勘察设计院集团有限公司 | Intelligent rail train in-out vehicle base line system |
CN108944954A (en) * | 2018-06-27 | 2018-12-07 | 中铁第四勘察设计院集团有限公司 | A kind of intelligence rail train discrepancy vehicle base line system |
CN108891423B (en) * | 2018-07-27 | 2024-04-19 | 中铁第四勘察设计院集团有限公司 | Track line structure of reserved branch line condition |
CN108891423A (en) * | 2018-07-27 | 2018-11-27 | 中铁第四勘察设计院集团有限公司 | A kind of track circuit structure of reserved branch line condition |
CN109131364A (en) * | 2018-09-21 | 2019-01-04 | 中铁第四勘察设计院集团有限公司 | A kind of intelligence gauge lines structural system |
CN109131364B (en) * | 2018-09-21 | 2023-09-26 | 中铁第四勘察设计院集团有限公司 | Intelligent track line structure system |
CN109229110A (en) * | 2018-11-15 | 2019-01-18 | 中铁第六勘察设计院集团有限公司 | A kind of subway line structure and its application scheme using three main track of twin islet |
CN109229110B (en) * | 2018-11-15 | 2024-02-09 | 中铁第六勘察设计院集团有限公司 | Subway line structure adopting double-island three-positive line and application scheme thereof |
CN110539754A (en) * | 2019-10-11 | 2019-12-06 | 中铁第六勘察设计院集团有限公司 | Arrangement structure for connecting rails in parallel between turnout and field section for urban rail transit |
CN112660163A (en) * | 2019-10-16 | 2021-04-16 | 无锡市轨道建设设计咨询有限公司 | Double-track traffic line shared vehicle section wiring form and double-island platform thereof |
CN112660163B (en) * | 2019-10-16 | 2023-05-16 | 无锡市轨道建设设计咨询有限公司 | Double-track traffic line shared vehicle section wiring form and double-island platform thereof |
CN110836065A (en) * | 2019-11-11 | 2020-02-25 | 通号城市轨道交通技术有限公司 | Platform shielding door linkage control method and device |
CN110861655A (en) * | 2019-11-29 | 2020-03-06 | 中铁第四勘察设计院集团有限公司 | Rail transit cross-over station with through and sectional operation and operation method thereof |
CN111297392A (en) * | 2020-04-02 | 2020-06-19 | 青岛大学附属医院 | Image radiology department infant chest radiography auxiliary device |
CN111634296A (en) * | 2020-06-28 | 2020-09-08 | 中铁第四勘察设计院集团有限公司 | Straddle type monorail wiring system and operation method |
CN112664013A (en) * | 2020-12-11 | 2021-04-16 | 交控科技股份有限公司 | Rail transit vehicle parking lot system |
CN112874540A (en) * | 2021-03-26 | 2021-06-01 | 中铁第六勘察设计院集团有限公司 | Urban area track single-island station with crossing, parking and turning-back functions |
CN112874539A (en) * | 2021-03-26 | 2021-06-01 | 中铁第六勘察设计院集团有限公司 | Urban area rail bilateral station with functions of crossing, parking and turning back |
Also Published As
Publication number | Publication date |
---|---|
CN106004886B (en) | 2018-04-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106004886A (en) | Track traffic track connection station wire distribution system and operation method thereof | |
CN106864464A (en) | Personal suspension type double track road is double dynamical to automatically control railway traffic system | |
CN105957376A (en) | No-signal intersection vehicle passing guiding system and method in cooperative vehicle infrastructure environment | |
CN116884099A (en) | Automatic ticket vending and checking system | |
CN102002900B (en) | Bus rapid transit system | |
WO2007124740A1 (en) | Active rail transport system | |
CN101992782A (en) | Urban unmanned electronic railcar taxi traffic system | |
CN106043315A (en) | Flowing railway station, track network matched with flowing railway station and combination system of flowing railway station and track network | |
CN107585166B (en) | Rail transit turn-back line arrangement structure | |
CN102248959A (en) | Successively-turned crossway and circulating line/network | |
CN105041022A (en) | City road intelligent type multifunctional stereo garage | |
CN101550667B (en) | Control method of integrated setting of on-board and off-board stop station of bus and taxi | |
CN105926379A (en) | Monorail traffic overhead section overhauling passage and application method thereof | |
CN201932156U (en) | Overhead and underground transmission belt public traffic system | |
CN102146649A (en) | Public traffic method | |
CN101864710A (en) | Annular flyover for straight movement and large-radius turning at crossroad | |
CN201850804U (en) | Bidirectional inner lane parking lot | |
CN207809379U (en) | A kind of rail traffic is turned back trajectory arrangement | |
CN108340925A (en) | A kind of intelligence rail train ground Station System structure | |
CN102039900A (en) | Telpher type urban public transport system | |
CN101942789A (en) | Bus station suitable for multiple buses to stop and setting method thereof | |
CN107139936A (en) | It is a kind of to be turned back cable architecture using the interval track traffic turned back | |
CN107128315A (en) | The arrangement of main line and branch line and the track traffic for having the structure integrate with station | |
CN211685059U (en) | Station arrangement structure of tramcar | |
CN207931716U (en) | A kind of intelligence rail train ground Station System structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |