CN105951967A CN201610382284.4A CN201610382284A CN105951967A CN 105951967 A CN105951967 A CN 105951967A CN 201610382284 A CN201610382284 A CN 201610382284A CN 105951967 A CN105951967 A CN 105951967A
Authority
CN
China
Prior art keywords
water
outrigger
cistern
aqueduct
spray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610382284.4A
Other languages
Chinese (zh)
Inventor
唐光暹
谢鸿卫
肖玉明
郑毅
邓焕昌
蔡俊
孙富达
胡波
罗伟
邱秋华
谢京伟
梁兵
禤战
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd
Original Assignee
Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd filed Critical Guangxi Construction Engineering Group No1 Construction Engineering Co Ltd
Priority to CN201610382284.4A priority Critical patent/CN105951967A/en
Publication of CN105951967A publication Critical patent/CN105951967A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B1/00Methods or layout of installations for water supply
    • E03B1/04Methods or layout of installations for water supply for domestic or like local supply
    • E03B1/041Greywater supply systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B3/00Methods or installations for obtaining or collecting drinking water or tap water
    • E03B3/02Methods or installations for obtaining or collecting drinking water or tap water from rain-water
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B1/00Methods or layout of installations for water supply
    • E03B1/04Methods or layout of installations for water supply for domestic or like local supply
    • E03B1/041Greywater supply systems
    • E03B2001/047Greywater supply systems using rainwater
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/30Relating to industrial water supply, e.g. used for cooling

Abstract

The invention relates to a construction site water recycling integrated method. Collected rainwater and wastewater are conveyed through a pipeline by means of a centrifugal water pump or a submerged pump and used for being sprayed onto an outer frame and a road surface for dust falling, being sprayed onto a roof for cooling, and being automatically supplied for daily life. A timing switch is arranged at the position where dust falling is needed, time is set according to raised dust produced in all site construction periods, and a spraying system is automatically started. A temperature control switch is arranged at the position where cooling is needed, and when the temperature of the roof reaches a set value, spraying is automatically started for cooling. Water for daily life is stored in a water tank, a water level sensor is arranged in the water tank, and when the water level is lower than a threshold, the water pump is automatically started for water injection. By collecting rainwater and wastewater and conducting multi-stage sand settling treatment and recycling for construction site ground flushing, dust falling and cooling, water resources are saved, and lots of labor is reduced.

Description

A kind of construction site Water Sproading utilizes integrated method
Technical field
The present invention relates to technical field of building construction, be specifically related to a kind of construction site Water Sproading and utilize integrated method.
Background technology
Green construction is the trend of building trade, and it is as an important stage in building life cycle management, is to realize building neck Territory resources conservation and the key link of energy-saving and emission-reduction.Many enterprises propose new measure how practicing green construction, but Economize on water the problem that this plate generally exists that water collection mode is single, purposes is single, to recycle degree the highest, energy-saving and emission-reduction Action effect is the most notable.
Summary of the invention
It is an object of the invention to the deficiency existed for prior art, it is provided that a kind of construction site Water Sproading utilizes integrated method, Collect water, rainwater and waste water at the construction field (site) and be used, thus playing the construction effect of " four joint one environmental protection ".
The technical scheme that the present invention takes is: a kind of construction site Water Sproading utilizes integrated method, comprises the following steps:
(7) wastewater collection:
Described waste water includes daily construction water and washes effective water, and described daily construction water is by building by laying bricks or stones at post-cast strip edgewise One post-cast strip discharge opening that intercepts water carries out water and dams, and the post-cast strip discharge opening that intercepts water is provided with post-cast strip closed cover and water inlet, makes to give up Water falls behind ground by filtering in water inlet and diversion conduit three grades of sedimentation tanks of inflow;Described wash effective water and first pass through and wash Pump line, is washed pump line and is arranged on exterior wall by clip, and the waste water washing pump line generation drains into three grades of sedimentation tanks through washing pipe sedimentation tank In filter;Described daily construction water and wash effective water to flow into cistern after filtering standby;
(8) rainwater-collecting:
Described rainwater is collected by eaves rain groove captation and ground infiltration captation, and described eaves rain groove catchments Device is standby in rain water on roof draining into cistern by rain groove and downpipe;Described ground infiltration captation is for face facility During the work stage, at underground preburied covered drainage ditch, covered drainage ditch fills sandstone and reserves ground air-vent, rainwater or waste water to ground Time upper, flowed into the covered drainage ditch of underground by the permeation filtration effect of ground air-vent, and flow into cistern through covered drainage ditch standby;
(9) water of cistern is used for outrigger spray dust:
Install outrigger aqueduct, outrigger aqueduct is communicated on outrigger from floor, next layer of overhang layer as infield, Being switched on outrigger by outrigger aqueduct, every layer is provided with a touch switch;Choose pvc pipe and serve as outrigger aqueduct, with Stainless steel waterpipe in floor connects, and seam uses pvc pipe joint, it is ensured that junction is the most glued, and installs in joint Plastic cement ball valve water feeding switch;After being fixed by trunk pipeline, utilize L-shaped universal joint that outrigger aqueduct is caused I-steel On the outrigger steel pipe of lower section, along floor peripheral disposition outrigger aqueduct, and outrigger aqueduct is in safety net and solid with iron wire Fixed;Installing while outrigger aqueduct, filling a plastic nozzle every 2.5-3.5 meter ampere, the root of nozzle in the shape of a spiral, First smearing binding agent, then entered by nozzle button in T-shaped universal joint, outrigger aqueduct then connects with T-shaped universal joint; Use water pump that the water in cistern is delivered to related floor and complete spray, at water pump, set time switch, according to each building site every day The construction period produces airborne dust situation and selects the time period to carry out automatic spray;Described airborne dust situation is measured by airborne dust detector;
(10) water of cistern is used for road surface spray dust:
Installing road surface aqueduct, road surface aqueduct is provided with manual switch, time switch and nozzle, and nozzlend is helically Shape, first smears binding agent, then is entered in T-shaped universal joint by nozzle button;Immersible pump is used to be transported out by the water in cistern, Spray dust is provided for scene, road surface;Produce airborne dust situation select the time period to carry out automatic spray according to construct every day of each building site period; Described airborne dust situation is measured by airborne dust detector;
(11) water of cistern is used for roofing spraying cooling:
Roofing spray piping is installed in direction along eaves rain groove, fills 120 ° of ball nozzles every 2.5-3.5 meter ampere;Roofing Spray piping is provided with control taps and temperature detect switch (TDS), and roofing is provided with metal smart temperature sensor;When roofing temperature > 34 DEG C Time, temperature control system automatically turns on spray, and by roofing spray piping, the water in cistern is delivered to roofing, lowers the temperature for roofing;
(12) water of cistern is used for daily automatic water-supply of living:
Living area automatic water-supply pipeline is installed, and sets water level switch and manual switch;With water living area, water tank is being set, in water tank Arranging level sensor, level sensor is connected with water level switch;Water level will store in cistern automatically less than during low level setting value Water inject in water tank, in water tank water level attain to a high place setting value time, be automatically switched off water filling.
Three grades of described sedimentation tanks are provided with water inlet and outlet, water inlet and daily construction water collection device and wash effective water receipts Acquisition means connects;Outlet is connected with cistern;The first partition wall and the second partition wall, the first partition wall top it is provided with in three grades of sedimentation tanks Being provided with the first overfall, the second partition wall middle and lower part is provided with the second overfall.
The present invention, by collecting rainwater and waste water, utilizes water storage system to carry out multistage desilting process to collecting rainwater, the waste water etc. come, Water after processing passes sequentially through water pump, main pipeline, branch pipe(tube) and flusher, is sprayed to job site with to job site Ground is rinsed, and to reach the purpose of depositing dust cooling, makes full use of natural water resources simultaneously and takes full advantage of job site The waste water produced, has saved water resource, has decreased a large amount of manpower.
Accompanying drawing explanation
Fig. 1 is the structure chart that the construction site Water Sproading described in the embodiment of the present invention utilizes integrated system.
Fig. 2 is that the external hanging type described in the embodiment of the present invention is washed pump tube device and washes the structural representation of pipe sedimentation tank.
Fig. 3 is the diversion conduit described in the embodiment of the present invention and the structural representation of three grades of sedimentation tanks.
Reference is:
1. exterior wall, 2. washes pump line, 3. clip, 4. washes pipe sedimentation tank, and 5. intercept water discharge opening in post-cast strip, 6. post-cast strip closed cover, 7. diversion conduit, 8. three grades of sedimentation tanks, 9. water inlet, 10. the first partition wall, 11. first overfalls, 12. second partition walls, 13. second Overfall, 14. outlets.
Detailed description of the invention
Illustrate below and combine accompanying drawing and technical scheme is described further.
First, according to Fig. 1-Fig. 3, the construction site Water Sproading setting up a set of present invention of being applicable to utilizes integrated system.
As it is shown in figure 1, a kind of construction site Water Sproading utilizes integrated system, including waste water collection device, rain collector, Three grades of sedimentation tanks, cistern, outrigger spray dust system, road surface spray dust system, roofing spraying cooling systems and life day Often automatic water supply system, described cistern by plumbing installation respectively with outrigger spray dust system, road surface spray dust system, Roofing spraying cooling system and daily automatic water supply system of living connect.Described plumbing installation includes aqueduct and control taps, Aqueduct is connected with cistern by water pump, and control taps is arranged on aqueduct.
As shown in Figure 1-Figure 3, described waste water collection device includes daily construction water collection device and washes effective water collecting device, Daily construction water is drained into three grades of precipitations by diversion conduit 7 and the post-cast strip discharge opening 5 that intercepts water by daily construction water collection device In pond 8;Wash effective water collecting device wash pump tube device by external hanging type and wash pipe sedimentation tank 4 and will wash effective water and drain into three grades of precipitations In pond 8.
As in figure 2 it is shown, the pump line 2 of washing that described external hanging type washes pump tube device is arranged on exterior wall 1 by clip 3, wash pump The waste water that pipe 2 produces can drain in three grades of sedimentation tanks 8 through washing pipe sedimentation tank 4.
As it is shown on figure 3, the waste water produced for daily spray, concrete curing and mortar mixer, by post-cast strip edgewise Building the post-cast strip discharge opening 5 that intercepts water by laying bricks or stones to carry out water and dam, the post-cast strip discharge opening 5 that intercepts water is provided with post-cast strip closed cover 6 and enters The mouth of a river, is made waste water fall behind ground and is flowed in three grades of sedimentation tanks 8 by water inlet and diversion conduit 7.Three grades of described sedimentation tanks 8 are provided with water inlet 9 and outlet 14, water inlet 9 and daily construction water collection device and wash effective water collecting device and be connected; Outlet 14 is connected with cistern;The first partition wall 10 and the second partition wall 12 it is provided with, on the first partition wall 10 in three grades of sedimentation tanks 8 Portion is provided with the first overfall 11, and the second partition wall 12 middle and lower part is provided with the second overfall 13.
As it is shown in figure 1, described rain collector includes eaves rain groove captation and ground infiltration captation, described Rain water on roof is drained in cistern by eaves rain groove captation by rain groove and downpipe;Rain groove installation requirement is smooth vertical and horizontal, therefore Needing to eject a control line to compare, every 10m error must not exceed 5mm.Note being positioned at when rain groove is installed downpipe another The rain groove of side carries out putting slope and processes so that water can be imported in downpipe by rain groove smoothly, and downpipe uses PVC with the seam of rain groove Downpipe joint, it is ensured that downpipe is the most glued between connecting, and attention level downpipe should suitably tilt, in order to rainwater can be smoothly Discharge.Ground rainwater is drained in cistern by described ground infiltration captation by ground air-vent and covered drainage ditch.
The aqueduct of described outrigger spray dust system is communicated on outrigger from floor, and next layer of overhang layer is as installing ground Point, is switched to aqueduct on outrigger, and every layer is provided with a touch switch.Choose pvc pipe and serve as aqueduct, with floor In stainless steel waterpipe connect, seam use pvc pipe joint, it is ensured that junction is the most glued, and joint install plastic cement Ball valve water feeding switch.After trunk pipeline is fixed, outside utilizing L-shaped universal joint to be caused below I-steel by aqueduct On frame steel pipe, along floor peripheral disposition aqueduct, and aqueduct is fixed in safety net and with iron wire.Water-supply-pipe is being installed While road, filling a plastic nozzle every 3 meter amperes, the root of nozzle in the shape of a spiral, first smears binding agent, then by nozzle button Entering in T-shaped universal joint, PVC pipeline then connects with T-shaped universal joint.Use water pump that water is delivered to relevant building Layer completes spray, sets time switch at water pump, produces airborne dust situation select the time period to carry out according to construct every day of each building site period Automatic spray.
The nozzlend of described road surface spray dust system in the shape of a spiral, is first smeared binding agent, then nozzle button is entered T-shaped ten thousand In joint.Use immersible pump to be transported out by the water in cistern, provide spray dust for scene.
Described roofing spraying cooling system is provided with metal smart temperature sensor and temperature detect switch (TDS), when roofing temperature > 34 DEG C, Temperature control system automatically turns on spray, lowers the temperature for roofing.Spray uses pvc pipe to serve as aqueduct, along the direction of eaves rain groove, 120 ° of ball nozzles are filled every 3 meter amperes.
The daily automatic water supply system of described life is provided with water tank and water level switch, arranges level sensor, level sensor in water tank Device is connected with water level switch.As for daily undrinkable water such as lavatory flushings, water level will store up in cistern automatically less than during 0.5m The water deposited injects in water tank, when water level reaches 1.6m in water tank, is automatically switched off water filling.
The present invention is carried collecting the water come by centrifugal water pump or immersible pump (according to differing heights), and is needing depositing dust Position arranges time switch, and the airborne dust produced according to each site construction period carries out time setting, automatically turns on spray system; Temperature detect switch (TDS) is set at the position (such as movable plank house roofing) needing cooling, when roofing temperature reaches setting value, automatically turns on spray Drench cooling;Using water tank water-retention at daily life use water (undrinkable water), and arrange level sensor in water tank, water level is low Water pump water filling is automatically turned on when limit value.
The present invention is respectively provided with special electronic box at each with the water pump of water spot, it is simple to manually opened-to close closed system, facilitates maintenance repair.

Claims (2)

1. a construction site Water Sproading utilizes integrated method, it is characterised in that comprise the following steps:
(1) wastewater collection:
Described waste water includes daily construction water and washes effective water, and described daily construction water is by building by laying bricks or stones at post-cast strip edgewise One post-cast strip discharge opening that intercepts water carries out water and dams, and the post-cast strip discharge opening that intercepts water is provided with post-cast strip closed cover and water inlet, makes to give up Water falls behind ground by filtering in water inlet and diversion conduit three grades of sedimentation tanks of inflow;Described wash effective water and first pass through and wash Pump line, is washed pump line and is arranged on exterior wall by clip, and the waste water washing pump line generation drains into three grades of sedimentation tanks through washing pipe sedimentation tank In filter;Described daily construction water and wash effective water to flow into cistern after filtering standby;
(2) rainwater-collecting:
Described rainwater is collected by eaves rain groove captation and ground infiltration captation, and described eaves rain groove catchments Device is standby in rain water on roof draining into cistern by rain groove and downpipe;Described ground infiltration captation is for face facility During the work stage, at underground preburied covered drainage ditch, covered drainage ditch fills sandstone and reserves ground air-vent, rainwater or waste water to ground Time upper, flowed into the covered drainage ditch of underground by the permeation filtration effect of ground air-vent, and flow into cistern through covered drainage ditch standby;
(3) water of cistern is used for outrigger spray dust:
Install outrigger aqueduct, outrigger aqueduct is communicated on outrigger from floor, next layer of overhang layer as infield, Being switched on outrigger by outrigger aqueduct, every layer is provided with a touch switch;Choose pvc pipe and serve as outrigger aqueduct, with Stainless steel waterpipe in floor connects, and seam uses pvc pipe joint, it is ensured that junction is the most glued, and installs in joint Plastic cement ball valve water feeding switch;After being fixed by trunk pipeline, utilize L-shaped universal joint that outrigger aqueduct is caused I-steel On the outrigger steel pipe of lower section, along floor peripheral disposition outrigger aqueduct, and outrigger aqueduct is in safety net and solid with iron wire Fixed;Installing while outrigger aqueduct, filling a plastic nozzle every 2.5-3.5 meter ampere, the root of nozzle in the shape of a spiral, First smearing binding agent, then entered by nozzle button in T-shaped universal joint, outrigger aqueduct then connects with T-shaped universal joint; Use water pump that the water in cistern is delivered to related floor and complete spray, at water pump, set time switch, according to each building site every day The construction period produces airborne dust situation and selects the time period to carry out automatic spray;Described airborne dust situation is measured by airborne dust detector;
(4) water of cistern is used for road surface spray dust:
Installing road surface aqueduct, road surface aqueduct is provided with manual switch, time switch and nozzle, and nozzlend is helically Shape, first smears binding agent, then is entered in T-shaped universal joint by nozzle button;Immersible pump is used to be transported out by the water in cistern, Spray dust is provided for scene, road surface;Produce airborne dust situation select the time period to carry out automatic spray according to construct every day of each building site period; Described airborne dust situation is measured by airborne dust detector;
(5) water of cistern is used for roofing spraying cooling:
Roofing spray piping is installed in direction along eaves rain groove, fills 120 ° of ball nozzles every 2.5-3.5 meter ampere;Roofing Spray piping is provided with control taps and temperature detect switch (TDS), and roofing is provided with metal smart temperature sensor;When roofing temperature > 34 DEG C Time, temperature control system automatically turns on spray, and by roofing spray piping, the water in cistern is delivered to roofing, lowers the temperature for roofing;
(6) water of cistern is used for daily automatic water-supply of living:
Living area automatic water-supply pipeline is installed, and sets water level switch and manual switch;With water living area, water tank is being set, in water tank Arranging level sensor, level sensor is connected with water level switch;Water level will store in cistern automatically less than during low level setting value Water inject in water tank, in water tank water level attain to a high place setting value time, be automatically switched off water filling.
Construction site the most according to claim 1 Water Sproading utilizes integrated method, it is characterised in that described three grades Sedimentation tank is provided with water inlet and outlet, water inlet and daily construction water collection device and wash effective water collecting device and be connected;Go out The mouth of a river is connected with cistern;Being provided with the first partition wall and the second partition wall in three grades of sedimentation tanks, the first partition wall top is provided with the first overfall, Second partition wall middle and lower part is provided with the second overfall.
CN201610382284.4A 2016-06-01 2016-06-01 Construction site water recycling integrated method Pending CN105951967A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610382284.4A CN105951967A (en) 2016-06-01 2016-06-01 Construction site water recycling integrated method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610382284.4A CN105951967A (en) 2016-06-01 2016-06-01 Construction site water recycling integrated method

Publications (1)

Publication Number Publication Date
CN105951967A true CN105951967A (en) 2016-09-21

Family

ID=56908356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610382284.4A Pending CN105951967A (en) 2016-06-01 2016-06-01 Construction site water recycling integrated method

Country Status (1)

Country Link
CN (1) CN105951967A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499032A (en) * 2016-11-16 2017-03-15 中冶建筑研究总院有限公司 A kind of large-scale plastic stone rockery construction waste water drainage system and method
CN109078422A (en) * 2018-08-17 2018-12-25 中水电第十工程局(郑州)有限公司 A kind of construction method of the automation spray dust for construction road
CN111794454A (en) * 2020-07-09 2020-10-20 中国二十二冶集团有限公司 Urban rainwater collecting and utilizing system
CN113502874A (en) * 2021-07-01 2021-10-15 广西建工集团控股有限公司 Construction method for recycling, circulating and spraying non-traditional waste water for building to reduce dust

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101519885A (en) * 2009-02-20 2009-09-02 深圳市建设(集团)有限公司 Method for synthetically utilizing concrete curing water and rain water in constructional engineering
CN202596175U (en) * 2012-05-25 2012-12-12 江西中联建设集团有限公司 Building construction site water recovery system
CN204196865U (en) * 2014-10-08 2015-03-11 广西建工集团第三建筑工程有限责任公司 A kind of building ground environmental protection and energy saving build-up type automatic car washing equipment
CN204352419U (en) * 2014-11-18 2015-05-27 广西建工集团联合建设有限公司 A kind of construction exterior rack Multi-functional spray system
CN104775500A (en) * 2015-04-13 2015-07-15 浙江欣捷建设有限公司 Building construction rainwater and wastewater recycling system
CN104909482A (en) * 2015-05-20 2015-09-16 广西建工集团第五建筑工程有限责任公司 Construction site water recovery and recycling system comprehensive purification tank and manufacturing method thereof
CN204662987U (en) * 2015-04-17 2015-09-23 中国十七冶集团有限公司 Water and concrete simple and easy separator during pump line rinses
CN204689755U (en) * 2015-05-20 2015-10-07 广西建工集团第五建筑工程有限责任公司 The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system
CN205637051U (en) * 2016-05-30 2016-10-12 广西建工集团第一建筑工程有限责任公司 Building site water recycle integrated system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101519885A (en) * 2009-02-20 2009-09-02 深圳市建设(集团)有限公司 Method for synthetically utilizing concrete curing water and rain water in constructional engineering
CN202596175U (en) * 2012-05-25 2012-12-12 江西中联建设集团有限公司 Building construction site water recovery system
CN204196865U (en) * 2014-10-08 2015-03-11 广西建工集团第三建筑工程有限责任公司 A kind of building ground environmental protection and energy saving build-up type automatic car washing equipment
CN204352419U (en) * 2014-11-18 2015-05-27 广西建工集团联合建设有限公司 A kind of construction exterior rack Multi-functional spray system
CN104775500A (en) * 2015-04-13 2015-07-15 浙江欣捷建设有限公司 Building construction rainwater and wastewater recycling system
CN204662987U (en) * 2015-04-17 2015-09-23 中国十七冶集团有限公司 Water and concrete simple and easy separator during pump line rinses
CN104909482A (en) * 2015-05-20 2015-09-16 广西建工集团第五建筑工程有限责任公司 Construction site water recovery and recycling system comprehensive purification tank and manufacturing method thereof
CN204689755U (en) * 2015-05-20 2015-10-07 广西建工集团第五建筑工程有限责任公司 The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system
CN205637051U (en) * 2016-05-30 2016-10-12 广西建工集团第一建筑工程有限责任公司 Building site water recycle integrated system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499032A (en) * 2016-11-16 2017-03-15 中冶建筑研究总院有限公司 A kind of large-scale plastic stone rockery construction waste water drainage system and method
CN109078422A (en) * 2018-08-17 2018-12-25 中水电第十工程局(郑州)有限公司 A kind of construction method of the automation spray dust for construction road
CN111794454A (en) * 2020-07-09 2020-10-20 中国二十二冶集团有限公司 Urban rainwater collecting and utilizing system
CN113502874A (en) * 2021-07-01 2021-10-15 广西建工集团控股有限公司 Construction method for recycling, circulating and spraying non-traditional waste water for building to reduce dust

Similar Documents

Publication Publication Date Title
CN105735455B (en) One kind enters river pollution complex ecological closure works system
CN104480994B (en) A kind of square, urban green space rainwater-collecting reutilization system
CN205637051U (en) Building site water recycle integrated system
CN105951967A (en) Construction site water recycling integrated method
CN105178387A (en) Intelligent control system for comprehensive utilization of rainwater and control method of intelligent control system
CN206360050U (en) A kind of collection at the non-traditional water source in job site is with utilizing device
CN207567889U (en) Residential quarters Rainwater collection system
CN201972229U (en) Residential rainwater comprehensive utilization system device
CN207062994U (en) A kind of Urban Storm Flood joint utilizes system
CN208748746U (en) Power plant's rainwater-collecting reutilization system
CN205116580U (en) Flat roof deck drainage system
CN205369377U (en) Automatic abandon class, retaining, overflow integration rainwater collection system
CN108035424A (en) A kind of turnover panel flow abandoning apparatus
CN106968317A (en) A kind of construction site rainwater recycle reutilization system
CN106760257A (en) A kind of photovoltaic afforests the system for reclaiming rainwater of composite roof
CN106638919A (en) Urban road rainwater reuse system and construction method
CN106917473B (en) A kind of rainwater recycle method of photovoltaic greening composite roof
CN205894165U (en) Job site precipitation recovery system
CN106677444B (en) House roof rainwater treatment system and construction method
CN206428911U (en) Mechanical float ball flow abandoning apparatus, rain water collecting system and roofing cooling structure
CN104652526A (en) Town residential area rainwater recovery system
CN214006283U (en) Drainage structure for rainwater gravity flow crossing roof deformation joint
CN106703157B (en) Construction method of rainwater recycling and comprehensive utilizing structure
CN103882918B (en) The water discharge method of floor hydrops and device during construction of super highrise building
CN204567592U (en) A kind of auto-induction type car washer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160921

RJ01 Rejection of invention patent application after publication