CN202596175U - Building construction site water recovery system - Google Patents

Building construction site water recovery system Download PDF

Info

Publication number
CN202596175U
CN202596175U CN 201220238108 CN201220238108U CN202596175U CN 202596175 U CN202596175 U CN 202596175U CN 201220238108 CN201220238108 CN 201220238108 CN 201220238108 U CN201220238108 U CN 201220238108U CN 202596175 U CN202596175 U CN 202596175U
Authority
CN
China
Prior art keywords
water
construction site
concrete curing
flushing
fire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220238108
Other languages
Chinese (zh)
Inventor
周越
贾世鹏
樊小华
周金根
万丽娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd
Original Assignee
JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd filed Critical JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd
Priority to CN 201220238108 priority Critical patent/CN202596175U/en
Application granted granted Critical
Publication of CN202596175U publication Critical patent/CN202596175U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a building construction site water recovery system which is characterized in that a water pump is arranged in a foundation ditch, and the water pump is sequentially connected with a settling pond and an impounding reservoir. A water system comprises domestic water, fire protection water, flushing water and concrete curing water, and the impounding reservoir is respectively connected with the domestic water, the fire protection water, the flushing water and the concrete curing water of the water system. The domestic water and the fire protection water are connected with a municipal pipe net in inserting mode, and the concrete curing water is directly connected into underground in inserting mode. The flushing water is sequentially connected with a flushing platform and an initial settling pond, and further connected with the settling pond. The building construction site water recovery system has the advantages of efficiently solving the water problem of an engineering construction site, reducing unnecessary water resource waste and pollution, greatly improving a schedule of engineering construction, and controlling cost.

Description

Construction site is used water reclamation system
Technical field
The utility model relates to water system for building, specifically utilizes the comprehensive water-using of foundation pit construction field process, and particularly construction site is used water reclamation system.
Technical background
At present; In the architectural engineering pit work progress; Underground water buries more shallow zone, and along with the excavation of foundation pit degree of depth is progressively deepened, the appearance of its underground shallow seated groundwater has but hindered engineering construction; And existing processing scheme all is that water is directly discharged to the municipal wastewater pipe network through suction pump, is convenient to continue construction to reduce water level.Because the job site is failed rational design planning and is caused great amount of water resources to run off.But, but the job site needs to use great amount of water resources.At present, job site water resource source is: 1, the tap water that provides of city planting ductwork; 2, the underground water of on-the-spot well-digging extraction, these way of supplying water need consume a large amount of freshwater resources and deep phreatic water resource.And the water position mainly comprises; 1, on-the-spot living water use; 2, on-the-spot watering airborne dust; 3, construction is built by laying bricks or stones and is plastered; 4, vehicle turnover flushing; 5, concrete structure maintenance; 6, water for fire or the like; Water after these are used generally all is to let it be lost in vain, does not reclaim, and is not only uneconomical but also waste energy; Waste water, the sewage of discharging in addition also cause environment pollution; Influence the surrounding resident life, precipitated impurities also is prone to stop up municipal blowdown pipe network, thereby has caused tremendous economic loss and corporate image infringement to enterprise.
Summary of the invention
The purpose of the utility model provides a job site water reclamation system, is better, the good water resource of more efficient use, reduces the use to extra power, reaches energy-saving and cost-reducing, the purpose of green construction.
To above-mentioned purpose, the technical scheme that the utility model adopts is that construction site is used water reclamation system; It is characterized in that foundation ditch is equipped with water pump, water pump connects sedimentation basin and reservoir successively; Water system comprises living water use, water for fire, wash water and concrete curing water; Reservoir connects living water use, water for fire, wash water and the concrete curing water of water system respectively, and living water use and water for fire insert city planting ductwork, and the concrete curing water is directly into underground; Wash water connects flushing platform and first sedimentation basin successively, connects sedimentation basin again.
The water source of the utility model is mainly derived from foundation ditch (groove) job site precipitation recycling system; Through utilizing foundation pit dewatering to extract the water concentration filter, deposit; Be used further to that living water use, watering airborne dust, construction are built by laying bricks or stones, water systems such as the maintenance of concrete structure and water for fire: through the gathering-device that is provided with its water treatment that utilized is handled again the one side reusable edible again; Utilize on the other hand from oozing effect and perched water is drawn ooze to lower floor's water table aquifer, most of water resource is recharged to underground water again.
The beneficial effect of the utility model is used for foundation ditch (groove) underground water and buries more shallow zone, can effectively solve the on-the-spot problem of water consumption of engineering construction, reduces unnecessary water resource waste and pollution.Improved the engineering construction progress greatly, controlled cost.The waste that reduces water resource makes it obtain recycling, has improved the utilization rate of operation water resource, cuts down the consumption of energy and discharges, and has controlled the engineering construction cost, has promoted the core competitive of enterprise, has satisfied the demand for development of green building construction.
Description of drawings
Fig. 1 is the system schematic of the utility model.
Among the figure: 1, foundation ditch, 2, water pump, 3, sedimentation basin, 4, reservoir, 5, water system, 51, living water use, 52, water for fire, 53, wash water, 54, the concrete curing water, 6, the flushing platform, 7, first sedimentation basin.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further, referring to Fig. 1, construction site is used water reclamation system; Foundation ditch 1 is equipped with water pump 2; Water pump 2 connects sedimentation basin 3 and reservoir 4 successively, and water system 5 comprises living water use 51, water for fire 52, wash water 53 and concrete curing water 54, and reservoir 4 connects living water use 51, water for fire 52, wash water 53 and the concrete curing water 54 of water system 5 respectively; Living water use 51 inserts city planting ductwork with water for fire 52; Concrete curing water 54 is directly into underground, and wash water 53 connects flushing platform 6 and first sedimentation basin 7 successively, connects sedimentation basin 3 again.
Embodiment:Certain building-site is provided with one and is 5 meters deeply, and area is 4600 square metres a foundation ditch 1.One water pump 2 is housed on the foundation ditch 1; Water pump 2 is connected with water pipe, and water inlet pipe connects foundation ditch 1, and outlet pipe inserts sedimentation basin 3; Sedimentation basin 3 connects reservoir 4 through water pipe, and reservoir 4 is connected to living water use 51, water for fire 52, wash water 53 and the concrete curing water 54 of water system 5 respectively.Living water use 51 is discharged the back with water for fire 52 and is inserted city planting ductwork, flows directly into underground after concrete curing water 54 is discharged.Wash water 53 is connected to sedimentation basin 7 just after flushing platform 6 is discharged, connect sedimentation basin 3 again, and the waste water of discharge flows back to sedimentation basin 3 again through behind the preliminary sedimentation of first sedimentation basin 7, comes back in the system to utilize again.
The technical scheme that its technical problem that solves the utility model adopts is; In job site construction deep foundation ditch (groove) scheme, the construction organization general design is crucial, should consider comprehensive situation of this work items; Make integrated planning; All kinds of provisional facility and the permanent structure that need to build at the scene that designs, core position are that the groundwater table of deep foundation ditch (groove) is buried more shallow zone and used, and deposit through groundwater abstraction concentration filter pond; The inferior extraction again of retaining used, thereby formed the utilisation system of a circulation.

Claims (1)

1. construction site is used water reclamation system; It is characterized in that; Foundation ditch (1) is equipped with water pump (2); Water pump (2) connects sedimentation basin (3) and reservoir (4) successively, and water system (5) comprises living water use (51), water for fire (52), wash water (53) and concrete curing water (54), and reservoir (4) connects living water use (51), water for fire (52), wash water (53) and the concrete curing water (54) of water system (5) respectively; Living water use (51) and water for fire (52) insert city planting ductwork; Concrete curing water (54) is directly into underground, and wash water (53) connects flushing platform (6) and first sedimentation basin (7) successively, connects sedimentation basin (3) again.
CN 201220238108 2012-05-25 2012-05-25 Building construction site water recovery system Expired - Fee Related CN202596175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220238108 CN202596175U (en) 2012-05-25 2012-05-25 Building construction site water recovery system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220238108 CN202596175U (en) 2012-05-25 2012-05-25 Building construction site water recovery system

Publications (1)

Publication Number Publication Date
CN202596175U true CN202596175U (en) 2012-12-12

Family

ID=47313723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220238108 Expired - Fee Related CN202596175U (en) 2012-05-25 2012-05-25 Building construction site water recovery system

Country Status (1)

Country Link
CN (1) CN202596175U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951967A (en) * 2016-06-01 2016-09-21 广西建工集团第建筑工程有限责任公司 Construction site water recycling integrated method
CN106320430A (en) * 2016-08-25 2017-01-11 中国冶集团有限公司 Wastewater collecting system
CN106595802A (en) * 2016-11-08 2017-04-26 中铁三局集团有限公司 Method of monitoring of underground water outside deep foundation pit, warning and automatic recharge construction
CN108325121A (en) * 2018-01-08 2018-07-27 深圳市贝优通新能源技术开发有限公司 A kind of equipment with ponding processing and the detection of fire-extinguishing function concurrently underground pipe gallery
CN112502174A (en) * 2020-10-05 2021-03-16 刘宏庆 Quick dewatering device for deep foundation pit

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951967A (en) * 2016-06-01 2016-09-21 广西建工集团第建筑工程有限责任公司 Construction site water recycling integrated method
CN106320430A (en) * 2016-08-25 2017-01-11 中国冶集团有限公司 Wastewater collecting system
CN106595802A (en) * 2016-11-08 2017-04-26 中铁三局集团有限公司 Method of monitoring of underground water outside deep foundation pit, warning and automatic recharge construction
CN108325121A (en) * 2018-01-08 2018-07-27 深圳市贝优通新能源技术开发有限公司 A kind of equipment with ponding processing and the detection of fire-extinguishing function concurrently underground pipe gallery
CN112502174A (en) * 2020-10-05 2021-03-16 刘宏庆 Quick dewatering device for deep foundation pit

Similar Documents

Publication Publication Date Title
CN202596175U (en) Building construction site water recovery system
CN201276718Y (en) Rainwater collecting and recycling system on building roofing
CN101975087B (en) Mine water overall treatment utilizing technology
CN205804380U (en) A kind of Deep Foundation Pit Well-Point Dewatering and the wastewater recycling system of pile tube subsoil water
CN102011428A (en) Rainwater utilization multifunctional integration structure
CN203625966U (en) Comprehensive ecological rainwater collecting and recycling system
CN205440296U (en) Simple and easy automatic vehicle washing system
CN103172205A (en) Underground type integrated sewage pretreatment reaction tank
CN206368389U (en) One kind backwash and sewage sucking system
CN201962720U (en) Rainwater utilization system
CN101519885B (en) Method for synthetically utilizing concrete curing water and rain water in constructional engineering
CN203173915U (en) Underground integrated sewage pretreatment reaction tank
CN102182225A (en) Automatic foundation ground water collecting system
CN104909482A (en) Construction site water recovery and recycling system comprehensive purification tank and manufacturing method thereof
CN203947519U (en) Multifunctional rain storage pool
CN107354949A (en) Cyclic utilization system for the Metro station excavation water resource close to high slope
CN104775481B (en) Water self-circulation system in building community
CN204040103U (en) To catchment module
CN207608997U (en) A kind of Tiny ecosystem filter bed rainwater ecological utilizes device
CN105064469A (en) Community water saving system for recycling use of sanitary wastewater
CN101967834A (en) Pulp concentration pool underground base structure with anti-floating function
CN204447424U (en) A kind of architectural engineering groundwater treatment and reclamation set
CN203795512U (en) Rainwater recycling device
CN203487619U (en) Water resource recycling system for city underground engineering construction
CN204530869U (en) Water self-circulation system in a kind of building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121212

Termination date: 20160525