CN204689755U - The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system - Google Patents
The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system Download PDFInfo
- Publication number
- CN204689755U CN204689755U CN201520325720.5U CN201520325720U CN204689755U CN 204689755 U CN204689755 U CN 204689755U CN 201520325720 U CN201520325720 U CN 201520325720U CN 204689755 U CN204689755 U CN 204689755U
- Authority
- CN
- China
- Prior art keywords
- water
- oil trap
- settling tank
- treating pond
- water reservoir
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
A comprehensive treating pond for construction site Water Sproading cyclic utilization system, is separated into settling tank, oil trap and water reservoir by partition wall in this treating pond, settling tank, is interconnected by overflow hole between oil trap and water reservoir; The overflow hole being communicated with settling tank and oil trap is arranged on partition wall top; The overflow hole being communicated with oil trap and water reservoir is arranged on partition wall top; Oil trap inside is provided with midfeather, is provided with overflow hole in midfeather middle and lower part; Be provided with blow-down pipe in described treating pond, described blow-down pipe is connected with underground drain; Settling tank, oil trap and water reservoir are provided with discharge opening respectively on blow-down pipe; Settling tank is communicated with the water port of waste effluent flume, rainwater building site; Be provided with municipal filling pipe in water reservoir and extend to the water absorption tube at the bottom of water reservoir pond, described water absorption tube is connected with high-pressure hydraulic pump.This treating pond structure is simple, and reasonable in design, purifying water effect is good; Energy-conserving and environment-protective, purify building site water and recycle, and solve the problem of building site water waste.
Description
Technical field
The utility model relates to comprehensive treating pond and the construction site Water Sproading cyclic utilization system of a kind of construction site Water Sproading cyclic utilization system.
Background technology
Today that urbanization develops rapidly, the Proposals of Water Resources of China severe situation.Construction site water consumption is comparatively large, and the treating pond in traditional construction site is simple due to structure, designs unreasonable, cause purifying water effect poor, the impurity in water is too much, is difficult to recycle, finally, these water that cannot follow bad utilization can be discharged to municipal pipeline becomes waste water, causes very large waste.
Notification number is: CN101519885A, denomination of invention discloses the method for the recycle of a kind of concrete curing water and rainwater for " method of construction work concrete curing water and rainwater comprehensive utilization ", but its emphasis is for collecting rainwater, for also may not proposing effective treatment process with the construction site water of greasy dirt.
Summary of the invention
The purpose of this utility model is the comprehensive treating pond and the construction site Water Sproading cyclic utilization system that provide a kind of construction site Water Sproading cyclic utilization system, improve for prior art, make up the deficiency that traditional architecture building site Water Sproading circulation comprehensive utilizes system, utilize and reclaim the treating pond that circulation comprehensive utilizes system, water resources purified and recycles, solving the problem of construction site water waste.
The technical scheme solved the problem is: the comprehensive treating pond of a kind of construction site Water Sproading cyclic utilization system, is separated into settling tank, oil trap and water reservoir by partition wall I, partition wall II in this treating pond, settling tank, is interconnected by overflow hole between oil trap and water reservoir; The overflow hole I being communicated with settling tank and oil trap is arranged on the top of the partition wall I between settling tank and oil trap; The overflow hole II being communicated with oil trap and water reservoir is arranged on the top of the partition wall II between oil trap and water reservoir; Oil trap inside is provided with midfeather, is provided with overflow hole III in midfeather middle and lower part;
Be provided with blow-down pipe in described treating pond, described blow-down pipe is connected with underground drain; Settling tank, oil trap and water reservoir are provided with discharge opening respectively on blow-down pipe; Settling tank is communicated with the water port of rainwater, waste effluent flume, building site; Be provided with municipal filling pipe in water reservoir and extend to the water absorption tube at the bottom of water reservoir pond, described water absorption tube is connected with high-pressure hydraulic pump.
The further technical scheme of the comprehensive treating pond of described construction site Water Sproading cyclic utilization system is: this treating pond top is provided with Chi Gai; The position that corresponding settling tank, oil trap and water reservoir are built in pond is provided with access hole respectively.
The further technical scheme of the comprehensive treating pond of described construction site Water Sproading cyclic utilization system is: the pool wall top of described settling tank is provided with overflow hole IV; Rainwater before entering settling tank, waste effluent flume, building site water outlet are provided with grid.
Described treating pond is brickwork construction or concrete pouring structure.
Another relevant technical scheme is: a kind of construction site Water Sproading cyclic utilization system, comprise comprehensive treating pond, connect board house, plan to build rainwater, the waste effluent flume, building site of building and flushing platform wasteway, water service pipe, rainwater, the outlet of waste effluent flume, building site are connected with comprehensive treating pond, it is characterized in that: described comprehensive treating pond is comprehensive treating pond according to claim 1, is separated into settling tank, oil trap and water reservoir by partition wall in this comprehensive treating pond, settling tank, is interconnected by overflow hole between oil trap and water reservoir; The overflow hole I being communicated with settling tank and oil trap is arranged on partition wall I top; The overflow hole II being communicated with oil trap and water reservoir is arranged on partition wall II top; Oil trap inside is provided with midfeather, is provided with overflow hole III in midfeather middle and lower part;
Be provided with blow-down pipe in described treating pond, described blow-down pipe is connected with underground drain; Settling tank, oil trap and water reservoir are provided with discharge opening respectively on blow-down pipe; Settling tank is communicated with the water port of rainwater, waste effluent flume, building site; Be provided with municipal filling pipe in water reservoir and extend to the water absorption tube at the bottom of water reservoir pond, described water absorption tube is connected with high-pressure hydraulic pump.
Compared with prior art, the utility model it " the comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system " has following characteristics and beneficial effect:
1, the comprehensive treating pond structure of the utility model construction site Water Sproading cyclic utilization system is simple, and reasonable in design, purifying water effect is good:
The comprehensive treating pond of the utility model adopts settling tank, oil trap and the water reservoir composition be interconnected, and settling tank, is communicated with by overflow hole between oil trap and water reservoir; First building site waste water or rainwater enter settling tank, then enter oil trap and water reservoir successively;
The settling tank for the treatment of pond heavy particles sink, can purify water quality; Oil trap can be separated oily material lighter than water for proportion from water, has further purified water quality; It is for subsequent use that water after settling tank, oil trap are cleaned flows into water reservoir;
Secondly, the water in blow-down pipe energy emptying treating pond, carries out cleaning to treating pond ready; The access hole arranged can be cleared up each pond, ensures that water quality meets service requirements; Municipal administration filling pipe for purify pool inner water not enough time, supplement municipal water, ensure construction site water demand.
2, the Water Sproading cyclic utilization system energy-conserving and environment-protective of the utility model construction site, construction site water is fully recycled: the utility model construction site Water Sproading cyclic utilization system is by collecting construction site water (comprise working-yard may with the working-yard water of organic oil), rainwater, utilize the comprehensive treating pond of construction site Water Sproading cyclic utilization system, construction site waste water is purified, to enter after water reservoir after water examination multiple correlation standard, deliver to board house cooling system respectively again, firewater system, working-yard water system, rinse platform water system, the waste water that these systems are crossed can also by the rainwater of wasteway, comprehensive treating pond is flowed back in waste effluent flume, building site, after purification, recirculation uses, secondly, the water supply of watering water system, lavatory flushing water system can also be used for through the water that water quality detection is qualified after purification, greatly reduce municipal water use, energy-conserving and environment-protective, save money laborsaving.
3, the comprehensive treating pond making method of the utility model construction site Water Sproading cyclic utilization system is easy, easy to implement, and economical and practical being convenient to is promoted, and effectively solves the recycling problem of building site water.
Below in conjunction with drawings and Examples, the comprehensive treating pond of the construction site Water Sproading cyclic utilization system of the utility model and the technical characteristic of construction site Water Sproading cyclic utilization system are described further.
Accompanying drawing explanation
Fig. 1: the comprehensive treating pond side structure schematic diagram of the construction site Water Sproading cyclic utilization system of the utility model;
Fig. 2: the comprehensive treating pond two dimensional structure schematic diagram (vertical view) of the construction site Water Sproading cyclic utilization system of the utility model;
Fig. 3: the construction site Water Sproading cyclic utilization system schematic diagram of the utility model.
In figure:
1-settling tank, 2-oil trap, 3-water reservoir, 4-blow-down pipe,
51-partition wall I, 52-partition wall II, 53-midfeather;
Overflow hole, overflow hole II, 531-, 511-overflow hole I, 521-III; 50-overflow hole IV;
6-municipal filling pipe, 7-grid, 8-rainwater, waste effluent flume, building site, 9-discharge opening, 10-water absorption tube, 11-access hole, 12-Chi Gai, 13-water service pipe; 131-plant irrigating water swivel; 132-lavatory flushing water swivel;
The comprehensive treating pond of A-, B-board house, C-plan to build building, D-flushing platform, E-building site waste water flow direction
The drip molding that B1-board house eaves are arranged; B2-roofing spraying cooling shower nozzle; B3-rainwater down pipe;
C1-outrigger sprinkling system shower nozzle; C2-water for fire-fighting purpose joint; C3-construction water joint;
D1-rinses platform water swivel; D2-settling pit.
Embodiment
Embodiment one:
The comprehensive treating pond of a kind of construction site Water Sproading cyclic utilization system, as shown in Figure 1, is separated into settling tank 1, oil trap 2 and water reservoir 3 by partition wall I, partition wall II in this treating pond, settling tank 1, is interconnected by overflow hole between oil trap 2 and water reservoir 3; The overflow hole I 511 of connection settling tank 1 and oil trap 2 is arranged on partition wall I 51 top between settling tank 1 and oil trap 2; The overflow hole II 521 of connection oil trap 2 and water reservoir 3 is arranged on partition wall II 52 top between oil trap 2 and water reservoir 3; Oil trap 2 inside is provided with midfeather 53, is provided with overflow hole III 531 in midfeather 53 middle and lower part;
Settling tank 1 in use can unavoidably be mixed into the impurities sink down such as the heavy particle of silt particle water, purifies water; Oil trap can be separated oily material lighter than water for proportion from water, further purifies water; Water reservoir stores the recirculated water after settling tank, oil trap purification for subsequent use;
Be provided with blow-down pipe 4 in described treating pond, described blow-down pipe 4 is connected with underground drain; Settling tank 1, oil trap 2 and water reservoir 3 are provided with discharge opening 9 respectively on blow-down pipe; Settling tank is communicated with the water port of rainwater, waste effluent flume, building site 8; The water absorption tube 10 being provided with municipal filling pipe 6 in water reservoir 3 and extending at the bottom of water reservoir pond, described water absorption tube 10 is connected with high-pressure hydraulic pump.When purifying pool inner water and being not enough, municipal water can be supplemented by opening municipal filling pipe 6.
This treating pond top is provided with treating pond cover plate, is called for short pond lid 12; The position that 12 corresponding settling tanks 1, oil trap 2 and water reservoir 3 are built in pond is provided with access hole 11 respectively, can clear up (see Fig. 2) each pond.
The pool wall top of described settling tank 1 is provided with overflow hole IV 50; Entering the rainwater before settling tank 1, waste effluent flume, building site 8 water outlet is provided with grid 7, the rubbish such as leaf can be blocked rear inflow settling tank 1 sand setting.
Embodiment two:
A kind of construction site Water Sproading cyclic utilization system, as shown in Figure 3, this construction site Water Sproading cyclic utilization system comprises comprehensive treating pond A, connect board house B, plan to build building C, the rainwater rinsing platform D wasteway, waste effluent flume, building site 8, water service pipe 13, rainwater, waste effluent flume, building site 8 export and are connected with comprehensive treating pond A; Described comprehensive treating pond A is the comprehensive treating pond of a kind of construction site Water Sproading cyclic utilization system described in embodiment one;
Is separated into settling tank 1, oil trap 2 and water reservoir 3 by partition wall in this comprehensive treating pond A, settling tank 1, is interconnected by overflow hole between oil trap 2 and water reservoir 3; The overflow hole I 511 being communicated with settling tank 1 and oil trap 2 is arranged on the top of the partition wall I 51 between settling tank 1 and oil trap 2; The overflow hole II 521 being communicated with oil trap 2 and water reservoir 3 is arranged on the top of the partition wall II 52 between oil trap 2 and water reservoir 3; Oil trap 2 inside is provided with midfeather 53, is provided with overflow hole III 531 in midfeather 53 middle and lower part;
Be provided with blow-down pipe 4 in described treating pond, described blow-down pipe 4 is connected with underground drain; Settling tank 1, oil trap 2 and water reservoir 3 are provided with discharge opening 9 respectively on blow-down pipe; Settling tank is communicated with the water port of rainwater, waste effluent flume, building site 8; The water absorption tube 10 being provided with municipal filling pipe 6 in water reservoir 3 and extending at the bottom of water reservoir pond, described water absorption tube 10 is connected with high-pressure hydraulic pump.
The principle of work of the utility model construction site Water Sproading cyclic utilization system is: by collecting rainwater, working-yard water, through settling tank with gravity separation principle, making heavy particles sink, purifying water quality; Water flows into oil trap after settling tank, and this pond can be separated oily material lighter than water for proportion from water, purifies water; Flow into water reservoir after purification of water quality, the water after finally using high-pressure hydraulic pump, water service pipe to carry purification to board house, plan to build building, rinse the position that platform etc. needs use water, for board house cooling, outrigger sprinkling system, concrete pouring, flushing vehicle etc.; Water enters after using to be collected drip molding, waterways etc. and again collects and enter treating pond and purify, and again carries out recycling (see Fig. 3) after purification.
After recirculated water uses, flow into rainwater, after grid 7 blocks the rubbish such as leaf, flow into settling tank 1 sand setting behind waste effluent flume, building site 8, then flow into oil trap and carry out oil removal, finally flow into water reservoir 3 stand-by; Be provided with municipal filling pipe 6 in water reservoir 3, when water reservoir 3 water shortage, supplement municipal water, ensure construction site water demand.Such construction site water resources just can reach the effect of recycle and reuse.Settling tank in treating pond, oil trap, water reservoir check once week about, find that water quality is undesirable, namely clear up each pond from access hole, ensure that water quality meets service requirements.
Claims (5)
1. the comprehensive treating pond of a construction site Water Sproading cyclic utilization system, it is characterized in that: is separated into settling tank (1), oil trap (2) and water reservoir (3) by partition wall I, partition wall II in this treating pond, settling tank (1), to be interconnected by overflow hole between oil trap (2) and water reservoir (3); The overflow hole I (511) being communicated with settling tank (1) and oil trap (2) is arranged on the top of the partition wall I (51) between settling tank and oil trap; The overflow hole II (521) being communicated with oil trap (2) and water reservoir (3) is arranged on the top of the partition wall II (52) between oil trap and water reservoir; Oil trap (2) inside is provided with midfeather (53), is provided with overflow hole III (531) in midfeather (53) middle and lower part;
Be provided with blow-down pipe (4) in described treating pond, described blow-down pipe (4) is connected with underground drain; Settling tank (1), oil trap (2) and water reservoir (3) are provided with discharge opening (9) respectively on blow-down pipe; Settling tank is communicated with the water port of rainwater, waste effluent flume, building site (8); Be provided with municipal filling pipe (6) in water reservoir (3) and extend to the water absorption tube (10) at the bottom of water reservoir pond, described water absorption tube (10) is connected with high-pressure hydraulic pump.
2. the comprehensive treating pond of construction site according to claim 1 Water Sproading cyclic utilization system, is characterized in that: this treating pond top is provided with Chi Gai (12); The position of Chi Gai (12) corresponding settling tank (1), oil trap (2) and water reservoir (3) is provided with access hole (11) respectively.
3. the comprehensive treating pond of construction site according to claim 1 Water Sproading cyclic utilization system, is characterized in that: the pool wall top of described settling tank (1) is provided with overflow hole IV (50); Entering the rainwater before settling tank (1), waste effluent flume, building site (8) water outlet is provided with grid (7).
4. the comprehensive treating pond of the construction site Water Sproading cyclic utilization system according to claim 1,2 or 3, is characterized in that: described treating pond is brickwork construction or concrete pouring structure.
5. a construction site Water Sproading cyclic utilization system, comprise comprehensive treating pond (A), connect board house (B), plan to build the rainwater of building (C) and flushing platform (D) wasteway, waste effluent flume, building site (8), water service pipe (13), rainwater, waste effluent flume, building site (8) outlet is connected with comprehensive treating pond (A), it is characterized in that: described comprehensive treating pond is comprehensive treating pond according to claim 1, settling tank (1) is separated into by partition wall in this comprehensive treating pond, oil trap (2) and water reservoir (3), settling tank (1), be interconnected by overflow hole between oil trap (2) and water reservoir (3), be communicated with settling tank (1) and be arranged on partition wall I (51) top with the overflow hole I (511) of oil trap (2), be communicated with oil trap (2) and be arranged on partition wall II (52) top with the overflow hole II (521) of water reservoir (3), oil trap (2) inside is provided with midfeather (53), is provided with overflow hole III (531) in midfeather (53) middle and lower part,
Be provided with blow-down pipe (4) in described treating pond, described blow-down pipe (4) is connected with underground drain; Settling tank (1), oil trap (2) and water reservoir (3) are provided with discharge opening (9) respectively on blow-down pipe; Settling tank is communicated with the water port of rainwater, waste effluent flume, building site (8); Be provided with municipal filling pipe (6) in water reservoir (3) and extend to the water absorption tube (10) at the bottom of water reservoir pond, described water absorption tube (10) is connected with high-pressure hydraulic pump.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520325720.5U CN204689755U (en) | 2015-05-20 | 2015-05-20 | The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520325720.5U CN204689755U (en) | 2015-05-20 | 2015-05-20 | The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204689755U true CN204689755U (en) | 2015-10-07 |
Family
ID=54230070
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520325720.5U Expired - Fee Related CN204689755U (en) | 2015-05-20 | 2015-05-20 | The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204689755U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105951967A (en) * | 2016-06-01 | 2016-09-21 | 广西建工集团第建筑工程有限责任公司 | Construction site water recycling integrated method |
CN106731198A (en) * | 2016-11-17 | 2017-05-31 | 苏州航天系统工程有限公司 | A kind of inspection shaft suitable for Domestic sewage collecting |
CN106968317A (en) * | 2017-05-16 | 2017-07-21 | 北京建工集团有限责任公司 | A kind of construction site rainwater recycle reutilization system |
CN107806168A (en) * | 2017-09-30 | 2018-03-16 | 武汉圣禹排水系统有限公司 | Online rainwater storage equipment |
CN113387459A (en) * | 2021-02-24 | 2021-09-14 | 浙江绿城筑乐美城市发展有限公司 | Building site water recycling and water treatment system |
-
2015
- 2015-05-20 CN CN201520325720.5U patent/CN204689755U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105951967A (en) * | 2016-06-01 | 2016-09-21 | 广西建工集团第建筑工程有限责任公司 | Construction site water recycling integrated method |
CN106731198A (en) * | 2016-11-17 | 2017-05-31 | 苏州航天系统工程有限公司 | A kind of inspection shaft suitable for Domestic sewage collecting |
CN106968317A (en) * | 2017-05-16 | 2017-07-21 | 北京建工集团有限责任公司 | A kind of construction site rainwater recycle reutilization system |
CN107806168A (en) * | 2017-09-30 | 2018-03-16 | 武汉圣禹排水系统有限公司 | Online rainwater storage equipment |
CN113387459A (en) * | 2021-02-24 | 2021-09-14 | 浙江绿城筑乐美城市发展有限公司 | Building site water recycling and water treatment system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204689755U (en) | The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system | |
CN204001088U (en) | A kind of building rainwater and daily life sewage intermediate water reuse system | |
CN107130663A (en) | Construction site water recycling system and method | |
CN104213599B (en) | Zero energy consumption roof rain water reclaims Waste water utilization system | |
CN202516413U (en) | Circulating water system for engineering vehicle cleaning tank | |
CN103253782A (en) | Device for washing car by utilizing rain water and recycling car-washing waste water | |
CN111321775A (en) | Green energy-saving rainwater recovery processing system | |
CN104909482A (en) | Construction site water recovery and recycling system comprehensive purification tank and manufacturing method thereof | |
CN103395407B (en) | Automatic cleaning system of construction site muck vehicle and application method thereof | |
CN203878648U (en) | Multifunctional rainwater collecting system | |
CN104032696B (en) | A kind of road purging method and rinse-system | |
CN203427765U (en) | Slag car automatic cleaning system at construction site | |
CN202728180U (en) | Vehicle cleaning pool on construction site | |
CN209778422U (en) | Water treatment system | |
CN115653065B (en) | Rainwater collecting and recycling system, control method and integrated control box | |
CN204475419U (en) | A kind of livestock house rain water collecting system | |
CN206815504U (en) | A kind of self-cleaning storm detention tank based on water-jet | |
CN203487015U (en) | Sewage treatment system | |
CN203060904U (en) | Improved advection setting device | |
CN202376811U (en) | Waste water recycling device for commercial concrete mixing plant | |
CN213477127U (en) | Rainwater regulation and storage system | |
CN211935706U (en) | Rainwater wastewater collecting and recycling device | |
CN203701248U (en) | Comprehensive recycling device for waste water resource of thermal power plant | |
CN210002198U (en) | construction site water collection comprehensive utilization system | |
CN208747857U (en) | A kind of construction site waste water, rainwater cyclic utilization system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151007 Termination date: 20200520 |