CN203427765U - Slag car automatic cleaning system at construction site - Google Patents

Slag car automatic cleaning system at construction site Download PDF

Info

Publication number
CN203427765U
CN203427765U CN201320529010.5U CN201320529010U CN203427765U CN 203427765 U CN203427765 U CN 203427765U CN 201320529010 U CN201320529010 U CN 201320529010U CN 203427765 U CN203427765 U CN 203427765U
Authority
CN
China
Prior art keywords
water
sludge
pipe
slag
communicated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320529010.5U
Other languages
Chinese (zh)
Inventor
胡湘冬
陈孟鸿
许宁
吴雄辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201320529010.5U priority Critical patent/CN203427765U/en
Application granted granted Critical
Publication of CN203427765U publication Critical patent/CN203427765U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a slag car automatic cleaning system at a construction site. The slag car automatic cleaning system comprises a collecting device used for collecting underground water and rain water, a settling pond, a high-pressure pump room and an automatic car washing shed. A water outlet pipeline of the water collecting device is communicated with the settling pond, a water outlet pipe of the settling pond is communicated with the high-pressure pump room, and a water outlet pipe of the high-pressure pump room is communicated with a cleaning pipe network of the automatic car washing shed. Construction sewage collected by the collecting device is pressurized and sent to the cleaning pipe network of the automatic car washing shed to carry out thorough cleaning on each portion of a slag car after being precipitated through the multi-stage settling pond and reaching the standard of reclaimed water, and the sewage is recollected and recycled after cleaning, so the purposes of saving manpower and material resources and improving efficiency are achieved by converting the collected rain water and underground water into the reclaimed water recycled to clean the slag car.

Description

Building ground slag-soil truck automatic cleaning system
Technical field
The utility model relates to a kind of building ground slag-soil truck automatic cleaning system.
Background technology
The cleaning of building ground slag-soil truck is that slag-soil truck is parked in automobile-washing groove substantially at present, by the hand-held bath rifle of operating personal, slag-soil truck is rinsed, and what wash by water rifle utilization is urban water supply tap water.There is the defect of the following aspects in such purging method: 1, car washing water consumption is large, and water resource waste is larger.Tradition automobile-washing groove water is all used urban water supply to rinse car, rinses sewage and mostly from ditch, directly drains, and does not collect and again utilizes, and wash water belongs to disposable consumption.2, labour power consumption is large.Tradition automobile-washing groove is to utilize 4-6 the hand-held hydraulic giant of workman to rinse each face of vehicle body, and per car dregs is transported outward out building site all needs to arrange workman to rinse each face of vehicle body, and labour power consumption is very large.3, labour intensity is large.Tradition automobile-washing groove, when dregs is transported outward, needs workman ceaselessly to rinse vehicle, and dregs outward transport all concentrates on night, and workman's daily schedule and mediocrity put upside down, and car cleaner's working time and intensity are large.Artificial flushing has the tired and sordid possibility of vehicle flushing.4, developing cost is high.Low because of the degree of utilization of water resource, labour power consumption is relatively high, and in labour power wage growing today, traditional automobile-washing groove car-cleaning cost is constantly increasing.5, each car carwash length consuming time.Tradition automobile-washing groove utilizes artificial flushing vehicle, rinses position and cannot launch rapidly comprehensively, needs position one by one to go to rinse according to priority, each car rinses length consuming time, and the car quantity by automobile-washing groove per hour is few, directly affects dregs outward transport efficiency, otherwise, affect city image.
Utility model content
The purpose of this utility model is to provide a kind of building ground slag-soil truck automatic cleaning system and application process thereof of efficient energy-saving.
The utility model discloses a kind of building ground slag-soil truck automatic cleaning system, this system comprises gathering-device, sludge pan, high pressure pump house and the automatic car washing shed for collecting earthing water and natural precipitation, the outlet pipeline of water collecting device is communicated with sludge pan, the outlet pipeline of sludge pan is communicated with high pressure pump house, and the cleaning pipe network of the outlet pipeline of high pressure pump house and automatic car washing shed is communicated with.
Described gathering-device comprises some earthing water collecting tubes, collecting pipe and collection well, and earthing water collecting tube is distributed in the foundation pit construction stage needs precipitation, drainage position, and the exit end of each underground water collection pipe is connected to collecting pipe; Collect in well and have sewage water pump, collecting pipe is connected to the pump mouth of sewage water pump.
Described sludge pan is one-level sludge pan, second-level settling pond and the three grades of sludge pans that are divided into partition wall in a large square pond body, three grades of sludge pans are positioned at one end of square pond body, one end of one-level sludge pan and second-level settling pond is positioned at the inner side of three grades of sludge pans side by side, between adjacent, have along square pond body partition wall longitudinally, the length of second-level settling pond is less than the length of this partition wall, the degree of depth of three grades of sludge pans strengthens successively, and the partition wall height between adjacent sludge pan is less than the exterior wall height of square pond body; The bottom surface of one-level sludge pan is the inclined-plane of sediment deposition for the benefit of, has twice wire net in second-level settling pond at least, for intercepting silt and slowing down water velocity, in three grades of sludge pans, has lift pump.
Described automatic car washing shed is that front and back end and end face are the cuboid box bodies of opening surface, its bottom surface is the integrated stand that steel pipe tiling forms, left side plate is integrally closed plate, the sewage collecting pool that the below of bottom surface has geomery to mate with it, the upper surface of sewage collecting pool is fixed in bottom surface, and sewage collecting pool is communicated with described one-level sludge pan by pipeline.
Described cleaning pipe network comprises the bottom flushing line fixing with described sewage collecting pool upper inside wall, along the side flushing line of described automatic car washing shed side plate and be positioned at the end face flushing line of automatic car washing shed front and back end; Bottom flushing line comprises along longitudinal, the corresponding slag-soil truck of described sewage collecting pool both sides wheel inner side and along the main-supply of described sewage collecting pool longitudinal side wall, middle main-supply upside is connected with longitudinal distributive pipe, the left and right sides in parallel and is connected with perpendicular horizontal distributive pipe, along the upside of the main-supply of described sewage collecting pool longitudinal side wall, is connected with longitudinal distributive pipe in parallel; Side flushing line comprises the some L shaped distributive pipe being connected in along the main-supply outside of described sewage collecting pool longitudinal side wall, and the vertical section of side plate along described automatic car washing shed of each L shaped distributive pipe makes progress and fix with it; End face flushing line comprises four distributive pipes that are vertically connected in respectively along the main-supply end of described sewage collecting pool longitudinal side wall; On each distributive pipe, be all furnished with the different shower nozzle of setting angle.
Described main-supply is communicated with the outlet pipeline of described high pressure pump house.
The utility model by arranging earthing water collecting tube in foundation ditch, natural precipitation in foundation ditch and earthing water are collected in collection well, the sewage water pump of collecting in well is precipitated to water in rear formation to multifeed clarifier, reach foundation pit construction dewatering effect, for middle water, collect source is provided again, this water saving measures greatly reduces the use of earth excavation stage urban water supply.The cleaning pipe network of delivering to automatic car washing shed after pressurizeing to middle water cleans slag-soil truck automatically, cleaning the different shower nozzle of each setting angle of pipe network rinses each position of slag-soil truck well, without arranging again workman to rinse, reduced the consumption of labour power, greatly shortened each car and cleaned required time.Sewage after carwash enters recycle after sludge pan precipitation after collecting pit is collected again, and greatly reduces operating personal, and saving water resource, improves dregs every day outward transport side and measure and then accelerated construction speed, has also just reduced building cost.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the floor plan schematic diagram between sludge pan and automatic car washing shed in Fig. 1.
Fig. 3 is the A-A schematic diagram in Fig. 2.
Fig. 4 is the B-B schematic diagram in Fig. 2.
Fig. 5 is the C-C schematic diagram in Fig. 1.
Fig. 6 is the schematic top plan view that automatic car washing shed cleans pipe network.
Fig. 7 is the D-D schematic diagram in Fig. 6.
Fig. 8 is workflow schematic diagram of the present utility model.
The specific embodiment
As shown in Figures 1 to 7, the utility model discloses a kind of building ground slag-soil truck automatic cleaning system, this system comprises gathering-device 1, sludge pan 2, high pressure pump house 3 and the automatic car washing shed 4 for collecting earthing water and natural precipitation.The outlet pipeline of water collecting device 1 is communicated with sludge pan 2, and the outlet pipeline of sludge pan 2 is communicated with high pressure pump house 3, and the cleaning pipe network 6 of the outlet pipeline of high pressure pump house 3 and automatic car washing shed 4 is communicated with.
Gathering-device 1 comprises some earthing water collecting tubes 11, collecting pipe 12 and collects well 13.Earthing water collecting tube 11 is distributed in the foundation pit construction stage needs precipitation, drainage position, on its sidewall, be evenly equipped with water seepage hole, the exit end of each underground water collection pipe 11 is connected to collecting pipe 12, collects in well 13 and has sewage water pump 14, and collecting pipe 13 is connected to the pump mouth of sewage water pump 14.
Sludge pan 2 is one-level sludge pan 21, second-level settling pond 22 and the three grades of sludge pans 23 that are divided into partition wall in a large square pond body.Three grades of sludge pans 23 are positioned at one end of square pond body, one end of one-level sludge pan 21 and second-level settling pond 22 is positioned at the inner side of three grades of sludge pans 23 side by side, between adjacent, have along square pond body partition wall longitudinally, the length of second-level settling pond 22 is less than the length of this partition wall, the degree of depth of three grades of sludge pans strengthens successively, and the partition wall height between adjacent sludge pan is less than the exterior wall height of square pond body; The bottom surface of one-level sludge pan 21 is the inclined-plane of sediment deposition for the benefit of, has twice wire net 24 in second-level settling pond 22, for intercepting silt and slowing down water velocity, in three grades of sludge pans 23, has lift pump 25.
Automatic car washing shed 4 is that front and back end and end face are the cuboid box bodies of opening surface, the integrated stand that its bottom surface 41 forms for steel pipe tiling, left side plate 42 is integrally closed plate, the sewage collecting pool 5 that the below of bottom surface 41 has geomery to mate with it, the upper surface of sewage collecting pool 5 is fixed in bottom surface 41, and sewage collecting pool 5 is communicated with one-level sludge pan 21 by pipeline.
The cleaning pipe network 6 of automatic car washing shed 4 comprises the bottom flushing line 61 fixing with sewage collecting pool 5 upper inside wall, along the side flushing line 62 of automatic car washing shed side plate and be positioned at the end face flushing line 63 of automatic car washing shed front and back end; Bottom flushing line 61 comprises along longitudinal, the corresponding slag-soil truck of sewage collecting pool 5 both sides wheel inner side and along the main-supply 611 of sewage collecting pool 5 longitudinal side walls, middle main-supply 611 upsides are connected with longitudinal distributive pipe 612, the left and right sides in parallel and are connected with perpendicular horizontal distributive pipe 613, along the upside of the main-supply 611 of sewage collecting pool 5 longitudinal side walls, are connected with longitudinal distributive pipe 612 in parallel; Side flushing line 62 comprises the L shaped distributive pipe being connected in along main-supply 611 outsides of sewage collecting pool 5 longitudinal side walls, and vertical section of L shaped distributive pipe side plate 42 along automatic car washing shed 4 upwards and fix with it; End face flushing line 63 comprises four distributive pipes that are vertically connected in respectively along main-supply 611 ends of sewage collecting pool 5 longitudinal side walls; On each distributive pipe, be all furnished with the different shower nozzle of setting angle 7, to meet each position.
The application concrete steps of above-mentioned washing system are as follows: first in the earth excavation stage, precipitation hole is set in foundation ditch, in precipitation hole, insert the diameter that diameter is less than precipitation hole, the earthing water collecting tube 11 that sidewall is evenly equipped with water seepage hole, then will between each underground water collection pipe 11 and precipitation hole, with stone, fill with real; Then each underground water collection pipe is communicated to total collecting pipe 12, collecting pipe 12 is communicated to the sewage water pump 14 in pump well 13, by sewage water pump 14, the natural precipitation of collecting in each underground water collection pipe 11 and the earthing water in foundation ditch are evacuated in pump well 13; Can also when construction, weep drain or intercepting ditch be set below bottom plate rear pouring tape, then weep drain or intercepting ditch be connected with pump well 13, water is imported and collected in well 13; Recycling water pump 8 is evacuated to one-level sludge pan 21, then flow through successively second-level settling pond 22 and three grades of sludge pans 23 by the sewage of collecting in pump well 13.Form middle water up to standard in three grades of sludge pans 23 after, by lift pump 25 wherein, middle water is delivered to high pressure pump house 3, after pressurization, delivering to each position of 6 pairs of slag-soil trucks of cleaning pipe network of automatic car washing shed 4 cleans: the outlet pipeline of high pressure pump house 3 and automatic car washing shed 4 belows, bottom surface, the bottom of sewage collecting pool 5 upper ends is rinsed pipe network 61 and is communicated with, the middle water that high pressure pump house 3 is sent so first flows into the main-supply 611 that pipe network 61 is rinsed in bottom, then branch to each longitudinal distributive pipe 612 and horizontal distributive pipe 613 and side flushing line 62 and end face flushing line 63, in the shower nozzle of finally installing by different angles on each pipeline, spray and each position of slag-soil truck is rinsed simultaneously, reach the object of high-efficiency rinsing.Sewage after flushing flows in sewage collecting pool 5 automatically, and then flow back to 21 recycles of one-level sludge pan by pipeline, realization is converted into middle water circulation use cleaning slag-soil truck by natural precipitation and the earthing water of collecting, and reaches the object that uses manpower and material resources sparingly, raises the efficiency.
The quantity of shower nozzle 7 and each distributive pipe and installing space determine as required, take meet that vehicle is leaned to one side, car anterior, the inside and outside of afterbody and wheel is cleaned without dead angle, is criterion.
Slag-soil truck enters automatic car washing shed 4 after crossing the preliminary cleaning in tank, cleans the shower nozzle 7 of pipe network 5 and vehicle body, wheel can be rinsed well, without arranging workman to rinse, has reduced the consumption of labour power again, has greatly shortened each car and has cleaned required time.The cleaning of whole slag-soil truck only partly consumes a small amount of urban water supply at mistake tank, and water resource has been saved in the sewage collecting recycle after middle water rinses greatly.

Claims (6)

1. a building ground slag-soil truck automatic cleaning system, it is characterized in that: this system comprises gathering-device, sludge pan, high pressure pump house and the automatic car washing shed for collecting earthing water and natural precipitation, the outlet pipeline of water collecting device is communicated with sludge pan, the outlet pipeline of sludge pan is communicated with high pressure pump house, and the cleaning pipe network of the outlet pipeline of high pressure pump house and automatic car washing shed is communicated with.
2. building ground as claimed in claim 1 slag-soil truck automatic cleaning system, it is characterized in that: described gathering-device comprises some earthing water collecting tubes, collecting pipe and collection well, earthing water collecting tube is distributed in the foundation pit construction stage needs precipitation, drainage position, and the exit end of each underground water collection pipe is connected to collecting pipe; Collect in well and have sewage water pump, collecting pipe is connected to the pump mouth of sewage water pump.
3. building ground as claimed in claim 1 slag-soil truck automatic cleaning system, it is characterized in that: described sludge pan is the one-level sludge pan being divided into partition wall in a large square pond body, second-level settling pond and three grades of sludge pans, three grades of sludge pans are positioned at one end of square pond body, one end of one-level sludge pan and second-level settling pond is positioned at the inner side of three grades of sludge pans side by side, between adjacent, have along square pond body partition wall longitudinally, the length of second-level settling pond is less than the length of this partition wall, the degree of depth of three grades of sludge pans strengthens successively, partition wall height between adjacent sludge pan is less than the exterior wall height of square pond body, the bottom surface of one-level sludge pan is the inclined-plane of sediment deposition for the benefit of, has twice wire net in second-level settling pond at least, for intercepting silt and slowing down water velocity, in three grades of sludge pans, has lift pump.
4. building ground as claimed in claim 3 slag-soil truck automatic cleaning system, it is characterized in that: described automatic car washing shed is that front and back end and end face are the cuboid box bodies of opening surface, its bottom surface is the integrated stand that steel pipe tiling forms, left side plate is integrally closed plate, the sewage collecting pool that the below of bottom surface has geomery to mate with it, the upper surface of sewage collecting pool is fixed in bottom surface, and sewage collecting pool is communicated with described one-level sludge pan by pipeline.
5. building ground as claimed in claim 4 slag-soil truck automatic cleaning system, is characterized in that: described cleaning pipe network comprises the bottom flushing line fixing with described sewage collecting pool upper inside wall, along the side flushing line of described automatic car washing shed side plate and be positioned at the end face flushing line of automatic car washing shed front and back end; Bottom flushing line comprises along longitudinal, the corresponding slag-soil truck of described sewage collecting pool both sides wheel inner side and along the main-supply of described sewage collecting pool longitudinal side wall, middle main-supply upside is connected with longitudinal distributive pipe, the left and right sides in parallel and is connected with perpendicular horizontal distributive pipe, along the upside of the main-supply of described sewage collecting pool longitudinal side wall, is connected with longitudinal distributive pipe in parallel; Side flushing line comprises the some L shaped distributive pipe being connected in along the main-supply outside of described sewage collecting pool longitudinal side wall, and vertical section of each L shaped distributive pipe makes progress and fix with it with the sidewall paneling of described automatic car washing shed; End face flushing line comprises four distributive pipes that are vertically connected in respectively along the main-supply end of described sewage collecting pool longitudinal side wall; On each distributive pipe, be all furnished with the different shower nozzle of setting angle.
6. building ground as claimed in claim 5 slag-soil truck automatic cleaning system, is characterized in that: described main-supply is communicated with the outlet pipeline of described high pressure pump house.
CN201320529010.5U 2013-08-29 2013-08-29 Slag car automatic cleaning system at construction site Expired - Fee Related CN203427765U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320529010.5U CN203427765U (en) 2013-08-29 2013-08-29 Slag car automatic cleaning system at construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320529010.5U CN203427765U (en) 2013-08-29 2013-08-29 Slag car automatic cleaning system at construction site

Publications (1)

Publication Number Publication Date
CN203427765U true CN203427765U (en) 2014-02-12

Family

ID=50056821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320529010.5U Expired - Fee Related CN203427765U (en) 2013-08-29 2013-08-29 Slag car automatic cleaning system at construction site

Country Status (1)

Country Link
CN (1) CN203427765U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105241691A (en) * 2015-10-30 2016-01-13 青岛农业大学 Soil leachate collection system and soil leachate collection method
CN105398426A (en) * 2015-12-17 2016-03-16 洛阳瑞临煤炭物资有限公司 In-and-out vehicle washing device
CN109204240A (en) * 2018-07-24 2019-01-15 北京天恒建设集团有限公司 It is a kind of to wash wheel device systems for the water-saving of construction place
CN109263611A (en) * 2018-10-29 2019-01-25 马鞍山钢铁建设集团有限公司 A kind of scouring table and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105241691A (en) * 2015-10-30 2016-01-13 青岛农业大学 Soil leachate collection system and soil leachate collection method
CN105398426A (en) * 2015-12-17 2016-03-16 洛阳瑞临煤炭物资有限公司 In-and-out vehicle washing device
CN109204240A (en) * 2018-07-24 2019-01-15 北京天恒建设集团有限公司 It is a kind of to wash wheel device systems for the water-saving of construction place
CN109204240B (en) * 2018-07-24 2023-10-20 北京天恒建设集团有限公司 Water-saving wheel washing equipment system for construction site
CN109263611A (en) * 2018-10-29 2019-01-25 马鞍山钢铁建设集团有限公司 A kind of scouring table and construction method

Similar Documents

Publication Publication Date Title
CN103395407B (en) Automatic cleaning system of construction site muck vehicle and application method thereof
CN203427765U (en) Slag car automatic cleaning system at construction site
CN107130663A (en) Construction site water recycling system and method
CN202516413U (en) Circulating water system for engineering vehicle cleaning tank
CN204689755U (en) The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system
CN104260699A (en) Combined type construction site vehicle washing facility
CN204139302U (en) One can self-cleaning rectangle storm detention tank
CN203821514U (en) Full-automatic household wastewater collection and utilization system capable of preventing water quality from deterioration
CN203854643U (en) Infrared truck washing device
CN205440296U (en) Simple and easy automatic vehicle washing system
CN104909482A (en) Construction site water recovery and recycling system comprehensive purification tank and manufacturing method thereof
CN204196865U (en) A kind of building ground environmental protection and energy saving build-up type automatic car washing equipment
CN109263611A (en) A kind of scouring table and construction method
CN206815504U (en) A kind of self-cleaning storm detention tank based on water-jet
CN204210428U (en) A kind of section construction building site vehicle wash facility
CN101332446A (en) Device and method for flushing gravel using recirculated water at construction site
CN207436248U (en) Rainwater storage tank injecting type flusher and rainwater storage tank
CN205903699U (en) Filter element cleaning machine of hydrologic cycle
CN206086656U (en) Carwash pond
CN213477127U (en) Rainwater regulation and storage system
CN208931313U (en) A kind of scouring table
CN210971004U (en) Muck vehicle washing device suitable for large-scale earth and stone engineering
CN203358545U (en) Water circulation automatic car washing system
CN205737450U (en) A kind of vicarious water circulation is from rinsing automobile-washing groove device
CN204567592U (en) A kind of auto-induction type car washer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212

Termination date: 20140829

EXPY Termination of patent right or utility model