CN208931313U - A kind of scouring table - Google Patents
A kind of scouring table Download PDFInfo
- Publication number
- CN208931313U CN208931313U CN201821758682.2U CN201821758682U CN208931313U CN 208931313 U CN208931313 U CN 208931313U CN 201821758682 U CN201821758682 U CN 201821758682U CN 208931313 U CN208931313 U CN 208931313U
- Authority
- CN
- China
- Prior art keywords
- level
- sedimentation
- platform
- pump
- gutter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a kind of scouring tables, belong to vehicle rinsing apparatus field.For the at high cost of the cleaning of building site vehicle in the prior art, low efficiency, the problem of sewage of flushing cannot recycle, it includes rinsing platform that the utility model, which provides a kind of scouring table, it rinses platform and is connected to by rinsing the gutter of mesa base with level-one sedimentation, level-one sedimentation is connected to by sedimentation gutter with second-level settling pond, it rinses on platform and several row's square tubes is set, eyelet is set on square tube outer wall, several row's square tubes are assembled into spray pipe network, it further include force (forcing) pump, force (forcing) pump is arranged in second-level settling pond, force (forcing) pump is connect by the pump line that pressurizes with spray pipe network.Water is sent in spray pipe network by the pressurized pump of the utility model carries out vehicle rinsing, the sewage of flushing is again fed in spray pipe network after precipitating twice to be reused, overall process is without wastewater disposition, realize that effluent cycle utilizes, and flush efficiency is high, it is cheap simple without expenses, structures such as post facility maintenances.
Description
Technical field
The utility model belongs to vehicle rinsing apparatus field, more specifically to a kind of scouring table.
Background technique
Due to the dust that construction generates, the dust that site works vehicle generates is entered and left, during continuous contact, largely
Construction site is all brought and take out of to dust into, causes surrounding enviroment by larger pollution, so that ambient air PM2.5 index compares
Height constitutes harm to the health of people.
At present to the method for disengaging building site vehicle rinsing, there are several types of: 1, by manual control giant, rinse vehicle
The dust and soil at each position, this purging method wasteness is big, and sewage flows over everywhere, low efficiency, and special messenger is needed to operate, right
In oversize vehicle flushing effect, it is difficult to ensure that, interference is big, and energy conservation and environmental protection requirement is also not achieved;2, purchase field vehicle rinses flat
Platform complete set of equipments will individually do mating foundation of civil work, individually make drainage system, send full-time staff to safeguard, establish special system, fixed
Phase maintenance;Oversize vehicle (slag-soil truck) is rinsed flushing platform currently on the market or blank;It is also wanted using out of joint
About producer overhauls again, delays construction, and it is more that engineering terminates to remove damage parts, is difficult investment and is used for multiple times etc., input cost
And daily maintenance is costly;3, scene construction one special cleaning facility, is arranged three-level coprecipitation mode, and construction scale is larger,
Circulation and liquidation procedures are many and diverse, and third level precipitating has little significance, and purchase complete set of equipments cost difference is little, effects of energy conservation and environmental protection
Generally.
It is also correspondingly improved regarding to the issue above, it is open such as Chinese Patent Application No. CN201410133800.0
Day is on March 9th, 2016, and which disclose a kind of automated vehicle purging method and its system, which is rinsed
Method includes: the cleaning using level-one Flushing nozzle to automobile first half chassis and front tyre;Using level-one Flushing nozzle and
Second level Flushing nozzle is together to 5 steps such as the cleanings of vehicle integral bottom plate wheel tire.The automated vehicle rinse-system, including it is clear
Platform and cleaning system are washed, the cleaning platform includes the first cleaning platform and the second cleaning platform, first cleaning platform
Multiple Flushing nozzles are equipped with the second cleaning platform bottom and side, being turned on or off for the Flushing nozzle is visited by induction
Head carries out automatic sensing control;The cleaning platform bottom is equipped with sewage flow road, and the sewage flow road is set with sewage treatment
Standby connection, the second cleaning platform rear positions are equipped with the platform that drips for automobile sunning, and the platform lower that drips is set
There is sewage flow road.The patent is disadvantageous in that: the flushing of vehicle is carried out by inductive probe induction Flushing nozzle, induction
Probe can due to external environment interference and have uncontrollability, cannot ensure Flushing nozzle accurately when vehicle enters
Start to clean, and the automated development system is more demanding to automating, there are certain unstability, and ease for use is general,
The cleaning effect of vehicle is general.
For another example Chinese Patent Application No. CN201721466495.2, publication date are on June 8th, 2018, which disclose
A kind of cycles, economized truck washing device, it is characterised in that: including platform, roller and column, horizontal interval on the platform
More rollers are installed, spray tube is installed between adjacent two roller bottoms, multiple spray heads are installed at interval on the spray tube, described flat
The arranged on left and right sides of platform installs silt basin, and sedimentation basin, installation brake in a roller side therein are provided on the outside of the silt basin
Unit.The patent is disadvantageous in that: the flusher can clean up the tire of vehicle, but for whole vehicle
For, vehicle body is not rinsed well, and generally speaking the cleaning effect of vehicle is general and structure is more complicated.
Summary of the invention
1, it to solve the problems, such as
For at high cost, the low efficiency of the cleaning of building site vehicle in the prior art, what the sewage of flushing cannot recycle is asked
Topic, the utility model provide a kind of scouring table.The utility model is pressurizeed recirculated water by force (forcing) pump, implements vehicle through spray pipe network
It rinses, the sewage of flushing is again fed in spray pipe network and reused after precipitating twice, and whole process is without sewage
Outlet realizes that effluent cycle utilizes, cheap, and without expenses such as post facility maintenances, and flush efficiency is high, and structure is simple,
The flushing effect of professional complete set of equipments can be reached.
2, technical solution
To solve the above problems, the utility model adopts the following technical scheme.
A kind of scouring table, including platform is rinsed, rinse gutter and level-one sedimentation of the platform by flushing mesa base
Connection, level-one sedimentation are connected to by sedimentation gutter with second-level settling pond, rinse on platform and several row's square tubes, square tube is arranged
Eyelet is set on outer wall, and it further includes force (forcing) pump that several row's square tubes, which are assembled into spray pipe network, and force (forcing) pump is arranged in second-level settling pond
In, force (forcing) pump is connect by the pump line that pressurizes with spray pipe network.Progress vehicle punching in spray pipe network is delivered water by pressure pump
It washes, the sewage of vehicle rinsing is precipitated twice can achieve the water quality requirement cleaned again, and the water after precipitating is defeated through pressure pump again
It gives spray pipe network and carries out vehicle rinsing, recycle water resource, whole process does not have the discharge of sewage, and it is free from environmental pollution, and
Multi-angle eyelet is set in square tube, forms multi-angle water curtain, so that vehicle rinsing is comprehensive, flushing effect is good.
Further, rinsing platform further includes bottom plate, and cross beam and pond body parapet, each cross beam are provided on bottom plate
Well word mouth in be respectively arranged with draining comb column I and draining comb column II.Ensure multi-angle, multiregion cleaning vehicle, flushing effect
Preferably.
Further, the flushing mesa base concrete face is provided with slope of catchmenting, at the end of the gradient direction on slope of catchmenting
End setting gutter, the setting on slope of catchmenting enable the sewage rinsed in platform to be smoothly flowed into level-one precipitating through gutter
In well;Cross beam is run through in gutter, is provided with tongue and groove on the Jing Zikou of cross beam, facilitates draining comb column I and drains comb column II's
Installation.
Further, the level-one sedimentation includes the borehole wall, and inner ring is provided on the inside of the borehole wall, is provided with well above the borehole wall
It covers, is provided with sedimentation gutter in inner ring, sedimentation gutter is connected to second-level settling pond, and inner ring a side and gutter connect
It is logical.
Further, the borehole wall and the bottom in inner ring are arc-shaped, and are round-corner transition at bottom corners,
Inner ring is wiped with cement mortar.
Further, the second-level settling pond includes Jing Chi, and inner wall is provided on the inside of well pond, is provided with lid above well pond
Plate.
Further, the inner ring bottom is fillet or chamfered transition, is wiped with cement bonded sand in well bottom of pond portion, inner wall
Slurry.
Further, it is provided with partition wall in the second-level settling pond, several columns are equidistantly provided on partition wall, every
Draining hole is provided on wall.So that water flow is unblocked.
It further, further include pressurized reservoir, pressurized reservoir is arranged in second-level settling pond, and force (forcing) pump is arranged in pressurized reservoir
In.The cleannes of water are further increased, also guarantee the reliability service of force (forcing) pump.
Further, pressurization bottom of pond portion is provided with water supplement port.When the water in second-level settling pond is not enough to clean vehicle,
By the way that water is added into water supplement port, so that meet the requirement of vehicle cleaning, it is simple and efficient to handle.
3, beneficial effect
Compared with the prior art, the utility model has the following beneficial effects:
(1) the utility model is connected to spray pipe network by several row's square tubes two-by-two end to end, and in square tube right angle outer wall
Water is sent to spray pipe network by pressurization pump line by the eyelet of upper setting different angle, force (forcing) pump, and water is sprayed through eyelet, implements vehicle
Flushing, the sewage of flushing enters level-one sedimentation from gutter and enters back into secondary sedimentation tank, to reach to the secondary of sewage
Purification, pressurized pump line feeding spray pipe network is recycled the water after cleaning again, and single unit system structure is simple, and can
Sewage is efficiently used, cycling use of water saves water resource, and rinses vehicle in all directions, and flushing effect is preferable;
(2) two-way cross beam is set on the bottom plate that the utility model rinses in platform, divides in each cross beam well word mouth
Comb column I and draining comb column II She Zhi not be drained, the beam lattice of the setting energy formation rule of two-way cross beam can bear tens of tons of vapour
Car weight amount, takes into account certain aesthetics, and the cross beam position that gutter is passed through is punched, it is ensured that water flow is unblocked, vehicle
It is parked in draining comb column, the sewage of vehicle rinsing drops from comb column into gutter, space is rationally utilized, so that single unit system knot
Structure is compact, is not take up redundant space, and sewage is effectively discharged and is recycled;
(3) the utility model rinses the sewage flow direction draining of vehicle by the way that slope of catchmenting is arranged in flushing mesa base concrete face
The gradient of ditch is set as 5% or so, and the gradient is too small, is easy rinsing Direct precipitation silt in platform, influences to rinse following for sewage
Ring effect, the gradient is excessive, increases excavation and infrastructure cost, meets scene and rinses vehicle, reduces waiting time, well to the greatest extent
It is provided with tongue and groove on word mouth, convenient for the installation of draining comb column;
(4) bottom of level-one sedimentation and second-level settling pond is disposed as arc-shaped by the utility model, and heavy in level-one
Well bottom of pond portion and inner wall are coated with cement mortar in shallow lake well inner ring, second-level settling pond, reduce the deposition degree of sludge in sewage,
Also it is brought convenience for the cleaning of subsequent sludge, so that the circulating effect of sewage is preferable, also greatlys save time cost;
(5) partition wall is arranged in the utility model in second-level settling pond, it is ensured that the precipitating water of second-level settling pond, which meets, rinses
It is required that and setting draining hole and build column on the partition wall of second-level settling pond so that the collection process of sewage is more smooth,
The circulation of sewage is effectively guaranteed, has reached expected circulating effect;
(6) construction of pressurized reservoir is increased in the utility model in construction method, and the bottom of pressurized reservoir is provided with
Water supplement port if water is inadequate, can enter pressurized reservoir by the way that water is added into water supplement port according to the spray situation of vehicle,
Then spray pipe network water is supplied by force (forcing) pump again and carries out the flushing to vehicle, substantially meet field engineering vehicle rinsing demand,
And effectively save water resource, it is easily operated;
(7) the utility model construction material requested is the common steel in construction site, concrete etc., is taken conveniently, section
About cost, and the device may be provided at building site gate entrance, land occupation size can also be according to different construction site actual conditions
It is adjusted, simple applicability is wide, without wastewater disposition in entire flushing process, meets environmental requirements;
(8) the utility model can be directed to different vehicles, the eyelet of multi-angle be arranged on square tube right angle outer wall, so that vehicle
Rinse more comprehensively, it is more completely, applied widely, rinsed by the selection of the controller that is mounted in entrance guard, switch from
Such as, entrance guard on duty can also serve as flushing vehicle operation, reduce artificial cost, and single unit system cost control significant effect.
Detailed description of the invention
Fig. 1 is the integral arrangement figure of the utility model;
Fig. 2 is the diagrammatic cross-section in the direction A-A in Fig. 1;
Fig. 3 is the diagrammatic cross-section of scouring table in the utility model;
Fig. 4 is the schematic diagram of the level-one sedimentation of the utility model;
Fig. 5 is the schematic diagram of the second-level settling pond of the utility model;
Fig. 6 is the circulation flushing floor map of the utility model.
Figure number explanation: 1, platform is rinsed;11 draining comb column I;12, comb column II is drained;13, cross beam;14 catchment slope;
15, vehicle to run position;16, square tube;17, pond body parapet;18, bottom plate;19, eyelet;2, level-one sedimentation;21, well lid;22,
Inner ring;23, the borehole wall;24, deposit depth;25, sedimentation gutter;3, second-level settling pond;31, cover board;32, inner wall;33, well
Pond;4, partition wall;5, force (forcing) pump;51, pressurized reservoir;52, water inlet pipe;53, pressure feed water pipe;6, intake direction;7, sewage confluence side
To;8, tongue and groove;9, water supplement port;10, gutter.
Specific embodiment
The utility model is further described below with attached drawing combined with specific embodiments below.
Embodiment 1
As shown in Figure 1, a kind of scouring table, including platform 1 is rinsed, it rinses platform 1 and passes through the gutter of flushing 1 bottom of platform
10 are connected to level-one sedimentation 2, and level-one sedimentation 2 is connected to by sedimentation gutter 25 with second-level settling pond 3, rinse platform 1
It is upper that several row's square tubes 16 are set, eyelet 19 is set on 16 outer wall of square tube, it is preferred that be provided with difference on 16 right angle outer wall of square tube
The eyelet 19 of angle;Several row's square tubes 16 are assembled into spray pipe network, it is preferred that several row's square tubes 16 through blanking-it is pre-splicing-weldering
It connect-removes the gred and is assembled into spray pipe network, welding slag should knock out cleaning in time, and must be smooth with weld in all directions square tube 16
Lead to and clean out, to ensure that pressure water energy is unblocked enough in square tube 16, so that the flushing effect of vehicle is preferable;
It further include force (forcing) pump 5, force (forcing) pump 5 is arranged in second-level settling pond 3, and force (forcing) pump 5 is connect by the pump line that pressurizes with spray pipe network, adds
Press pump 5 includes water inlet pipe 52 and pressure feed water pipe 53, and 53 water supply of pressure feed water pipe in force (forcing) pump 5, water inlet pipe 52 is according to water inlet side
It is delivered water into 6 and carries out vehicle rinsing in spray pipe network, the sewage for rinsing vehicle flows to level-one precipitating through sewage confluence direction 7
Well 2 flows to secondary sedimentation tank 3 by the sewage of primary sedimentation again, precipitates twice, reaches the processing effect of sewage, to make
Sewage is obtained to be recycled after processing;
As shown in fig. 6, water is transported in spray pipe network by force (forcing) pump 5 by the pump line that pressurizes in the present apparatus, to start vehicle
Cleaning, the sewage of vehicle cleaning is flowed into level-one sedimentation 2 according to sewage confluence direction 7 through gutter 10, and level-one is heavy
Sewage is flowed into second-level settling pond 3 through sedimentation gutter 25 in shallow lake well 2, and sewage reaches by precipitating twice can be with cleaning vehicle
Requirement, then through processed water, water is delivered in spray pipe network and rinses vehicle by pressurized pump 5 again, entire vehicle rinsing
In the process without wastewater disposition, and sewage is recycled after precipitating, water resource is saved, on 16 right angle outer wall of square tube
The eyelet 19 of multi-angle is set, and the eyelet 19 of multi-angle can rinse vehicle in all directions, so that the flushing effect of vehicle is preferable.
Embodiment 2
Substantially with embodiment 1, rinsing platform 1 as shown in Figures 2 and 3, in the present embodiment further includes bottom plate 18, bottom plate 18 4
Cross beam 13 and pond body parapet 17 are provided on all walls, the cross beam 13 is two-way cross beam, and two-way cross beam forms rule
Beam lattice then and there is certain aesthetics, there is biggish span-depth radio, overall structure compared to general contignation
Intensity is big, is not easy to collapse;Draining comb column I11 and draining comb column II12, vehicle are respectively arranged in the well word mouth of each cross beam 13
It is parked in draining comb column, the settings on multiple draining comb columns make it possible to disposably rinse more vehicles, so that flush efficiency is high, save
The about vehicle queue time;The sewage of vehicle rinsing drops from draining comb column I11 and draining comb column II12 into gutter 10 respectively,
Rationally redundant space is not take up so that single unit system is compact-sized using space;1 bottom concrete face of the flushing platform setting
There is slope 14 of catchmenting, tongue and groove 8 is provided on the Jing Zikou in cross beam 13, slope 14 of catchmenting is arranged in the bottom concrete face for rinsing platform 1, makes
The sewage generated when obtaining vehicle rinsing unimpeded easily can flow to level-one sedimentation 2 through gutter 10, and rinsing in platform 1 does not have
Sewage accumulates, and sewage is effectively recycled;Preferably, catchment slope 14 the gradient be arranged 5% or so, the gradient is too small, be easy
The Direct precipitation silt in rinsing platform 1, influences the circulating effect of flushing water;If the gradient is excessive, it certainly will increase and rinse platform 1
Depth, while the depth of level-one sedimentation 2 and second-level settling pond 3 is also increase accordingly, and increases cost, therefore collect in the present embodiment
The gradient on water slope 14 is set as 5% or so, and sewage is all drained into in the case where save the cost level-one sedimentation 2 as far as possible
In.
Embodiment 3
Substantially with embodiment 1, it is preferred that as shown in figure 4, the level-one sedimentation 2 includes the borehole wall 23, set on the inside of the borehole wall 23
It is equipped with inner ring 22, well lid 21 is provided with above the borehole wall 23, sedimentation gutter 25, sedimentation gutter 25 are provided in inner ring 22
It is connected to second-level settling pond 3,22 a side of inner ring is connected to gutter 10;The borehole wall 23 and the bottom in inner ring 22 are circle
Arc, and bottom is round-corner transition, the borehole wall 23 uses second-hand brick and masonry of cement mortar, and inner ring 22 is wiped with cement mortar, draws materials
Convenient and save the cost;As shown in figure 5, the second-level settling pond 3 includes well pond 33, well pond 33 is grouted using second-hand brick and cement bonded sand
It builds, inner wall 32 is provided on the inside of well pond 33, cover board 31 is provided with above well pond 33, it is preferred that cover board 31 is reinforced concrete;In described
Enclosing 22 bottoms is fillet or chamfered transition, is wiped with cement mortar in 33 bottom of well pond, inner wall 32;In the second-level settling pond 3
It is provided with partition wall 4, builds several columns on partition wall 4 at equal intervals, and the setting draining hole on partition wall 4, it is ensured that level-one is heavy
The draining of shallow lake well 2 is unobstructed;The bottom of level-one sedimentation 2 and second-level settling pond 3 be disposed as it is arc-shaped, and in level-one sedimentation 2
Middle inner ring 22,3 pond Zhong Jing of second-level settling pond, 33 bottom, inner wall 32 are wiped with cement mortar, are conducive to the deposition of sludge in sewage,
And it is also brought convenience for the cleaning of subsequent sludge, so that the circulating effect of sewage is preferable, several columns and draining hole guarantee
The sewage to come from level-one sedimentation 2 straightway can flow to second-level settling pond 3, so that the collection process of sewage is more
Smoothly, the cleaning circulation of sewage is effectively guaranteed, has reached a good circulating effect.
Embodiment 4
A kind of construction method based on any scouring table, its step are as follows:
One, to rinse platform 1, level-one sedimentation 2 and second-level settling pond 3 are once positioned, positioning can according to vehicle into
The gate of live major trunk roads nearby determines position or determines the flushing platform according to the construction peak period vehicles passing in and out number that is averaged out
1, the size of level-one sedimentation 2 and second-level settling pond 3 starts excavation and construction;
Two, platform 1 is rinsed in construction, and first the bottom plate 18 of platform 1 is rinsed in construction, 18 top concrete structure of bottom plate of then constructing, together
When construction drainage ditch 10 and production spray pipe network;Construction is rinsed platform 1 and is included the following steps:
2.1 dig it is deep is usually no more than 1.5m, soil property is relatively good, can not slope, directly as clay model;If soil property compares
Loosely, or there is underground water, can lay bricks side form, do a C15 bed course for 50mm thickness, rinse platform 1, level-one sedimentation 2, second level
Sedimentation basin 3 has once been dug, and the deep relevant parameter that can refer to is dug according to clause in specific each position, and the setting of concrete face flows to gutter 10
The gradient can do the two-way nine-squares beam structure on top for maintenance one day or more 5% or so, after bottom plate 18 has poured.
2.2 two-way nine-squares beam structure bar one-time bindings are completed, and can be used the wooden bed die and wood support, be provided span centre by specification
Arch camber;It rinses 1 internal drainage ditch 10 of platform also to synchronize and carries out, bed die and support can be used as disposable, not have to demoulding;Side form can
To be used in turn with combined steel;Entire top concrete structure one-time-concreting molding, what the slope aspect gutter 10 on slope 14 of catchmenting was started
Side inner corner trim can be made into fillet, convenient for clearing up settled sludge in the future, maintenance no less than one week after concrete placings.
2.3 rinse 1 concrete top mark height of platform than the construction site high slightly lower 10mm~20mm of hardening terrace top mark, can ensure
Vehicle passes through, and ground cleaning ponding can be made to flow back into time and rinsed in platform 1, rinses each cross beam 13 in platform 1
In well word mouth in setting draining comb column I11 and draining comb column II12, vehicle is parked on the comb column of flushing tank, rinses the mud to get off
Water, drops into gutter 10, is flowed to level-one sedimentation 2 together, and unlikely trickling scene is everywhere, and ring is effectively protected
Border, the flushing platform 1 can rinse more vehicles simultaneously, and flush efficiency is high.
After 2.4 side forms are removed, spray pipe net construction can be carried out, the square tube 16 of national standard 80mm × 4mm is selected to make spray tube
Road, blanking → pre-splicing → welding → slagging-off, welding slag preferably knock out cleaning in time, in all directions square tube 16 and weld must it is unimpeded simultaneously
It cleans out, it is ensured that pressure water energy recycles unblocked in pipe.
2.5 originate position in submergence pressure pump line and spray pipe network, match and connect the most with 16 size of square tube of 80mm × 4mm
Close galvanized pipe is inserted in 16 certain depth of square tube, generally in 100mm or so, welds at the right angle position that outer ring is contacted with square tube 16
It is full, unlikely anti-spilling water when guaranteeing that water supply has pressure.
2.6 square tube, 16 detailed treatment
2.6.1 square tube 16 it is oblique on right angle use electric drill perforating, pitch of holes 150mm or so, 19 density degree of eyelet with
Substantially it can guarantee to cover and be rinsed vehicle each position of leaning to one side and be advisable, aperture 8mm~10mm, aperture is excessive, Yao Zengjia hydraulic pressure,
It is uneconomical using more high powered water pump, therefore be advisable with reaching flushing vehicle effect;Different angles are beaten on 16 right angle outer wall of square tube
The eyelet 19 of degree, it is ensured that the water column of ejection is ejected on vehicle at different angles, and is flushed to full vehicle position as far as possible, including
Loading space baffle, so that it is guaranteed that comprehensively being rinsed to vehicle, 45 degree and 75 degree of eyelets 19, such angle are done in preferred interval
Vehicle top and the bottom can be taken into account, can accomplish the cleaning at full vehicle position in the higher engineering truck in flushing chassis,
So that the cleaning effect of vehicle is preferable.
2.6.3 fillet to be polished into 19 clear-cut margin part of eyelet, prevents vehicle from surprisingly pressing the logical tire of stamp, to vehicle
Bring damage.
Three, successively construction level-one sedimentation 2 and second-level settling pond 3, while construct level-one sedimentation 2 and second-level settling pond 3
Internal drainage ditch;It needs to be determined that three parameters when level-one sedimentation 2 is constructed: 2 bottom absolute altitude h of level-one sedimentation;Reach level-one precipitating
The height difference of 25 bottom absolute altitude of sedimentation gutter in well;The inner diameter size of level-one sedimentation 2;The inner bottom of level-one sedimentation 2, which need to be stayed, to be set
Deposit depth 24, these three parameters are according to the number of an entire ejected wash water amount of dropping, according to used 5 power of force (forcing) pump
Pumping water is calculated with the once flushing time, and considers that surplus is lost;It needs level-one sedimentation effect to be achieved and keeps sewage
Residence time in well, to precipitate water in half clear state as control standard;Second-level settling pond 3 construct when it needs to be determined that three
Parameter: the upper absolute altitude of 3 bottom of pond absolute altitude of second-level settling pond, that is, concrete bottom plate;The interior long inner width in length and width dimensions, that is, pond;The precipitating set need to be stayed
Thickness;These three parameters can be determined according to the streamflow to come from level-one sedimentation 2 and daily vehicle rinsing water consumption;Level-one is heavy
The bottom of shallow lake well 2 and second-level settling pond 3 be disposed as it is arc-shaped, and in level-one sedimentation 2 inner ring 22, in second-level settling pond 3
33 bottom of well pond, inner wall 32 are wiped with cement mortar, there is the deposition using sludge in sewage, and are also subsequent sludge cleaning tape
Facilitate, so that the circulating effect of sewage is preferable;Thickness upper surface is precipitated according to Mud Property in level-one sedimentation 2, rises and calculates
The bottom absolute altitude in sedimentation gutter 25, preferably slightly below upper surface, because the cleaning precipitating that need to uncap is dirty when reaching deposit depth 24
Mud, by 3% or so slope aspect second-level settling pond 3 of the gradient.
Four, second-level settling pond 3 installs pressure pump 5 after the completion of constructing;
Five, penstocks are docked with spray pipe network;
Six, the installation of distribution system threading, debugging are checked and accepted and are used.
Platform 1, level-one sedimentation 2 and 3 bottom of second-level settling pond are being rinsed in the appropriate to the occasion fillet or tiltedly of being arranged to of constructing structure
Chamfering, can easy cleaning go out settled sludge, rinse platform 1 and can raise draining comb column at one week or so and observe situation in pond, clear up
The precipitating mudstone that part does not flow away;Level-one sedimentation 2 opens well lid 21 and observes sedimentation gutter 25 and sedimentary clay face
Situation such as has been approached out 25 bottom absolute altitude of sedimentation gutter, should clear up in time;Second-level settling pond 3 opens cover board 31 and observes bottom
Whether fillet part all floods lid, such as has been approached, it should which cleaning in time, conventional tool manual cleaning, such as discovery rinse pressure
Power obviously weakens, and can also open inspection in advance, clears up in time.
Vehicle rinsing use process: control cable is when hardening site road, while service sleeve, when installing force (forcing) pump 5
It threads, debug again;Force (forcing) pump 5 is responsible for unlatching by entrance guard, and ensuring to rinse region before unlatching cannot have personnel to walk up and down, and rinses flat
Vehicle advanced positions are guided with yellow guide wire before platform 1, yellow line, which is drawn in, rinses on 1 vehicle in front walking position 15 of platform, and marks
" vehicle cleaning " four words are infused, to positive double-edged fine-toothed comb midline position, tire is avoided accidentally to damage spray pipe network by pressure, guarantees spraying effect.This reality
Apply the truck washing step in example are as follows: vehicle enters setting land regions → unlatching 5 → multi-angle of force (forcing) pump and rinses vehicle → dirt
Water collects and draining → level-one precipitating, and → two-stage precipitation (in due course moisturizing) → recycles.
Embodiment 5
Substantially with embodiment 1, the present embodiment further includes pressurized reservoir 51, and pressurized reservoir 51 is arranged in second-level settling pond 3, pressurization
Pump 5 is arranged in pressurized reservoir 51, and 51 bottom of pressurized reservoir is provided with water supplement port 9, preferably in the big eye steel wire of 5 surrounding of force (forcing) pump
Enclosing forms pressurized reservoir 51, and the setting of pressurized reservoir 51 further increases the cleannes of water, also guarantees the reliability service of force (forcing) pump 5;
51 bottom of pressurized reservoir is provided with water supplement port 9, according to spray situation, if waterpower is inadequate, can access water supplement port 9 by water supply pipe,
Moisturizing is directly entered pressurized reservoir 51;Also depth of water situation in observable pressurized reservoir 51, decides whether moisturizing, in entire flushing process not
It is the case where will appear vehicle anhydrous flushing, easily operated;Pressurized reservoir 51 is covered with reinforcing bar double-edged fine-toothed comb, prevents factory personnel due to not small
The heart crashes into pressurized reservoir 51, and personnel is also facilitated to observe the situation in pressurized reservoir 51.
Scouring table in the utility model is the vehicle dirt mud punching for having homemade energy-saving and environmental protection, recycling water resource
Cleaning device by the water after flushing after precipitation process twice, then is delivered water by force (forcing) pump 5 using organized draining
Spray pipe network carries out circulation flushing, and the water after vehicle rinsing flows into 2 primary deposition of level-one sedimentation by gutter 10, then
It flows into second-level settling pond 3 to precipitate again, the water after precipitation process twice has reached cleaning vehicle needs, then by force (forcing) pump 5
It is pressurized to spray pipe network, carries out car body flushing.When the water shortage in second-level settling pond 3, moisturizing can be accessed by water supply pipe
Mouth 9 is fed, and can significantly reduce the waste of water resource in this way, to achieve the purpose that water conservation.
Example described in the utility model is only that preferred embodiments of the present invention are described, not to this reality
It is defined with novel conception and scope, under the premise of not departing from the design concept of the utility model, this field engineering technology people
The various changes and improvements that member makes the technical solution of the utility model, should all fall into the protection scope of the utility model.
Claims (10)
1. a kind of scouring table, including rinse platform (1), rinse platform (1) by rinse the gutter (10) of platform (1) bottom with
Level-one sedimentation (2) connection, level-one sedimentation (2) are connected to by sedimentation gutter (25) with second-level settling pond (3), feature
It is: rinses on platform (1) and several row's square tubes (16) are set, eyelet (19) is set on square tube (16) outer wall, several row's square tubes
(16) it is assembled into spray pipe network, further includes force (forcing) pump (5), force (forcing) pump (5) is arranged in second-level settling pond (3), and force (forcing) pump (5) is logical
Pump line is overpressurized to connect with spray pipe network.
2. a kind of scouring table according to claim 1, it is characterised in that: rinsing platform (1) further includes bottom plate (18), bottom plate
(18) it is provided with cross beam (13) and pond body parapet (17) on, draining is respectively arranged in the well word mouth of each cross beam (13) and is combed
Column I (11) and draining comb column II (12).
3. a kind of scouring table according to claim 2, it is characterised in that: flushing platform (1) bottom concrete face setting
There are slope of catchmenting (14), gutter (10) is set in the end of the gradient direction of slope of catchmenting (14), gutter (10) run through cross beam
(13), tongue and groove (8) are provided on the Jing Zikou of cross beam (13).
4. a kind of scouring table according to claim 1, it is characterised in that: the level-one sedimentation (2) includes the borehole wall (23),
It is provided with inner ring (22), is provided with well lid (21) above the borehole wall (23), inner ring is provided with sedimentation in (22) on the inside of the borehole wall (23)
Gutter (25), sedimentation gutter (25) are connected to second-level settling pond (3), and inner ring (22) a side and gutter (10) are even
It is logical.
5. a kind of scouring table according to claim 4, it is characterised in that: the bottom in the borehole wall (23) and inner ring (22)
It is arc-shaped, and is round-corner transition at bottom corners, inner ring (22) is wiped with cement mortar.
6. a kind of scouring table according to claim 1, it is characterised in that: the second-level settling pond (3) includes (33) Jing Chi,
It is provided with inner wall (32) on the inside of Jing Chi (33), is provided with cover board (31) above Jing Chi (33).
7. a kind of scouring table according to claim 6, it is characterised in that: inner wall (32) bottom is fillet or chamfering mistake
It crosses, is wiped with cement mortar in Jing Chi (33) bottom, inner wall (32).
8. a kind of scouring table according to claim 7, it is characterised in that: be provided with partition wall in the second-level settling pond (3)
(4), several columns are equidistantly provided on partition wall (4).
9. a kind of scouring table according to claim 1, it is characterised in that: further include pressurized reservoir (51), pressurized reservoir (51) is set
It sets in second-level settling pond (3), force (forcing) pump (5) is arranged in pressurized reservoir (51).
10. a kind of scouring table according to claim 9, it is characterised in that: pressurized reservoir (51) bottom is provided with water supplement port
(9)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821758682.2U CN208931313U (en) | 2018-10-29 | 2018-10-29 | A kind of scouring table |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821758682.2U CN208931313U (en) | 2018-10-29 | 2018-10-29 | A kind of scouring table |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208931313U true CN208931313U (en) | 2019-06-04 |
Family
ID=66726299
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821758682.2U Active CN208931313U (en) | 2018-10-29 | 2018-10-29 | A kind of scouring table |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208931313U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109263611A (en) * | 2018-10-29 | 2019-01-25 | 马鞍山钢铁建设集团有限公司 | A kind of scouring table and construction method |
-
2018
- 2018-10-29 CN CN201821758682.2U patent/CN208931313U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109263611A (en) * | 2018-10-29 | 2019-01-25 | 马鞍山钢铁建设集团有限公司 | A kind of scouring table and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104260699B (en) | A kind of section construction building site vehicle wash facility | |
CN202516413U (en) | Circulating water system for engineering vehicle cleaning tank | |
CN103395407B (en) | Automatic cleaning system of construction site muck vehicle and application method thereof | |
CN204689755U (en) | The comprehensive treating pond of construction site Water Sproading cyclic utilization system and construction site Water Sproading cyclic utilization system | |
CN109263611A (en) | A kind of scouring table and construction method | |
CN208931313U (en) | A kind of scouring table | |
CN205440296U (en) | Simple and easy automatic vehicle washing system | |
CN203427765U (en) | Slag car automatic cleaning system at construction site | |
CN112813987B (en) | Assembled foundation ditch driving trestle and car washing platform integrated system | |
CN113387414A (en) | Building site machineshop car self-cleaning spray set | |
CN204210428U (en) | A kind of section construction building site vehicle wash facility | |
CN216800250U (en) | Wall body spraying equipment that in-process used is built in green construction room | |
CN206815504U (en) | A kind of self-cleaning storm detention tank based on water-jet | |
CN214871484U (en) | Maintenance device for T-beam precast yard | |
CN205769209U (en) | Circulating water wash recessing | |
CN214607441U (en) | Novel building site machineshop car self-cleaning sprays device | |
CN213773399U (en) | Water and soil conservation ecological slope protection capable of preventing water and soil loss | |
CN205311561U (en) | Intelligence engineering car washer | |
CN214353192U (en) | Prefabricated T roof beam intelligence sprays maintenance system | |
CN210062931U (en) | Automatic electromagnetic valve flushing device for rolling concrete transport vehicle | |
CN111717170B (en) | Water-saving carwash pond system of circulated use | |
CN210971004U (en) | Muck vehicle washing device suitable for large-scale earth and stone engineering | |
CN207416790U (en) | A kind of automatic car washing system suitable for construction site | |
CN218558806U (en) | Transport vehicle flushing system | |
CN202157406U (en) | Washing table of engineering truck for job site |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |