CN105931029B - A kind of beam field production management system based on BIM - Google Patents

A kind of beam field production management system based on BIM Download PDF

Info

Publication number
CN105931029B
CN105931029B CN201610325674.8A CN201610325674A CN105931029B CN 105931029 B CN105931029 B CN 105931029B CN 201610325674 A CN201610325674 A CN 201610325674A CN 105931029 B CN105931029 B CN 105931029B
Authority
CN
China
Prior art keywords
production
module
management
workbench
production management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610325674.8A
Other languages
Chinese (zh)
Other versions
CN105931029A (en
Inventor
张晓俊
靳华中
高波
钱叶存
毛春光
张弓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei University of Technology
First Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
Hubei University of Technology
First Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei University of Technology, First Construction Co Ltd of China Construction Third Engineering Division filed Critical Hubei University of Technology
Priority to CN201610325674.8A priority Critical patent/CN105931029B/en
Publication of CN105931029A publication Critical patent/CN105931029A/en
Application granted granted Critical
Publication of CN105931029B publication Critical patent/CN105931029B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The beam field production management system based on BIM that the invention discloses a kind of, including:Plan generation module, for the dynamic generation beam production schedule;Production management module, for according to the beam production schedule processed to the actual production management process of box beam into line trace and monitoring, electronical record and flow tracking are carried out to the process that each process is completed, it is ensured that each step of flow is tracked;Data management module;Query analysis module, for by comparing and analyzing inquiry, the progress situation of tracking system beam to engineering current schedules and beam production schedule progress processed;Plan rescheduling module, the analysis comparing result for being obtained according to weather condition and query analysis module carry out dynamic regulation to the beam production schedule processed;System management module, for carrying out system data maintenance and system setting management.

Description

A kind of beam field production management system based on BIM
Technical field
The present invention relates to industrial information technology more particularly to a kind of beam field production management systems based on BIM.
Background technology
In existing Liang Chang productions, production schedule scheduled production, field surveillance beam process are carried out according to artificial, and pass through papery The procedural informations such as paper trail quality, progress, insufficient, field engineering personnel monitor procedure that there is artificial production planning and sequencing reasonability It can not recall, the problem of quality of production statistical difficulty, and in the supervision of whole duration progress, lack unified effective supervision Platform, understanding of the leader to production management situation need a large amount of materials for support, and intuitive and convenience are insufficient.
Invention content
The technical problem to be solved in the present invention is to provide a kind of Liang Chang based on BIM for the defects in the prior art Production management system, the system can effectively facilitate the promotion of beam field production efficiency.
The technical solution adopted by the present invention to solve the technical problems is:A kind of beam field production management system based on BIM, Including:
Plan generation module, for the production according to existing manufacturing schedule situation, the service condition of workbench, assembly line Ability, single beam residence time threshold value on the table and the right width of left width originate beam number information, carry out dynamic generation beam The production schedule;
Production management module, for according to the beam production schedule processed to the actual production management process of box beam into line trace and prison Control carries out electronical record and flow tracking, it is ensured that each step of flow is tracked to the process that each process is completed;
Data management module, including:
Qualitative data administrative unit is beaten for recording user according to the evaluation that condition about practice examining carries out the quality of beam Point, the foundation as performance rating;
Technical Data Management unit, for storing and inquiring technology person confide a technological secret the archive of document;
Material data administrative unit, design quantity and actual amount for storing and inquiring production materials;
Device data management unit, for storing and query facility maintenance record, gantry crane safety inspection record and equipment Account;
Query analysis module, for being looked by being compared and analyzed to engineering current schedules and beam production schedule progress processed It askes, the progress situation of tracking system beam;
Plan rescheduling module, the analysis comparing result for being obtained according to weather condition and query analysis module, to beam processed The production schedule carries out dynamic regulation;
System management module, for carrying out system data maintenance and system setting management.
By said program, the query analysis module is additionally operable to monitor and analyze box beam state, work mesa-shaped in beam field State and deposit beam-like state.
By said program, the production energy according to existing manufacturing schedule situation, the service condition of workbench, assembly line Residence time threshold value, the right width starting beam number information of left width of power, single beam on the table, carry out dynamic comprehensive and generate beam life processed Production plan is as follows:
1)The case where according to internal model external mold, forms preliminary production meter to determine the sequence of preliminary production time of precast beam It draws;
T(N,0)=min{innerTimei+T(N-|i|,outerTimei}
Wherein N is the operation that all precast beams are formed, innerTimeiRefer to the internal model process time of i-th beam, outerTimeiRefer to the external mold process time of i-th beam, T be it is total take, time-consuming be minimised as object function with total It can obtain the sequence of an operation i;
2)The life of operation i is corrected according to the residence time threshold value of the idle condition of workbench, single beam on the table Programmed sequence is produced, the production specific time of beam is generated, while being every beam setting pair according to the right width starting beam number information of left width The workbench answered.
By said program, the production management module includes:
Workbench production management submodule, the production status for monitoring each workbench;
Manufacturing schedule tracks submodule, the specific condition of production for monitoring emphasis fine strain of millet, and each process has to by obtaining Live completion confirmation and scene photograph record are obtained, next process can be entered;
Case fine strain of millet production management submodule corresponds to the condition of production of beam for monitoring the engineering as unit of engineering;
Fine strain of millet real-time management submodule is deposited, the real-time storage situation for recording fine strain of millet.
The beneficial effect comprise that:The present invention to the dynamic adjustment of the production schedule by effectively increasing Liang Chang's Whole production efficiency.
The production production planning and sequencing that present system generates is more reasonable, fully takes into account beam processed and the process set a roof beam in place and existing The workbench of assembly line lays situation.The supervision of production process is more acurrate, and each process of every beam has to pass through mobile phone terminal Scene confirm and take pictures, next process can be entered, foundation is provided for quality assurance.The visualization of BIM components and Schedule status inquiry is analyzed so that the manufacturing schedule situation in entire precast beam field is very clear.
Description of the drawings
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is the structural schematic diagram of the embodiment of the present invention;
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, is not used to limit The fixed present invention.
As shown in Figure 1, a kind of beam field production management system based on BIM, including:
Plan generation module, for the production according to existing manufacturing schedule situation, the service condition of workbench, assembly line Ability, single beam residence time threshold value on the table and the right width of left width originate beam number information, carry out dynamic generation beam The production schedule;
It is as follows:
1)The case where according to internal model external mold, forms preliminary production meter to determine the sequence of preliminary production time of precast beam It draws;
T(N,0)=min{innerTimei+T(N-|i|,outerTimei}
Wherein N is the operation that all precast beams are formed, innerTimeiRefer to the internal model process time of i-th beam, outerTimeiRefer to the external mold process time of i-th beam, T be it is total take, time-consuming be minimised as object function with total It can obtain the sequence of an operation i;
2)The life of operation i is corrected according to the residence time threshold value of the idle condition of workbench, single beam on the table Programmed sequence is produced, the production specific time of beam is generated, while being every beam setting pair according to the right width starting beam number information of left width The workbench answered.
Production management module, for according to the beam production schedule processed to the actual production management process of box beam into line trace and prison Control carries out electronical record and flow tracking, it is ensured that each step of flow is tracked to the process that each process is completed;
Production management module includes:
Workbench production management submodule, the production status for monitoring each workbench;
Manufacturing schedule tracks submodule, the specific condition of production for monitoring emphasis fine strain of millet, and each process has to by obtaining Live completion confirmation and scene photograph record are obtained, next process can be entered;
Case fine strain of millet production management submodule corresponds to the condition of production of beam for monitoring the engineering as unit of engineering;
Fine strain of millet real-time management submodule is deposited, the real-time storage situation for recording fine strain of millet.
Data management module, including:
Qualitative data administrative unit is beaten for recording user according to the evaluation that condition about practice examining carries out the quality of beam Point, the foundation as performance rating;
Technical Data Management unit, for storing and inquiring technology person confide a technological secret the archive of document;
Material data administrative unit, design quantity and actual amount for storing and inquiring production materials;
Device data management unit, for storing and query facility maintenance record, gantry crane safety inspection record and equipment Account;
Query analysis module, for being looked by being compared and analyzed to engineering current schedules and beam production schedule progress processed It askes, the progress situation of tracking system beam;
Query analysis module is additionally operable to monitor and analyze box beam state in beam field, workbench state and deposits beam-like state.
Plan rescheduling module, the analysis comparing result for being obtained according to weather condition and query analysis module, to beam processed The production schedule carries out dynamic regulation;
System management module, for carrying out system data maintenance and system setting management.
It should be understood that for those of ordinary skills, it can be modified or changed according to the above description, And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.

Claims (3)

1. a kind of beam field production management system based on BIM, which is characterized in that including:
Plan generation module, for the production energy according to existing manufacturing schedule situation, the service condition of workbench, assembly line Power, single beam residence time threshold value on the table and the right width of left width originate beam number information, carry out the life of dynamic generation beam Production plan;It is as follows:
1)The case where according to internal model external mold, forms the preliminary production schedule to determine the sequence of preliminary production time of precast beam;
T(N,0)=min{innerTimei+T(N-|i|,outerTimei}
Wherein N is the operation that all precast beams are formed, innerTimeiRefer to the internal model process time of i-th beam, outerTimeiRefer to the external mold process time of i-th beam, T be it is total take, time-consuming be minimised as object function with total It can obtain the sequence of an operation i;
2)The production meter of operation i is corrected according to the residence time threshold value of the idle condition of workbench, single beam on the table Sequence is drawn, the production specific time of beam is generated, while being that every beam setting is corresponding according to the right width starting beam number information of left width Workbench;
Production management module, for according to the beam production schedule processed to the actual production management process of box beam into line trace and monitoring, Electronical record and flow tracking are carried out to the process that each process is completed, it is ensured that each step of flow is tracked;
Data management module, including:
Qualitative data administrative unit is given a mark according to the evaluation that condition about practice examining carries out the quality of beam for recording user, is made For the foundation of performance rating;
Technical Data Management unit, for storing and inquiring technology person confide a technological secret the archive of document;
Material data administrative unit, design quantity and actual amount for storing and inquiring production materials;
Device data management unit, for storing and query facility maintenance record, gantry crane safety inspection record and equipment account;
Query analysis module, for by comparing and analyzing inquiry to engineering current schedules and beam production schedule progress processed, with The progress situation of track beam;
Plan rescheduling module, the analysis comparing result for being obtained according to weather condition and query analysis module, produces beam processed Plan carries out dynamic regulation;
System management module, for carrying out system data maintenance and system setting management.
2. beam field according to claim 1 production management system, which is characterized in that the query analysis module is additionally operable to supervise It controls and analyzes the box beam state in beam field, workbench state and deposit beam-like state.
3. beam field according to claim 1 production management system, which is characterized in that the production management module includes:
Workbench production management submodule, the production status for monitoring each workbench;
Manufacturing schedule tracks submodule, the specific condition of production for monitoring emphasis fine strain of millet, and each process has to by being showed Field completes to confirm and scene photograph records, and can enter next process;
Case fine strain of millet production management submodule corresponds to the condition of production of beam for monitoring the engineering as unit of engineering;
Fine strain of millet real-time management submodule is deposited, the real-time storage situation for recording fine strain of millet.
CN201610325674.8A 2016-05-17 2016-05-17 A kind of beam field production management system based on BIM Active CN105931029B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610325674.8A CN105931029B (en) 2016-05-17 2016-05-17 A kind of beam field production management system based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610325674.8A CN105931029B (en) 2016-05-17 2016-05-17 A kind of beam field production management system based on BIM

Publications (2)

Publication Number Publication Date
CN105931029A CN105931029A (en) 2016-09-07
CN105931029B true CN105931029B (en) 2018-08-03

Family

ID=56840761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610325674.8A Active CN105931029B (en) 2016-05-17 2016-05-17 A kind of beam field production management system based on BIM

Country Status (1)

Country Link
CN (1) CN105931029B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106503896A (en) * 2016-10-21 2017-03-15 中国化学工程第六建设有限公司 Construction equipment management method based on BIM technology
CN107728588A (en) * 2017-08-25 2018-02-23 姜肇祺 A kind of intelligence manufacture and quality detecting system and method
CN109523182A (en) * 2018-11-27 2019-03-26 华规软件(上海)有限公司 A kind of beam field production management method, platform, computer equipment and storage medium
CN110070284A (en) * 2019-04-17 2019-07-30 江苏开通建设工程有限公司 A kind of wisdom beam course management system based on BIM technology
CN111860202A (en) * 2020-06-28 2020-10-30 中铁大桥科学研究院有限公司 Beam yard pedestal state identification method and system combining image identification and intelligent equipment
CN112132423B (en) * 2020-09-04 2023-12-29 中铁大桥局集团有限公司 Production management method and system for track movable beam making pedestal
CN112883580A (en) * 2021-03-09 2021-06-01 中国三峡建设管理有限公司 Dam pouring plan dynamic adjustment method based on BIM
CN113793000A (en) * 2021-08-31 2021-12-14 广东瀚阳轨道信息科技有限公司 Beam field information processing system, beam field information processing method, computer device, and storage medium
CN114997698A (en) * 2022-06-21 2022-09-02 保利长大工程有限公司 Multifunctional intelligent beam yard manufacturing management system
CN115129958B (en) * 2022-08-17 2023-04-14 北京市政路桥股份有限公司 BIM technology-based visual production scheduling method for precast beam
CN116011739A (en) * 2022-12-15 2023-04-25 北京市政路桥股份有限公司 Highway bridge precast beam information management system based on BIM

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104091215A (en) * 2014-07-22 2014-10-08 上海建科工程咨询有限公司 Project planning management system based on building information model
CN105023201A (en) * 2015-07-24 2015-11-04 中建三局第一建设工程有限责任公司 Assembled building detailed design and construction method based on BIM (Building Information Modeling) and large data

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105303308A (en) * 2015-10-22 2016-02-03 张玉英 Management system and method for whole steel bar engineering process based on 3D figure information platform

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104091215A (en) * 2014-07-22 2014-10-08 上海建科工程咨询有限公司 Project planning management system based on building information model
CN105023201A (en) * 2015-07-24 2015-11-04 中建三局第一建设工程有限责任公司 Assembled building detailed design and construction method based on BIM (Building Information Modeling) and large data

Also Published As

Publication number Publication date
CN105931029A (en) 2016-09-07

Similar Documents

Publication Publication Date Title
CN105931029B (en) A kind of beam field production management system based on BIM
CN110322147A (en) A kind of Project Supervision approaches to IM and system
CN113450065B (en) Production operation management system and method for wind power plant
CN103440531A (en) Wind power plant short-term wind power prediction system in view of operating state of wind power plant draught fan
CN103729735A (en) Engineering progress condition management method based on BS frame
CN108873056A (en) Seismic prospecting scene real-time quality monitoring method, client, apparatus and system
CN107153903A (en) A kind of rural power grids circuit high-low pressure equipment operation management system
CN108767851A (en) A kind of substation's O&M intelligent operation command methods and system
CN104218679B (en) A kind of transformer station's remote auto method for inspecting based on remote viewing system
CN106384303A (en) Distribution room operation and maintenance management system and method
CN110852624A (en) Intelligent manufacturing management system facing enterprise execution layer and operation method thereof
CN105388876A (en) Method and device for obtaining team-based intermittent-type chemical production process conformity
CN106849064B (en) Regional power grid load prediction management system based on meteorological data
CN115809785A (en) Wisdom building site management system
CN108313658A (en) The methods, devices and systems of belt feeder speed governing
CN105469324A (en) Data acquisition and entering and operation and maintenance management system and data entering method of power distribution network
CN112418548B (en) Intelligent workshop management method and system based on artificial intelligence technology
CN112505604B (en) Measurement standard field evaluation process monitoring system
CN114298645A (en) Building decoration project building control system and method
CN110852638A (en) Construction project progress and cost management system
CN117151961B (en) 5G communication-based law enforcement record digital analysis management system and method
CN116579769B (en) Production control method of refrigeration equipment
CN106600122A (en) Nuclear power station device intelligent monitoring method, apparatus and system
CN117313985A (en) Engineering operation site visa real-time management method and system
CN117254591A (en) Intelligent inspection system applied to rectification substation in electrolytic aluminum industry

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant