CN105927152A - Pile body and pile cap integrated construction device for long spiral bored pile - Google Patents

Pile body and pile cap integrated construction device for long spiral bored pile Download PDF

Info

Publication number
CN105927152A
CN105927152A CN201610406129.1A CN201610406129A CN105927152A CN 105927152 A CN105927152 A CN 105927152A CN 201610406129 A CN201610406129 A CN 201610406129A CN 105927152 A CN105927152 A CN 105927152A
Authority
CN
China
Prior art keywords
pile
drilling rod
rod blade
construction device
drill rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610406129.1A
Other languages
Chinese (zh)
Inventor
徐其新
徐涵
杨姣
孙鸿林
梁龙标
沈宇浈
江涛
明刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Chang Xin Foundation Works Co Ltd
Original Assignee
Jiangsu Chang Xin Foundation Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Chang Xin Foundation Works Co Ltd filed Critical Jiangsu Chang Xin Foundation Works Co Ltd
Priority to CN201610406129.1A priority Critical patent/CN105927152A/en
Publication of CN105927152A publication Critical patent/CN105927152A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/22Rods or pipes with helical structure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00Rotary drilling
    • E21B3/02Surface drives for rotary drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention belongs to the technical field of building construction foundation drilling tool application, and particularly discloses a pile body and pile cap integrated construction device for a long spiral bored pile. The device comprises a self-propelled vehicle, an electric distribution operation room, a three-door head pulley, a main winch, a support, a machine frame supporting rod, a horizontal head sliding part, a power transmission box, a drill rod, a drill rod blade, a sleeving drill rod blade and an alloy bit, wherein the electric distribution operation room, the three-door head pulley, the main winch, the support and the machine frame supporting rod are arranged on the self-propelled vehicle; the horizontal head sliding part is arranged on the support, the power transmission box is connected with the horizontal head sliding part, and the drill rod is connected with the power transmission box; and the drill rod blade is arranged on the drill rod, the sleeving drill rod blade is arranged at the end of the drill rod blade, and the alloy bit is arranged at the end of the drill rod. The pile body and pile cap integrated construction device solves the problems that an existing long spiral drilling machine is low in efficiency and unstable in whole structure, and prestress cannot meet the production and construction requirement; the device is reasonable in design, meets the standard construction requirement and capable of quickly enabling pile body concrete and pile cap concrete to be integrally formed with high quality, raw materials are saved, and production cost is lowered (the pile body and pile cap integrated construction device has been practically applied to construction of the Shen-Mao railway).

Description

A kind of long screw auger drilling deposited pile pile jacking cap integrative construction device
Technical field
The invention belongs to construction basis drilling tool applied technical field, be specifically related to a kind of long screw auger drilling deposited pile pile jacking cap integrative construction device, quick, high-quality can make pile body, pile cover concrete energy integrated molding.
Background technology
Long-spiral drilling machine, it includes hydraulic moving mechanism pile frame and drilling system two parts.Pile frame uses hydraulic walking chassis, and automaticity is high, can walk voluntarily and 360 degree of revolutions, is provided with four hydraulic legs and a walking oil cylinder increases complete machine stability during construction with auxiliary walking and revolution simultaneously, can be transported through by complete machine.Column is folding box column, flange connection, and column uses two pieces high thickness masks and uses large-sized bender brake techniques, is welded with four reinforcements every 60cm and fixes through twice weld seam is welded while inside column, increases column torsion resistant and bending resistant.Column is controlled its landing by two luffing hydraulic jacks.Drilling system includes unit head and drilling tool, and the output shaft of unit head and spiral drill are hollow type, and stake machine uses long spire pore-forming, by drilling rod central canal, concrete or mud can be carried out pump concrete CFG pile driving construction.
Existing structure design long-spiral drilling machine, although it can complete the pile body of conventional need, pile cover concrete formation production and construction requirement, but can not realize pile body, the production and construction of pile cover concrete integrated molding requires that the most current production and construction is for separately completing that time-consuming efficiency is low and integrally-built stability and prestressing force do not reach production and construction requirement, in the most existing construction operation, mixed earthy raw materials consumes bigger, add production cost, and this is current urgently to be resolved hurrily.
Therefore, based on the problems referred to above, the present invention provides a kind of long screw auger drilling deposited pile pile jacking cap integrative construction device.
Summary of the invention
Goal of the invention: it is an object of the invention to provide a kind of long screw auger drilling deposited pile pile jacking cap integrative construction device, solve the problem that existing long screw auger engine efficiency is low and overall structure unstable and prestressing force does not reaches production and construction requirement, it is reasonable in design, meet construction reference requirement, quick, high-quality can make pile body, pile cover concrete energy integrated molding, save raw material, reduced production cost.
Technical scheme: the present invention provides a kind of long screw auger drilling deposited pile pile jacking cap integrative construction device, including automatic walking car, and it is arranged on the electric distribution operating room on automatic walking car, three head pulleys, and be arranged on automatic walking car and be positioned at electric distribution operating room, main turning hoisting machine between three head pulleys, and be arranged on automatic walking car and be positioned at the support outside three head pulleys, and two ends connect the frame support bar of support respectively, and the sleeping head saddle being arranged on support, and the power transmission casing being connected with sleeping head saddle, and the drilling rod being connected with power transmission casing, and the drilling rod blade being arranged on drilling rod, and it is arranged on the overcoat drilling rod blade of drilling rod blade tip, and it is arranged on the alloy bit of drill rod end.
The technical program, described support is barrel-type supporting structure.
The technical program, described power transmission casing is double-motor power transmission case body.
The technical program, described drilling rod blade, overcoat drilling rod blade are respectively helical structure.
The technical program, the diameter of described drilling rod blade is less than overcoat drilling rod blade.
The technical program, the power of described power transmission casing is 55KW.
The technical program, described drilling rod blade, the diameter of overcoat drilling rod blade are respectively 500mm, 1000mm.
Compared with prior art, having the beneficial effects that of the present invention a kind of long screw auger drilling deposited pile pile jacking cap integrative construction device: 1, overall construction design is reasonable, controls construction operation safety and construction quality is stable;2, solve that existing long screw auger engine efficiency is low and problem that overall structure unstability and prestressing force do not reach production and construction requirement, it is reasonable in design, meet construction reference requirement, quick, high-quality can make pile body, pile cover concrete energy integrated molding, save raw material, reduced production cost (this integrated apparatus is practical in the construction of deep cyclopentadienyl railway).
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of long screw auger drilling deposited pile pile jacking cap integrative construction device of the present invention;
Fig. 2 is the drilling rod blade of a kind of long screw auger drilling deposited pile pile jacking cap integrative construction device of the present invention, overcoat drilling rod blade partial enlargement structural representation;
Fig. 3 is the construction process flow diagram of a kind of long screw auger drilling deposited pile pile jacking cap integrative construction device of the present invention;
Wherein, in figure, sequence number mark is as follows: 1-automatic walking car, 2-electric distribution operating room, the main turning hoisting machine of 3-, tri-head pulleys of 4-, 5-support, 6-frame support bar, 7-crouch head saddle, 8-power transmission casing, 9-drilling rod, 10-drilling rod blade, 11-overcoat drilling rod blade, 12-alloy bit.
Detailed description of the invention
Below in conjunction with the accompanying drawings and specific embodiment, it is further elucidated with the present invention.
nullSuch as Fig. 1、A kind of long screw auger drilling deposited pile pile jacking cap integrative construction device shown in Fig. 2 and Fig. 3,Including automatic walking car 1,And it is arranged on the electric distribution operating room 2 on automatic walking car 1、Three head pulleys 4,And be arranged on automatic walking car 1 and be positioned at electric distribution operating room 2、Main turning hoisting machine 3 between three head pulleys 4,And be arranged on automatic walking car 1 and be positioned at the support 5 outside three head pulleys 4,And two ends connect the frame support bar 6 of support 5 respectively,And the sleeping head saddle 7 being arranged on support 5,And the power transmission casing 8 being connected with sleeping head saddle 7,And the drilling rod 9 being connected with power transmission casing 8,And the drilling rod blade 10 being arranged on drilling rod 9,And it is arranged on the overcoat drilling rod blade 11 of drilling rod blade 10 end,And it is arranged on the alloy bit 12 of drilling rod 9 end.
It is further preferred that support 5 is barrel-type supporting structure, its location supports firm stable and is easily installed dismounting, safeguards;Power transmission casing 8 be the power of double-motor power transmission case body and power transmission casing 8 be 55KW, for drilling rod 9 being provided sufficient power support, it is ensured that the drilling rod 9 of multiple different-diameter size can be driven to carry out efficient construction operation;Drilling rod blade 10, overcoat drilling rod blade 11 are respectively helical structure, and drilling construction efficiency is high and is easy to safeguard;The diameter of drilling rod blade 10 is respectively 500mm, 1000mm less than the diameter of overcoat drilling rod blade 11 and drilling rod blade 10, overcoat drilling rod blade 11; wherein; during construction operation, overcoat drilling rod blade 11 protects the joint face of the two to be that helical structure connects for drilling rod blade 10 is formed support; can guarantee that drilling rod blade 10 does not tilts in construction operation; make boring meet construction requirement, and control stable, accurate along counter-rotating.
Embodiment
The most as shown in Figure 1, Figure 2 and Figure 3, when during drill-pouring construction, alloy bit 12 creeps into, enlarged footing drilling tool (not marking enlarged footing drilling tool in figure, be overcoat drilling rod blade 11 between enlarged footing drilling tool and drilling rod 9) is installed at drill bit position;(stake diameter can be with 80cm, can also 1m, depending on the helmet diameter of job site), enlarged footing drilling tool is 60cm the most deeply, after enlarged footing is partially into soil layer 60cm, drilling rod can be automatically disengaged, enlarged footing drilling tool rests on 60cm deep soil layer position, drilling rod is made to continue to creep into designing pile length position, promote and fill concrete, drilling rod is mentioned 60cm position, top, the upper enlarged footing drilling tool of band the most up carries, and make the 1m diameter of enlarged footing drilling tool fill concrete together so that it is reach pile body, pile cover concrete energy integrated molding.
The above is only the preferred embodiment of the present invention, it is noted that for those skilled in the art, under the premise without departing from the principles of the invention, it is also possible to make some improvement, and these improvement also should be regarded as protection scope of the present invention.

Claims (7)

1. a long screw auger drilling deposited pile pile jacking cap integrative construction device, it is characterised in that: include automatic walking car
null(1),And it is arranged on the electric distribution operating room (2) on automatic walking car (1)、Three head pulleys (4),And be arranged on automatic walking car (1) and be positioned at electric distribution operating room (2)、Main turning hoisting machine (3) between three head pulleys (4),And be arranged on automatic walking car (1) and be positioned at the support (5) in three head pulley (4) outsides,And two ends connect the frame support bar (6) of support (5) respectively,And the sleeping head saddle (7) being arranged on support (5),And the power transmission casing (8) being connected with sleeping head saddle (7),And the drilling rod (9) being connected with power transmission casing (8),And the drilling rod blade (10) being arranged on drilling rod (9),And it is arranged on overcoat drilling rod blade (11) of drilling rod blade (10) end,And it is arranged on the alloy bit (12) of drilling rod (9) end.
A kind of long screw auger drilling deposited pile pile jacking cap integrative construction device the most according to claim 1, it is characterised in that: described support (5) is barrel-type supporting structure.
A kind of long screw auger drilling deposited pile pile jacking cap integrative construction device the most according to claim 1, it is characterised in that: described power transmission casing (8) is double-motor power transmission case body.
A kind of long screw auger drilling deposited pile pile jacking cap integrative construction device the most according to claim 1, it is characterised in that: described drilling rod blade (10), overcoat drilling rod blade (11) are respectively helical structure.
5. according to a kind of long screw auger drilling deposited pile pile jacking cap integrative construction device described in claim 1 or 4, it is characterised in that: the diameter of described drilling rod blade (10) is less than overcoat drilling rod blade (11).
6. according to a kind of long screw auger drilling deposited pile pile jacking cap integrative construction device described in claim 1 or 3, it is characterised in that: the power of described power transmission casing (8) is 55KW.
A kind of long screw auger drilling deposited pile pile jacking cap integrative construction device the most according to claim 5, it is characterised in that: described drilling rod blade (10), the diameter of overcoat drilling rod blade (11) are respectively 500mm, 1000mm.
CN201610406129.1A 2016-06-12 2016-06-12 Pile body and pile cap integrated construction device for long spiral bored pile Pending CN105927152A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610406129.1A CN105927152A (en) 2016-06-12 2016-06-12 Pile body and pile cap integrated construction device for long spiral bored pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610406129.1A CN105927152A (en) 2016-06-12 2016-06-12 Pile body and pile cap integrated construction device for long spiral bored pile

Publications (1)

Publication Number Publication Date
CN105927152A true CN105927152A (en) 2016-09-07

Family

ID=56833587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610406129.1A Pending CN105927152A (en) 2016-06-12 2016-06-12 Pile body and pile cap integrated construction device for long spiral bored pile

Country Status (1)

Country Link
CN (1) CN105927152A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344399A (en) * 2019-05-15 2019-10-18 武汉谦诚桩工科技股份有限公司 A kind of method and its Counterboring apparatus of pile body and the disposable pile of pile cover

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1458383A (en) * 2003-06-18 2003-11-26 钱奂云 Multifunctional drill machine and its construction method
JP2005336702A (en) * 2004-02-27 2005-12-08 Hiromi Kuwahata Ground excavator
CN201851002U (en) * 2010-11-20 2011-06-01 威海市海泰起重机械有限公司 PLC (Programmable Logic Controller) controlled frequency conversion pile driver
CN202117556U (en) * 2011-03-01 2012-01-18 何庆林 Auger driller for moulding concrete piles with different depth and shapes
CN105401893A (en) * 2014-09-12 2016-03-16 王永龙 Pressure-relief and hole-protection drill pipe for soft coal and rock drilling
CN206053840U (en) * 2016-06-12 2017-03-29 江苏昌鑫基础工程有限公司 A kind of long screw auger drilling deposited pile pile jacking cap integrative construction device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1458383A (en) * 2003-06-18 2003-11-26 钱奂云 Multifunctional drill machine and its construction method
JP2005336702A (en) * 2004-02-27 2005-12-08 Hiromi Kuwahata Ground excavator
CN201851002U (en) * 2010-11-20 2011-06-01 威海市海泰起重机械有限公司 PLC (Programmable Logic Controller) controlled frequency conversion pile driver
CN202117556U (en) * 2011-03-01 2012-01-18 何庆林 Auger driller for moulding concrete piles with different depth and shapes
CN105401893A (en) * 2014-09-12 2016-03-16 王永龙 Pressure-relief and hole-protection drill pipe for soft coal and rock drilling
CN206053840U (en) * 2016-06-12 2017-03-29 江苏昌鑫基础工程有限公司 A kind of long screw auger drilling deposited pile pile jacking cap integrative construction device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344399A (en) * 2019-05-15 2019-10-18 武汉谦诚桩工科技股份有限公司 A kind of method and its Counterboring apparatus of pile body and the disposable pile of pile cover

Similar Documents

Publication Publication Date Title
CN102002941B (en) Large-aperture long screw rig, reinforcement cage concreting device and fabricating method of large-aperture deep pile
CN102628336B (en) Construction method of batter pile construction drilling machine
CN109083591B (en) Drilling bored concrete pile body and pile cap integrated drilling pore-forming method
CN105927154A (en) Spiral drilling and pouring device applied to pile top and pile cap integrated construction
CN105862733A (en) Novel long spiral drilling hole cast-in-situ pile top and cap integrated construction device
CN105862732A (en) PLC-controlled (programmable logic controller controlled) integrated construction apparatus for long-spiral cast-in-place bored pile top cap
CN206090539U (en) Long spiral drilling filling pile pile jacking cap integrated construction device of PLC control
CN105927152A (en) Pile body and pile cap integrated construction device for long spiral bored pile
CN105888576A (en) Drilling assembly for integrated construction of long spiral bored perfusion pile top and cap
CN201843132U (en) Large-aperture deep-pile long-auger drilling rig
CN206053840U (en) A kind of long screw auger drilling deposited pile pile jacking cap integrative construction device
CN1884717A (en) Flexible pile composite foundation pile press with given force and its use
CN204419031U (en) A kind of full screw earth auger and Static pressure pile driver all-in-one
CN206053870U (en) A kind of boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction
CN206090538U (en) Novel long spiral drilling filling pile pile jacking cap integrated construction device
CN206053838U (en) A kind of auger boring device for casting for being applied to stake top pile cover integrated construction
CN202970543U (en) Automatic mounting demounting device for pipe shed drilling machine drill rod
CN215256037U (en) Construction equipment for rock-entering reaming pile
CN203050487U (en) Tubular drill and pile cutting drilling machine using same
CN201826438U (en) Steel column convenient for constructing temporary operating platform
CN206053839U (en) It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction
CN105927153A (en) Control supporting frame applied to pile body and pile cap integrated construction for long spiral bored pile
CN203559909U (en) Height-adjustable lining trolley
CN210530745U (en) Combined drilling bottom-expanding pile-planting system
CN208056060U (en) Piling drilling all-in-one machine and road construction equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160907

WD01 Invention patent application deemed withdrawn after publication