CN206053839U - It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction - Google Patents
It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction Download PDFInfo
- Publication number
- CN206053839U CN206053839U CN201620557431.2U CN201620557431U CN206053839U CN 206053839 U CN206053839 U CN 206053839U CN 201620557431 U CN201620557431 U CN 201620557431U CN 206053839 U CN206053839 U CN 206053839U
- Authority
- CN
- China
- Prior art keywords
- construction
- pile
- support
- bracing frame
- screw auger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
This utility model belongs to construction basis drilling tool accessory applied technical field, specifically disclose the control bracing frame for long screw auger drilling deposited pile pile jacking cap integrated construction, including automatic walking car, and it is arranged on electric distribution operating room on automatic walking car, pulley, main turning hoisting machine and support, and the frame support bar of connecting bracket, and the sleeping head saddle being arranged on support are distinguished in two ends.This utility model is applied to the beneficial effect of the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction:Overall construction design rationally, can realize efficiently, the purpose of accurately control adjustment drilling rod and drill bit, while firm, effective guarantee construction operation safety and construction quality stability are positioned after adjustment;Solve that existing long-spiral drilling machine control regulated efficiency is low and integrated support structure supports instable phenomenon, which is reasonable in design, meet it is stable support and efficiently adjust construction requirement, position it is firm, and then saved raw material, reduced production cost.
Description
Technical field
This utility model belongs to construction basis drilling tool accessory applied technical field, and in particular to be applied to long screw auger
The control bracing frame of hole pouring pile pile jacking cap integrated construction, can accurately adjust institute's bore position of control long-spiral drilling machine,
Ensure construction pouring quality and improve efficiency of construction.
Background technology
Long-spiral drilling machine, which includes hydraulic moving mechanism pile frame and drilling system two parts.Pile frame adopts hydraulic walking chassis,
High degree of automation, voluntarily can walk and 360 degree revolution, be provided with four hydraulic legs and one walking oil cylinder with aid in walking and
Revolution simultaneously increases complete machine stability during construction, can whole machine be transported through.Column be folding box column, flange connection
Mode, column adopt two pieces high thickness masks and use large-sized bender brake techniques, and Jing twice weld seams are welded while vertical
Four reinforcements are welded with every 60cm inside post to fix, increase column torsion resistant and bending resistant.Column is by two luffing hydraulic jack controls
Make its landing.Drilling system includes unit head and drilling tool, and output shaft and the spiral drill of unit head are hollow type, and stake machine is adopted
Concrete or mud can be carried out pump concrete CFG pile driving constructions by drilling rod central canal by long spire pore-forming.
In the construction operation of long-spiral drilling machine, the control bracing frame for adjustment control drilling rod, drill bit is also which is important
Ingredient, controls the construction quality that fixing, high efficiency of control adjustment of bracing frame etc. can directly affect long-spiral drilling machine
And efficiency of construction, and the existing control bracing frame for being used in combination with long-spiral drilling machine, adjust in its complex structure construction
It is not firm to position after whole time-consuming big and adjustment, so as to reduce the efficiency and high standard prescription of perfusion drilling construction operation,
When error is larger to be needed to do over again, the consumption that construction speed also increases mixed mud raw material is not only reduced, and this is current
It is urgently to be resolved hurrily.
Therefore, based on the problems referred to above, this utility model offer is applied to long screw auger drilling deposited pile pile jacking cap integration and applies
The control bracing frame of work.
Utility model content
Utility model purpose:The purpose of this utility model is to provide and is applied to the integration of long screw auger drilling deposited pile pile jacking cap
The control bracing frame of construction, the existing long-spiral drilling machine control regulated efficiency of solution is low and integrated support structure supports instable
Phenomenon, which is reasonable in design, meet it is stable support and efficiently adjust construction requirement, position it is firm, and then saved raw material, reduced
Production cost.
Technical scheme:This utility model provides the control support for long screw auger drilling deposited pile pile jacking cap integrated construction
Frame, including automatic walking car, and be arranged on automatic walking car electric distribution operating room, pulley, and be arranged on automatically
Main turning hoisting machine on walking car and between electric distribution operating room, pulley, and be arranged on automatic walking car and be located at
Support on the outside of pulley, and the frame support bar of two ends difference connecting bracket, and the sleeping head saddle being arranged on support.
The technical program, the pulley is three head pulleys.
The technical program, the support is barrel-type supporting structure.
Compared with prior art, this utility model is applied to the control of long screw auger drilling deposited pile pile jacking cap integrated construction
The beneficial effect of bracing frame is:1st, overall construction design rationally, can realize efficiently, accurately controlling adjusting drilling rod and drill bit
Purpose, while positioning firm after adjustment, effectively ensures construction operation safety and construction quality stability;2nd, solve existing length
Twist bit control regulated efficiency is low and integrated support structure supports instable phenomenon, stable of its reasonable in design, satisfaction
Support and efficiently adjustment construction requirement, position it is firm, and then saved raw material, reduced production cost(This control support frame structure
Practicality is in the construction of deep cyclopentadienyl railway).
Description of the drawings
Fig. 1 is the control bracing frame for being applied to long screw auger drilling deposited pile pile jacking cap integrated construction of the present utility model
Structural representation;
Wherein, in figure, sequence number mark is as follows:The automatic walking cars of 1-, 2- electric distribution operating rooms, the main turning hoisting machines of 3-, 4- are slided
The sleeping head saddle of wheel, 5- supports, 6- frame support bars, 7-.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment, further elucidate this utility model.
Control bracing frame for long screw auger drilling deposited pile pile jacking cap integrated construction as shown in Figure 1, including it is automatic
Walking car 1, and be arranged on automatic walking car 1 electric distribution operating room 2, pulley 4, and be arranged on automatic walking car
Main turning hoisting machine 3 on 1 and between electric distribution operating room 2, pulley 4, and be arranged on automatic walking car 1 and be located at pulley
Support 5 on the outside of 4, and the frame support bar 6 of two ends difference connecting bracket 5, and the sleeping head saddle 7 being arranged on support 5.
It is further preferred that pulley 4 is three head pulleys, during construction adjustment control operation, which is with main turning hoisting machine 3 and is connected
Rope is accurately controlled to the position of the head saddle 7 that crouches, and stable positioning can be carried out to the position after adjustment, and then ensures to apply
Work irrigates the quality of bore operation;Support 5 is barrel-type supporting structure, rational in infrastructure and install convenient, itself and frame support bar 6
It is used in combination, stable positioning is formed to the head saddle 7 that crouches and is supported, it is ensured that the angle and construction drill essence of drilling rod and drill bit adjustment
Degree.
Embodiment
Further such as Fig. 1, during adjustment operation, controls main turning hoisting machine 3 counterclockwise or up time using electric distribution operating room 2
Pin rotates, and main turning hoisting machine 3 counterclockwise or turns clockwise and then is driven across the sleeping head saddle of connecting rope control 7 of pulley 4 and rise
Or decline, finally realize accurate, efficient and stable control.
The above is only preferred implementation of the present utility model, it is noted that for the common skill of the art
For art personnel, on the premise of without departing from this utility model principle, some improvement can also be made, these improvement also should be regarded as
Protection domain of the present utility model.
Claims (3)
1. the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction is applied to, it is characterised in that:Including certainly
Dynamic walking car(1), and it is arranged on automatic walking car(1)On electric distribution operating room(2), pulley(4), and arrange
In automatic walking car(1)Above and positioned at electric distribution operating room(2), pulley(4)Between main turning hoisting machine(3), and be arranged on
Automatic walking car(1)And it is located at pulley(4)The support in outside(5), and two ends difference connecting bracket(5)Frame support bar
(6), and it is arranged on support(5)On sleeping head saddle(7).
2. the control bracing frame for being applied to long screw auger drilling deposited pile pile jacking cap integrated construction according to claim 1,
It is characterized in that:The pulley(4)For three head pulleys.
3. the control bracing frame for being applied to long screw auger drilling deposited pile pile jacking cap integrated construction according to claim 1,
It is characterized in that:The support(5)For barrel-type supporting structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620557431.2U CN206053839U (en) | 2016-06-12 | 2016-06-12 | It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620557431.2U CN206053839U (en) | 2016-06-12 | 2016-06-12 | It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206053839U true CN206053839U (en) | 2017-03-29 |
Family
ID=58373074
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620557431.2U Expired - Fee Related CN206053839U (en) | 2016-06-12 | 2016-06-12 | It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206053839U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105927153A (en) * | 2016-06-12 | 2016-09-07 | 江苏昌鑫基础工程有限公司 | Control supporting frame applied to pile body and pile cap integrated construction for long spiral bored pile |
-
2016
- 2016-06-12 CN CN201620557431.2U patent/CN206053839U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105927153A (en) * | 2016-06-12 | 2016-09-07 | 江苏昌鑫基础工程有限公司 | Control supporting frame applied to pile body and pile cap integrated construction for long spiral bored pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101660357A (en) | Machinery for installing light partition battens | |
CN206053839U (en) | It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction | |
CN206128158U (en) | Underground continuous wall construction equipment | |
CN106436796B (en) | A kind of construction of diaphragm wall equipment and construction method | |
CN102937004B (en) | Coordinated hoisting control system of foldable type drilling machine base | |
CN205704617U (en) | Precast beam hydraulic pressure opening template | |
CN206090539U (en) | Long spiral drilling filling pile pile jacking cap integrated construction device of PLC control | |
CN105927154A (en) | Spiral drilling and pouring device applied to pile top and pile cap integrated construction | |
CN113175223A (en) | Synchronous sliding structure of performance theater steel structure | |
CN205314539U (en) | Large -scale cantilever type combination steel form | |
CN206053838U (en) | A kind of auger boring device for casting for being applied to stake top pile cover integrated construction | |
CN105862732A (en) | PLC-controlled (programmable logic controller controlled) integrated construction apparatus for long-spiral cast-in-place bored pile top cap | |
CN206090538U (en) | Novel long spiral drilling filling pile pile jacking cap integrated construction device | |
CN206053870U (en) | A kind of boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction | |
CN206859658U (en) | A kind of adjustable slab form support system | |
CN106836216B (en) | Pile foundation back-pressure concrete dado construction auxiliary device and construction method thereof | |
CN105862733A (en) | Novel long spiral drilling hole cast-in-situ pile top and cap integrated construction device | |
CN206599391U (en) | A kind of tower crane conversion platform | |
CN105927153A (en) | Control supporting frame applied to pile body and pile cap integrated construction for long spiral bored pile | |
CN105888576A (en) | Drilling assembly for integrated construction of long spiral bored perfusion pile top and cap | |
CN210289150U (en) | Liftable concrete placement template support column | |
CN202001787U (en) | Detachable ground anchor of tower crane | |
CN202324821U (en) | Lifting mechanism of rotary drilling rig | |
CN103075026A (en) | Novel height-adjustable building bracket | |
CN209413871U (en) | Long-spiral drilling machine regulating device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: Room 609, Wanda Center Office Building, Yixing City, Wuxi City, Jiangsu Province Patentee after: Jiangsu Changxin Foundation Engineering Group Co.,Ltd. Address before: Room 609, Wanda Center Office Building, Yixing City, Wuxi City, Jiangsu Province Patentee before: JIANGSU CHANGXIN BASIC ENGINEERING CO.,LTD. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170329 |
|
CF01 | Termination of patent right due to non-payment of annual fee |