CN206053839U - It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction - Google Patents

It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction Download PDF

Info

Publication number
CN206053839U
CN206053839U CN201620557431.2U CN201620557431U CN206053839U CN 206053839 U CN206053839 U CN 206053839U CN 201620557431 U CN201620557431 U CN 201620557431U CN 206053839 U CN206053839 U CN 206053839U
Authority
CN
China
Prior art keywords
construction
pile
support
bracing frame
screw auger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620557431.2U
Other languages
Chinese (zh)
Inventor
徐其新
徐涵
杨姣
孙鸿林
梁龙标
沈宇浈
江涛
明刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Changxin Foundation Engineering Group Co ltd
Original Assignee
Jiangsu Chang Xin Foundation Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Chang Xin Foundation Works Co Ltd filed Critical Jiangsu Chang Xin Foundation Works Co Ltd
Priority to CN201620557431.2U priority Critical patent/CN206053839U/en
Application granted granted Critical
Publication of CN206053839U publication Critical patent/CN206053839U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

This utility model belongs to construction basis drilling tool accessory applied technical field, specifically disclose the control bracing frame for long screw auger drilling deposited pile pile jacking cap integrated construction, including automatic walking car, and it is arranged on electric distribution operating room on automatic walking car, pulley, main turning hoisting machine and support, and the frame support bar of connecting bracket, and the sleeping head saddle being arranged on support are distinguished in two ends.This utility model is applied to the beneficial effect of the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction:Overall construction design rationally, can realize efficiently, the purpose of accurately control adjustment drilling rod and drill bit, while firm, effective guarantee construction operation safety and construction quality stability are positioned after adjustment;Solve that existing long-spiral drilling machine control regulated efficiency is low and integrated support structure supports instable phenomenon, which is reasonable in design, meet it is stable support and efficiently adjust construction requirement, position it is firm, and then saved raw material, reduced production cost.

Description

It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction
Technical field
This utility model belongs to construction basis drilling tool accessory applied technical field, and in particular to be applied to long screw auger The control bracing frame of hole pouring pile pile jacking cap integrated construction, can accurately adjust institute's bore position of control long-spiral drilling machine, Ensure construction pouring quality and improve efficiency of construction.
Background technology
Long-spiral drilling machine, which includes hydraulic moving mechanism pile frame and drilling system two parts.Pile frame adopts hydraulic walking chassis, High degree of automation, voluntarily can walk and 360 degree revolution, be provided with four hydraulic legs and one walking oil cylinder with aid in walking and Revolution simultaneously increases complete machine stability during construction, can whole machine be transported through.Column be folding box column, flange connection Mode, column adopt two pieces high thickness masks and use large-sized bender brake techniques, and Jing twice weld seams are welded while vertical Four reinforcements are welded with every 60cm inside post to fix, increase column torsion resistant and bending resistant.Column is by two luffing hydraulic jack controls Make its landing.Drilling system includes unit head and drilling tool, and output shaft and the spiral drill of unit head are hollow type, and stake machine is adopted Concrete or mud can be carried out pump concrete CFG pile driving constructions by drilling rod central canal by long spire pore-forming.
In the construction operation of long-spiral drilling machine, the control bracing frame for adjustment control drilling rod, drill bit is also which is important Ingredient, controls the construction quality that fixing, high efficiency of control adjustment of bracing frame etc. can directly affect long-spiral drilling machine And efficiency of construction, and the existing control bracing frame for being used in combination with long-spiral drilling machine, adjust in its complex structure construction It is not firm to position after whole time-consuming big and adjustment, so as to reduce the efficiency and high standard prescription of perfusion drilling construction operation, When error is larger to be needed to do over again, the consumption that construction speed also increases mixed mud raw material is not only reduced, and this is current It is urgently to be resolved hurrily.
Therefore, based on the problems referred to above, this utility model offer is applied to long screw auger drilling deposited pile pile jacking cap integration and applies The control bracing frame of work.
Utility model content
Utility model purpose:The purpose of this utility model is to provide and is applied to the integration of long screw auger drilling deposited pile pile jacking cap The control bracing frame of construction, the existing long-spiral drilling machine control regulated efficiency of solution is low and integrated support structure supports instable Phenomenon, which is reasonable in design, meet it is stable support and efficiently adjust construction requirement, position it is firm, and then saved raw material, reduced Production cost.
Technical scheme:This utility model provides the control support for long screw auger drilling deposited pile pile jacking cap integrated construction Frame, including automatic walking car, and be arranged on automatic walking car electric distribution operating room, pulley, and be arranged on automatically Main turning hoisting machine on walking car and between electric distribution operating room, pulley, and be arranged on automatic walking car and be located at Support on the outside of pulley, and the frame support bar of two ends difference connecting bracket, and the sleeping head saddle being arranged on support.
The technical program, the pulley is three head pulleys.
The technical program, the support is barrel-type supporting structure.
Compared with prior art, this utility model is applied to the control of long screw auger drilling deposited pile pile jacking cap integrated construction The beneficial effect of bracing frame is:1st, overall construction design rationally, can realize efficiently, accurately controlling adjusting drilling rod and drill bit Purpose, while positioning firm after adjustment, effectively ensures construction operation safety and construction quality stability;2nd, solve existing length Twist bit control regulated efficiency is low and integrated support structure supports instable phenomenon, stable of its reasonable in design, satisfaction Support and efficiently adjustment construction requirement, position it is firm, and then saved raw material, reduced production cost(This control support frame structure Practicality is in the construction of deep cyclopentadienyl railway).
Description of the drawings
Fig. 1 is the control bracing frame for being applied to long screw auger drilling deposited pile pile jacking cap integrated construction of the present utility model Structural representation;
Wherein, in figure, sequence number mark is as follows:The automatic walking cars of 1-, 2- electric distribution operating rooms, the main turning hoisting machines of 3-, 4- are slided The sleeping head saddle of wheel, 5- supports, 6- frame support bars, 7-.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment, further elucidate this utility model.
Control bracing frame for long screw auger drilling deposited pile pile jacking cap integrated construction as shown in Figure 1, including it is automatic Walking car 1, and be arranged on automatic walking car 1 electric distribution operating room 2, pulley 4, and be arranged on automatic walking car Main turning hoisting machine 3 on 1 and between electric distribution operating room 2, pulley 4, and be arranged on automatic walking car 1 and be located at pulley Support 5 on the outside of 4, and the frame support bar 6 of two ends difference connecting bracket 5, and the sleeping head saddle 7 being arranged on support 5.
It is further preferred that pulley 4 is three head pulleys, during construction adjustment control operation, which is with main turning hoisting machine 3 and is connected Rope is accurately controlled to the position of the head saddle 7 that crouches, and stable positioning can be carried out to the position after adjustment, and then ensures to apply Work irrigates the quality of bore operation;Support 5 is barrel-type supporting structure, rational in infrastructure and install convenient, itself and frame support bar 6 It is used in combination, stable positioning is formed to the head saddle 7 that crouches and is supported, it is ensured that the angle and construction drill essence of drilling rod and drill bit adjustment Degree.
Embodiment
Further such as Fig. 1, during adjustment operation, controls main turning hoisting machine 3 counterclockwise or up time using electric distribution operating room 2 Pin rotates, and main turning hoisting machine 3 counterclockwise or turns clockwise and then is driven across the sleeping head saddle of connecting rope control 7 of pulley 4 and rise Or decline, finally realize accurate, efficient and stable control.
The above is only preferred implementation of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of without departing from this utility model principle, some improvement can also be made, these improvement also should be regarded as Protection domain of the present utility model.

Claims (3)

1. the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction is applied to, it is characterised in that:Including certainly
Dynamic walking car(1), and it is arranged on automatic walking car(1)On electric distribution operating room(2), pulley(4), and arrange In automatic walking car(1)Above and positioned at electric distribution operating room(2), pulley(4)Between main turning hoisting machine(3), and be arranged on Automatic walking car(1)And it is located at pulley(4)The support in outside(5), and two ends difference connecting bracket(5)Frame support bar (6), and it is arranged on support(5)On sleeping head saddle(7).
2. the control bracing frame for being applied to long screw auger drilling deposited pile pile jacking cap integrated construction according to claim 1, It is characterized in that:The pulley(4)For three head pulleys.
3. the control bracing frame for being applied to long screw auger drilling deposited pile pile jacking cap integrated construction according to claim 1, It is characterized in that:The support(5)For barrel-type supporting structure.
CN201620557431.2U 2016-06-12 2016-06-12 It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction Expired - Fee Related CN206053839U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620557431.2U CN206053839U (en) 2016-06-12 2016-06-12 It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620557431.2U CN206053839U (en) 2016-06-12 2016-06-12 It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction

Publications (1)

Publication Number Publication Date
CN206053839U true CN206053839U (en) 2017-03-29

Family

ID=58373074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620557431.2U Expired - Fee Related CN206053839U (en) 2016-06-12 2016-06-12 It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction

Country Status (1)

Country Link
CN (1) CN206053839U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927153A (en) * 2016-06-12 2016-09-07 江苏昌鑫基础工程有限公司 Control supporting frame applied to pile body and pile cap integrated construction for long spiral bored pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927153A (en) * 2016-06-12 2016-09-07 江苏昌鑫基础工程有限公司 Control supporting frame applied to pile body and pile cap integrated construction for long spiral bored pile

Similar Documents

Publication Publication Date Title
CN101660357A (en) Machinery for installing light partition battens
CN206053839U (en) It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction
CN206128158U (en) Underground continuous wall construction equipment
CN106436796B (en) A kind of construction of diaphragm wall equipment and construction method
CN102937004B (en) Coordinated hoisting control system of foldable type drilling machine base
CN205704617U (en) Precast beam hydraulic pressure opening template
CN206090539U (en) Long spiral drilling filling pile pile jacking cap integrated construction device of PLC control
CN105927154A (en) Spiral drilling and pouring device applied to pile top and pile cap integrated construction
CN113175223A (en) Synchronous sliding structure of performance theater steel structure
CN205314539U (en) Large -scale cantilever type combination steel form
CN206053838U (en) A kind of auger boring device for casting for being applied to stake top pile cover integrated construction
CN105862732A (en) PLC-controlled (programmable logic controller controlled) integrated construction apparatus for long-spiral cast-in-place bored pile top cap
CN206090538U (en) Novel long spiral drilling filling pile pile jacking cap integrated construction device
CN206053870U (en) A kind of boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction
CN206859658U (en) A kind of adjustable slab form support system
CN106836216B (en) Pile foundation back-pressure concrete dado construction auxiliary device and construction method thereof
CN105862733A (en) Novel long spiral drilling hole cast-in-situ pile top and cap integrated construction device
CN206599391U (en) A kind of tower crane conversion platform
CN105927153A (en) Control supporting frame applied to pile body and pile cap integrated construction for long spiral bored pile
CN105888576A (en) Drilling assembly for integrated construction of long spiral bored perfusion pile top and cap
CN210289150U (en) Liftable concrete placement template support column
CN202001787U (en) Detachable ground anchor of tower crane
CN202324821U (en) Lifting mechanism of rotary drilling rig
CN103075026A (en) Novel height-adjustable building bracket
CN209413871U (en) Long-spiral drilling machine regulating device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Room 609, Wanda Center Office Building, Yixing City, Wuxi City, Jiangsu Province

Patentee after: Jiangsu Changxin Foundation Engineering Group Co.,Ltd.

Address before: Room 609, Wanda Center Office Building, Yixing City, Wuxi City, Jiangsu Province

Patentee before: JIANGSU CHANGXIN BASIC ENGINEERING CO.,LTD.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

CF01 Termination of patent right due to non-payment of annual fee