CN206053870U - A kind of boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction - Google Patents
A kind of boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction Download PDFInfo
- Publication number
- CN206053870U CN206053870U CN201620557413.4U CN201620557413U CN206053870U CN 206053870 U CN206053870 U CN 206053870U CN 201620557413 U CN201620557413 U CN 201620557413U CN 206053870 U CN206053870 U CN 206053870U
- Authority
- CN
- China
- Prior art keywords
- drilling
- drilling rod
- pile
- construction
- boring assemblies
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
This utility model belongs to construction basis drilling tool accessory applied technical field, specifically disclose a kind of boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction, including power transmission casing, and the drilling rod being connected with power transmission casing, and the drilling rod blade being uniformly arranged on drilling rod, and it is arranged on the overcoat drilling rod blade of drilling rod blade tip, and the alloy bit for being arranged on drill rod end.A kind of beneficial effect of the boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction of this utility model is:1st, overall construction design rationally, can be realized that efficient, accurately drill-pouring purpose, and then the existing long-spiral drilling machine boring assemblies drill-pouring efficiency of solution is low and cannot be used in combination with long-spiral drilling machine completing stake top pile cover integrated construction requirement;2nd, this hole structure is practical can effectively ensure the safety of drill-pouring construction operation and drill-pouring construction quality stability in the construction of deep cyclopentadienyl railway, saved raw material, reduced production cost.
Description
Technical field
This utility model belongs to construction basis drilling tool accessory applied technical field, and in particular to a kind of long auger
The boring assemblies of bored concrete pile pile jacking cap integrated construction, precisely, efficiently can carry out drill-pouring operation according to construction demand, protect
Card construction pouring quality and raising efficiency of construction.
Background technology
Long-spiral drilling machine, which includes hydraulic moving mechanism pile frame and drilling system two parts.Pile frame adopts hydraulic walking chassis,
High degree of automation, voluntarily can walk and 360 degree revolution, be provided with four hydraulic legs and one walking oil cylinder with aid in walking and
Revolution simultaneously increases complete machine stability during construction, can whole machine be transported through.Column be folding box column, flange connection
Mode, column adopt two pieces high thickness masks and use large-sized bender brake techniques, and Jing twice weld seams are welded while vertical
Four reinforcements are welded with every 60cm inside post to fix, increase column torsion resistant and bending resistant.Column is by two luffing hydraulic jack controls
Make its landing.Drilling system includes unit head and drilling tool, and output shaft and the spiral drill of unit head are hollow type, and stake machine is adopted
Concrete or mud can be carried out pump concrete CFG pile driving constructions by drilling rod central canal by long spire pore-forming.
In the construction operation of long-spiral drilling machine, it is also its important component part for carrying out bore operation boring assemblies,
The reasonability of its design directly affects the quality and efficiency of drill-pouring, and existing for being used in combination with long-spiral drilling machine
Boring assemblies, in the construction of its complex structure, adjustment is time-consuming big and positions after adjusting not firm, applies so as to reduce perfusion drilling
The efficiency and high standard prescription of work industry, while cannot being used in combination with long-spiral drilling machine, to complete stake top pile cover integrated
Construction requirement, and this is current urgently to be resolved hurrily.
Therefore, based on the problems referred to above, this utility model is provided answers a kind of long screw auger drilling deposited pile pile jacking cap integration to apply
The boring assemblies of work.
Utility model content
Utility model purpose:The purpose of this utility model is to provide a kind of long screw auger drilling deposited pile pile jacking cap integration and applies
The boring assemblies of work, the existing long-spiral drilling machine boring assemblies drill-pouring efficiency of solution is low and cannot be engaged with long-spiral drilling machine
Using completing stake top pile cover integrated construction requirement, which is reasonable in design, meet the efficient construction requirement of drill-pouring.
Technical scheme:This utility model is provided for a kind of drilling of long screw auger drilling deposited pile pile jacking cap integrated construction
Component, including power transmission casing, and the drilling rod being connected with power transmission casing, and the drilling rod leaf being uniformly arranged on drilling rod
Piece, and it is arranged on the overcoat drilling rod blade of drilling rod blade tip, and the alloy bit for being arranged on drill rod end.
The technical program, the power transmission casing is double-motor power transmission case body.
The technical program, the drilling rod blade, overcoat drilling rod blade are respectively helical structure.
The technical program, the diameter of the drilling rod blade is less than overcoat drilling rod blade.
The technical program, the power of the power transmission casing is 55KW.
The technical program, the drilling rod blade, the diameter of overcoat drilling rod blade are respectively 500mm, 1000mm.
Compared with prior art, a kind of drilling group of long screw auger drilling deposited pile pile jacking cap integrated construction of this utility model
The beneficial effect of part is:1st, overall construction design rationally, can realize efficient, accurately drill-pouring purpose, and then solution now
There is long-spiral drilling machine boring assemblies drill-pouring efficiency low and cannot be used in combination with long-spiral drilling machine and complete stake top pile cover one
Body construction requirement;2nd, this hole structure is practical in the construction of deep cyclopentadienyl railway, can effectively ensure that drill-pouring construction is made
Industry safety and drill-pouring construction quality stability, have saved raw material, have reduced production cost.
Description of the drawings
Fig. 1 is a kind of structure of the boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction of the present utility model
Schematic diagram;
Fig. 2 is a kind of drilling rod of the boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction of the present utility model
Blade, overcoat drilling rod blade partial enlargement structural representation;
Wherein, in figure, sequence number mark is as follows:1- power transmission casings, 2- drilling rods, 3- drilling rod blades, 4- overcoat drilling rod leaves
Piece, 5- alloy bits.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment, further elucidate this utility model.
A kind of boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction as depicted in figs. 1 and 2,:Including
Power transmission casing 1, and the drilling rod 2 being connected with power transmission casing 1, and the drilling rod blade 3 being uniformly arranged on drilling rod 2, and
It is arranged on the overcoat drilling rod blade 4 of 3 end of drilling rod blade, and the alloy bit 5 for being arranged on 4 end of drilling rod.
It is further preferred that power transmission casing 1 for the power of double-motor power transmission case body and power transmission casing 1 is
55KW, for the power support of abundance is provided to drilling rod 2, it is ensured that the drilling rod 2 of multiple different-diameter sizes can be driven to carry out efficiently
Drill-pouring construction operation;Drilling rod blade 3, overcoat drilling rod blade 4 are respectively helical structure, drilling construction efficiency high and are easy to
Safeguard;The diameter of drilling rod blade 3 is less than overcoat drilling rod blade 4, and drilling rod blade 3, the diameter of overcoat drilling rod blade 4 are respectively
500mm, 1000mm, wherein, during drill-pouring construction operation, overcoat drilling rod blade 3 supports protection for being formed to drilling rod blade 4
I.e. the joint face of the two connects for helical structure, can guarantee that drilling rod blade 3 is not inclined in construction operation so that drilling satisfaction is applied
Work is required, and it is stable, accurate to control lifting/lowering along counter-rotating.
Embodiment
Further as depicted in figs. 1 and 2, when when drill-pouring is constructed, alloy bit 5 creeps into, drill bit position is installed and is expanded
Head drilling tool(Enlarged footing drilling tool is not marked in figure, is overcoat drilling rod blade 4 between enlarged footing drilling tool and drilling rod 2);(Stake diameter can be with
80cm, it is also possible to 1m, depending on the helmet diameter of job site), enlarged footing drilling tool is typically 60cm deeply, and enlarged footing is partially into soil
After layer 60cm, drilling rod can be automatically disengaged, enlarged footing drilling tool rests on 60cm depth soil layers position, make drilling rod continue drilling to design stake
Long position, is lifted and fills concrete, is mentioned top 60cm positions, then is taken enlarged footing drilling tool up carry on drilling rod together, and makes expansion
The 1m diameters of major part drilling tool fill concrete together so as to reach pile body, pile cover concrete energy integrated molding.
The above is only preferred implementation of the present utility model, it is noted that for the common skill of the art
For art personnel, on the premise of without departing from this utility model principle, some improvement can also be made, these improvement also should be regarded as
Protection domain of the present utility model.
Claims (6)
1. a kind of boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction, it is characterised in that:Including power transmission
Casing(1), and with power transmission casing(1)The drilling rod of connection(2), and it is uniformly arranged on drilling rod(2)On drilling rod blade(3),
And it is arranged on drilling rod blade(3)The overcoat drilling rod blade of end(4), and it is arranged on drilling rod(2)The alloy bit of end(5).
2. boring assemblies of a kind of long screw auger drilling deposited pile pile jacking cap integrated construction according to claim 1, which is special
Levy and be:The power transmission casing(1)For double-motor power transmission case body.
3. boring assemblies of a kind of long screw auger drilling deposited pile pile jacking cap integrated construction according to claim 1, which is special
Levy and be:The drilling rod blade(3), overcoat drilling rod blade(4)Respectively helical structure.
4. boring assemblies of a kind of long screw auger drilling deposited pile pile jacking cap integrated construction according to claim 1 or 3, its
It is characterised by:The drilling rod blade(3)Diameter be less than overcoat drilling rod blade(4).
5. boring assemblies of a kind of long screw auger drilling deposited pile pile jacking cap integrated construction according to claim 1 and 2, its
It is characterised by:The power transmission casing(1)Power be 55KW.
6. boring assemblies of a kind of long screw auger drilling deposited pile pile jacking cap integrated construction according to claim 4, which is special
Levy and be:The drilling rod blade(3), overcoat drilling rod blade(4)Diameter be respectively 500mm, 1000mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620557413.4U CN206053870U (en) | 2016-06-12 | 2016-06-12 | A kind of boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620557413.4U CN206053870U (en) | 2016-06-12 | 2016-06-12 | A kind of boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206053870U true CN206053870U (en) | 2017-03-29 |
Family
ID=58372739
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620557413.4U Expired - Fee Related CN206053870U (en) | 2016-06-12 | 2016-06-12 | A kind of boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206053870U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105888576A (en) * | 2016-06-12 | 2016-08-24 | 江苏昌鑫基础工程有限公司 | Drilling assembly for integrated construction of long spiral bored perfusion pile top and cap |
-
2016
- 2016-06-12 CN CN201620557413.4U patent/CN206053870U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105888576A (en) * | 2016-06-12 | 2016-08-24 | 江苏昌鑫基础工程有限公司 | Drilling assembly for integrated construction of long spiral bored perfusion pile top and cap |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110374500B (en) | Grouped drilling and pile planting construction method | |
CN100572676C (en) | Large area sawed joint cutting construction method of concrete gravity dam cross joint | |
CN104018792A (en) | Reducing screw displacement pile drilling tool and construction method thereof | |
CN104563126B (en) | A kind of churning driven bored pile construction method | |
CN206053870U (en) | A kind of boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction | |
CN206090539U (en) | Long spiral drilling filling pile pile jacking cap integrated construction device of PLC control | |
CN105064922A (en) | Reamer bit for abrasion drill | |
CN105927154A (en) | Spiral drilling and pouring device applied to pile top and pile cap integrated construction | |
CN105888576A (en) | Drilling assembly for integrated construction of long spiral bored perfusion pile top and cap | |
CN104389525B (en) | Liftable working platform at front end of pile frame and operation method thereof | |
CN210530738U (en) | Pile system is planted in drilling in groups | |
CN110331936B (en) | Combined drilling bottom-expanding pile-planting construction method | |
CN206053840U (en) | A kind of long screw auger drilling deposited pile pile jacking cap integrative construction device | |
CN105862732A (en) | PLC-controlled (programmable logic controller controlled) integrated construction apparatus for long-spiral cast-in-place bored pile top cap | |
CN105862733A (en) | Novel long spiral drilling hole cast-in-situ pile top and cap integrated construction device | |
CN206090538U (en) | Novel long spiral drilling filling pile pile jacking cap integrated construction device | |
CN206053838U (en) | A kind of auger boring device for casting for being applied to stake top pile cover integrated construction | |
CN210134427U (en) | Composite steel pipe pile rapping fine-adjustment guiding system | |
CN206201222U (en) | A kind of architectural engineering drill | |
CN203050487U (en) | Tubular drill and pile cutting drilling machine using same | |
RU2354781C2 (en) | Method of bored pile construction and device for method implementation | |
CN206053839U (en) | It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction | |
CN210530745U (en) | Combined drilling bottom-expanding pile-planting system | |
CN210714465U (en) | Double dynamical screw thread bored pile rig | |
CN202767878U (en) | Multifunctional all-hydraulic drill |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: Room 609, Wanda Center Office Building, Yixing City, Wuxi City, Jiangsu Province Patentee after: Jiangsu Changxin Foundation Engineering Group Co.,Ltd. Address before: Room 609, Wanda Center Office Building, Yixing City, Wuxi City, Jiangsu Province Patentee before: JIANGSU CHANGXIN BASIC ENGINEERING CO.,LTD. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170329 |
|
CF01 | Termination of patent right due to non-payment of annual fee |