CN206053838U - A kind of auger boring device for casting for being applied to stake top pile cover integrated construction - Google Patents

A kind of auger boring device for casting for being applied to stake top pile cover integrated construction Download PDF

Info

Publication number
CN206053838U
CN206053838U CN201620557430.8U CN201620557430U CN206053838U CN 206053838 U CN206053838 U CN 206053838U CN 201620557430 U CN201620557430 U CN 201620557430U CN 206053838 U CN206053838 U CN 206053838U
Authority
CN
China
Prior art keywords
drilling rod
support
power transmission
drill bushing
pile cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620557430.8U
Other languages
Chinese (zh)
Inventor
徐其新
徐涵
杨姣
孙鸿林
梁龙标
沈宇浈
江涛
明刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Changxin Foundation Engineering Group Co ltd
Original Assignee
Jiangsu Chang Xin Foundation Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Chang Xin Foundation Works Co Ltd filed Critical Jiangsu Chang Xin Foundation Works Co Ltd
Priority to CN201620557430.8U priority Critical patent/CN206053838U/en
Application granted granted Critical
Publication of CN206053838U publication Critical patent/CN206053838U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

This utility model belongs to construction basis drilling tool applied technical field, specifically disclose a kind of auger boring device for casting for being applied to stake top pile cover integrated construction, including automatic walking car, and the electric distribution operating room being arranged on automatic walking car, three head pulleys, main turning hoisting machine and support, and the sleeping head saddle being arranged on support, and the power transmission casing being connected with sleeping head saddle, and the drilling rod being connected with power transmission casing, and the drilling rod blade being arranged on drilling rod, and it is arranged on the cylindrical drill bushing of drilling rod blade tip, and it is arranged on the alloy bit of drill rod end, and the limiting plate for being separately positioned on support and being used in combination with cylindrical drill bushing.The beneficial effects of the utility model are:Efficiently solve the problems, such as that existing long screw auger engine efficiency is low, and overall structure unstability and prestressing force do not reach production and construction requirement, quick, high-quality can enable pile body, pile cover concrete integrated molding, saved raw material, have reduced production cost.

Description

A kind of auger boring device for casting for being applied to stake top pile cover integrated construction
Technical field
This utility model belongs to construction basis drilling tool applied technical field, specifically relates to one kind and is applied to stake top pile cover one The auger boring device for casting of bodyization construction, quick, high-quality can enable pile body, pile cover concrete integrated molding.
Background technology
Long-spiral drilling machine, which includes hydraulic moving mechanism pile frame and drilling system two parts.Pile frame adopts hydraulic walking chassis, High degree of automation, voluntarily can walk and 360 degree revolution, be provided with four hydraulic legs and one walking oil cylinder with aid in walking and Revolution simultaneously increases complete machine stability during construction, can whole machine be transported through.Column be folding box column, flange connection Mode, column adopt two pieces high thickness masks and use large-sized bender brake techniques, and Jing twice weld seams are welded while vertical Four reinforcements are welded with every 60cm inside post to fix, increase column torsion resistant and bending resistant.Column is by two luffing hydraulic jack controls Make its landing.Drilling system includes unit head and drilling tool, and output shaft and the spiral drill of unit head are hollow type, and stake machine is adopted Concrete or mud can be carried out pump concrete CFG pile driving constructions by drilling rod central canal by long spire pore-forming.
Existing structure designs long-spiral drilling machine, although which can complete the pile body of conventional need, the life of pile cover concrete formation Construction requirement is produced, but pile body can not be realized, the production that the production and construction requirement of pile cover concrete integrated molding is i.e. current is applied Time-consuming efficiency is low, and integrally-built stability and prestressing force do not reach production and construction requirement separately to complete for work, while existing In construction operation, mixed mud raw materials consumption is larger, increased production cost, and this is current urgently to be resolved hurrily.
Therefore, based on the problems referred to above, this utility model provides a kind of auger for being applied to stake top pile cover integrated construction Hole device for casting.
Utility model content
Utility model purpose:The purpose of this utility model is to provide a kind of spiral for being applied to stake top pile cover integrated construction Drill hole perfusion device, the existing long screw auger engine efficiency of solution is low and overall structure is unstable and prestressing force does not reach production and construction and wants The problem asked, which is reasonable in design, meet construction reference requirement, and pile body, pile cover concrete quick, high-quality can be enable integrated Molding, has saved raw material, has reduced production cost.
Technical scheme:This utility model provides a kind of auger boring perfusion dress for being applied to stake top pile cover integrated construction Put, including automatic walking car, and be arranged on automatic walking car electric distribution operating room, three head pulleys, and arrange Main turning hoisting machine on automatic walking car and between electric distribution operating room, three head pulleys, and it is arranged on step automatically Shoe formula car and the support on the outside of three head pulleys, and the frame support bar of two ends difference connecting bracket, and it is arranged on support On sleeping head saddle, and the power transmission casing being connected with sleeping head saddle, and the drilling rod being connected with power transmission casing, and arranging Drilling rod blade on drilling rod, and be arranged on the cylindrical drill bushing of drilling rod blade tip, wherein, the side of cylindrical drill bushing with Frame is flexibly connected, and is arranged on the alloy bit of drill rod end, and is separately positioned on support and is engaged with cylindrical drill bushing The limiting plate for using.
The technical program, the support is barrel-type supporting structure.
The technical program, the power transmission casing is double-motor power transmission case body and power is 55KW.
The technical program, the drilling rod blade, the diameter of cylindrical drill bushing are respectively 500mm, 1000mm.
Compared with prior art, a kind of auger boring perfusion dress for being applied to stake top pile cover integrated construction of this utility model The beneficial effect put is:1st, overall construction design rationally, controls construction operation safety and construction quality is stable;2nd, solve existing Have that long screw auger engine efficiency is low, and overall structure unstability and prestressing force do not reach the problem of production and construction requirement, its design Rationally, meet construction reference requirement, quick, high-quality can enable pile body, pile cover concrete integrated molding, save former material Material, reduction production cost(This integrated apparatus is practical in the construction of deep cyclopentadienyl railway).
Description of the drawings
Fig. 1 is a kind of structure of auger boring device for casting for being applied to stake top pile cover integrated construction of the present utility model Schematic diagram;
Fig. 2 is a kind of auger boring device for casting drilling rod leaf for being applied to stake top pile cover integrated construction of the present utility model The partial enlargement structural representation of piece, cylindrical drill bushing;
Fig. 3 is a kind of construction of auger boring device for casting for being applied to stake top pile cover integrated construction of the present utility model Flow process flow diagram;
Wherein, in figure, sequence number mark is as follows:The automatic walking cars of 1-, 2- electric distribution operating rooms, the main turning hoisting machines of 3-, 4- tri- The sleeping head saddle of door head pulley, 5- supports, 6- frame support bars, 7-, 8- power transmission casings, 9- drilling rods, 10- drilling rod blades, 11- Cylindrical drill bushing, 12- alloy bits, 13- limiting plates.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment, further elucidate this utility model.
As shown in Figure 1, Figure 2 with a kind of auger boring device for casting for being applied to stake top pile cover integrated construction shown in Fig. 3, Including automatic walking car 1, and 2, three head pulleys 4 of the electric distribution operating room being arranged on automatic walking car 1, and arrange Main turning hoisting machine 3 on automatic walking car 1 and between 2, three head pulleys 4 of electric distribution operating room, and be arranged on certainly Dynamic walking car 1 and the support 5 on the outside of three head pulleys 4, and the frame support bar 6 of two ends difference connecting bracket 5, and set The sleeping head saddle 7 on support 5, and the power transmission casing 8 being connected with sleeping head saddle 7 are put, and is connected with power transmission casing 8 Drilling rod 9, and the drilling rod blade 10 being arranged on drilling rod 9, and be arranged on the cylindrical drill bushing 11 of 10 end of drilling rod blade, its In, the side of cylindrical drill bushing 11 is flexibly connected with support 5(It is provided with what is be used in conjunction with each other between cylindrical drill bushing and support Slide plate, chute, do not mark in figure), and be arranged on the alloy bit 12 of 9 end of drilling rod, and be separately positioned on support 5 and with circle The limiting plate 13 that cylindricality drill bushing 11 is used in combination, wherein, the cylindrical drill bushing 11 of limiting plate 13 pairs is positioned, and is ensureing one Safety when lifting/lowering is controlled is improved while changing drill-pouring operation.
It is further preferred that support 5 is barrel-type supporting structure, its positioning support it is firm stable and be easily installed dismounting, Safeguard;Power transmission casing 8 is 55KW for the power of double-motor power transmission case body and power transmission casing 8, for drilling rod 9 There is provided sufficient power support, it is ensured that the drilling rod 9 of multiple different-diameter sizes can be driven to carry out efficient construction operation;Drilling rod leaf Piece 10, the diameter of cylindrical drill bushing 11 are respectively 500mm, 1000mm, wherein, during construction operation, cylindrical drill bushing 11 is for boring 1 positioning operation of bar blade, effectively ensures that drilling rod blade 10 is not inclined in construction operation so that drilling meets construction requirement.
Embodiment
Further as shown in Figure 1, Figure 2 and Figure 3, when when drill-pouring is constructed, alloy bit 12 creeps into, drill bit position peace Dress enlarged footing drilling tool(Enlarged footing drilling tool is not marked in figure),(Stake diameter can be with 80cm, it is also possible to 1m, straight with job site pile cover Depending on footpath), enlarged footing drilling tool is typically 60cm deeply, after enlarged footing is partially into soil layer 60cm, can automatically disengage drilling rod, enlarged footing Drilling tool rests on 60cm depth soil layers position, makes drilling rod continue drilling to designing pile length position, is lifted and fill concrete, mentioned on drilling rod Top 60cm positions, then take enlarged footing drilling tool and up carry together, and make the 1m diameters of enlarged footing drilling tool fill concrete together, Reach pile body, pile cover concrete energy integrated molding.
The above is only preferred implementation of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of without departing from this utility model principle, some improvement can also be made, these improvement also should be regarded as Protection domain of the present utility model.

Claims (2)

1. a kind of auger boring device for casting for being applied to stake top pile cover integrated construction, it is characterised in that:Including automatic stride Formula car (1), and be arranged on automatic walking car (1) electric distribution operating room (2), three head pulleys (4), and be arranged on from On dynamic walking car (1) and positioned at the main turning hoisting machine (3) between electric distribution operating room (2), three head pulleys (4), and arrange In automatic walking car (1) and be located at three head pulleys (4) on the outside of support (5), and two ends difference connecting bracket (5) frame Support bar (6), and the sleeping head saddle (7) being arranged on support (5), and the power transmission casing being connected with sleeping head saddle (7) (8) drilling rod (9), and with power transmission casing (8) being connected, and the drilling rod blade (10) being arranged on drilling rod (9), and be arranged on The cylindrical drill bushing (11) of drilling rod blade (10) end, wherein, the side of cylindrical drill bushing (11) is flexibly connected with support (5), And the alloy bit (12) of drilling rod (9) end is arranged on, and be separately positioned on support (5) and match with cylindrical drill bushing (11) The limiting plate (13) that conjunction is used;The support (5) is barrel-type supporting structure.
2. a kind of auger boring device for casting for being applied to stake top pile cover integrated construction according to claim 1, which is special Levy and be:The power transmission casing (8) is 55KW for double-motor power transmission case body and power, the drilling rod blade (10), The diameter of cylindrical drill bushing (11) is respectively 500mm, 1000mm.
CN201620557430.8U 2016-06-12 2016-06-12 A kind of auger boring device for casting for being applied to stake top pile cover integrated construction Expired - Fee Related CN206053838U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620557430.8U CN206053838U (en) 2016-06-12 2016-06-12 A kind of auger boring device for casting for being applied to stake top pile cover integrated construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620557430.8U CN206053838U (en) 2016-06-12 2016-06-12 A kind of auger boring device for casting for being applied to stake top pile cover integrated construction

Publications (1)

Publication Number Publication Date
CN206053838U true CN206053838U (en) 2017-03-29

Family

ID=58372649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620557430.8U Expired - Fee Related CN206053838U (en) 2016-06-12 2016-06-12 A kind of auger boring device for casting for being applied to stake top pile cover integrated construction

Country Status (1)

Country Link
CN (1) CN206053838U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927154A (en) * 2016-06-12 2016-09-07 江苏昌鑫基础工程有限公司 Spiral drilling and pouring device applied to pile top and pile cap integrated construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927154A (en) * 2016-06-12 2016-09-07 江苏昌鑫基础工程有限公司 Spiral drilling and pouring device applied to pile top and pile cap integrated construction

Similar Documents

Publication Publication Date Title
CN206090539U (en) Long spiral drilling filling pile pile jacking cap integrated construction device of PLC control
CN107939277B (en) Low-clearance double-rotary drilling machine and construction method thereof
CN206053838U (en) A kind of auger boring device for casting for being applied to stake top pile cover integrated construction
CN105927154A (en) Spiral drilling and pouring device applied to pile top and pile cap integrated construction
CN206053840U (en) A kind of long screw auger drilling deposited pile pile jacking cap integrative construction device
CN206090538U (en) Novel long spiral drilling filling pile pile jacking cap integrated construction device
CN110529041B (en) Self-soil-taking type double-layer full casing pipe for inclined pile hole forming and construction method thereof
CN203188942U (en) Novel multifunctional racking platform
CN105862733A (en) Novel long spiral drilling hole cast-in-situ pile top and cap integrated construction device
CN206053870U (en) A kind of boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction
CN102322138A (en) The modular sliding formwork
CN105862732A (en) PLC-controlled (programmable logic controller controlled) integrated construction apparatus for long-spiral cast-in-place bored pile top cap
CN206053839U (en) It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction
CN105888576A (en) Drilling assembly for integrated construction of long spiral bored perfusion pile top and cap
CN206873531U (en) Guide rod type revolution cutting chute forming machine
CN206503081U (en) Packaged type box girder formwork
CN202767878U (en) Multifunctional all-hydraulic drill
CN201428378Y (en) Drill for recycling tower crane foundation screws
CN205634045U (en) Reinforcing bar charging equipment
CN212003077U (en) Drill rod guiding device of rotary drilling rig
CN205314539U (en) Large -scale cantilever type combination steel form
CN211889093U (en) Arch frame connecting plate combined type accurate positioning drilling machine
CN210530745U (en) Combined drilling bottom-expanding pile-planting system
CN202970543U (en) Automatic mounting demounting device for pipe shed drilling machine drill rod
CN201627532U (en) Concentric double-rotation drilling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Room 609, Wanda Center Office Building, Yixing City, Wuxi City, Jiangsu Province

Patentee after: Jiangsu Changxin Foundation Engineering Group Co.,Ltd.

Address before: Room 609, Wanda Center Office Building, Yixing City, Wuxi City, Jiangsu Province

Patentee before: JIANGSU CHANGXIN BASIC ENGINEERING CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329