CN206090538U CN201620557416.8U CN201620557416U CN206090538U CN 206090538 U CN206090538 U CN 206090538U CN 201620557416 U CN201620557416 U CN 201620557416U CN 206090538 U CN206090538 U CN 206090538U
Authority
CN
China
Prior art keywords
pile
drilling rod
drilling
drill bushing
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620557416.8U
Other languages
Chinese (zh)
Inventor
徐其新
徐涵
杨姣
孙鸿林
梁龙标
沈宇浈
江涛
明刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Changxin Foundation Engineering Group Co ltd
Original Assignee
Jiangsu Chang Xin Foundation Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Chang Xin Foundation Works Co Ltd filed Critical Jiangsu Chang Xin Foundation Works Co Ltd
Priority to CN201620557416.8U priority Critical patent/CN206090538U/en
Application granted granted Critical
Publication of CN206090538U publication Critical patent/CN206090538U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model belongs to the technical field of construction basis drilling tool is used, specifically disclose a novel long spiral drilling filling pile pile jacking cap integrated construction device, including automatic walking car, and the power distribution control chamber of setting on automatic walking car, three -doors head pulley, machine and support are raised to main the commentaries on classics, and both ends difference linking bridge's frame bracing piece, and the for sleeping in first saddle of setting on the support, reach the power transmission box of being connected with the first saddle that crouches, reach the drilling rod of being connected with the power transmission box, and the drilling rod blade of setting on the drilling rod, and the drill bushing of setting at drilling rod blade end, wherein, the inside screwed connection groove that is provided with of drill bushing, and the one side and the supports active connections of drill bushing, and the alloy bit of setting at the drilling rod tip. The utility model discloses, solve current long auger drilling inefficiency and overall structure unstability and prestressing force and do not reached the problem that production construction required, its reasonable in design, satisfied the construction standard requirement, can quick, high -quality messengers pile body, the shaping that can unify of pile cover concrete, saving raw and other materials, reduction in production cost.

Description

A kind of new long screw auger drilling deposited pile pile jacking cap integrative construction device
Technical field
The utility model belongs to construction basis drilling tool applied technical field, and in particular to a kind of new long auger Bored concrete pile pile jacking cap integrative construction device, quick, high-quality can enable pile body, pile cover concrete integrated molding.
Background technology
Long-spiral drilling machine, it includes hydraulic moving mechanism pile frame and drilling system two parts.Pile frame adopts hydraulic walking chassis, High degree of automation, can voluntarily walk and 360 degree revolution, be provided with four hydraulic legs and one walking oil cylinder with aid in walking and Revolution increases complete machine stability during construction simultaneously, can whole machine be transported through.Column is folding box column, and flange connects Mode, column is using two pieces high thickness masks and uses large-sized bender brake techniques, and Jing twice weld seams are welded simultaneously vertical Four reinforcements are welded with inside post every 60cm to fix, increase column torsion resistant and bending resistant.Column is by two luffing hydraulic jack controls Make its landing.Drilling system includes unit head and drilling tool, and output shaft and the spiral drill of unit head are hollow type, and stake machine is adopted Long spire pore-forming, can carry out pump concrete CFG pile driving constructions by drilling rod central tube by concrete or mud.
Existing structure designs long-spiral drilling machine, although it can complete the pile body of conventional need, the life of pile cover concrete formation Construction requirement is produced, but pile body can not be realized, the production that the production and construction requirement of pile cover concrete integrated molding is i.e. current is applied Work separately to complete low time-consuming efficiency and integrally-built stability and prestressing force do not reach production and construction requirement, while existing Mixed mud raw materials consumption is larger in construction operation, increased production cost, and this is current urgently to be resolved hurrily.
Therefore, based on the problems referred to above, the utility model provides a kind of new long screw auger drilling deposited pile pile jacking cap integration Constructing device.
Utility model content
Utility model purpose:The purpose of this utility model is to provide a kind of new long screw auger drilling deposited pile pile jacking cap one Change constructing device, the existing long screw auger engine efficiency of solution is low and overall structure unstability and prestressing force do not reach production and construction The problem of requirement, its is reasonable in design, meet construction reference requirement, quick, high-quality can enable pile body, pile cover concrete integrally Chemical conversion type, has saved raw material, has reduced production cost.
Technical scheme:The utility model provides a kind of new long screw auger drilling deposited pile pile jacking cap integrative construction device, Including automatic walking car, and the electric distribution operating room on automatic walking car, three head pulleys are arranged on, and are arranged on certainly Main turning hoisting machine on dynamic walking car and between electric distribution operating room, three head pulleys, and it is arranged on automatic walking Car and the support on the outside of three head pulleys, and the frame support bar of two ends difference connecting bracket, and be arranged on support Sleeping head saddle, and the power transmission casing being connected with sleeping head saddle, and the drilling rod being connected with power transmission casing, and it is arranged on brill Drilling rod blade on bar, and the drill bushing of drilling rod blade tip is arranged on, wherein, drill bushing is internally provided with spiral link slot, and bores The side of set is flexibly connected with support, and is arranged on the alloy bit of drill rod end.
The technical program, the support is barrel-type supporting structure.
The technical program, the power transmission casing is double-motor power transmission case body and power is 55KW.
The technical program, the drilling rod blade, the diameter of drill bushing are respectively 500mm, 1000mm.
Compared with prior art, a kind of new long screw auger drilling deposited pile pile jacking cap integrative construction device of the utility model Beneficial effect be:1st, overall construction design rationally, controls construction operation safety and construction quality is stable;2nd, solve existing Long screw auger engine efficiency is low and overall structure unstability and prestressing force do not reach the problem of production and construction requirement, and its design is closed Manage, meet construction reference requirement, quick, high-quality can enable pile body, pile cover concrete integrated molding, saved former material Material, reduction production cost(This integrated apparatus is practical in the construction of deep cyclopentadienyl railway).
Description of the drawings
Fig. 1 is that a kind of structure of new long screw auger drilling deposited pile pile jacking cap integrative construction device of the present utility model is shown It is intended to;
Fig. 2 is a kind of drilling rod leaf of new long screw auger drilling deposited pile pile jacking cap integrative construction device of the present utility model The partial enlargement structural representation of piece, drill bushing;
Fig. 3 is a kind of construction stream of new long screw auger drilling deposited pile pile jacking cap integrative construction device of the present utility model Journey flow diagram;
Wherein, sequence number mark is as follows in figure:The automatic walking cars of 1-, 2- electric distribution operating rooms, the main turning hoisting machines of 3-, 4- tri- The sleeping head saddle of door head pulley, 5- supports, 6- frame support bars, 7-, 8- power transmission casings, 9- drilling rods, 10- drilling rod blades, 11- Spiral link slot, 12- alloy bits, 13- drill bushings.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the utility model is further elucidated.
As shown in Figure 1, Figure 2 with a kind of new long screw auger drilling deposited pile pile jacking cap integrative construction device shown in Fig. 3, bag Automatic walking car 1, and 2, the three head pulleys 4 of electric distribution operating room being arranged on automatic walking car 1 are included, and is arranged on Automatically the main turning hoisting machine 3 on walking car 1 and between 2, three head pulleys 4 of electric distribution operating room, and be arranged on automatically Walking car 1 and the support 5 on the outside of three head pulleys 4, and the frame support bar 6 of two ends difference connecting bracket 5, and arrange Sleeping head saddle 7 on support 5, and the power transmission casing 8 being connected with sleeping head saddle 7, and be connected with power transmission casing 8 Drilling rod 9, and the drilling rod blade 10 being arranged on drilling rod 9, and the drill bushing 13 of the end of drilling rod blade 10 is arranged on, wherein, drill bushing 13 Spiral link slot 11 is internally provided with, and the side of drill bushing 13 is flexibly connected with support 5(It is provided between drill bushing and support mutually Slide plate, the chute for using cooperatively, does not mark in figure), and the alloy bit 12 for being arranged on the end of drilling rod 9.
It is further preferred that support 5 is barrel-type supporting structure, its positioning support it is firm stable and be easily installed dismounting, Safeguard;Power transmission casing 8 is 55KW for the power of double-motor power transmission case body and power transmission casing 8, for drilling rod 9 There is provided sufficient power support, it is ensured that can drive the drilling rod 9 of multiple different-diameter sizes carries out efficient construction operation;Drilling rod leaf Piece 10, the diameter of drill bushing 13 are respectively 500mm, 1000mm, wherein, during construction operation, the spiral link slot of the inner surface of drill bushing 13 11 are used to support the protection i.e. joint face of the two to be helical structure connection the formation of drilling rod blade 10, can guarantee that drilling rod blade 10 exists Do not incline in construction operation so that drilling meets construction requirement, and controls along counter-rotating stable, accurate.
Embodiment
Further as shown in Figure 1, Figure 2 and Figure 3, when alloy bit 12 creeps into when drill-pouring is constructed, drill bit position peace Dress enlarged footing drilling tool(Enlarged footing drilling tool is not marked in figure),(Stake diameter can be with 80cm, it is also possible to 1m, straight with job site pile cover Depending on footpath), the general depth of enlarged footing drilling tool is 60cm, and enlarged footing is partially into after soil layer 60cm, can automatically disengage drilling rod, enlarged footing Drilling tool rests on 60cm depth soil layers position, makes drilling rod continue to creep into designing pile length position, is lifted and fills concrete, mentions on drilling rod Top 60cm positions, then take enlarged footing drilling tool and up carry together, and make the 1m diameters of enlarged footing drilling tool fill concrete together, Reach pile body, pile cover concrete energy integrated molding.
The above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of without departing from the utility model principle, some improvement can also be made, these improvement also should be regarded as Protection domain of the present utility model.

Claims (4)

1. a kind of new long screw auger drilling deposited pile pile jacking cap integrative construction device, it is characterised in that:Including automatic stride
Formula car(1), and it is arranged on automatic walking car(1)On electric distribution operating room(2), three head pulleys(4), and arrange In automatic walking car(1)Above and positioned at electric distribution operating room(2), three head pulleys(4)Between main turning hoisting machine(3), and It is arranged on automatic walking car(1)And positioned at three head pulleys(4)The support in outside(5), and two ends difference connecting bracket(5)'s Frame support bar(6), and it is arranged on support(5)On sleeping head saddle(7), and with sleeping head saddle(7)The power transmission box of connection Body(8), and with power transmission casing(8)The drilling rod of connection(9), and it is arranged on drilling rod(9)On drilling rod blade(10), and arrange In drilling rod blade(10)The drill bushing of end(13), wherein, drill bushing(13)It is internally provided with spiral link slot(11), and drill bushing(13) Side and support(5)It is flexibly connected, and is arranged on drilling rod(9)The alloy bit of end(12).
2. a kind of new long screw auger drilling deposited pile pile jacking cap integrative construction device according to claim 1, its feature It is:The support(5)For barrel-type supporting structure.
3. a kind of new long screw auger drilling deposited pile pile jacking cap integrative construction device according to claim 1, its feature It is:The power transmission casing(8)It is 55KW for double-motor power transmission case body and power.
4. a kind of new long screw auger drilling deposited pile pile jacking cap integrative construction device according to claim 1, its feature It is:The drilling rod blade(10), drill bushing(13)Diameter be respectively 500mm, 1000mm.
CN201620557416.8U 2016-06-12 2016-06-12 Novel long spiral drilling filling pile pile jacking cap integrated construction device Expired - Fee Related CN206090538U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620557416.8U CN206090538U (en) 2016-06-12 2016-06-12 Novel long spiral drilling filling pile pile jacking cap integrated construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620557416.8U CN206090538U (en) 2016-06-12 2016-06-12 Novel long spiral drilling filling pile pile jacking cap integrated construction device

Publications (1)

Publication Number Publication Date
CN206090538U true CN206090538U (en) 2017-04-12

Family

ID=58471791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620557416.8U Expired - Fee Related CN206090538U (en) 2016-06-12 2016-06-12 Novel long spiral drilling filling pile pile jacking cap integrated construction device

Country Status (1)

Country Link
CN (1) CN206090538U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862733A (en) * 2016-06-12 2016-08-17 江苏昌鑫基础工程有限公司 Novel long spiral drilling hole cast-in-situ pile top and cap integrated construction device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862733A (en) * 2016-06-12 2016-08-17 江苏昌鑫基础工程有限公司 Novel long spiral drilling hole cast-in-situ pile top and cap integrated construction device

Similar Documents

Publication Publication Date Title
CN102002941B (en) Large-aperture long screw rig, reinforcement cage concreting device and fabricating method of large-aperture deep pile
CN110374500B (en) Grouped drilling and pile planting construction method
CN100572676C (en) Large area sawed joint cutting construction method of concrete gravity dam cross joint
CN206090539U (en) Long spiral drilling filling pile pile jacking cap integrated construction device of PLC control
CN107939277B (en) Low-clearance double-rotary drilling machine and construction method thereof
CN206090538U (en) Novel long spiral drilling filling pile pile jacking cap integrated construction device
CN105927154A (en) Spiral drilling and pouring device applied to pile top and pile cap integrated construction
CN206053840U (en) A kind of long screw auger drilling deposited pile pile jacking cap integrative construction device
CN206053838U (en) A kind of auger boring device for casting for being applied to stake top pile cover integrated construction
CN105862732A (en) PLC-controlled (programmable logic controller controlled) integrated construction apparatus for long-spiral cast-in-place bored pile top cap
CN105862733A (en) Novel long spiral drilling hole cast-in-situ pile top and cap integrated construction device
CN206053870U (en) A kind of boring assemblies of long screw auger drilling deposited pile pile jacking cap integrated construction
CN102322138A (en) The modular sliding formwork
CN110331936B (en) Combined drilling bottom-expanding pile-planting construction method
CN102251522B (en) Filling pile coring method and combined concrete coring device
CN105888576A (en) Drilling assembly for integrated construction of long spiral bored perfusion pile top and cap
CN206053839U (en) It is applied to the control bracing frame of long screw auger drilling deposited pile pile jacking cap integrated construction
CN206873531U (en) Guide rod type revolution cutting chute forming machine
CN212003077U (en) Drill rod guiding device of rotary drilling rig
CN201535071U (en) Retractor for quickly adjusting verticality of steel column
CN210530745U (en) Combined drilling bottom-expanding pile-planting system
CN105927152A (en) Pile body and pile cap integrated construction device for long spiral bored pile
CN212983846U (en) Concrete-poured spiral building pile
CN201428378Y (en) Drill for recycling tower crane foundation screws
CN106522830A (en) Split-type spiral drilling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Room 609, Wanda Center Office Building, Yixing City, Wuxi City, Jiangsu Province

Patentee after: Jiangsu Changxin Foundation Engineering Group Co.,Ltd.

Address before: Room 609, Wanda Center Office Building, Yixing City, Wuxi City, Jiangsu Province

Patentee before: JIANGSU CHANGXIN BASIC ENGINEERING CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170412