CN105926455A CN201610355645.6A CN201610355645A CN105926455A CN 105926455 A CN105926455 A CN 105926455A CN 201610355645 A CN201610355645 A CN 201610355645A CN 105926455 A CN105926455 A CN 105926455A
Authority
CN
China
Prior art keywords
box
wearing
formwork
box girder
top board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610355645.6A
Other languages
English (en)
Other versions
CN105926455B (zh
Inventor
尹景燕
刘俊
王兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201610355645.6A priority Critical patent/CN105926455B/zh
Publication of CN105926455A publication Critical patent/CN105926455A/zh
Application granted granted Critical
Publication of CN105926455B publication Critical patent/CN105926455B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Abstract

一种箱梁底模整体拆除方法,其步骤为:(1)预埋拆模孔:顶板浇筑前预埋80mm拆模孔,使顶板和底模的预埋管处于同一竖直位置,向预埋管中穿入铁链;(2)对穿螺栓加固:顶板浇筑完成后,箱梁底模和顶板采用对穿螺栓加固;(3)箱梁底模整体拆除:拆除箱梁底部的脚手架后,采用电动吊架通过铁链将底模下放至箱梁下部的板车上,运走后修补拆模孔。本发明方法具有优势有:(1)模板整体分段拆除工艺不占用大型起重设备,电动吊架操作简单快捷,加固方式稳固;(2)施工效率高,机械作业、材料使用成本低,安全风险系数低。

Description

一种箱梁底模整体拆除方法
技术领域
本发明涉及工程建设领域的箱梁工程技术领域,尤其涉及一种箱梁底模整体拆除方法。
背景技术
在铁路、城市道路和公路的桥梁工程施工中底板模板的拆除一直以来都是工程的难点和重点,在以往的箱梁工程底模拆除施工中,传统的方法是采用人工拆除模板,采用这种方法拆除高大的模板或者钢制模板效率低,且施工危险系数较高,同时拆除下来的模板再次使用时,需要进行拼装,拼装时需要对模板进行筛选,耗费大量人力财力,对施工单位造成巨大的进度压力和成本压力。
如何将箱梁底模的整体性,机械的特性,拆除的安全性,三者结合起来是项目面临的严峻考验。本发明采用预埋拆模孔,拆模吊架从箱梁顶板吊装起重作业,平板车倒运的形式进行施工。
发明内容
本发明为解决上述问题提供了一种箱梁底模整体拆除方法。
本发明所采取的技术方案:
一种箱梁底模整体拆除方法,其步骤为:
(1)预埋拆模孔:顶板浇筑前预埋80mm拆模孔,使顶板和底模的预埋管处于同一竖直位置,向预埋管中穿入铁链;
(2)对穿螺栓加固:顶板浇筑完成后,箱梁底模和顶板采用对穿螺栓加固,顶板与对穿螺栓接触位置垫有“凹形”对穿垫片;
(3)箱梁底模整体拆除:对穿螺栓加固完毕后,拆除箱梁底部的脚手架,待脚手架拆除完毕后,将电动吊架移动到拆模孔的正上方,采用对穿帽连接对穿螺栓,紧固完成后将铁链提升至紧固状态,拆除对穿螺栓后,启动电动吊架通过铁链将底模下放至箱梁下部的板车上,运走后修补拆模孔,转至其他箱梁底模使用。
本发明的有益效果:
(1)模板整体分段拆除工艺不占用大型起重设备,电动吊架操作简单快捷,加固方式稳固;
(2)安全性高,人员没有高空作业的安全隐患,起重过程不需要人员的辅助;
(3)速度快,效率高,整体拆除同时保证了转运效率,全面缩短机械施工作业周期,节省材料。
附图说明
图1为本发明箱梁底模整体拆除施工示意图。
其中:1-板车;2-底模;3-铁链;4-电动吊架。
具体实施方式
一种箱梁底模整体拆除方法,其步骤为:
(1)预埋拆模孔:顶板浇筑前预埋80mm拆模孔,使顶板和底模的预埋管处于同一竖直位置,向预埋管中穿入铁链;
(2)对穿螺栓加固:顶板浇筑完成后,箱梁底模和顶板采用对穿螺栓加固,顶板与对穿螺栓接触位置垫有“凹形”对穿垫片;
(3)箱梁底模整体拆除:对穿螺栓加固完毕后,拆除箱梁底部的脚手架,待脚手架拆除完毕后,将电动吊架移动到拆模孔的正上方,采用对穿帽连接对穿螺栓,紧固完成后将铁链提升至紧固状态,拆除对穿螺栓后,启动电动吊架通过铁链将底模下放至箱梁下部的板车上,运走后修补拆模孔,转至其他箱梁底模使用。
以上对本发明的一个实施例进行了详细说明,但所述内容仅为本发明的较佳实施例,不能被认为用于限定本发明的实施范围。凡依本发明申请范围所作的均等变化与改进等,均应仍归属于本发明的专利涵盖范围之内。

Claims (1)

1.一种箱梁底模整体拆除方法,其特征在于,其步骤为:
(1)预埋拆模孔:顶板浇筑前预埋80mm拆模孔,使顶板和底模的预埋管处于同一竖直位置,向预埋管中穿入铁链;
(2)对穿螺栓加固:顶板浇筑完成后,箱梁底模和顶板采用对穿螺栓加固,顶板与对穿螺栓接触位置垫有“凹形”对穿垫片;
(3)箱梁底模整体拆除:对穿螺栓加固完毕后,拆除箱梁底部的脚手架,待脚手架拆除完毕后,将电动吊架移动到拆模孔的正上方,采用对穿帽连接对穿螺栓,紧固完成后将铁链提升至紧固状态,拆除对穿螺栓后,启动电动吊架通过铁链将底模下放至箱梁下部的板车上,运走后修补拆模孔,转至其他箱梁底模使用。
CN201610355645.6A 2016-05-25 2016-05-25 一种箱梁底模整体拆除方法 Active CN105926455B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610355645.6A CN105926455B (zh) 2016-05-25 2016-05-25 一种箱梁底模整体拆除方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610355645.6A CN105926455B (zh) 2016-05-25 2016-05-25 一种箱梁底模整体拆除方法

Publications (2)

Publication Number Publication Date
CN105926455A true CN105926455A (zh) 2016-09-07
CN105926455B CN105926455B (zh) 2018-10-09

Family

ID=56841161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610355645.6A Active CN105926455B (zh) 2016-05-25 2016-05-25 一种箱梁底模整体拆除方法

Country Status (1)

Country Link
CN (1) CN105926455B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364365A (zh) * 2020-03-23 2020-07-03 中国十九冶集团有限公司 螺旋钢管桩组合支架拆除方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000054076A (ko) * 2000-05-22 2000-09-05 이석원 콘크리트 빔 사이의 크로스빔 시공방법
CN101391438A (zh) * 2008-10-27 2009-03-25 上海市建筑构件制品有限公司 薄壁u型梁整拆整装整体滑移大模板
CN201785704U (zh) * 2010-09-19 2011-04-06 中铁十二局集团有限公司 连续箱梁合拢段施工的挂篮装置
CN202644407U (zh) * 2012-06-12 2013-01-02 甘肃路桥建设集团有限公司 抱箍法施工盖梁底板托架脱模装置
CN103469736A (zh) * 2013-10-11 2013-12-25 中铁十九局集团第六工程有限公司 T形梁桥面系横隔板支模装置及支模拆模方法
CN204690596U (zh) * 2015-05-21 2015-10-07 上海市政建设有限公司 高架桥盖梁定型底模支架
CN204959606U (zh) * 2015-03-23 2016-01-13 修林岩 一种挂蓝吊带预留孔封堵装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000054076A (ko) * 2000-05-22 2000-09-05 이석원 콘크리트 빔 사이의 크로스빔 시공방법
CN101391438A (zh) * 2008-10-27 2009-03-25 上海市建筑构件制品有限公司 薄壁u型梁整拆整装整体滑移大模板
CN201785704U (zh) * 2010-09-19 2011-04-06 中铁十二局集团有限公司 连续箱梁合拢段施工的挂篮装置
CN202644407U (zh) * 2012-06-12 2013-01-02 甘肃路桥建设集团有限公司 抱箍法施工盖梁底板托架脱模装置
CN103469736A (zh) * 2013-10-11 2013-12-25 中铁十九局集团第六工程有限公司 T形梁桥面系横隔板支模装置及支模拆模方法
CN204959606U (zh) * 2015-03-23 2016-01-13 修林岩 一种挂蓝吊带预留孔封堵装置
CN204690596U (zh) * 2015-05-21 2015-10-07 上海市政建设有限公司 高架桥盖梁定型底模支架

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364365A (zh) * 2020-03-23 2020-07-03 中国十九冶集团有限公司 螺旋钢管桩组合支架拆除方法

Also Published As

Publication number Publication date
CN105926455B (zh) 2018-10-09

Similar Documents

Publication Publication Date Title
CN103195450B (zh) 液压隧道仰拱作业台车及仰拱施工方法
CN203979647U (zh) 一种可拆卸重复利用导轨穿管器
CN103572763B (zh) 大跨度钢支撑基坑支护拆除施工方法
CN205000974U (zh) 一种用于隧道开挖施工的轮胎式自动升降组装台架
CN105155553A (zh) 混凝土支撑静力破碎与劈裂法组合绿色拆除施工方法
CN203053782U (zh) 一种矸石充填试验压缩模具
CN106216408A (zh) 一种用于更换宽厚板轧机液压agc缸的装置及其使用方法
CN103452328B (zh) 用于钢筋混凝土构件的减柱强梁加固装置及方法
CN105926455A (zh) 一种箱梁底模整体拆除方法
CN207863474U (zh) 一种用于建筑的安装模板结构
CN201474297U (zh) 简易钢管定型模板
CN106902911A (zh) 一种水利工程破碎装置
CN110482395A (zh) 一种盾体辅助翻身装置
CN206128095U (zh) 用于大型无底钢围堰的气囊下水装置
CN203188223U (zh) 一种实现干作业100%回收的无底双壁钢套箱
CN106276030B (zh) 一种干熄焦炉大修拆除废料的运输方法
CN207209786U (zh) 膺架现浇梁支架整体式自动拆除装置
CN206104558U (zh) 一种用于更换宽厚板轧机液压agc缸的装置
CN204532374U (zh) 地铁车站施工用多功能台车
CN206815861U (zh) 装配式出料平台
CN202644407U (zh) 抱箍法施工盖梁底板托架脱模装置
CN102729328A (zh) 一种混凝土构件翻转机
CN207943794U (zh) 一种隧道内管路快速拆除装置
CN206913060U (zh) 一种销轴拔出装置
CN205976595U (zh) 抵抗高空悬挑钢结构平台拆除过程中冲击荷载的拆除结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant