CN105911457A - Method for realizing ICT and FCT multi-machine parallel testing - Google Patents

Method for realizing ICT and FCT multi-machine parallel testing Download PDF

Info

Publication number
CN105911457A
CN105911457A CN201610262288.9A CN201610262288A CN105911457A CN 105911457 A CN105911457 A CN 105911457A CN 201610262288 A CN201610262288 A CN 201610262288A CN 105911457 A CN105911457 A CN 105911457A
Authority
CN
China
Prior art keywords
pcba
test
pallet
section
line testing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610262288.9A
Other languages
Chinese (zh)
Other versions
CN105911457B (en
Inventor
万国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen jinruida Equipment Co.,Ltd.
Original Assignee
Shenzhen Recodel Testing Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Recodel Testing Technology Co Ltd filed Critical Shenzhen Recodel Testing Technology Co Ltd
Priority to CN201610262288.9A priority Critical patent/CN105911457B/en
Publication of CN105911457A publication Critical patent/CN105911457A/en
Application granted granted Critical
Publication of CN105911457B publication Critical patent/CN105911457B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/28Testing of electronic circuits, e.g. by signal tracer
    • G01R31/2801Testing of printed circuits, backplanes, motherboards, hybrid circuits or carriers for multichip packages [MCP]
    • G01R31/2806Apparatus therefor, e.g. test stations, drivers, analysers, conveyors
    • G01R31/2808Holding, conveying or contacting devices, e.g. test adapters, edge connectors, extender boards

Abstract

The invention provides a method for realizing ICT and FCT multi-machine parallel testing. The action process of a test section comprises the following steps that 1) a PCBA tray is conveyed to a rotary distribution table from a previous working position through a conveying track, the PCBA tray is conveyed to the rotary distribution table, the PCBA tray is arranged in place and then the rotary distribution table rotates for 90 degrees to distribute the PCBA tray to a first online test machine, the first online test machine detects the in-place state of the PCBA tray and then starts testing, and the rotary distribution table returns to wait for receiving the next PCBA tray to be tested; and 2) the rotary distribution table receives the PCBA tray again and then rotates for 90 degrees to distribute the PCBA tray to a second online test machine. According to the method for realizing ICT and FCT multi-machine parallel testing, cost can be reduced, and a production line can be formed through connection of the original independently produced ICT and FCT so that automatic production can be realized, the machines of different beats can be effectively utilized and the use efficiency of the machines is enabled to be optimal.

Description

A kind of method realizing the test of ICT and FCT multi-host parallel
Technical field
The present invention relates to a kind of method realizing the test of ICT and FCT multi-host parallel.
Background technology
In electronic manufacturing industry, the production of PCBA is requisite link.The production process of PCBA In, ICT and FCT is also the inspection operation that it is required, the most all can be through one section of ICT and at least one section of FCT (being also likely to be multistage FCT), most of ICT and FCT is to use the automanual pattern of unit, Every machine is required for being equipped with operator manual work, it is impossible to realizes on-line automation and produces, seriously hinders The automated process of PCBA production industry.
ICT and FCT is carried out automatic improving and has a scheme conventional with two kinds:
1) use robot to replace people's operation to realize automated production, but the improvement cost of this mode be high, Debugging cycle is the most long.
2) transform traditional ICT and FCT and make it have the function of on-line testing, be typically all at present and use The mode one of series connection connects one and sets up production line, so there is Railway Project: 1, when a wherein machine When device needs debugging maintenance, whole production line has to stop;2, when ICT and FCT testing time not Meanwhile, can only be used as productive temp with the board of time length, the equipment so making whole production line can not Effectively utilize, inefficiency;3, the problem low in order to solve the 2nd point efficiency, increases some identical functions Test machine time PCBA transmission between machine and machine can be made again to become the most complicated.
Summary of the invention
It is an object of the invention to overcome above-mentioned the deficiencies in the prior art, it is provided that it is many that one realizes ICT and FCT The method of machine concurrent testing, the method can reduce automatic improving cost, improving production efficiency.Make originally ICT and FCT of single machine production is linked to be the production line testing workshop section more, it is achieved automated production.According to unit Production time different, it is possible to use ICT or FCT of 1,2 or multiple stage identical function forms one Test workshop section, the production time of the most each test workshop section is basically identical, and the service efficiency making machine can be optimum Change.
The present invention is achieved in that a kind of method realizing the test of ICT and FCT multi-host parallel, tests work The course of action of section comprises the following steps:
1) PCBA pallet station in the past distributes platform transmission, PCBA pallet transmission by delivery track to rotation To rotating distribution platform, PCBA pallet rotates distribution platform half-twist distribution PCBA pallet to first after putting in place On-line testing machine, the first on-line testing machine examination measures and starts test after PCBA pallet puts in place, rotates simultaneously and divide Join platform to return to waiting for receiving next block PCBA to be tested pallet;
2) rotate distribution platform and again receive half-twist after PCBA pallet, distribution PCBA pallet to the Two on-line testing machines;
3) the second on-line testing machine examination measures and starts test after PCBA pallet puts in place, rotates distribution platform etc. waiting Receive the PCBA pallet that the first on-line testing machine has been tested, rotate distribution platform and receive receipts the first on-line testing machine The PCBA pallet tested;
4) rotate distribution platform half-twist, transmit rearward the PCBA pallet that the first on-line testing machine has been tested, The PCBA pallet of front station to be received such as rotate after distribution platform has transmitted rearward, receive PCBA pallet After, rotate distribution platform half-twist and again distribute PCBA pallet to the first on-line testing machine, first surveys online Test-run a machine detects that PCBA pallet starts test after putting in place;
5) rotate the PCBA pallet that the second on-line testing machines to be received such as distribution platform have been tested, rotate distribution Platform receives the PCBA pallet that the second on-line testing machine has been tested, and rotates after distribution platform has transmitted rearward The PCBA pallet of front station to be received;
6) rotate distribution platform again by step 2) action repeat.
The course of action of the automatic p-wire of basic configuration comprises the following steps:
1) operator is placed on PCBA to PCBA pallet in feeding section, by starting button;
2) PCBA pallet is sent to test workshop section, will complete test according to the course of action of described test workshop section;
3) PCBA pallet is sent to blanking section blanking machine, it will have two kinds of situation: a, the PCBA of test PASS The operator or the mechanical hand that will stay on operation after waiting above blanking machine are taken away, operator or mechanical hand After taking PCBA away, blanking machine declines;B, test FAIL PCBA will be direct together with PCBA pallet Decline;
4) PCBA and the PCBA pallet of test FAIL returns delivery track from lower tray and returns to feeding Section, feeding section feeder declines the PCBA pallet receiving return, and feeder receives the PCBA torr of return Rise after dish and wait that operator continues to put into PCBA, if after having the PCBA operator of FAIL to take out, then Put into PCBA to be tested;
5) according to above process do action.
The course of action of the automatic p-wire of Typical Disposition comprises the following steps:
1) operator is placed on PCBA to PCBA pallet in feeding section, by starting button;
2) PCBA pallet is sent to the first test workshop section, by the automatic p-wire according to described basic configuration Course of action completes test;
3) PCBA pallet is sent to the second test workshop section, it will have two kinds of situation: a, the first test workshop section to survey That tries PASS will continue test in the second test workshop section, and b, the first test workshop section test FAIL, will not Carry out test directly by the second test workshop section, and continue directly directly to arrive blanking by follow-up test workshop section Section, and return to feeding section together with PCBA pallet;
4) the second test workshop section completes test, and PCBA pallet is sent to the 3rd test workshop section, and same has Two kinds of situation: a, second test workshop sections test directly directly being arrived down of FAIL by follow-up test workshop section Material section, b, second test workshop section test FAIL by entrances the 3rd test workshop section test, the 3rd test Workshop section includes the on-line testing machine of 4 identical functions, and PCBA pallet is according to the situation of on-line testing machine free time Transmit, when the first on-line testing machine and the second on-line testing machine free time, distribution platform distribution will be rotated by second PCBA pallet, when the 3rd on-line testing machine and the 4th on-line testing machine free time, PCBA pallet will directly pass through Second rotates distribution platform and connection platform arrival the 3rd rotation distribution platform, and the 3rd rotates distribution platform distributes PCBA torr Dish, same first on-line testing machine and the second on-line testing machine tested, and second rotates distribution platform receives PCBA pallet transmits rearward, and rotates distribution platform by connection platform and the 3rd and arrives the section of plugging into, the 3rd on-line testing Machine and the 4th on-line testing machine have been tested, and the 3rd rotates distribution platform reception PCBA pallet transmits rearward The section of plugging into;
5) the PCBA pallet of the section of plugging into is arrived, it will have two kinds of situation: a, the 3rd test workshop section test PASS Will continue test, b, the 3rd test workshop section test FAIL in the 4th test workshop section, will not test Directly by the 4th test workshop section, directly arriving blanking section, the 4th test workshop section is according to described basic configuration Automatically the course of action of p-wire completes test;
6) PCBA pallet is sent to blanking section blanking machine, it will have two kinds of situation: a, 4 test workshop sections all The PCBA of test PASS will stay on the operator of operation or mechanical hand after waiting above blanking machine and takes away, After PCBA taken away by operator or mechanical hand, blanking machine decline, b, have one test workshop section FAIL PCBA Directly will decline together with PCBA pallet;
7) PCBA and the PCBA pallet of test FAIL returns delivery track from lower tray and returns to feeding Section, feeding section feeder declines the PCBA pallet receiving return, and feeder receives the PCBA torr of return Rise after dish and wait that operator continues to put into PCBA, if after having the PCBA operator of FAIL to take out, then Put into PCBA to be tested;
8) according to above process do action.
The invention has the beneficial effects as follows: cost can be reduced, make ICT and FCT of single machine production originally be linked to be Production line, it is achieved automated production, and make the machine of different beat effectively to utilize, make the use of machine imitate Rate energy optimization.
Accompanying drawing explanation
In order to be illustrated more clearly that technical scheme, below by embodiment required use attached Figure is briefly described, it should be apparent that, the accompanying drawing in describing below is only some embodiments of the present invention, For those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to this A little accompanying drawings obtain other accompanying drawing.
Fig. 1 is the method testing work realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides Segment structure figure.
Fig. 2 is the method testing work realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The structure chart of section action.
Fig. 3 is the method testing work realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The structure chart of section action.
Fig. 4 is the method testing work realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The structure chart of section action.
Fig. 5 is the method testing work realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The structure chart of section action.
Fig. 6 is the method testing work realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The structure chart of section action.
Fig. 7 is the method testing work realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The structure chart of section action.
Fig. 8 is the method testing work realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The structure chart of section action.
Fig. 9 is the method testing work realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The structure chart of section action.
Figure 10 is the method testing realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The structure chart of workshop section's action.
Figure 11 is the method testing work realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The structure chart of section action.
Figure 12 is the method testing realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The structure chart of workshop section's action.
Figure 13 is the method testing realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The structure chart of workshop section's action.
Figure 14 is the method testing realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The structure chart of workshop section's action.
Figure 15 is the basic of the method realizing the test of ICT and FCT multi-host parallel of embodiment of the present invention offer The plan structure figure of the automatic p-wire of configuration.
Figure 16 is the basic of the method realizing the test of ICT and FCT multi-host parallel of embodiment of the present invention offer The main TV structure figure of the automatic p-wire of configuration
Figure 17 is the basic of the method realizing the test of ICT and FCT multi-host parallel of embodiment of the present invention offer The movement structure figure of the automatic p-wire of configuration.
Figure 18 is the typical case of the method realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The plan structure figure of the automatic p-wire of configuration.
Figure 19 is the typical case of the method realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The main TV structure figure of the automatic p-wire of configuration.
Figure 20 is the typical case of the method realizing the test of ICT and FCT multi-host parallel that the embodiment of the present invention provides The movement structure figure of the automatic p-wire of configuration.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clearly Chu, it is fully described by.
As shown in Fig. 1-Figure 14, a kind of method realizing the test of ICT and FCT multi-host parallel, test workshop section Including: distribute platform 2, with delivery track 1 with delivery track 1, the rotatable rotation of delivery track 1 First on-line testing machine 3 and the second on-line testing machine 4 with delivery track 1.
The course of action of test workshop section comprises the following steps:
1) station in the past of the PCBA6 on PCBA pallet 5 is passed to rotating distribution platform 2 by delivery track 1 Sending, PCBA pallet 5 is sent to rotate distribution platform 2, and PCBA pallet 5 rotates distribution platform 2 and rotates after putting in place 90 ° are distributed PCBA pallet the 5 to the first on-line testing machine 3, the first on-line testing machine 3 by delivery track 1 Detect that PCBA pallet 5 starts test after putting in place, rotate distribution platform 2 simultaneously and return to waiting for receiving next block PCBA pallet 5 to be tested;
2) rotate distribution platform 2 and again receive half-twist after PCBA pallet 5, by delivery track 1 Distribution PCBA pallet the 5 to the second on-line testing machine 4;
3) the second on-line testing machine 3 detects that PCBA pallet 5 starts test after putting in place, rotates distribution platform 2 The PCBA pallet 5 tested etc. the first on-line testing machine 3 to be received, rotates distribution platform 2 and receives first The PCBA pallet 5 that on-line testing machine 3 has been tested;
4) rotate distribution platform 2 half-twist, transmit rearward the PCBA that the first on-line testing machine 3 has been tested Pallet 5, the PCBA pallet 5 of front station to be received such as rotates after distribution platform 2 has transmitted rearward, receives After PCBA pallet 5, rotation distribution platform 2 half-twist again distributes PCBA pallet 5 to the first and surveys online Test-run a machine 3, the first on-line testing machine 3 detects that PCBA pallet 5 starts test after putting in place;
5) the PCBA pallet 5 that the second on-line testing machines 4 to be received such as distribution platform 2 have been tested, rotation are rotated Turn distribution platform 2 and receive the PCBA pallet 5 that the second on-line testing machine 4 has been tested, rotate distribution platform 2 backward The PCBA pallet 5 of front station to be received such as after having transmitted;
6) rotate distribution platform 2 again by step 2) action repeat.
Such as Figure 15-17, the automatic p-wire of basic configuration includes feeding section, test workshop section 8 and blanking section, on Material section configures liftable feeder 7, and blanking section configures liftable blanking machine 9.
The course of action of the automatic p-wire of basic configuration comprises the following steps:
1) operator is placed on PCBA6 to PCBA pallet 5 in feeding section, by starting button;
2) PCBA pallet 5 is sent to test workshop section 8, will complete to survey according to the course of action of test workshop section 8 Examination;
3) PCBA pallet 5 is sent to blanking section blanking machine 9, it will have two kinds of situation: a, test PASS PCBA6 will stay on wait above blanking machine 9 after the operator of operation or mechanical hand take away, operator Or after PCBA6 taken away by mechanical hand, blanking machine 9 declines;B, test FAIL PCBA6 will and PCBA Pallet 5 the most directly declines;
4) PCBA6 and the PCBA pallet 5 of test FAIL returns from lower tray return delivery track 10 To feeding section, feeding section feeder 7 declines the PCBA pallet 5 receiving return, and feeder 7 receives return PCBA pallet 5 after rise wait operator continue to put into PCBA6, if there being the PCBA6 of FAIL to make After industry person takes out, place into PCBA6 to be tested;
5) according to above process do action.
The automatic p-wire of Typical Disposition include feeding section, the first test workshop section 11, second test workshop section 12, 3rd test workshop section 13, the section of plugging into the 14, the 4th test workshop section 15 and blanking section composition.The configuration of feeding section can The feeder 7 of lifting, the first test workshop section 11 is made up of the automatic p-wire of a basic configuration, and second surveys Trial work section 12 is made up of separate unit on-line testing machine, and the 3rd test workshop section 13 is by the automatic survey of 2 basic configuration Examination line and a connection platform composition, the section of plugging into 14 is made up of a connection platform, and the 4th test workshop section 15 is by one The automatic p-wire composition of individual basic configuration, blanking section configures liftable blanking machine 9.
The course of action of the automatic p-wire of Typical Disposition comprises the following steps:
1) operator is placed on PCBA6 to PCBA pallet 5 in feeding section, by starting button;
2) PCBA pallet 5 is sent to the first test workshop section 11, by the automatic p-wire according to basic configuration Course of action completes test;
3) PCBA pallet 5 is sent to the second test workshop section 12, it will have two kinds of situation: a, the first test Workshop section 11 test PASS will second test workshop section 12 continue test, b, first test workshop section 11 test FAIL's, test will not be carried out directly by the second test workshop section 12, and continue directly by follow-up test work Section directly arrives blanking section, and returns to feeding section together with PCBA pallet 5;
4) the second test workshop section 12 completes test, and PCBA pallet 5 is sent to the 3rd test workshop section 13, with Sample have two kinds of situation: a, the second test workshop section 12 tests FAIL will directly pass through follow-up test workshop section Directly arrive blanking section, b, second test workshop section 12 test FAIL by entrances the 3rd test workshop section 13 enter Row test, the 3rd test workshop section 13 includes the on-line testing machine of 4 identical functions, 5, PCBA pallet The situation idle according to on-line testing machine transmits, and the first on-line testing machine 3 and the second on-line testing machine 4 are empty Idle will be rotated distribution platform 16 by second and distribute PCBA pallet 5, and the 3rd on-line testing machine 17 and the 4th is online When test machine 18 is idle, PCBA pallet 5 will directly be arrived by the second rotation distribution platform 16 and connection platform 19 Reaching the 3rd rotation distribution platform 20, the 3rd rotates distribution platform 20 distributes PCBA pallet 5, and same first surveys online Test-run a machine 3 and the second on-line testing machine 4 have been tested, and second rotates distribution platform 16 receives PCBA pallet 5 Transmit rearward, rotate the distribution platform 20 arrival section of plugging into 14, the 3rd on-line testing by connection platform 19 and the 3rd Machine 17 and the 4th on-line testing machine 18 have been tested, and the 3rd rotates distribution platform 20 receives PCBA pallet 5 Transmit rearward the section of plugging into 14;
5) the PCBA pallet 5 of the section of plugging into 14 is arrived, it will have two kinds of situation: a, the 3rd test workshop section 13 Test PASS will continue test in the 4th test workshop section 14, and b, the 3rd test workshop section 13 test FAIL , test will not be carried out directly by the 4th test workshop section 14, directly arrive blanking section, the 4th test workshop section 14 complete test according to the course of action of the automatic p-wire of basic configuration;
6) PCBA pallet 5 is sent to blanking section blanking machine 9, it will have two kinds of situation: a, 4 test works Section all test the PCBA of PASS will stay on wait above blanking machine 9 after the operator of operation or mechanical hand Taking away, after PCBA taken away by operator or mechanical hand, blanking machine 9 declines, b, have one test workshop section FAIL PCBA6 directly will decline together with PCBA pallet 5;
7) PCBA6 and the PCBA pallet 5 of test FAIL returns to from lower tray return delivery track Material section, feeding section feeder 7 declines the PCBA pallet 5 receiving return, and feeder 7 receives return Rise after PCBA pallet 5 and wait that operator continues to put into PCBA6, if there being the PCBA6 operation of FAIL After member takes out, place into PCBA6 to be tested;
8) according to above process do action.
The invention has the beneficial effects as follows: cost can be reduced, make ICT and FCT of single machine production originally be linked to be Production line, it is achieved automated production, and make the machine of different beat effectively to utilize, make the use of machine imitate Rate energy optimization.
The above is the preferred embodiment of the present invention, it is noted that for the common skill of the art For art personnel, under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications, this A little improvements and modifications are also considered as protection scope of the present invention.

Claims (3)

1. the method realizing the test of ICT and FCT multi-host parallel, it is characterised in that: test workshop section is moved Comprise the following steps as process:
1) PCBA pallet station in the past distributes platform transmission, PCBA pallet transmission by delivery track to rotation To rotating distribution platform, PCBA pallet rotates distribution platform half-twist distribution PCBA pallet to first after putting in place On-line testing machine, the first on-line testing machine examination measures and starts test after PCBA pallet puts in place, rotates simultaneously and divide Join platform to return to waiting for receiving next block PCBA to be tested pallet;
2) rotate distribution platform and again receive half-twist after PCBA pallet, distribution PCBA pallet to the Two on-line testing machines;
3) the second on-line testing machine examination measures and starts test after PCBA pallet puts in place, rotates distribution platform etc. waiting Receive the PCBA pallet that the first on-line testing machine has been tested, rotate distribution platform and receive the first on-line testing machine The PCBA pallet tested;
4) rotate distribution platform half-twist, transmit rearward the PCBA pallet that the first on-line testing machine has been tested, The PCBA pallet of front station to be received such as rotate after distribution platform has transmitted rearward, receive PCBA pallet After, rotate distribution platform half-twist and again distribute PCBA pallet to the first on-line testing machine, first surveys online Test-run a machine detects that PCBA pallet starts test after putting in place;
5) rotate the PCBA pallet that the second on-line testing machines to be received such as distribution platform have been tested, rotate distribution Platform receives the PCBA pallet that the second on-line testing machine has been tested, and rotates after distribution platform has transmitted rearward The PCBA pallet of front station to be received;
6) rotate distribution platform again by step 2) action repeat.
A kind of method realizing the test of ICT and FCT multi-host parallel the most according to claim 1, it is special Levy and be: the course of action of the automatic p-wire of basic configuration comprises the following steps:
1) operator is placed on PCBA to PCBA pallet in feeding section, by starting button;
2) PCBA pallet is sent to test workshop section, will complete test according to the course of action of described test workshop section;
3) PCBA pallet is sent to blanking section blanking machine, it will have two kinds of situation: a, the PCBA of test PASS The operator or the mechanical hand that will stay on operation after waiting above blanking machine are taken away, operator or mechanical hand After taking PCBA away, blanking machine declines;B, test FAIL PCBA will be direct together with PCBA pallet Decline;
4) PCBA and the PCBA pallet of test FAIL returns delivery track from lower tray and returns to feeding Section, feeding section feeder declines the PCBA pallet receiving return, and feeder receives the PCBA torr of return Rise after dish and wait that operator continues to put into PCBA, if after having the PCBA operator of FAIL to take out, then Put into PCBA to be tested;
5) according to above process do action.
A kind of method realizing the test of ICT and FCT multi-host parallel the most according to claim 1, it is special Levy and be: the course of action of the automatic p-wire of Typical Disposition comprises the following steps:
1) operator is placed on PCBA to PCBA pallet in feeding section, by starting button;
2) PCBA pallet is sent to the first test workshop section, by the automatic p-wire according to described basic configuration Course of action completes test;
3) PCBA pallet is sent to the second test workshop section, it will have two kinds of situation: a, the first test workshop section to survey That tries PASS will continue test in the second test workshop section, and b, the first test workshop section test FAIL, will not Carry out test directly by the second test workshop section, and continue directly directly to arrive blanking by follow-up test workshop section Section, and return to feeding section together with PCBA pallet;
4) the second test workshop section completes test, and PCBA pallet is sent to the 3rd test workshop section, and same has Two kinds of situation: a, second test workshop sections test directly directly being arrived down of FAIL by follow-up test workshop section Material section, b, second test workshop section test FAIL by entrances the 3rd test workshop section test, the 3rd test Workshop section includes the on-line testing machine of 4 identical functions, and PCBA pallet is according to the situation of on-line testing machine free time Transmit, when the first on-line testing machine and the second on-line testing machine free time, distribution platform distribution will be rotated by second PCBA pallet, when the 3rd on-line testing machine and the 4th on-line testing machine free time, PCBA pallet will directly pass through Second rotates distribution platform and connection platform arrival the 3rd rotation distribution platform, and the 3rd rotates distribution platform distributes PCBA torr Dish, same first on-line testing machine and the second on-line testing machine tested, and second rotates distribution platform receives PCBA pallet transmits rearward, and rotates distribution platform by connection platform and the 3rd and arrives the section of plugging into, the 3rd on-line testing Machine and the 4th on-line testing machine have been tested, and the 3rd rotates distribution platform reception PCBA pallet transmits rearward The section of plugging into;
5) the PCBA pallet of the section of plugging into is arrived, it will have two kinds of situation: a, the 3rd test workshop section test PASS Will continue test, b, the 3rd test workshop section test FAIL in the 4th test workshop section, will not test Directly by the 4th test workshop section, directly arriving blanking section, the 4th test workshop section is according to described basic configuration Automatically the course of action of p-wire completes test;
6) PCBA pallet is sent to blanking section blanking machine, it will have two kinds of situation: a, 4 test workshop sections all The PCBA of test PASS will stay on the operator of operation or mechanical hand after waiting above blanking machine and takes away, After PCBA taken away by operator or mechanical hand, blanking machine decline, b, have one test workshop section FAIL PCBA Directly will decline together with PCBA pallet;
7) PCBA and the PCBA pallet of test FAIL returns delivery track from lower tray and returns to feeding Section, feeding section feeder declines the PCBA pallet receiving return, and feeder receives the PCBA torr of return Rise after dish and wait that operator continues to put into PCBA, if after having the PCBA operator of FAIL to take out, then Put into PCBA to be tested;
8) according to above process do action.
CN201610262288.9A 2016-04-26 2016-04-26 A method of realizing the test of ICT and FCT multi-host parallels Active CN105911457B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610262288.9A CN105911457B (en) 2016-04-26 2016-04-26 A method of realizing the test of ICT and FCT multi-host parallels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610262288.9A CN105911457B (en) 2016-04-26 2016-04-26 A method of realizing the test of ICT and FCT multi-host parallels

Publications (2)

Publication Number Publication Date
CN105911457A true CN105911457A (en) 2016-08-31
CN105911457B CN105911457B (en) 2018-09-18

Family

ID=56752016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610262288.9A Active CN105911457B (en) 2016-04-26 2016-04-26 A method of realizing the test of ICT and FCT multi-host parallels

Country Status (1)

Country Link
CN (1) CN105911457B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111537193A (en) * 2019-02-07 2020-08-14 株式会社Ap科技 Camera module comprehensive detection system comprising rotating part
CN117007946A (en) * 2023-10-07 2023-11-07 深圳市拓普泰克技术股份有限公司 Automatic test management method and related device for PCBA

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1367371A (en) * 2001-01-12 2002-09-04 日本电产丽德株式会社 Circuit board checking device and method
US20050122127A1 (en) * 2003-12-04 2005-06-09 Carlo Grillettc Method and apparatus for testing of integrated circuit package
US7821277B2 (en) * 2008-04-18 2010-10-26 King Yuan Electronics Co., Ltd. Parallel test fixture for mixed signal integrated circuits
CN103674949A (en) * 2012-08-31 2014-03-26 深圳麦逊电子有限公司 Four-station parallel testing device and method
CN203688705U (en) * 2014-02-07 2014-07-02 湖南牧特自动化有限公司 Automatic one-with-two test line with screening function
CN104237765A (en) * 2013-06-14 2014-12-24 珠海格力电器股份有限公司 FCT automatic test system integrated on ICT device
CN204142907U (en) * 2014-07-28 2015-02-04 深圳市德富莱自动化设备有限公司 Small-sized PCBA Auto-Test System
CN105007357A (en) * 2015-08-21 2015-10-28 成都博视广达科技有限责任公司 Mobile phone multi-station parallel testing device and realization method thereof
CN105025142A (en) * 2015-08-21 2015-11-04 成都博视广达科技有限责任公司 Mobile phone multi-station parallel test system and implementation method thereof
CN105314392A (en) * 2015-10-27 2016-02-10 苏州和瑞科自动化科技有限公司 System for multi-station circuit board parallel tests

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1367371A (en) * 2001-01-12 2002-09-04 日本电产丽德株式会社 Circuit board checking device and method
US20050122127A1 (en) * 2003-12-04 2005-06-09 Carlo Grillettc Method and apparatus for testing of integrated circuit package
US7821277B2 (en) * 2008-04-18 2010-10-26 King Yuan Electronics Co., Ltd. Parallel test fixture for mixed signal integrated circuits
CN103674949A (en) * 2012-08-31 2014-03-26 深圳麦逊电子有限公司 Four-station parallel testing device and method
CN104237765A (en) * 2013-06-14 2014-12-24 珠海格力电器股份有限公司 FCT automatic test system integrated on ICT device
CN203688705U (en) * 2014-02-07 2014-07-02 湖南牧特自动化有限公司 Automatic one-with-two test line with screening function
CN204142907U (en) * 2014-07-28 2015-02-04 深圳市德富莱自动化设备有限公司 Small-sized PCBA Auto-Test System
CN105007357A (en) * 2015-08-21 2015-10-28 成都博视广达科技有限责任公司 Mobile phone multi-station parallel testing device and realization method thereof
CN105025142A (en) * 2015-08-21 2015-11-04 成都博视广达科技有限责任公司 Mobile phone multi-station parallel test system and implementation method thereof
CN105314392A (en) * 2015-10-27 2016-02-10 苏州和瑞科自动化科技有限公司 System for multi-station circuit board parallel tests

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111537193A (en) * 2019-02-07 2020-08-14 株式会社Ap科技 Camera module comprehensive detection system comprising rotating part
CN111537193B (en) * 2019-02-07 2022-04-01 株式会社Ap科技 Camera module comprehensive detection system comprising rotating part
CN117007946A (en) * 2023-10-07 2023-11-07 深圳市拓普泰克技术股份有限公司 Automatic test management method and related device for PCBA
CN117007946B (en) * 2023-10-07 2023-12-22 深圳市拓普泰克技术股份有限公司 Automatic test management method and related device for PCBA

Also Published As

Publication number Publication date
CN105911457B (en) 2018-09-18

Similar Documents

Publication Publication Date Title
CN103934206B (en) The directed sorting sequencing feeding system of a kind of fresh edible maize fringe and directed sorting sort method thereof
CN104049198A (en) PCBA online fully-automatic unmanned testing system
CN206527068U (en) A kind of transformer back segment automatic test all-in-one machine equipment
CN203688705U (en) Automatic one-with-two test line with screening function
CN108551513A (en) A kind of automatic production line of mobile phone screen test
CN108899732A (en) A kind of full-automatic connecting terminal intelligence kludge
CN205165216U (en) Quick feeding beam split color scanner of full -automatic paster LED
CN206935820U (en) A kind of plasterboard on-line checking and sorting equipment
CN105610032A (en) Wiring terminal machining equipment and control system therefor
CN201681131U (en) Circuit board test machine station
CN209238446U (en) A kind of transmission belt sorting equipment
CN106571441A (en) Battery liquid-injection device
CN105911457A (en) Method for realizing ICT and FCT multi-machine parallel testing
CN105758439A (en) Robot detection device and system
CN207524492U (en) A kind of battery core paired device
CN105966863B (en) Automatic assembly line after a kind of sanitary ceramics kiln discharge
CN105470779A (en) Wiring terminal machining device and machining method thereof
CN208257095U (en) A kind of full-automatic connecting terminal intelligence kludge
CN207903450U (en) A kind of Novel disc-type highspeed sorters
CN203356088U (en) Automatic sheet selection machine
CN212502533U (en) Multifunctional integrated machine assembly line
CN209327522U (en) A kind of Optimum Design device of circuit board
CN209493071U (en) A kind of PCB carrier cover board automation unloading, transportation system
CN209349076U (en) A kind of comprehensive survey production line for PCBA board
CN107247982B (en) Classification sorting device and classification sorting method for smart cards

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210120

Address after: 518000 room 402, building 17, Changxing Science Park, Wan'an Road, Shayi community, Shajing street, Bao'an District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen jinruida Equipment Co.,Ltd.

Address before: 518000 the first floor of building 21, Ma'anshan community, Shajing street, Bao'an District, Shenzhen City, Guangdong Province

Patentee before: SHENZHEN RECODEL TESTING TECHNOLOGY Co.,Ltd.