CN105908977A - Joint bar construction structure and method - Google Patents

Joint bar construction structure and method Download PDF

Info

Publication number
CN105908977A
CN105908977A CN201610405076.1A CN201610405076A CN105908977A CN 105908977 A CN105908977 A CN 105908977A CN 201610405076 A CN201610405076 A CN 201610405076A CN 105908977 A CN105908977 A CN 105908977A
Authority
CN
China
Prior art keywords
joint bar
joint
positioner
bar
finished surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610405076.1A
Other languages
Chinese (zh)
Other versions
CN105908977B (en
Inventor
周帆
田泽辉
温雪飞
李善继
冯家荣
王永斌
刘刚
陈忠
文俊杰
林裕
王文珏
张敏
尹超
罗学
唐怀春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Construction Industry Group Co.,Ltd.
Original Assignee
CHENGDU CONSTRUCTION ENGINEERING GROUP CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU CONSTRUCTION ENGINEERING GROUP CORP filed Critical CHENGDU CONSTRUCTION ENGINEERING GROUP CORP
Priority to CN201610405076.1A priority Critical patent/CN105908977B/en
Publication of CN105908977A publication Critical patent/CN105908977A/en
Application granted granted Critical
Publication of CN105908977B publication Critical patent/CN105908977B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • E04G21/122Machines for joining reinforcing bars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a joint bar construction structure which comprises joint bars to be positioned inserted into a wall and joint bar positioning devices arranged at the upper portions of the joint bars to be positioned. Each joint bar positioning device comprises a positioning body. Positioning holes allowing the joint bars to be positioned to be inserted in a one-to-one matched mode and a plurality of vibration channels allowing vibration bars to penetrate therein are formed in the positioning bodies. The joint bar positioning devices are arranged on or above the concrete pouring completion face. The invention further discloses a joint bar construction method adopting the joint bar construction structure. Joint bar construction is performed through the joint bar construction method adopting the joint bar construction structure, it can be ensured that joint bars below the concrete pouring completion face can be precisely installed, and therefore precise installation and connection of the wall and the upper-layer structure are promoted.

Description

Joint bar constructing structure and method
Technical field
The present invention relates to technical field of building construction, be specifically related to a kind of joint bar constructing structure and method.
Background technology
Joint bar is not tie more than lower floor with class A of geometric unitA or superstructure reinforcing bar radical with superstructure at basal layer or understructure Reserved steel bar in understructure is needed to stretch into the reinforcing bar that superstructure overlaps with class A of geometric unitA with superstructure during the reinforcing bar radical of structure. Joint bar when joint bar is divided into the basic joint bar of vertical member and vertical member variable cross-section to need anchoring substantially.
In existing building structure, it is usually before basis or understructure carry out concreting, according to the construction designed Blueprint determines joint bar position, then directly carries out joint bar by joint bar location line, and the reinforcing bar bottom of insertion uses certain fixed knot Structure is connected firmly;Or it is previously inserted reinforcing bar composition prefabricated components.Above-mentioned joint bar construction typically may be only available for joint bar essence Spend less demanding project situation, such as some traditional cast-in-place concrete structures;And for the higher engineering of joint bar required precision Situation, the construction of above-mentioned joint bar obviously cannot meet the requirement of these project situation, mix especially for assembled integral in recent years Xtah Crude Clay structure applies situation the most widely in modern civil engineering, and joint bar construction precision requires more and more higher.
Assembled monolithic concrete structure is by precast concrete or parts by reinforcing bar, connector or Shi Hanzhang in addition Connecting and poured in place concrete, it combines the advantage of cast-in-place monolithic construction and prefabricated construction, saves template, Reduce engineering cost, globality and the shock resistance of engineering can be improved again.Assembled monolithic concrete structure typically has two kinds of situations, When floor is skyscraper, assembled monolithic concrete structure mainly includes that lower floor's cast-in-place concrete structure, upper strata assembled are mixed Xtah Crude Clay structure and be arranged at transition zone between the two, wherein transition zone is as lower floor's cast-in-place concrete structure and upper strata assembled The conversion layer of xoncrete structure uses cast-in-place concrete structure;When floor is low-rise building or tier building, assembling entirety Formula xoncrete structure includes basal layer, upper strata prefabricated concrete structure, and basal layer uses cast-in-place concrete structure.Above-mentioned two Planting in assembled monolithic concrete structure, can the prefabricated components of composition upper strata prefabricated concrete structure be installed smoothly and directly depend on In transition layer structure or the construction quality of base layer structure, therefore assembled monolithic concrete structure is constructed for the joint bar of transition zone The joint bar construction precision of precision or basal layer requires to require high compared to traditional joint bar construction precision, and technology requires the most more Add harsh.Owing to joint bar construction quality directly affects the installation of upper strata prefabricated components, if transition zone joint bar constructing structure or base Plinth layer joint bar constructing structure is inaccurate, and upper strata prefabricated components can be caused cannot to install or cause body of wall entirety positioning to deform smoothly, Need a kind of joint bar constructing structure that can improve joint bar construction precision and method the most at present badly.
Chinese patent literature CN205012665U discloses the temporary fastening device of a kind of concrete walls joint bar, including respectively against in The twice arranged outside interior socket muscle and outside outer socket muscle position bar along wall direction, along solid inside the bar of location, wall direction described in per pass Surely bar is fixed in the vertical wall direction having multiple tracks spaced, and described vertical wall direction is fixed bar and is perpendicular to described along location, wall direction bar, And being close proximity to joint bar, described vertical wall direction is fixed bar and is fixed bar colligation in joint bar with described along wall direction;Along wall described in twice Being fixedly connected with, between the bar of location, direction, the vertical wall direction drawknot bar that multiple tracks is spaced, described vertical wall direction drawknot bar is vertical Bar is positioned along wall direction in described.In addition this patent documentation also discloses by the temporary fastening device structure of concrete walls joint bar The joint bar constructing structure become, after the temporary fastening device of concrete walls joint bar is completed, completes it at reinforced concrete wall joint bar Afterwards, before concreting completes, this device colligation is fixed on the joint bar higher than concrete surface to be poured.This joint bar construction knot Although structure can avoid reinforcing bar to deform to a certain extent, there is following problem: first, bar is fixed in vertical wall direction And fix between bar and joint bar, need to carry out one by one colligation along wall direction so that device integral installation structure complexity is time-consuming, constructor Member operates also inconvenient, and the incorrect situation of device installation site once occurs, needs again a pair above-mentioned colligation knot Structure unbinds, and seriously delays project progress;Second, bar is fixed in vertical wall direction and suitable wall direction is fixed and adopted between bar and joint bar Binding structure to fix intensity general, only some abuts against vertical wall direction and fixes on bar joint bar, once runs into mixed Solidifying soil crosses situation of shaking, and binding structure is still easy to occur to loosen, and the situation of joint bar displacement and deformation inevitably occurs, The most still the body of wall positioning of composition can be caused to deform, not reach preferable joint bar locating effect.
Summary of the invention
The technical problem to be solved is to provide a kind of joint bar constructing structure that can improve joint bar construction precision and side Method.
In order to solve above-mentioned prior art problem, the present invention realizes by the following technical solutions:
Joint bar constructing structure of the present invention, including inserting the joint bar to be positioned of body of wall and being arranged on the joint bar on joint bar top to be positioned calmly Position device, described joint bar positioner includes that positioning body, described positioning body are provided with to be agreed with one by one plug for joint bar to be positioned Hole, location and several passages that vibrates passed for vibrating spear, described joint bar positioner is arranged on concreting finished surface Or more than concreting finished surface.Present configuration is simple, it is only necessary to joint bar to be positioned agrees with insertion location hole, then root Border service condition adjusts the installation site of joint bar positioner factually, and the hole, location agreed with circumference can limit joint bar position, prevents Joint bar is subjected to displacement and deformation in follow-up concreting process, thus accurately positions joint bar, and the passage that vibrates can supply Vibrating spear is through vibration uniform to concrete in the casting process facilitate later stage concrete, and the joint bar positioner in the present invention is relative The template used in concreting process is the structure being independently arranged, therefore, it is possible to freely install and remove, and thus can be real The recycling of existing joint bar positioner, joint bar positioner is arranged on concreting finished surface or more than, it is possible to protect Joint bar below card mixed insertion muscle positioner can accurately be installed, and the most beneficially body of wall is accurately installed with superstructure and is connected, undetermined Position joint bar agrees with hole, insertion location, agrees with and refers to ensure the stable installation on joint bar of the joint bar positioner, and concrete The power that operation of vibrating in casting process produces moves insufficient for joint bar positioner;And when the external world is applied to joint bar positioner On power big the most to a certain extent time can adjust the position of joint bar positioner, but the structure of joint bar positioner will not be caused Damage.
As the further improvement of above-mentioned joint bar constructing structure, the superstructure of described wall connecting is prefabricated components.Assembling entirety Formula xoncrete structure typically has two kinds of situations, and when floor is skyscraper, assembled monolithic concrete structure mainly includes lower floor Cast-in-place concrete structure, upper strata prefabricated concrete structure and be arranged at transition zone between the two, wherein transition zone as under Layer cast-in-place concrete structure uses cast-in-place concrete structure with the conversion layer of upper strata prefabricated concrete structure;When floor is the end When layer building or tier building, assembled monolithic concrete structure includes basal layer, upper strata prefabricated concrete structure, basal layer Use cast-in-place concrete structure.No matter which kind of structure above-mentioned, the superstructure of wall connecting is prefabricated components, assembled integral Xoncrete structure requires to require to exceed perhaps compared to traditional joint bar construction precision for the joint bar construction precision of transition zone or basal layer Many, technology requires the most harsh, therefore for the joint bar of transition zone body of wall or basal layer, selects inserting of the invention described above Muscle constructing structure can ensure transition zone body of wall or basal layer body of wall joint bar precision effectively, so that assembled integral concrete The integral wall position of structure is accurate, does not occur positioning to deform.
Further, the distance between joint bar positioner and concreting finished surface is concreting finished surface and prefabricated structure The height of horizontal joint between part.After concreting is complete, transition zone or basal layer need the set with prefabricated components bottom Cylinder abutting joint, can leave gap at vertical direction between transition zone or basal layer and prefabricated components after abutting joint, this seam Gap is the horizontal joint between concreting finished surface and prefabricated components, owing to this horizontal joint needs to carry out grouting operation, for Ensure being connected firmly of transition zone or basal layer and prefabricated components, be positioned at the joint bar at horizontal joint and be also required to be held in position as far as possible Accurately do not deform positioning, arranges joint bar positioner according to said structure, be possible not only to ensure concreting finished surface with Under joint bar accurately install, moreover it is possible to ensure that the joint bar at transition zone or basal layer and prefabricated components horizontal joint does not deform positioning, And joint bar more than horizontal joint energy after transition zone or basal layer walls concrete pour and horizontal joint grouting operation is complete Enough again regulate, be thus further ensured that the integral wall position of assembled monolithic concrete structure is the most accurate, install the most suitable Profit, does not occur positioning to deform.
Further, described joint bar positioner is 20mm with the spacing of concreting finished surface, under this distance condition, Joint bar location is the most accurate, and the integral wall position of assembled monolithic concrete structure is the most accurate, installs the most smooth.
As the further improvement of above-mentioned joint bar constructing structure, described positioning body is to be provided with hole, location and the location of the passage that vibrates Plate, described location-plate is provided with angle steel in one week, and this angle steel can arrange angle steel in one week, in concreting process, especially by location-plate It is device entirety can to play reinforcement effect in the process of vibrating, and anti-locking apparatus is structural instability under the active force that vibrates, thus protects Demonstrate,prove the stability of joint bar constructing structure.
As the further improvement of above-mentioned joint bar constructing structure, the diameter 1-3mm bigger than the diameter of joint bar to be positioned in hole, described location. Under this condition, joint bar constructing structure agrees with effect between hole, location and joint bar best, it is possible to ensure that joint bar positioner is being inserted Stable installation on muscle, and concreting process is vibrated operation produce power move insufficient for joint bar positioner; And when the external world be applied to the power on joint bar positioner big the most to a certain extent time can not adjust the position of joint bar positioner, but not The structure of joint bar positioner can be caused damage.
Present invention also offers a kind of joint bar construction method using above-mentioned joint bar constructing structure, comprise the following steps:
(I) body of wall is carried out joint bar, while joint bar, every joint bar to be positioned is checked one by one, then by fixing Joint bar bottom is fixed by structure;
(II) after complete for the insertion of all joint bars to be positioned, joint bar entirety to be positioned is checked;
(III) joint bar positioner is arranged at the top of joint bar to be positioned, and described joint bar positioner includes positioning body, institute State positioning body to be provided with and agree with the hole, location plugged one by one for joint bar to be positioned and several are logical for vibrating of passing of vibrating spear Road, inserts joint bar to be positioned hole, location one by one and is connected therewith;
(IV) joint bar positioner is adjusted more than concreting finished surface or concreting finished surface.
Use above-mentioned joint bar construction method, twice joint bar checked and joint bar position is accurately positioned by joint bar positioner Enable to each reinforcing bar inserting body of wall the most accurately installed, thus prevent joint bar position in later stage concreting process Move and deformation so that joint bar constructing structure is more stable, thus beneficially body of wall is installed accurately, smoothly with superstructure and is connected.
As the further improvement of above-mentioned joint bar construction method, the superstructure of described wall connecting is prefabricated components.Assembling entirety Formula xoncrete structure requires to require to exceed compared to traditional joint bar construction precision for the joint bar construction precision of transition zone or basal layer Many, technology requires the most harsh, therefore for the joint bar of transition zone body of wall or basal layer, selects the invention described above Joint bar constructing structure can ensure transition zone body of wall or basal layer body of wall joint bar precision effectively, so that assembled integral coagulation The integral wall position of soil structure is accurate, does not occur positioning to deform.
Further, joint bar positioner is adjusted to by step (IV) keep at a certain distance away with concreting finished surface, should Distance is the height of horizontal joint between concreting finished surface and prefabricated components.According to the method described above joint bar is constructed, not only Can ensure that the joint bar of below concreting finished surface is accurately installed, moreover it is possible to ensure transition zone or basal layer and prefabricated components level The joint bar of seam crossing does not deform positioning, and joint bar more than horizontal joint transition zone or basal layer walls concrete pour with And horizontal joint grouting operation complete after can again regulate, so that the integral wall of assembled monolithic concrete structure Body position is accurate, does not occur positioning to deform.
Further, described joint bar positioner and concreting finished surface spacing distance are 20mm.Under this distance condition, Joint bar location is the most accurate so that the integral wall position of assembled monolithic concrete structure is accurate, does not occur positioning to deform.
Below by way of accompanying drawing and detailed description of the invention, the invention will be further described.
Accompanying drawing explanation
Fig. 1 is joint bar constructing structure of the present invention.
Fig. 2 is one of joint bar positioner schematic diagram in the present invention.
Fig. 3 is along line B-B sectional view in Fig. 2.
Fig. 4 is along line A-A sectional view in Fig. 2.
Fig. 5 is in the present invention the two of joint bar positioner schematic diagram.
Detailed description of the invention
Below by way of present invention application in assembled monolithic concrete structure to the joint bar constructing structure in the present invention and joint bar Construction method elaborates.
As it is shown in figure 1, the transition zone 1 in assembled monolithic concrete structure is carried out joint bar construction, superstructure is corresponding Prefabricated components 3, transition zone 1 as the transformational structure between prefabricated components 3 and understructure in-situ concrete wall, need into One step explanation, joint bar 120 to be positioned typically uses stirrup to tie up in joint bar 120 bottom to be positioned after inserting transition zone 1 body of wall Ligation structure is fixed, and stirrup binding structure here is different according to concrete condition of construction structure, when joint bar 120 to be positioned exists When the position that lower floor's in-situ concrete wall is corresponding exists reinforcing bar, just directly joint bar 120 to be positioned is connected with these reinforcing bars, when Joint bar 120 to be positioned, when the position that lower floor's in-situ concrete wall is corresponding does not has reinforcing bar, needs at lower floor's in-situ concrete wall Reinforcing bar on the new additional bar of colligation, then additional bar is carried out colligation with joint bar 120 to be positioned and fixes, thereby guarantee that it It is not subjected to displacement, existing attachment structure between transition zone 1 and its understructure in-situ concrete wall, prefabricated knot not shown in figure The bottom of structure 3 is provided with and joint bar 120 sleeve 310 one to one to be positioned, and joint bar constructing structure includes inserting transition zone 1 wall The joint bar to be positioned 120 of body and be arranged on the joint bar positioner 2 on joint bar 120 top to be positioned, joint bar positioner 2 energy Enough the joint bar to be positioned 120 that it is following is positioned one by one, prevent these joint bars 120 to be positioned be subjected to displacement and deform, this joint bar Distance d between concreting finished surface 110 on positioner 2 and transition zone 1 is the complete transition afterwards of concreting Horizontal joint height between layer 1 and prefabricated components 3, this distance preferably 20mm, joint bar location is the most accurate with this understanding, The integral wall position that in-situ concrete wall, transition zone 1, prefabricated components 3 three are constituted is the most accurate, and body of wall will not run Position deformation.
As shown in Figure 2-5, joint bar positioner 2 includes that positioning body 210, described positioning body 210 are provided with for be positioned Joint bar 120 agrees with the hole 212, location plugged and several passages 211 that vibrates passed for vibrating spear, preferred orientation hole one by one The diameter of 212 is than the joint bar 120 big 2mm of diameter to be positioned so that joint bar 120 to be positioned just agrees with hole 212, location so that Joint bar positioner 2 entirety is stable on joint bar 120 to be positioned installs, and vibrates what operation produced in concreting process Power moves insufficient for joint bar positioner;And when the external world be applied to the power on joint bar positioner big the most to a certain extent time can Adjust the position of joint bar positioner, but the structure of joint bar positioner will not be caused damage, sized by positioning body 210 The square location-plate identical with transition zone 1 upper surface, the passage 211 that vibrates for being arranged on through hole of the same size on square plate, this A little through holes are located along the same line, and thereby guarantee that during vibrating, concrete vibrating is uniform, and square plate is welded with angle steel 220 in one week, Joint bar positioner 2 reinforced by angle steel 220, extends its service life, between two through holes respectively of two ends, square plate left and right Being respectively provided with angle cleat 220 and square plate reinforcing angle 230, reinforcing angle 230 plays reinforces joint bar positioner 2 further Effect, angle steel 220 and reinforcing angle 230 be bottom surface and be welded on square plate, vertical on reinforcing angle 230 square plate between Every being provided with the gate shape handle 240 that two round steel are constituted, joint bar positioner 2 entirety is made up of galvanized steel.
The joint bar construction method using above-mentioned joint bar constructing structure comprises the following steps:
(I) body of wall carrying out joint bar, described body of wall is the transition zone being connected between in-situ concrete wall and prefabricated components 3 Body of wall 1, releases joint bar location line in body of wall side before joint bar construction, this joint bar location line is drawn by the control line of floor, should Control line is drawn from first floor datum mark, and joint bar position is determined by the joint bar location line according to releasing, after determining position, Every joint bar 120 to be positioned is checked one by one simultaneously, then by fixed structure, joint bar 120 bottom to be positioned is fixed, Fixed structure is joint bar 120 to be positioned to carry out the stirrup that colligation is fixing, when joint bar 120 to be positioned is at lower floor's cast-in-place concrete wall When the position that body is corresponding exists reinforcing bar, just directly joint bar 120 to be positioned is connected with these reinforcing bars, when joint bar 120 to be positioned exists When the position that lower floor's in-situ concrete wall is corresponding does not has reinforcing bar, need colligation on the reinforcing bar of lower floor's in-situ concrete wall new Additional bar, then carries out colligation by additional bar with joint bar 120 to be positioned and fixes;
(II) all joint bars 120 to be positioned are inserted complete after joint bar 120 entirety to be positioned is checked, again check Joint bar 120 position to be positioned ensures that follow-up joint bar positioner 2 can accurately be installed;
(III) joint bar positioner 2 is arranged at the top of joint bar 120 to be positioned, and described joint bar positioner 2 includes location Main body 210, positioning body 210 described in described joint bar positioner 2 is provided with to agree with one by one for joint bar 120 to be positioned and plugs Hole 212, location and several passages 211 that vibrates passed for vibrating spear, insert hole 212, location one by one by joint bar 120 to be positioned And be connected therewith;
(IV) joint bar positioner 2 is adjusted at concreting finished surface more than 110, joint bar positioner 2 is adjusted to Keeping at a certain distance away d with concreting finished surface 110, this distance d is concreting finished surface 110 and prefabricated components 3 Between the height of horizontal joint, described joint bar positioner 2 is 20mm with concreting finished surface 110 spacing distance d.
Use above-mentioned joint bar construction method, twice joint bar checked and joint bar position is accurately positioned by joint bar positioner Enable to each reinforcing bar inserting body of wall the most accurately installed, thus prevent joint bar position in later stage concreting process Move and deformation so that joint bar constructing structure is more stable, thus beneficially body of wall is installed smoothly with upper strata prefabricated components.Assembled integral Xoncrete structure requires to require high compared to traditional joint bar construction precision for the joint bar construction precision of transition zone, technology Requiring the most harsh, therefore for transition zone body of wall joint bar, the joint bar construction method selecting the invention described above can be effective Ground ensures transition zone body of wall joint bar precision, so that in-situ concrete wall, transition zone body of wall, prefabricated components three composition Integral wall position is accurate, does not occur positioning to deform.According to the method described above assembled monolithic concrete structure transition zone is inserted Muscle is constructed, and is possible not only to ensure that the joint bar of below concreting finished surface is accurately installed, moreover it is possible to ensure transition zone and prefabricated components Joint bar at horizontal joint does not deform positioning, and joint bar more than horizontal joint pours and water at transition zone walls concrete Carvel joint grouting operation complete after can again regulate, be thus further ensured that in-situ concrete wall, transition zone body of wall, The integral wall position that prefabricated components three is constituted is accurate, does not occur positioning to deform, described joint bar positioner and concreting Finished surface spacing distance is 20mm, and under this distance condition, joint bar location is the most accurate, in-situ concrete wall, transition zone, pre- The integral wall position that component three processed is constituted is the most accurate.The above-mentioned joint bar constructing structure of final employing and joint bar construction method are carried out After joint bar construction is complete, control at≤3mm all the time by inspection joint bar final position deviation, it is possible to meet assembling entirety well The requirement to transition zone joint bar construction precision of the formula xoncrete structure.
Based on body of wall during layer, joint bar constructing structure and method and above-mentioned body of wall as joint bar constructing structure during transition zone and Method is identical, and simply base layer structure is different from transition zone wall body structure, and the steel with basal layer is being inserted after body of wall in the bottom of joint bar Muscle or additional reinforcing bar carry out colligation, based on layer cast-in-place concrete structure and as the cast-in-place concrete structure of transition zone It is prior art, does not therefore repeat at this.

Claims (10)

1. joint bar constructing structure, including inserting the joint bar to be positioned (120) of body of wall and being arranged on joint bar to be positioned (120) The joint bar positioner (2) in portion, it is characterised in that described joint bar positioner (2) includes positioning body (210), described fixed Position main body (210) is provided with agrees with, for joint bar to be positioned (120), the hole, location (212) plugged and several are for vibrating one by one What rod passed vibrate passage (211), described joint bar positioner (2) is arranged on concreting finished surface (110) or coagulation Soil pours more than finished surface (110).
2. joint bar constructing structure as claimed in claim 1, it is characterised in that the superstructure of described wall connecting is prefabricated structure Part (3).
3. joint bar constructing structure as claimed in claim 2, it is characterised in that joint bar positioner (2) and concreting Distance (d) between finished surface (110) is horizontal joint between concreting finished surface (110) and prefabricated components (3) Height.
4. joint bar constructing structure as claimed in claim 3, it is characterised in that described joint bar positioner (2) and concrete The spacing pouring finished surface (110) is 20mm.
5. joint bar constructing structure as claimed in claim 1, it is characterised in that described positioning body (210) is for being provided with location Hole (212) and the location-plate of the passage that vibrates (211), described location-plate is provided with angle steel (220) for one week.
6. joint bar constructing structure as claimed in claim 1, it is characterised in that the diameter ratio in hole, described location (212) is undetermined The big 1-3mm of diameter of position joint bar (120).
7. joint bar construction method, it is characterised in that comprise the following steps:
(I) body of wall is carried out joint bar, while joint bar, every joint bar to be positioned (120) is checked one by one, then lead to Cross fixed structure to be fixed joint bar to be positioned (120) bottom;
(II) all joint bars to be positioned (120) are inserted complete after joint bar to be positioned (120) entirety is checked;
(III) joint bar positioner (2) is arranged at the top of joint bar to be positioned (120), described joint bar positioner (2) Including positioning body (210), described positioning body (210) is provided with and agrees with, for joint bar to be positioned (120), determining of plugging one by one Hole, position (212) and several passages that vibrates (211) passed for vibrating spear, it is fixed to be inserted one by one by joint bar to be positioned (120) Hole, position (212) is also connected therewith;
(IV) joint bar positioner (2) is adjusted at concreting finished surface (110) or concreting finished surface (110) Above.
8. joint bar construction method as claimed in claim 7, it is characterised in that the superstructure of described wall connecting is prefabricated structure Part (3).
9. joint bar construction method as claimed in claim 8, it is characterised in that step (IV) is by joint bar positioner (2) Being adjusted to keep at a certain distance away (d) with concreting finished surface (110), this distance is concreting finished surface (110) And the height of horizontal joint between prefabricated components (3).
10. joint bar construction method as claimed in claim 9, it is characterised in that described joint bar positioner (2) and concrete Pouring finished surface (110) spacing distance (d) is 20mm.
CN201610405076.1A 2016-06-08 2016-06-08 Joint bar constructing structure and method Active CN105908977B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610405076.1A CN105908977B (en) 2016-06-08 2016-06-08 Joint bar constructing structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610405076.1A CN105908977B (en) 2016-06-08 2016-06-08 Joint bar constructing structure and method

Publications (2)

Publication Number Publication Date
CN105908977A true CN105908977A (en) 2016-08-31
CN105908977B CN105908977B (en) 2019-02-15

Family

ID=56750576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610405076.1A Active CN105908977B (en) 2016-06-08 2016-06-08 Joint bar constructing structure and method

Country Status (1)

Country Link
CN (1) CN105908977B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759939A (en) * 2016-12-29 2017-05-31 上海建工五建集团有限公司 The attachment structure and method of vertical precast concrete
CN106759280A (en) * 2016-12-22 2017-05-31 中国十七冶集团有限公司 A kind of extra-long foundation pile foundation joint bar positioning construction method
CN107083804A (en) * 2017-06-09 2017-08-22 中建七局第四建筑有限公司 A kind of wall structure post joint bar construction method
CN107130590A (en) * 2017-06-26 2017-09-05 中国核工业第二二建设有限公司 A kind of device and construction method that reinforcing bar is properly inserted to plain concrete pile
CN107675838A (en) * 2017-09-26 2018-02-09 中国二十二冶集团有限公司 Assembled architecture sidewalk brick precast beam embedded sleeve barrel joint bar construction method
CN108193598A (en) * 2017-12-05 2018-06-22 上海市基础工程集团有限公司 The column joint bar mounting and positioning device and method of bearing platform construction
CN109208783A (en) * 2018-10-09 2019-01-15 中国建筑第七工程局有限公司 A kind of connecting node positioning device, connection structure and its construction method for exempting from binding
CN110453796A (en) * 2019-09-06 2019-11-15 吉林建筑大学 A kind of construction tool and construction method for assembled architecture conversion layer joint seal
CN111424706A (en) * 2020-03-31 2020-07-17 上海宝冶集团有限公司 Construction method of basement wall foundation-free joint bar

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110247291A1 (en) * 2010-04-07 2011-10-13 Adrian Hammon Reinforcement Bar Support Device
CN102425310A (en) * 2011-12-15 2012-04-25 中国二十二冶集团有限公司 Assembly-type residential shear wall structural wall body vertical connection construction method
GB2503228A (en) * 2012-06-19 2013-12-25 Laing O Rourke Plc Pre-cast column assembly with reinforcement and connection parts
CN104594641A (en) * 2015-01-28 2015-05-06 北京住总集团有限责任公司 Reinforcing bar positioning fixture and reinforcing bar positioning method for prefabrication wall installation
CN105003029A (en) * 2015-07-22 2015-10-28 山东明达建筑科技有限公司 Sleeve bar straightening butt joint formwork
CN205012665U (en) * 2015-08-27 2016-02-03 中国建筑第六工程局有限公司 Temporary fixing device of concrete wall joint bar
CN205857745U (en) * 2016-06-08 2017-01-04 成都建筑工程集团总公司 Joint bar constructing structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110247291A1 (en) * 2010-04-07 2011-10-13 Adrian Hammon Reinforcement Bar Support Device
CN102425310A (en) * 2011-12-15 2012-04-25 中国二十二冶集团有限公司 Assembly-type residential shear wall structural wall body vertical connection construction method
GB2503228A (en) * 2012-06-19 2013-12-25 Laing O Rourke Plc Pre-cast column assembly with reinforcement and connection parts
CN104594641A (en) * 2015-01-28 2015-05-06 北京住总集团有限责任公司 Reinforcing bar positioning fixture and reinforcing bar positioning method for prefabrication wall installation
CN105003029A (en) * 2015-07-22 2015-10-28 山东明达建筑科技有限公司 Sleeve bar straightening butt joint formwork
CN205012665U (en) * 2015-08-27 2016-02-03 中国建筑第六工程局有限公司 Temporary fixing device of concrete wall joint bar
CN205857745U (en) * 2016-06-08 2017-01-04 成都建筑工程集团总公司 Joint bar constructing structure

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759280A (en) * 2016-12-22 2017-05-31 中国十七冶集团有限公司 A kind of extra-long foundation pile foundation joint bar positioning construction method
CN106759939A (en) * 2016-12-29 2017-05-31 上海建工五建集团有限公司 The attachment structure and method of vertical precast concrete
CN107083804A (en) * 2017-06-09 2017-08-22 中建七局第四建筑有限公司 A kind of wall structure post joint bar construction method
CN107083804B (en) * 2017-06-09 2019-05-10 中建七局第四建筑有限公司 A kind of wall structure column joint bar construction method
CN107130590A (en) * 2017-06-26 2017-09-05 中国核工业第二二建设有限公司 A kind of device and construction method that reinforcing bar is properly inserted to plain concrete pile
CN107130590B (en) * 2017-06-26 2022-04-22 中国核工业第二二建设有限公司 Device for accurately inserting reinforcing steel bars into plain concrete pile and construction method
CN107675838A (en) * 2017-09-26 2018-02-09 中国二十二冶集团有限公司 Assembled architecture sidewalk brick precast beam embedded sleeve barrel joint bar construction method
CN108193598A (en) * 2017-12-05 2018-06-22 上海市基础工程集团有限公司 The column joint bar mounting and positioning device and method of bearing platform construction
CN109208783A (en) * 2018-10-09 2019-01-15 中国建筑第七工程局有限公司 A kind of connecting node positioning device, connection structure and its construction method for exempting from binding
CN110453796A (en) * 2019-09-06 2019-11-15 吉林建筑大学 A kind of construction tool and construction method for assembled architecture conversion layer joint seal
CN110453796B (en) * 2019-09-06 2024-02-23 吉林建筑科技学院 Construction tool and construction method for sealing joints of prefabricated building conversion layer
CN111424706A (en) * 2020-03-31 2020-07-17 上海宝冶集团有限公司 Construction method of basement wall foundation-free joint bar

Also Published As

Publication number Publication date
CN105908977B (en) 2019-02-15

Similar Documents

Publication Publication Date Title
CN105908977A (en) Joint bar construction structure and method
CN104895092B (en) The method that a kind of interim lattice column of inner support is used as permanent structure post
CN205857530U (en) Joint bar positioner
CN105804241A (en) Single-layer prefabricated assembly type reinforced concrete beam-column joint
KR100788623B1 (en) Top-down method using precast-concrete colum
CN107268424A (en) Can fast leveling precast assembly bridge pier structure and its construction method
CN206189647U (en) Novel infilled wall brickwork drawknot muscle structure
CN106930277A (en) A kind of construction of manual-excavation cast-in-place pile method
JP5202708B2 (en) Steel pipe pile and pile foundation method using the steel pipe pile
JP4611113B2 (en) Integrated construction method of pile and column
CN205857745U (en) Joint bar constructing structure
CN213741571U (en) Prefabricated column and beam column node for prefabricated concrete building structure reserved steel bar perforation
JP4901900B2 (en) Precast pile cap structure and joining method
JP3671344B2 (en) Joint structure between foundation pile and column base and its construction method
JP3235890U (en) Construction system of the joint point between the roof plate and the newly built structural column in the remodeling by the reverse striking method
JP2009046942A (en) Foundation block for retaining wall
JP2017057642A (en) Footing foundation structure
CN103352568A (en) Method for building constructional column on foundation pad
TWM608166U (en) Precast column pile structure with combined component
CN209162874U (en) A kind of basis prefabricated post and foundation structure
KR100429283B1 (en) Construction Method using Precast Concrete for Diaphragm Wall
JP4298628B2 (en) Construction method of viaduct beam using steel pipe column joint element
JP2020070627A (en) Joint structure of pile and foundation concrete portion, precast concrete body, and construction method
CN114016536B (en) Method for building large-volume concrete bearing platform
JP7396763B1 (en) 3-point anchor integrated liner, long anchor integrated liner, equipment installation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.111 Babao Street, Chengdu, Sichuan 610000

Patentee after: Chengdu Construction Industry Group Co.,Ltd.

Address before: No. 111, Babao Street, Chengdu, Sichuan 610000

Patentee before: CHENGDU CONSTRUCTION ENGINEERING Group Corp.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20210316

Address after: No.30, Section 1, Fuqing Road, Jinniu District, Chengdu, Sichuan 610000

Patentee after: CHENGDU SECOND CONSTRUCTION ENGINEERING Co.,Ltd. OF CDCEG

Patentee after: Chengdu Construction Industry Group Co.,Ltd.

Address before: No. 111, Babao Street, Chengdu, Sichuan 610000

Patentee before: Chengdu Construction Industry Group Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210325

Address after: No.111 Babao Street, Qingyang District, Chengdu, Sichuan 610000

Patentee after: Chengdu Construction Industry Group Co.,Ltd.

Address before: No.30, Section 1, Fuqing Road, Jinniu District, Chengdu, Sichuan 610000

Patentee before: CHENGDU SECOND CONSTRUCTION ENGINEERING Co.,Ltd. OF CDCEG

Patentee before: Chengdu Construction Industry Group Co.,Ltd.

TR01 Transfer of patent right