CN111424706A - Construction method of basement wall foundation-free joint bar - Google Patents
Construction method of basement wall foundation-free joint bar Download PDFInfo
- Publication number
- CN111424706A CN111424706A CN202010244287.8A CN202010244287A CN111424706A CN 111424706 A CN111424706 A CN 111424706A CN 202010244287 A CN202010244287 A CN 202010244287A CN 111424706 A CN111424706 A CN 111424706A
- Authority
- CN
- China
- Prior art keywords
- wall
- steel bar
- foundation
- reinforcement
- blanking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/16—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/12—Mounting of reinforcing inserts; Prestressing
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1841—Means for positioning building parts or elements
- E04G21/185—Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
The invention relates to a construction method of a basement wall without foundation joint bar; the method is characterized in that: step 1, familiarizing the specification and model of the wall steel bar and the longitudinal steel bar spacing; step 2, combining blanking software, optimizing nodes and wall reinforcing bars in the blanking software, and canceling wall joint bars reserved on a foundation and wall longitudinal steel bar joints of a previous floor; blanking according to the blanking list; and (3) binding the steel bars by combining a construction drawing, and taking a lateral temporary fixing measure after the conventional binding operation of the longitudinal steel bars of the wall is finished when the basic reinforcement of the project is a single-layer bidirectional reinforcement. The basement wall steel bar is removed from the foundation joint bar in the construction process of the foundation stage, and the traditional construction method is changed, so that the steel bar joint cost of the foundation joint bar and the wall longitudinal steel bar, such as the steel bar material cost of a binding joint, the steel bar threading labor cost of a straight thread joint and the material cost of a straight thread sleeve, is saved.
Description
Technical Field
The invention relates to the field of civil construction, in particular to a construction method of a basement wall foundation-free dowel.
Background
At present, in basement major structure basic stage work progress, the vertical reinforcing bar of wall body can be according to the specification interval of the vertical reinforcing bar of wall body according to drawing set regulation and conventional construction process in advance to keep somewhere corresponding basic dowel steel in the stage of basic reinforcement. The process of reserving the basic dowel bars has some problems. For example, the cost of producing the foundation reinforcing bars is additionally increased, and a series of costs such as whether the reinforcement joint processing of the foundation reinforcing bars reaches standards, manual spot-checking of the foundation reinforcing bars, and the like are increased.
Disclosure of Invention
The invention aims to overcome the problems and provides a construction method for directly inserting the longitudinal steel bars of the wall body into the foundation without the insertion of the foundation steel bars, so that the cost of the steel bar joint can be saved, and the quality risk caused by the steel bar joint can be avoided.
In order to achieve the above object, the present invention is realized by:
a construction method of a basement wall foundation-free dowel steel comprises the following steps:
step 1, carrying out technical planning in advance, and mastering basic information of basement engineering and specification type longitudinal steel bar spacing of wall steel bars, namely other accessory conditions by familiarizing with drawings;
step 2, combining Guangda, Luban or other computer-assisted blanking software, optimizing nodes and wall reinforcing bars in the blanking software, canceling wall joint bars reserved in a foundation and wall longitudinal reinforcing steel bar joints of the previous floor, and performing accounting and drawing;
step 3, performing bottom crossing on a steel bar operator on a construction site according to a steel bar blanking list, performing blanking according to the bottom crossing or the steel bar material list of a technical manager, and ensuring the accuracy of steel bar blanking;
step 4, combining the construction drawing to perform reinforcement binding operation, and when the foundation reinforcement of the project is a double-layer bidirectional reinforcement, performing conventional binding operation on the wall longitudinal reinforcement in the foundation according to the requirements of the drawing and the drawing; when the basic reinforcement of the project is a single-layer bidirectional reinforcement, a lateral temporary fixing measure is adopted after the conventional binding operation of the longitudinal reinforcement of the wall body is finished.
The construction method provided by the invention eliminates the foundation joint bars in the construction process of the basement wall steel bars in the foundation stage, changes the traditional construction method, and saves the steel bar joint cost of the foundation joint bars and the wall longitudinal steel bars, such as the steel bar material cost of binding joints, the steel bar threading labor cost of straight thread joints and the material cost of straight thread sleeves.
Drawings
FIG. 1 is a schematic diagram of the binding of steel bars in a wall body.
Fig. 2 is a schematic view of a rebar structure.
Fig. 3 is a schematic view of a lateral support structure.
Detailed Description
The invention is further illustrated by the following specific examples.
A construction method of a basement wall foundation-free dowel steel comprises the following steps:
step 1, carrying out technical planning in advance, and mastering basic information of basement engineering and specification type longitudinal steel bar spacing of wall steel bars, namely other accessory conditions by familiarizing with drawings;
step 2, as shown in fig. 1, combining Guangda, Luban or other computer-aided blanking software, optimizing nodes and wall reinforcing bars in the blanking software, canceling wall joint bars reserved in a foundation and wall longitudinal steel bar joints of a previous floor, and performing checking and drawing;
step 3, as shown in fig. 2, bottom crossing is performed on steel bar operators on a construction site according to a steel bar blanking list, blanking is performed according to bottom crossing or a steel bar material list of technical managers, and the accuracy of steel bar blanking is guaranteed;
step 4, as shown in fig. 3, performing reinforcement binding operation by combining construction drawings, and performing conventional binding operation on wall longitudinal reinforcements in the foundation according to the requirements of the drawing and the drawing when the engineering foundation reinforcements are double-layer bidirectional reinforcements; when the basic reinforcement of the project is a single-layer bidirectional reinforcement, a lateral temporary fixing measure is adopted after the conventional binding operation of the longitudinal reinforcement of the wall body is finished.
The construction method provided by the invention eliminates the foundation joint bars in the construction process of the basement wall steel bars in the foundation stage, changes the traditional construction method, and saves the steel bar joint cost of the foundation joint bars and the wall longitudinal steel bars, such as the steel bar material cost of binding joints, the steel bar threading labor cost of straight thread joints and the material cost of straight thread sleeves.
Claims (1)
1. A construction method of a basement wall foundation-free joint bar is characterized by comprising the following steps: the method comprises the following steps:
step 1, carrying out technical planning in advance, and mastering basic information of basement engineering and specification type longitudinal steel bar spacing of wall steel bars, namely other accessory conditions by familiarizing with drawings;
step 2, combining Guangda, Luban or other computer-assisted blanking software, optimizing nodes and wall reinforcing bars in the blanking software, canceling wall joint bars reserved in a foundation and wall longitudinal reinforcing steel bar joints of the previous floor, and performing accounting and drawing;
step 3, performing bottom crossing on a steel bar operator on a construction site according to a steel bar blanking list, performing blanking according to the bottom crossing or the steel bar material list of a technical manager, and ensuring the accuracy of steel bar blanking;
step 4, combining the construction drawing to perform reinforcement binding operation, and when the foundation reinforcement of the project is a double-layer bidirectional reinforcement, performing conventional binding operation on the wall longitudinal reinforcement in the foundation according to the requirements of the drawing and the drawing; when the basic reinforcement of the project is a single-layer bidirectional reinforcement, a lateral temporary fixing measure is adopted after the conventional binding operation of the longitudinal reinforcement of the wall body is finished.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010244287.8A CN111424706A (en) | 2020-03-31 | 2020-03-31 | Construction method of basement wall foundation-free joint bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010244287.8A CN111424706A (en) | 2020-03-31 | 2020-03-31 | Construction method of basement wall foundation-free joint bar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111424706A true CN111424706A (en) | 2020-07-17 |
Family
ID=71550266
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010244287.8A Pending CN111424706A (en) | 2020-03-31 | 2020-03-31 | Construction method of basement wall foundation-free joint bar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111424706A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101294397A (en) * | 2008-06-06 | 2008-10-29 | 中冶京唐建设有限公司 | Colligation molding construction method at one time for main rod of reinforced concrete retaining wall |
CN105908977A (en) * | 2016-06-08 | 2016-08-31 | 成都建筑工程集团总公司 | Joint bar construction structure and method |
-
2020
- 2020-03-31 CN CN202010244287.8A patent/CN111424706A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101294397A (en) * | 2008-06-06 | 2008-10-29 | 中冶京唐建设有限公司 | Colligation molding construction method at one time for main rod of reinforced concrete retaining wall |
CN105908977A (en) * | 2016-06-08 | 2016-08-31 | 成都建筑工程集团总公司 | Joint bar construction structure and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104895318B (en) | Aluminum alloy template system and construction method of same | |
CN104895092B (en) | The method that a kind of interim lattice column of inner support is used as permanent structure post | |
CN107083804B (en) | A kind of wall structure column joint bar construction method | |
CN107355008B (en) | Prefabricated connection structure and method for newly added concrete filled steel tubular column and existing structure | |
CN107065801B (en) | Simulative construction method is automatically assembled using the section of track production line of BIM technology | |
CN206917087U (en) | A kind of prefabricated assembling type reinforced concrete framework open tubular column and its making mould | |
CN112257150A (en) | Refined calculation amount method of raft foundation slab band reinforcing ribs based on BIM modeling | |
CN203174880U (en) | Novel building block lintel | |
CN111424706A (en) | Construction method of basement wall foundation-free joint bar | |
CN211817000U (en) | Constructional column steel bar positioning mechanism | |
CN111255158B (en) | Constructional column construction method | |
CN100507174C (en) | Pre-buried construction method for prestressed hollow floor suspender PVC sleeve | |
CN108979205B (en) | Staggered floor flow construction method for super high-rise residential structure | |
CN103352568A (en) | Method for building constructional column on foundation pad | |
CN110552445A (en) | Construction process for reserved tie bar of main body wall column structure | |
CN216239744U (en) | Pre-buried positioning tool of high-rise building pipeline well sleeve pipe | |
CN108385991A (en) | A kind of infilled wall tie bar bar planting positioning construction method and dedicated positioning device | |
CN211572583U (en) | Template perforation-free ring beam formwork structure | |
CN207892255U (en) | A kind of dedicated positioning device | |
CN206956981U (en) | The prefabricated partition wall of staircase | |
CN113718811B (en) | Application method of precast concrete in metallurgical engineering | |
CN112507422A (en) | Automatic drawing method for assembled prefabricated frame column deepening drawing | |
CN217353214U (en) | Embedded steel bar inserting component for constructional column steel bar | |
CN215858605U (en) | Measuring tool applied to inclined cylinder construction method | |
CN220599144U (en) | Reservation structure of cantilever plate is worn to wire rope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200717 |