CN111424706A CN202010244287.8A CN202010244287A CN111424706A CN 111424706 A CN111424706 A CN 111424706A CN 202010244287 A CN202010244287 A CN 202010244287A CN 111424706 A CN111424706 A CN 111424706A
Authority
CN
China
Prior art keywords
wall
steel bar
foundation
reinforcement
blanking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010244287.8A
Other languages
Chinese (zh)
Inventor
王松松
郭文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN202010244287.8A priority Critical patent/CN111424706A/en
Publication of CN111424706A publication Critical patent/CN111424706A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/16Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention relates to a construction method of a basement wall without foundation joint bar; the method is characterized in that: step 1, familiarizing the specification and model of the wall steel bar and the longitudinal steel bar spacing; step 2, combining blanking software, optimizing nodes and wall reinforcing bars in the blanking software, and canceling wall joint bars reserved on a foundation and wall longitudinal steel bar joints of a previous floor; blanking according to the blanking list; and (3) binding the steel bars by combining a construction drawing, and taking a lateral temporary fixing measure after the conventional binding operation of the longitudinal steel bars of the wall is finished when the basic reinforcement of the project is a single-layer bidirectional reinforcement. The basement wall steel bar is removed from the foundation joint bar in the construction process of the foundation stage, and the traditional construction method is changed, so that the steel bar joint cost of the foundation joint bar and the wall longitudinal steel bar, such as the steel bar material cost of a binding joint, the steel bar threading labor cost of a straight thread joint and the material cost of a straight thread sleeve, is saved.

Description

Construction method of basement wall foundation-free joint bar
Technical Field
The invention relates to the field of civil construction, in particular to a construction method of a basement wall foundation-free dowel.
Background
At present, in basement major structure basic stage work progress, the vertical reinforcing bar of wall body can be according to the specification interval of the vertical reinforcing bar of wall body according to drawing set regulation and conventional construction process in advance to keep somewhere corresponding basic dowel steel in the stage of basic reinforcement. The process of reserving the basic dowel bars has some problems. For example, the cost of producing the foundation reinforcing bars is additionally increased, and a series of costs such as whether the reinforcement joint processing of the foundation reinforcing bars reaches standards, manual spot-checking of the foundation reinforcing bars, and the like are increased.
Disclosure of Invention
The invention aims to overcome the problems and provides a construction method for directly inserting the longitudinal steel bars of the wall body into the foundation without the insertion of the foundation steel bars, so that the cost of the steel bar joint can be saved, and the quality risk caused by the steel bar joint can be avoided.
In order to achieve the above object, the present invention is realized by:
a construction method of a basement wall foundation-free dowel steel comprises the following steps:
step 1, carrying out technical planning in advance, and mastering basic information of basement engineering and specification type longitudinal steel bar spacing of wall steel bars, namely other accessory conditions by familiarizing with drawings;
step 2, combining Guangda, Luban or other computer-assisted blanking software, optimizing nodes and wall reinforcing bars in the blanking software, canceling wall joint bars reserved in a foundation and wall longitudinal reinforcing steel bar joints of the previous floor, and performing accounting and drawing;
step 3, performing bottom crossing on a steel bar operator on a construction site according to a steel bar blanking list, performing blanking according to the bottom crossing or the steel bar material list of a technical manager, and ensuring the accuracy of steel bar blanking;
step 4, combining the construction drawing to perform reinforcement binding operation, and when the foundation reinforcement of the project is a double-layer bidirectional reinforcement, performing conventional binding operation on the wall longitudinal reinforcement in the foundation according to the requirements of the drawing and the drawing; when the basic reinforcement of the project is a single-layer bidirectional reinforcement, a lateral temporary fixing measure is adopted after the conventional binding operation of the longitudinal reinforcement of the wall body is finished.
The construction method provided by the invention eliminates the foundation joint bars in the construction process of the basement wall steel bars in the foundation stage, changes the traditional construction method, and saves the steel bar joint cost of the foundation joint bars and the wall longitudinal steel bars, such as the steel bar material cost of binding joints, the steel bar threading labor cost of straight thread joints and the material cost of straight thread sleeves.
Drawings
FIG. 1 is a schematic diagram of the binding of steel bars in a wall body.
Fig. 2 is a schematic view of a rebar structure.
Fig. 3 is a schematic view of a lateral support structure.
Detailed Description
The invention is further illustrated by the following specific examples.
A construction method of a basement wall foundation-free dowel steel comprises the following steps:
step 1, carrying out technical planning in advance, and mastering basic information of basement engineering and specification type longitudinal steel bar spacing of wall steel bars, namely other accessory conditions by familiarizing with drawings;
step 2, as shown in fig. 1, combining Guangda, Luban or other computer-aided blanking software, optimizing nodes and wall reinforcing bars in the blanking software, canceling wall joint bars reserved in a foundation and wall longitudinal steel bar joints of a previous floor, and performing checking and drawing;
step 3, as shown in fig. 2, bottom crossing is performed on steel bar operators on a construction site according to a steel bar blanking list, blanking is performed according to bottom crossing or a steel bar material list of technical managers, and the accuracy of steel bar blanking is guaranteed;
step 4, as shown in fig. 3, performing reinforcement binding operation by combining construction drawings, and performing conventional binding operation on wall longitudinal reinforcements in the foundation according to the requirements of the drawing and the drawing when the engineering foundation reinforcements are double-layer bidirectional reinforcements; when the basic reinforcement of the project is a single-layer bidirectional reinforcement, a lateral temporary fixing measure is adopted after the conventional binding operation of the longitudinal reinforcement of the wall body is finished.
The construction method provided by the invention eliminates the foundation joint bars in the construction process of the basement wall steel bars in the foundation stage, changes the traditional construction method, and saves the steel bar joint cost of the foundation joint bars and the wall longitudinal steel bars, such as the steel bar material cost of binding joints, the steel bar threading labor cost of straight thread joints and the material cost of straight thread sleeves.

Claims (1)

1. A construction method of a basement wall foundation-free joint bar is characterized by comprising the following steps: the method comprises the following steps:
step 1, carrying out technical planning in advance, and mastering basic information of basement engineering and specification type longitudinal steel bar spacing of wall steel bars, namely other accessory conditions by familiarizing with drawings;
step 2, combining Guangda, Luban or other computer-assisted blanking software, optimizing nodes and wall reinforcing bars in the blanking software, canceling wall joint bars reserved in a foundation and wall longitudinal reinforcing steel bar joints of the previous floor, and performing accounting and drawing;
step 3, performing bottom crossing on a steel bar operator on a construction site according to a steel bar blanking list, performing blanking according to the bottom crossing or the steel bar material list of a technical manager, and ensuring the accuracy of steel bar blanking;
step 4, combining the construction drawing to perform reinforcement binding operation, and when the foundation reinforcement of the project is a double-layer bidirectional reinforcement, performing conventional binding operation on the wall longitudinal reinforcement in the foundation according to the requirements of the drawing and the drawing; when the basic reinforcement of the project is a single-layer bidirectional reinforcement, a lateral temporary fixing measure is adopted after the conventional binding operation of the longitudinal reinforcement of the wall body is finished.
CN202010244287.8A 2020-03-31 2020-03-31 Construction method of basement wall foundation-free joint bar Pending CN111424706A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010244287.8A CN111424706A (en) 2020-03-31 2020-03-31 Construction method of basement wall foundation-free joint bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010244287.8A CN111424706A (en) 2020-03-31 2020-03-31 Construction method of basement wall foundation-free joint bar

Publications (1)

Publication Number Publication Date
CN111424706A true CN111424706A (en) 2020-07-17

Family

ID=71550266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010244287.8A Pending CN111424706A (en) 2020-03-31 2020-03-31 Construction method of basement wall foundation-free joint bar

Country Status (1)

Country Link
CN (1) CN111424706A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101294397A (en) * 2008-06-06 2008-10-29 中冶京唐建设有限公司 Colligation molding construction method at one time for main rod of reinforced concrete retaining wall
CN105908977A (en) * 2016-06-08 2016-08-31 成都建筑工程集团总公司 Joint bar construction structure and method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101294397A (en) * 2008-06-06 2008-10-29 中冶京唐建设有限公司 Colligation molding construction method at one time for main rod of reinforced concrete retaining wall
CN105908977A (en) * 2016-06-08 2016-08-31 成都建筑工程集团总公司 Joint bar construction structure and method

Similar Documents

Publication Publication Date Title
CN104895318B (en) Aluminum alloy template system and construction method of same
CN104895092B (en) The method that a kind of interim lattice column of inner support is used as permanent structure post
CN107083804B (en) A kind of wall structure column joint bar construction method
CN107355008B (en) Prefabricated connection structure and method for newly added concrete filled steel tubular column and existing structure
CN107065801B (en) Simulative construction method is automatically assembled using the section of track production line of BIM technology
CN206917087U (en) A kind of prefabricated assembling type reinforced concrete framework open tubular column and its making mould
CN112257150A (en) Refined calculation amount method of raft foundation slab band reinforcing ribs based on BIM modeling
CN203174880U (en) Novel building block lintel
CN111424706A (en) Construction method of basement wall foundation-free joint bar
CN211817000U (en) Constructional column steel bar positioning mechanism
CN111255158B (en) Constructional column construction method
CN100507174C (en) Pre-buried construction method for prestressed hollow floor suspender PVC sleeve
CN108979205B (en) Staggered floor flow construction method for super high-rise residential structure
CN103352568A (en) Method for building constructional column on foundation pad
CN110552445A (en) Construction process for reserved tie bar of main body wall column structure
CN216239744U (en) Pre-buried positioning tool of high-rise building pipeline well sleeve pipe
CN108385991A (en) A kind of infilled wall tie bar bar planting positioning construction method and dedicated positioning device
CN211572583U (en) Template perforation-free ring beam formwork structure
CN207892255U (en) A kind of dedicated positioning device
CN206956981U (en) The prefabricated partition wall of staircase
CN113718811B (en) Application method of precast concrete in metallurgical engineering
CN112507422A (en) Automatic drawing method for assembled prefabricated frame column deepening drawing
CN217353214U (en) Embedded steel bar inserting component for constructional column steel bar
CN215858605U (en) Measuring tool applied to inclined cylinder construction method
CN220599144U (en) Reservation structure of cantilever plate is worn to wire rope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200717