CN207892255U - A kind of dedicated positioning device - Google Patents

A kind of dedicated positioning device Download PDF

Info

Publication number
CN207892255U
CN207892255U CN201820090606.2U CN201820090606U CN207892255U CN 207892255 U CN207892255 U CN 207892255U CN 201820090606 U CN201820090606 U CN 201820090606U CN 207892255 U CN207892255 U CN 207892255U
Authority
CN
China
Prior art keywords
vertical
positioning
column
bar
tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820090606.2U
Other languages
Chinese (zh)
Inventor
李晓飞
李波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Binzhou University
Original Assignee
Binzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Binzhou University filed Critical Binzhou University
Priority to CN201820090606.2U priority Critical patent/CN207892255U/en
Application granted granted Critical
Publication of CN207892255U publication Critical patent/CN207892255U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model is related to the realm of building construction, particularly disclose a kind of dedicated positioning device, it includes positioning vertical column, the positioning vertical column is equipped with the uniformly distributed tie rod hole of two column pitch, the tie rod hole is configured with π type positioning tie bars, the positioning tie bar is made of a cross bar and two vertical poles, the mating coloring cotton-padded covering in free end of the vertical pole.The utility model can guarantee vertical vertical muscle, stirrup position all with infilled wall tie bar not cross-coincidence;While tension rib bar planting optimum position can be quickly and easily found again, the cross-coincidence of tension rib and the vertical vertical muscle and stirrup of main part is avoided, and can be discharged since worker's span is inaccurate, the caused tension rib that lacks a sense of responsibility bends phenomenon.

Description

A kind of dedicated positioning device
Technical field
The utility model is related to the realm of building construction, more particularly to a kind of dedicated positioning device.
Background technology
Currently, infilled wall tie bar construction mainly uses following two methods:
(1)The pre-buried method of joint bar:This method is to be punched in template in advance, and the reinforcing bar of certain length is penetrated and tied up from hole It pricks on main part steel reinforcement cage, main part refers to frame column or shear wall, and to be onstructed finish again will be pre- after form removal Reinforcement welding spreading is stayed, the disadvantage is that punching has compared with havoc template, cannot preferably be recycled, and form removal compares Trouble.In addition, it cannot be guaranteed that tension rib position coincide with filling wall mortar joint, drawknot effect is had a greatly reduced quality.
(2)Chemically-planted steel bar method:This method is after main part concrete coagulation hardens form removal in corresponding position Bar planting, this method can avoid punching template, and construction is simple, so being that current infilled wall tie bar construction is most common Method.But the disadvantage is that the reinforcing bar in main part is easily encountered in bar planting hole causes useless hole, and traditional bar planting method is to use Tape measure span setting-out from bottom to top drills, and such speed is slow, influences construction speed.The most serious is often existing due to constructing The reasons such as field quality control is not tight, and worker lacks a sense of responsibility cause infilled wall tie bar position situations such as offset, bending occur, Seriously affect the construction quality of filling wall.
Invention content
The utility model provides a kind of suitable for infilled wall tie bar bar planting positioning to make up the defect of the prior art The dedicated positioning device of construction method.
The utility model is achieved by the following technical solution:
A kind of dedicated positioning device, it is characterized in that:Including positioning vertical column, the positioning vertical column is uniformly distributed equipped with two column pitch Tie rod hole, the tie rod hole is configured with π type positioning tie bars, and the positioning tie bar is made of a cross bar and two vertical poles, institute State the mating coloring cotton-padded covering in free end of vertical pole.
The positioning column lower end is in expansion horn shape.
The positioning vertical column is made with light material.
The vertical pole is made by softer fibrous materials.
One sleeve made by softer fibrous materials of every vertical pole end sleeve is connected by connecting rod between two sleeves It connects.
The construction method of wall tension rib bar planting positioning is filled according to above-mentioned dedicated positioning device, characterized in that packet Include following steps:
1)The stage is bound in main part steel reinforcement cage, find the specific location that will build filling wall by laying bricks or stones first and carries out mark Note, in binding work progress, positioning vertical column is taken back and is placed on before main part, is then inserted into the vertical pole of positioning tie bar In tie rod hole and a distance is stretched out, two free ends of vertical pole are the position of tension rib, then make the free end of vertical pole Stirrup and vertical muscle position are monitored in real time for tension rib;
2)When finding that stirrup is possible to overlap with tension rib position, the lashing location of stirrup is moved up or down, Using the tension rib that is staggered as objective;
3)After form removal is hardened in concrete setting, sundries around main part is cleaned, finds assembling reinforcement again When placement positioning column position, positioning vertical column is then placed on original place, the vertical pole of positioning tie bar is inserted into tie rod hole, is then existed Cotton-padded covering is coloured in the end sleeve of vertical pole, dips in paint, then pushes cross bar that coloring cotton-padded covering is made to be contacted with main part surface, is contacted Position just leaves colored spots;From the bottom up successively to each layer drilling point location, the colored spots that main part surface leaves i.e. For later stage tension rib bar planting most rational position;
4)Steel planting is carried out in main part surface colored spots position.
The case where being aligned with main part edge for filling wall after two vertical poles are inserted into tie rod hole, covers upper bush, will Two sleeves are inwardly bent into toed-in, and to be staggered, then vertically vertical muscle starts positioning binding stirrup, need replacing again as objective When position, sleeve is removed, extracts vertical pole out, is inserted into the tie rod hole of last layer, covers upper bush, continues to bind last layer stirrup.
The main part is frame column or shear wall.
The utility model has the beneficial effects that:
The utility model can guarantee vertical vertical muscle, stirrup position all with infilled wall tie bar not cross-coincidence;Simultaneously again Tension rib bar planting optimum position can be quickly and easily found, the friendship of tension rib and the vertical vertical muscle and stirrup of main part is avoided Fork overlaps, and can be discharged since worker's span is inaccurate, the caused tension rib that lacks a sense of responsibility bends phenomenon.
Description of the drawings
The utility model will be further described below with reference to the accompanying drawings.
Fig. 1 is the process of binding schematic diagram of the utility model;
Fig. 2 is the coloring process schematic diagram of the utility model;
Fig. 3 is the separate structure schematic diagram of positioning tie bar;
Fig. 4 is the separate structure schematic diagram after solid-section bending.
In figure, 1 positioning vertical column, 2 tie rod holes, 3 cross bars, 4 vertical poles, 5 sleeves, 51 sections, 52 solid-sections, 53 connecting rods, 6 Color cotton set, 7 stirrups, 8 vertically indulge muscle, 9 main parts, 10 colored spots.
Specific implementation mode
Attached drawing is specific embodiment of the utility model.As shown in Figures 1 to 4, this kind of dedicated positioning device, including one fixed Position column 1, in order to increase stability, 1 lower end of positioning vertical column is to expand horn shape, and nimble in order to carry, positioning vertical column 1 uses light material It makes, such as timber etc., the uniformly distributed tie rod hole 2 of two column pitch is bored on positioning vertical column 1, be in addition also equipped with an energy and pass through pull rod The π type positioning tie bars in hole 2, positioning tie bar are made of a cross bar 3 and two vertical poles 4,4 mating sleeves 5 of every vertical pole, set It is clamped between cylinder 5 and vertical pole 4, sleeve 5 is stuck on vertical pole 4 and cannot fall down, and sleeve 5 is by a cylinder section 51 and a solid-section 52 Composition, solid-section 52 are convenient for bending, are connected by connecting rod 53 between two sleeves 5,5 mating coloring cotton-padded coverings of each sleeve 6, vertical pole 4 and sleeve 5 are all made with softer fibrous materials, solid-section 52 can make it is identical as 4 thickness of vertical pole, in this way be convenient for spirit It is living to use so that coloring cotton-padded covering 6 can be sleeved in solid-section 52, can be also sleeved on vertical pole 4.
Then start to bind stirrup 7, steps are as follows:
1)The stage is bound in 9 steel reinforcement cage of main part, main part 9 may be frame column, it is also possible to shear wall, first It finds the specific location that will build filling wall by laying bricks or stones and marks, in binding work progress, positioning vertical column 1 is taken back and is placed on Then the vertical pole of positioning tie bar 4 is inserted into tie rod hole 2 and is stretched out a distance by 9 front of main part, two of vertical pole 4 are certainly It is the position of tension rib by end, then stirrup 7 and vertical muscle position is supervised in real time using the free end of vertical pole 4 as tension rib It surveys;
2)When finding that stirrup 7 is possible to overlap with tension rib position, the lashing location of stirrup 7 is moved upward or downward It is dynamic, using the tension rib that is staggered as objective;
3)After form removal is hardened in concrete setting, 9 surrounding sundries of main part is cleaned, finds assembling reinforcement again When placement positioning column 1 position, positioning vertical column 1 is then placed on original place, the vertical pole 4 of positioning tie bar is inserted into tie rod hole 2, is connect The coloring cotton-padded covering 6 in the end sleeve of vertical pole 4, paint is dipped in, then cross bar 3 is pushed to make coloring cotton-padded covering 6 and 9 surface of main part Contact, contact position just leave colored spots;Each layer of drilling point location is left on 9 surface of main part successively from the bottom up Colored spots 10 be later stage tension rib bar planting most rational position;
4)Steel planting is carried out in 9 surface colored spots of main part, 10 position.
In above steps, sleeve 5 can be used, sleeve 5 can not also be used.
The case where being aligned with 9 edge of main part for filling wall after two vertical poles 4 are inserted into tie rod hole 2, covers upper bush 5, the solid-section 52 of two sleeves 5 is inwardly bent into toed-in, or by the 52 inside bending of one of solid-section, to be staggered Vertically vertical muscle 8 is objective, then starts positioning binding stirrup 7 again, when needing replacing position, sleeve 5 is removed, extracts vertical pole 4 out, It is inserted into the tie rod hole 2 of last layer, covers upper bush 5, continues to bind last layer stirrup 7;When coloring will coloring cotton-padded covering 6 be sleeved on it is solid In section 52.
In addition to technical characteristic described in specification, remaining technical characteristic is technology known to those skilled in the art.

Claims (5)

1. a kind of dedicated positioning device, it is characterized in that:Including positioning vertical column(1), the positioning vertical column(1)It is equipped with two column pitch Uniformly distributed tie rod hole(2), the tie rod hole(2)π type positioning tie bars are configured with, the positioning tie bar is by a cross bar(3)With two Root vertical pole(4)Composition, the vertical pole(4)The mating coloring cotton-padded covering in free end(6).
2. dedicated positioning device according to claim 1, characterized in that the positioning column lower end is in expansion horn shape.
3. dedicated positioning device according to claim 1, characterized in that the positioning vertical column(1)It is made with light material.
4. dedicated positioning device according to any one of claims 1 to 3, characterized in that the vertical pole(4)By soft fibre Material is made.
5. dedicated positioning device according to claim 4, characterized in that every vertical pole(4)End sleeve one is by soft fibre The sleeve that dimension material is made(5), two sleeves(5)Between pass through connecting rod(53)Connection.
CN201820090606.2U 2018-01-19 2018-01-19 A kind of dedicated positioning device Expired - Fee Related CN207892255U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820090606.2U CN207892255U (en) 2018-01-19 2018-01-19 A kind of dedicated positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820090606.2U CN207892255U (en) 2018-01-19 2018-01-19 A kind of dedicated positioning device

Publications (1)

Publication Number Publication Date
CN207892255U true CN207892255U (en) 2018-09-21

Family

ID=63544636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820090606.2U Expired - Fee Related CN207892255U (en) 2018-01-19 2018-01-19 A kind of dedicated positioning device

Country Status (1)

Country Link
CN (1) CN207892255U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385991A (en) * 2018-01-19 2018-08-10 滨州学院 A kind of infilled wall tie bar bar planting positioning construction method and dedicated positioning device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385991A (en) * 2018-01-19 2018-08-10 滨州学院 A kind of infilled wall tie bar bar planting positioning construction method and dedicated positioning device
CN108385991B (en) * 2018-01-19 2023-06-20 滨州学院 Positioning construction method for tie bar planting of filling wall and special positioning device

Similar Documents

Publication Publication Date Title
CN204645268U (en) A kind of infilled wall tie bar built-in fitting
CN102003069A (en) Construction method and pouring device for framework masonry infill wall structure
CN209308282U (en) The positioning device of reinforcing bar is planted after a kind of constructional column
CN106801517A (en) A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method
CN107829569A (en) Masonry panel fracture unit method
CN207892255U (en) A kind of dedicated positioning device
CN108385991A (en) A kind of infilled wall tie bar bar planting positioning construction method and dedicated positioning device
CN103556819A (en) Construction method for reserving constructional column holes in beam plate
CN110241842A (en) Jump storehouse top and bottom process construction method in a kind of cooling tower large-sized annular basis
CN107083804B (en) A kind of wall structure column joint bar construction method
CN108412094A (en) The construction method and device of the hollow concrete wall of masonry between a kind of replacement shear wall
CN109296138A (en) The positioning device and construction method of reinforcing bar are planted after a kind of constructional column
CN107100366A (en) A kind of construction method for skyscraper reinforced concrete stairs formwork
CN211817000U (en) Constructional column steel bar positioning mechanism
CN108086623A (en) Bright frame wall brick system and its construction method in a kind of assembled room
CN207469596U (en) A kind of beam column outer rim is exempted to tear concrete mold open
CN208105876U (en) A kind of mold for top plate hole to be provided
CN206928647U (en) The precast lintel formwork erecting structure that a kind of live wire pipe passes through
CN108277993A (en) A kind of steel bar truss floor support plate hanging brace device and its assembling production method
CN113073789B (en) Construction method of crotch column inclined column of swimming pool
CN108193874A (en) A kind of stairway steel formwork for building
CN113006345A (en) Steel plate wall and construction method thereof
CN208415925U (en) A kind of PVC column-form
CN110374286B (en) Stone wet hanging method and structure of gypsum aerated brick wall surface
CN206752707U (en) Steel construction track vestibule expansion gap device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180921

Termination date: 20210119