CN208415925U - A kind of PVC column-form - Google Patents

A kind of PVC column-form Download PDF

Info

Publication number
CN208415925U
CN208415925U CN201821081268.2U CN201821081268U CN208415925U CN 208415925 U CN208415925 U CN 208415925U CN 201821081268 U CN201821081268 U CN 201821081268U CN 208415925 U CN208415925 U CN 208415925U
Authority
CN
China
Prior art keywords
column
pvc
steel pipe
mould
pipe hoop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821081268.2U
Other languages
Chinese (zh)
Inventor
林磊
农站
韦慧春
银燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group Construction General Contractor Co Ltd
Original Assignee
Guangxi Construction Engineering Group Construction General Contractor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction Engineering Group Construction General Contractor Co Ltd filed Critical Guangxi Construction Engineering Group Construction General Contractor Co Ltd
Priority to CN201821081268.2U priority Critical patent/CN208415925U/en
Application granted granted Critical
Publication of CN208415925U publication Critical patent/CN208415925U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of PVC column-forms, including pvc pipe, wooden flute, the lateral ties of column and steel pipe hoop;The pvc pipe is column mould, vertically places a plurality of wooden flute outside column mould, sets multiple tracks lateral ties of column hooping column mould and wooden flute respectively by vertical spacing is designed, sets multiple tracks steel pipe hoop hooping column mould respectively by vertical spacing and wooden flute, the steel pipe hoop are connected with full hall scaffold.The template source of drawing material of the utility model is extensive, and PVC pipe buying is convenient;Pvc pipe inner surface itself is smooth, and circularity is accurate, and has certain impact resistance;Seam is few, integrated degree is high, and vertical piece contact is closely not easy spillage;Without transverse joint, radian is accurate;High from heavy and light, good toughness, impact resistance, intensity, wearability is good.It is easy to process;It is easy to form, convenient for disassembly and assembly, work efficiency is high.

Description

A kind of PVC column-form
Technical field
The utility model belongs to building template technical field, especially a kind of PVC column-form.
Background technique
Currently, the higher concrete frame post design of most of layers of height is cylinder, concrete is just unavoidably used in work progress Cylinder typified form.Popular column-form is cylinder sizing steel, wood formwork system for a long time.Steel form has recycling Often, sturdy and durable feature, but cost is high and is not easy to cut, at the position for encountering the handover of beam and column When have no idea to accomplish primary concreting, and it is too heavy not easy to operate to be self-possessed, it is necessary to operated using large-scale crane or tower crane, Waste a large amount of man power and materials.Plank sheathing is using veneer by being glued layer by layer, primary by high temperature and pressure in special die Molding typified form.The template uses wooden material, be transported to after building-site according to construction need to carry out it is secondary cut plus Work.When above two template all haves the shortcomings that more piece, construction cost, cost it is high, from great, artificial mobile inconvenient.
Utility model content
In view of the above-mentioned problems, the utility model provides a kind of PVC column-form.
The utility model adopts the following technical solution solves above-mentioned technical problem:
A kind of PVC column-form, including pvc pipe, wooden flute, the lateral ties of column and steel pipe hoop;The pvc pipe is column mould, column mould A plurality of wooden flute is vertically placed outside, multiple tracks lateral ties of column hooping column mould and wooden flute are set respectively by vertical spacing is designed, by vertical spacing Multiple tracks steel pipe hoop hooping column mould is set respectively and wooden flute, the steel pipe hoop are connected with full hall scaffold.
The pvc pipe dimidiation, two halves integrator are set in outside column muscle.
The lateral ties of column are set together by the vertical every 500mm of spacing is designed.
The lateral ties of column circularize openning shape using 10 lis of steel bar meters, and opening is fixed by screw.
The vertical spacing of the steel pipe hoop are as follows: to away between the 200mm of Vierendeel girder bottom from column mould is away from ground 200mm, every 500mm sets one of steel pipe hoop.
The steel pipe hoop per pass is made of four steel pipes, and four steel pipes surround rectangle and connected by fastener;Opposite steel pipe Between pass through split bolt reinforce.
Utility model has the advantages that the utility model template PVC pipe uses pressure sintering extrusion forming, in itself Surface is smooth, and has preferable resistance to corrosion, and price is low, and quality is hard.Concrete blinding can be changed by wooden form The traditional concept for controlling concrete formation, is easy to appear showing for irregular seam after the finished product demoulding of solution wooden form output As.Using the radian and toughness of pvc pipe itself, cooperate the rigidity of external wooden flute, finally using the lateral ties of column wooden flute and pvc pipe Anchor ear is integral.Become high-precision cylindrical body after concreting finishes.The utility model template source of drawing material is extensive, PVC pipe buying is convenient;Pvc pipe inner surface itself is smooth, and circularity is accurate, and has certain impact resistance;Seam is few, integrated Change degree is high, and vertical piece contact is closely not easy spillage;Without transverse joint, radian is accurate;From heavy and light, good toughness, impact resistance, strong Degree is high, and wearability is good.It is easy to process;It is easy to form, convenient for disassembly and assembly, work efficiency is high.Fee of material, labour cost, rework cost substantially subtract It is few.The utility model template is constructed suitable for cast-in-situ steel reinforced concrete column-form.PVC column mould specification use scope: cylinder is straight Diameter is less than or equal to the bolster stake of 500mm.
Detailed description of the invention
Fig. 1 is the schematic view of facade structure of the utility model PVC column-form.
Fig. 2 is the schematic diagram of the section structure of Fig. 1.
In figure: 1: the lateral ties of column, 2: wooden flute, 3: steel pipe hoop, 4:PVC pipe, 5: column concrete, 6: bolt.
Specific embodiment
It elaborates, but does not constitute to this reality to specific embodiment of the present invention with attached drawing with reference to embodiments With the limitation of novel claims.
As depicted in figs. 1 and 2, a kind of PVC column-form, including pvc pipe 4, wooden flute 2, the lateral ties of column 1 and steel pipe hoop 3;Institute Stating pvc pipe 4 is column mould, is column concrete 5 in column mould, vertically places a plurality of wooden flute 2 outside column mould, sets multiple tracks respectively by vertical spacing is designed The lateral ties of column 1 enclose column mould and wooden flute 2, set multiple tracks steel pipe hoop 3 respectively by vertical spacing and enclose column mould and wooden flute 2, the steel pipe Hoop 3 is connected with full hall scaffold.4 dimidiation of pvc pipe, two halves integrator are set in outside column muscle.The steel bar column Hoop 1 is set together by the vertical every 500mm of spacing is designed.
The lateral ties of column 1 circularize openning shape using 10 lis of steel bar meters, and opening is fixed by screw.
The vertical spacing of the steel pipe hoop 3 are as follows: to away between the 200mm of Vierendeel girder bottom from column mould is away from ground 200mm, every 500mm sets one of steel pipe hoop 3.
3 per pass of steel pipe hoop is made of four steel pipes, and four steel pipes surround rectangle and connected by fastener;Opposite steel pipe Between reinforced by split bolt 6.
Using the process flow of the utility model template construction:
After column reinforcing bar is bound, releases axis and control line → placement cushion block → column mould is in place → placement wooden flute → and tighten The lateral ties of column → first Uprightness adjusting → with full hall frame fix → root blocks up slurry → column concrete placings → polyphony vibration again → column root is cleared up → and tears open Mould brush oil.
Key points for operation:
1, axis and control line are released: being separated according to design drawing, first wipes the cement mortar of 1:1 by absolute altitude in cylinder root Screed-coat, and put column sideline well by cylinder axis, with guarantee cylinder absolute altitude and positioning it is accurate.
2, cushion block: every column totally 8 pieces of cushion blocks is placed, each 4 pieces of upper and lower level, lay by cross hairs: lower layer divides away from 50 ㎜ of ground It Fang Zhi not be 4 pieces;50 ㎜ place 4 pieces respectively under the absolute altitude of capital.Concrete pad and plastic cushion are advisable with the selection of the latter.
3, column mould is in place: integrated two halves pvc pipe is placed from column top rib portion is safe from top to bottom to column hemline.
4, it places wooden flute: suitable pvc pipe is selected according to the diameter of engineering characteristic and construction condition, especially cylinder The wooden flute for being suitable for size.Column mould elevation is drawn to have told somebody what one's real intentions are worker.
5, the lateral ties of column are tightened: noticing that the opening vertical direction of the lateral ties of column is staggered, so as to more preferable stress.By vertically under It is supreme to tighten one by one.
6, first Uprightness adjusting: after column mould installs, it is necessary to be checked cylinder verticality with theodolite or messenger wire, steel ruler, and will be justified The correction of shaft template.If live sight is preferable, it can be immediately seen cylinder upper, middle and lower line, collimation method is thrown using theodolite and carry out Detection and correction.If live intervisibility is difficult, is detected and corrected using parallel lines cultellation method using messenger wire and steel ruler, hung down Straight degree detection should meet code requirement.
7, fix with full hall frame: steel pipe hoop is connected with full hall scaffold respectively, forms a firm support system, prevents Only column mould run-off the straight.
8, the stifled slurry in root: in the rectangular or circular wooden frame in column mould root outer hoop one, when column concrete will be poured in its sky Mortar is inserted in gap, prevents column mould bottom spillage rotten.
9, column concrete placings: cylinder concrete answers placement layer by layer, and every thickness degree is not more than 50cm;Cylinder height, can within 3m On cylinder top, direct blanking is poured;When more than 3m, poured using tumbling barrel or in the sub- hole dress inclined chute segmentation of formwork sides enabling, often Duan Gaodu is no more than 2m, every section pour after door hole obturaged and bind round jail.
10, polyphony shakes again: before concrete initial set, the steel pipe hoop of shaft is finely tuned under the guiding of messenger wire pendant measurement, to pillar Verticality carries out review correction, can obtain higher verticality.
11, column root is cleared up: the time that pours of single column concrete is generally 0.5~1h, lifts column mould root after pouring immediately Portion's outer hoop frame, mortar is rooted out.
12, demoulding brush oil: cylinder strength of mould stripping is 1MPa, general 8~12h, that is, collapsible die under room temperature.A piece column mould is one It can be had enough to meet the need in it 1~2 time.Form removable sequence is torn open with erection sequence on the contrary, first propping up afterwards, and rear branch is first torn open.Cylinder mold of first dismantling branch Support body system, then the lateral ties of column are laid down, wooden flute is removed, column mould is then manually gently agitated with crowbar, is detached from it with concrete ?.
Guangxi cell uses the PVC column-form formwork construction of the utility model, effectively controls cylinder molding ruler Very little and protective layer thickness, entity detection are up-to-standard.Occur in construction without safety accident, wins provincial safe and civilized building site and knot Structure cup obtains good economic benefit and social benefit.

Claims (6)

1. a kind of PVC column-form, which is characterized in that including pvc pipe, wooden flute, the lateral ties of column and steel pipe hoop;The pvc pipe is Column mould, column mould vertically place a plurality of wooden flute outside, set multiple tracks lateral ties of column hooping column mould and wooden flute respectively by vertical spacing is designed, press Vertical spacing sets multiple tracks steel pipe hoop hooping column mould respectively and wooden flute, the steel pipe hoop are connected with full hall scaffold.
2. a kind of PVC column-form as described in claim 1, which is characterized in that the pvc pipe dimidiation, two is semi-synthetic It is integrally set in outside column muscle.
3. a kind of PVC column-form as described in claim 1, which is characterized in that the lateral ties of column are by the vertical spacing of design Every 500mm is set together.
4. a kind of PVC column-form as described in claim 1, which is characterized in that the lateral ties of column are added using 10 lis of reinforcing bars Work circularizes openning shape, and opening is fixed by screw.
5. a kind of PVC column-form as described in claim 1, which is characterized in that the vertical spacing of the steel pipe hoop are as follows: from column Mould rises away from ground 200mm to away between the 200mm of Vierendeel girder bottom, sets one of steel pipe hoop every 500mm.
6. a kind of PVC column-form as described in claim 1, which is characterized in that the steel pipe hoop per pass is by four steel pipes At four steel pipes surround rectangle and connected by fastener;It is reinforced between opposite steel pipe by split bolt.
CN201821081268.2U 2018-07-09 2018-07-09 A kind of PVC column-form Expired - Fee Related CN208415925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821081268.2U CN208415925U (en) 2018-07-09 2018-07-09 A kind of PVC column-form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821081268.2U CN208415925U (en) 2018-07-09 2018-07-09 A kind of PVC column-form

Publications (1)

Publication Number Publication Date
CN208415925U true CN208415925U (en) 2019-01-22

Family

ID=65126651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821081268.2U Expired - Fee Related CN208415925U (en) 2018-07-09 2018-07-09 A kind of PVC column-form

Country Status (1)

Country Link
CN (1) CN208415925U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779246A (en) * 2019-01-29 2019-05-21 中国五冶集团有限公司 Reinforced Concrete Circular Cylinder template construct method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779246A (en) * 2019-01-29 2019-05-21 中国五冶集团有限公司 Reinforced Concrete Circular Cylinder template construct method

Similar Documents

Publication Publication Date Title
CN106677069B (en) A kind of construction method of bridge pier integral formwork support one-shot forming structure
CN107297810A (en) A kind of making of precast wall body component and installation method
CN103088844A (en) Reinforced concrete inspection well whole prefabricated hoisting construction method
CN206903215U (en) Girder with rolled steel section en cased in concrete is without scaffold formwork
CN206267422U (en) A kind of assembly concrete superposed column
CN106836463A (en) The constructing device and construction method of cushion cap and ground girder construction
CN103603359A (en) Deep foundation pit diagonal bracing support structure demolition method
CN203856202U (en) Simple pullable sizing device of reserved holes
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN106988603A (en) A kind of Assembled enclosing wall and its construction method
CN106760502A (en) Shear wall end cylinder construction method
CN104972550B (en) The polygonal mould and preparation method of a kind of in-situ precast concrete-pile
CN205976167U (en) Based on cast -in -place floor structures of detachable positioning control spare
CN208415925U (en) A kind of PVC column-form
CN205296197U (en) Prefabricated cushion cap of anticorrosive industry factory building concrete rim of a cup formula
CN109763606A (en) A kind of construction method of reinforced concrete combination batter post
CN204174614U (en) Flap shape pretensioning prestressed concrete pile
CN108130889B (en) Manufacturing method of stepped construction joint between main bottom plate of pump brake and side wall of runner layer
CN114277672B (en) Large-span prestressed concrete bent cap structure and construction method thereof
CN107939094B (en) Conical concrete funnel construction method
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN213952981U (en) Steel pipe supporting base of stair platform
CN108193874A (en) A kind of stairway steel formwork for building
CN106639290A (en) Construction method for reinforcing cantilever scaffold through recyclable embedded bolts
CN206553938U (en) Bridge pier integral formwork support one-shot forming structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190122

CF01 Termination of patent right due to non-payment of annual fee