CN105908977B - Joint bar constructing structure and method - Google Patents

Joint bar constructing structure and method Download PDF

Info

Publication number
CN105908977B
CN105908977B CN201610405076.1A CN201610405076A CN105908977B CN 105908977 B CN105908977 B CN 105908977B CN 201610405076 A CN201610405076 A CN 201610405076A CN 105908977 B CN105908977 B CN 105908977B
Authority
CN
China
Prior art keywords
joint bar
joint
wall
bar
positioning device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610405076.1A
Other languages
Chinese (zh)
Other versions
CN105908977A (en
Inventor
周帆
田泽辉
温雪飞
李善继
冯家荣
王永斌
刘刚
陈忠
文俊杰
林裕
王文珏
张敏
尹超
罗学
唐怀春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Construction Industry Group Co.,Ltd.
Original Assignee
CHENGDU CONSTRUCTION ENGINEERING GROUP CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU CONSTRUCTION ENGINEERING GROUP CORP filed Critical CHENGDU CONSTRUCTION ENGINEERING GROUP CORP
Priority to CN201610405076.1A priority Critical patent/CN105908977B/en
Publication of CN105908977A publication Critical patent/CN105908977A/en
Application granted granted Critical
Publication of CN105908977B publication Critical patent/CN105908977B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • E04G21/122Machines for joining reinforcing bars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of joint bar constructing structures, including being inserted into the joint bar to be positioned of wall and the joint bar positioning device on joint bar top to be positioned being arranged in, the joint bar positioning device includes positioning body, the positioning body is equipped with agrees with the location hole plugged and several channels of vibrating passed through for vibrating spear for joint bar to be positioned one by one, and the joint bar positioning device is arranged in concreting finished surface or more.The invention also discloses a kind of joint bar construction methods using above-mentioned joint bar constructing structure.Joint bar construction is carried out through the invention, can guarantee that concreting finished surface joint bar below can be installed accurately, is thus accurately installed and is connect with superstructure conducive to wall.

Description

Joint bar constructing structure and method
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of joint bar constructing structure and method.
Background technique
Joint bar is that do not have similar component or superstructure reinforcing bar radical more in basal layer or understructure and superstructure The reserved steel bar in understructure is needed to protrude into superstructure component similar with superstructure when the reinforcing bar radical of understructure Overlapped reinforcing bar.Joint bar is divided into the basic joint bar of vertical member and joint bar when vertical member variable cross-section needs to anchor substantially.
In existing building structure, usually before basis or understructure carry out concreting, according to designing Construction blueprint determine joint bar position, joint bar is directly then carried out by joint bar position line, the reinforcing bar lower part of insertion is using certain Fixed structure be connected firmly;It is either previously inserted reinforcing bar and constitutes prefabricated components.Above-mentioned joint bar construction can only be generally applicable in In the project situation not high to joint bar required precision, such as some traditional cast-in-place concrete structures;And joint bar precision is wanted Higher project situation is sought, above-mentioned joint bar construction obviously can no longer meet the requirement of these project situations, especially in recent years Carry out assembled monolithic concrete structure in modern civil engineering using more and more extensive situation, the requirement of joint bar construction precision It is higher and higher therewith.
Assembled monolithic concrete structure is to be answered in advance by precast concrete or component by reinforcing bar, connector or application The advantages of power is connected and poured in place concrete, combines both cast-in-place monolithic construction and prefabricated construction, Template is saved, reduces engineering cost, and the globality and shock resistance of engineering can be improved.Assembled monolithic concrete structure is general There are two types of situation, when floor is skyscraper, assembled monolithic concrete structure mainly include lower layer's cast-in-place concrete structure, Upper layer prefabricated concrete structure and it is set to transition zone between the two, wherein transition zone is as lower layer's cast-in-place concrete knot The conversion layer of structure and upper layer prefabricated concrete structure is using cast-in-place concrete structure;When floor is low-rise building or multilayer When building, assembled monolithic concrete structure includes basal layer, upper layer prefabricated concrete structure, and basal layer uses cast-in-place coagulation Soil structure.In above two assembled monolithic concrete structure, the prefabricated components energy of upper layer prefabricated concrete structure is constituted No smooth installation directly depends on the construction quality of transition layer structure or base layer structure, therefore assembled monolithic concrete structure The joint bar construction precision of joint bar construction precision or basal layer for transition zone requires to want compared to traditional joint bar construction precision Ask high, technical requirements are also more harsh.Since joint bar construction quality directly affects the installation of upper layer prefabricated components, such as Fruit transition zone joint bar constructing structure or basal layer joint bar constructing structure inaccuracy, will lead to upper layer prefabricated components can not be successfully installation Or cause wall entirety positioning to deform, therefore need at present a kind of joint bar constructing structure that can be improved joint bar construction precision and Method.
Chinese patent literature CN205012665U discloses a kind of temporary fastening device of concrete walls joint bar, including respectively It is close proximity on the outside of interior socket muscle and the twice that are arranged on the outside of outlet joint bar is along wall direction locating rod, positioned described in per pass along wall direction It is fixed with the vertical wall direction fixed link that multiple tracks is spaced apart from each other on the inside of bar, vertical wall direction fixed link is perpendicular to the suitable wall Direction locating rod, and it is close proximity to joint bar, vertical wall direction fixed link and the suitable wall direction fixed link binding are in joint bar; The vertical wall direction drawknot bar that multiple tracks is spaced apart from each other, the vertical wall are fixedly connected between suitable wall direction locating rod described in twice Direction drawknot bar is perpendicular to the suitable wall direction locating rod.In addition to this it also discloses in the patent document by concrete walls joint bar Temporary fastening device constitute joint bar constructing structure, after the temporary fastening device of concrete walls joint bar is completed, in reinforcing bar After the completion of concrete walls joint bar, before concreting completion, this device binding and fixing is being higher than concrete surface to be poured On joint bar.Although the joint bar constructing structure can avoid reinforcing bar from deforming to a certain extent, there are the following problems: the One, it needs to be bound one by one between vertical wall direction fixed link and suitable wall direction fixed link and joint bar, so that device is integrally pacified Assembling structure complexity is time-consuming, and it is also inconvenient that construction personnel operates, and the incorrect situation of device installation site once occurs, It needs an a pair of above-mentioned binding structure to be unbinded again, seriously delays project progress;Second, vertical wall direction fixed link and Shun Qiang The binding structure fixing intensity used between direction fixed link and joint bar is general, joint bar only some be to abut against vertical wall side To in fixed link, once encountering concrete over vibration situation, binding structure is still easy to loosen, inevitably occur The situation of joint bar displacement and deformation finally still will cause the wall positioning deformation of composition, and ideal joint bar positioning effect is not achieved Fruit.
Summary of the invention
Technical problem to be solved by the present invention lies in provide a kind of joint bar construction knot that can be improved joint bar construction precision Structure and method.
In order to solve above-mentioned prior art problem, the present invention is implemented with the following technical solutions:
Joint bar constructing structure of the present invention, including being inserted into the joint bar to be positioned of wall and joint bar top to be positioned being arranged in Joint bar positioning device, the joint bar positioning device includes positioning body, and the positioning body is equipped with for joint bar to be positioned one by one Agree with the location hole plugged and several channels of vibrating passed through for vibrating spear, the joint bar positioning device is arranged in concrete Pour finished surface or concreting finished surface or more.The configuration of the present invention is simple, it is only necessary to it is fixed that joint bar to be positioned be agreed with into insertion Position hole, then according to the installation site of actual use situation adjustment joint bar positioning device, the location hole agreed with can be limited circumferentially Joint bar position prevents joint bar to be subjected to displacement in subsequent concreting process and deformation, thus accurately positions to joint bar, Channel of vibrating can pass through to facilitate in the casting process of later period concrete for vibrating spear and uniformly vibrate to concrete, in the present invention Joint bar positioning device is the structure being independently arranged relative to template used in concreting process, therefore can freely be installed And dismounting completes the setting of joint bar positioning device in concreting it is possible thereby to realize the recycling of joint bar positioning device Thus face or more is conducive to wall and upper layer thus, it is possible to guarantee that mixed insertion muscle positioning device joint bar below can be installed accurately Structure accurately installs connection, and joint bar to be positioned agrees with insertion location hole, and agreeing with is to refer to guarantee joint bar positioning device in joint bar On stablize installation, and the power that operation generates of vibrating in concreting process is mobile insufficient for joint bar positioning device; And when the power that is applied in joint bar positioning device of the external world greatly to a certain extent when can adjust the position of joint bar positioning device, but The structure of joint bar positioning device will not be damaged.
As the further improvement of above-mentioned joint bar constructing structure, the superstructure of the wall connecting is prefabricated components.Dress With Integratde concrete struction, generally there are two types of situations, and when floor is skyscraper, assembled monolithic concrete structure is main Including lower layer's cast-in-place concrete structure, upper layer prefabricated concrete structure and it is set to transition zone between the two, wherein mistake Layer is crossed as the conversion layer of lower layer's cast-in-place concrete structure and upper layer prefabricated concrete structure using cast-in-place concrete knot Structure;When floor is bottom building or tier building, assembled monolithic concrete structure includes basal layer, upper layer assembled coagulation Soil structure, basal layer use cast-in-place concrete structure.No matter which kind of above-mentioned structure, the superstructure of wall connecting is prefabricated structure Part, assembled monolithic concrete structure require to apply compared to traditional joint bar for the joint bar construction precision of transition zone or basal layer Work required precision is high, and technical requirements are also more harsh, therefore for the joint bar of transition zone wall or basal layer, choosing The joint bar constructing structure for selecting aforementioned present invention can effectively guarantee transition zone wall or basal layer wall joint bar precision, to make The integral wall position for obtaining assembled monolithic concrete structure is accurate, and positioning deformation does not occur.
Further, the distance between joint bar positioning device and concreting finished surface be concreting finished surface with The height of horizontal joint between prefabricated components.After concreting finishes, transition zone or basal layer need and prefabricated components The docking sleeve of lower part is installed, vertical direction can there are seams between transition zone or basal layer and prefabricated components after abutting joint Gap, horizontal joint of this gap between concreting finished surface and prefabricated components, since the horizontal joint needs to carry out Grouting operation, in order to guarantee being connected firmly for transition zone or basal layer and prefabricated components, the joint bar at horizontal joint is also needed It to be held in position the positioning that do not deform accurately as far as possible, joint bar positioning device is set according to above structure, can not only guarantee to mix Solidifying soil pours finished surface joint bar below and accurately installs, moreover it is possible to guarantee at transition zone or basal layer and prefabricated components horizontal joint Joint bar does not deform positioning, and joint bar more than horizontal joint pours and horizontal in transition zone or basal layer walls concrete It is able to carry out after joint grouting end of operation and adjusts again, be thus further ensured that the entirety of assembled monolithic concrete structure Wall position is most accurate, and installation is most smooth, and positioning deformation does not occur.
Further, between the joint bar positioning device and concreting finished surface distance be 20mm, this apart from item Under part, joint bar positioning is most accurate, and the integral wall position of assembled monolithic concrete structure is most accurate, installs most smooth.
As the further improvement of above-mentioned joint bar constructing structure, the positioning body is equipped with location hole and channel of vibrating Positioning plate, the positioning plate one week be equipped with angle steel, the angle steel can one week setting angle steel of positioning plate, in concreting process In, especially can integrally play reinforcement effect to device in process of vibrating, anti-locking apparatus in active force flowering structure unstability of vibrating, To ensure that the stability of joint bar constructing structure.
As the further improvement of above-mentioned joint bar constructing structure, the diameter of the location hole is bigger than the diameter of joint bar to be positioned 1-3mm.Under this condition, it is best to agree with effect in joint bar constructing structure between location hole and joint bar, can guarantee that joint bar positions Device stablizes installation on joint bar, and the power that operation generates of vibrating in concreting process is positioned insufficient for joint bar Device is mobile;And when the power that is applied in joint bar positioning device of the external world greatly to a certain extent when can adjust joint bar positioning device Position, but the structure of joint bar positioning device will not be damaged.
The present invention also provides a kind of joint bar construction methods using above-mentioned joint bar constructing structure, comprising the following steps:
(I) joint bar is carried out to wall, every joint bar to be positioned is checked one by one while joint bar, then by solid Determine structure to fix joint bar lower part;
(II) joint bar to be positioned is integrally checked after finishing all joint bar insertions to be positioned;
(III) joint bar positioning device is set to the top of joint bar to be positioned, the joint bar positioning device includes positioning master Body, the positioning body is equipped with agrees with the location hole that plugs for joint bar to be positioned and several are passed through for vibrating spear one by one It vibrates channel, joint bar to be positioned is inserted into location hole one by one and is connected therewith;
(IV) by the adjustment of joint bar positioning device more than concreting finished surface or concreting finished surface.
Using above-mentioned joint bar construction method, check and joint bar positioning device are carried out to the essence of joint bar position to joint bar twice The reinforcing bar for determining that position enables to each root cutting to enter wall is all accurately installed, and later period concreting process is thus prevented Middle joint bar is displaced and deformation, so that joint bar constructing structure is more stable, to be conducive to wall, accurate, smooth installation connects with superstructure It connects.
As the further improvement of above-mentioned joint bar construction method, the superstructure of the wall connecting is prefabricated components.Dress Essence of constructing compared to traditional joint bar is required with joint bar construction precision of the Integratde concrete struction for transition zone or basal layer Degree requires high, and technical requirements are also more harsh, therefore for the joint bar of transition zone wall or basal layer, in selection Transition zone wall or basal layer wall joint bar precision can effectively be guaranteed by stating joint bar constructing structure of the invention, so that dress Integral wall position with Integratde concrete struction is accurate, and positioning deformation does not occur.
Further, in step (IV) by joint bar positioning device be adjusted to concreting complete face interval centainly away from From the height of distance horizontal joint between concreting finished surface and prefabricated components.Joint bar is applied according to the method described above Work can not only guarantee that concreting finished surface joint bar below is accurately installed, moreover it is possible to guarantee transition zone or basal layer and pre- The joint bar of modular level seam crossing processed does not deform positioning, and joint bar more than horizontal joint is in transition zone or basal layer wall Concreting and horizontal joint grouting operation are able to carry out after finishing and adjust again, so that assembled integral coagulation The integral wall position of soil structure is accurate, and positioning deformation does not occur.
Further, the joint bar positioning device and concreting finished surface spacing distance are 20mm.This apart from item Under part, joint bar positioning is most accurate, so that the integral wall position of assembled monolithic concrete structure is accurate, positioning change does not occur Shape.
Below by way of attached drawing and specific embodiment, the invention will be further described.
Detailed description of the invention
Fig. 1 is joint bar constructing structure of the present invention.
Fig. 2 is one of joint bar positioning device schematic diagram in the present invention.
Fig. 3 is in Fig. 2 along line B-B sectional view.
Fig. 4 is in Fig. 2 along line A-A sectional view.
Fig. 5 is two of joint bar positioning device schematic diagram in the present invention.
Specific embodiment
Below by way of application of the present invention in assembled monolithic concrete structure to the joint bar constructing structure in the present invention And joint bar construction method elaborates.
As shown in Figure 1, carrying out joint bar construction to the transition zone 1 in assembled monolithic concrete structure, superstructure is pair The prefabricated components 3 answered, transition zone 1 are needed as the transformational structure between prefabricated components 3 and understructure in-situ concrete wall It further illustrates, joint bar 120 to be positioned is inserted into 120 lower part of joint bar to be positioned after 1 wall of transition zone and generally uses stirrup Binding structure is fixed, and stirrup binding structure here is different according to specific condition of construction structure, when joint bar 120 to be positioned In the corresponding position of lower layer's in-situ concrete wall there are when reinforcing bar, just directly joint bar 120 to be positioned is connected with these reinforcing bars, When joint bar 120 to be positioned is not when the corresponding position of lower layer's in-situ concrete wall has reinforcing bar, need in lower layer's cast-in-place concrete New additional bar is bound on the reinforcing bar of wall, and additional bar and joint bar 120 to be positioned are then subjected to binding and fixing, thus protected It demonstrate,proves it not to be subjected to displacement, the connection structure between existing transition zone 1 and its understructure in-situ concrete wall is not shown in the figure, in advance The lower part of structure 3 processed, which is equipped with, includes insertion transition zone 1 with the one-to-one sleeve 310 of joint bar 120 to be positioned, joint bar constructing structure The joint bar to be positioned 120 of wall and the joint bar positioning device 2 that 120 top of joint bar to be positioned is set, 2 energy of joint bar positioning device It is enough to position its joint bar 120 to be positioned below one by one, prevent these joint bars 120 to be positioned to be subjected to displacement and deform, the joint bar The distance between concreting finished surface 110 in positioning device 2 and transition zone 1 d is transition after concreting finishes Horizontal joint height between layer 1 and prefabricated components 3, the distance are preferably 20mm, and joint bar positioning is most accurate with this condition, existing The integral wall position that pouring concrete wall, transition zone 1,3 three of prefabricated components are constituted is most accurate, and positioning change will not occur for wall Shape.
As shown in Figure 2-5, joint bar positioning device 2 includes positioning body 210, and the positioning body 210 is equipped with for undetermined Position joint bar 120 agrees with the location hole 212 plugged and several channels 211 of vibrating passed through for vibrating spear, preferred orientation one by one The diameter in hole 212 is 2mm bigger than 120 diameter of joint bar to be positioned, so that joint bar to be positioned 120 just agrees with location hole 212, so that Joint bar positioning device 2 is whole to stablize installation on joint bar 120 to be positioned, and vibrates what operation generated in concreting process Power is mobile insufficient for joint bar positioning device;And when the external world be applied to power in joint bar positioning device greatly to a certain extent when energy The position of joint bar positioning device is enough adjusted, but the structure of joint bar positioning device will not be damaged, positioning body 210 is big Small rectangular positioning plate identical with 1 upper surface of transition zone, channel 211 of vibrating through-hole of the same size on square plate for setting, These through-holes are located along the same line, and thereby guarantee that concrete vibrating is uniform in process of vibrating, are welded with angle steel within square plate one week 220, angle steel 220 reinforces joint bar positioning device 2, prolongs its service life, positioned at two through-holes of square plate left and right ends respectively Between be respectively provided with angle cleat 220 and square plate reinforcing angle 230, reinforcing angle 230, which plays, further reinforces joint bar positioning dress 2 effect is set, angle steel 220 and reinforcing angle 230 are that bottom surface is welded on square plate, vertical on 230 square plate of reinforcing angle It is equipped at intervals with the gate shape handle 240 of two round steel composition, joint bar positioning device 2 is whole to be made of galvanized steel.
Using above-mentioned joint bar constructing structure joint bar construction method the following steps are included:
(I) joint bar is carried out to wall, the wall is the transition being connected between in-situ concrete wall and prefabricated components 3 Layer wall 1 releases joint bar position line in wall side before joint bar construction, which is drawn by the control line of floor, The control line from first floor datum mark draw, joint bar position is determined according to the joint bar position line of releasing, determine good position it Afterwards, while to every joint bar 120 to be positioned it is checked, is then consolidated 120 lower part of joint bar to be positioned by fixed structure one by one Fixed, fixed structure is the stirrup that binding and fixing are carried out to joint bar 120 to be positioned, when joint bar 120 to be positioned is in the cast-in-place coagulation of lower layer Joint bar 120 to be positioned is just directly connected, when joint bar to be positioned by the corresponding position of cob wall body there are when reinforcing bar with these reinforcing bars 120, when the corresponding position of lower layer's in-situ concrete wall does not have reinforcing bar, need on the reinforcing bar of lower layer's in-situ concrete wall New additional bar is bound, additional bar and joint bar 120 to be positioned are then subjected to binding and fixing;
(II) 120 entirety of joint bar to be positioned is checked after finishing all insertions of joint bar 120 to be positioned, again school Core 120 position of joint bar to be positioned guarantees that subsequent joint bar positioning device 2 can be installed accurately;
(III) joint bar positioning device 2 is set to the top of joint bar 120 to be positioned, the joint bar positioning device 2 includes fixed Position main body 210, positioning body 210 described in the joint bar positioning device 2 are equipped with to agree with one by one for joint bar 120 to be positioned and plug Location hole 212 and several channels 211 of vibrating passed through for vibrating spear, are inserted into location hole 212 for joint bar 120 to be positioned one by one And it is connected therewith;
(IV) joint bar positioning device 2 is adjusted in 110 or more concreting finished surface, joint bar positioning device 2 is adjusted To being concreting finished surface 110 and prefabricated components 3 with the d spaced apart of concreting finished surface 110, distance d Between horizontal joint height, the joint bar positioning device 2 and 110 spacing distance d of concreting finished surface is 20mm.
Using above-mentioned joint bar construction method, check and joint bar positioning device are carried out to the essence of joint bar position to joint bar twice The reinforcing bar for determining that position enables to each root cutting to enter wall is all accurately installed, and later period concreting process is thus prevented Middle joint bar displacement and deformation are smoothly installed to be conducive to wall with upper layer prefabricated components so that joint bar constructing structure is more stable.Dress It requires to require compared to traditional joint bar construction precision with joint bar construction precision of the Integratde concrete struction for transition zone high Many out, technical requirements are also more harsh, therefore for transition zone wall joint bar, the joint bar of aforementioned present invention are selected to construct Method can effectively guarantee transition zone wall joint bar precision, so that in-situ concrete wall, transition zone wall, prefabricated structure The integral wall position that part three is constituted is accurate, and positioning deformation does not occur.According to the method described above to assembled integral concrete knot Structure transition zone carries out joint bar construction, can not only guarantee that concreting finished surface joint bar below is accurately installed, moreover it is possible to guarantee Joint bar at transition zone and prefabricated components horizontal joint does not deform positioning, and joint bar more than horizontal joint is in transition zone wall Body concrete pours and horizontal joint grouting operation is finished to be able to carry out later and be adjusted again, is thus further ensured that cast-in-place mixed The integral wall position that solidifying cob wall body, transition zone wall, prefabricated components three are constituted is accurate, and positioning deformation does not occur, described to insert Muscle positioning device and concreting finished surface spacing distance are 20mm, and under the distance condition, joint bar positioning is most accurate, cast-in-place The integral wall position that concrete wall, transition zone, prefabricated components three are constituted is most accurate.Finally using above-mentioned joint bar construction knot Structure and joint bar construction method carry out after joint bar construction finishes, by examine joint bar final position deviation control always≤ 3mm can meet requirement of the assembled monolithic concrete structure to transition zone joint bar construction precision well.
Based on wall when layer, joint bar construction is tied when joint bar constructing structure and method and above-mentioned wall are as transition zone Structure and method are identical, and only base layer structure is different from transition zone wall body structure, the lower part of joint bar after being inserted into wall with base The reinforcing bar of plinth layer or additional reinforcing bar are bound, based on layer cast-in-place concrete structure and as the cast-in-place of transition zone Concrete structure is the prior art, therefore this will not be repeated here.

Claims (4)

1. joint bar construction method, which comprises the following steps:
(I) joint bar is carried out to wall, the wall is cast-in-place concrete structure, to every joint bar to be positioned while joint bar (120) it is checked, is then fixed joint bar to be positioned (120) lower part by fixed structure one by one;
(II) joint bar to be positioned (120) is integrally checked after finishing all joint bar (120) insertions to be positioned;
(III) joint bar positioning device (2) is set to the top of joint bar to be positioned (120), the joint bar positioning device (2) includes Positioning body (210), the positioning body (210) is equipped with agrees with the location hole plugged for joint bar to be positioned (120) one by one (212) and several channels of vibrating (211) for being passed through for vibrating spear joint bar to be positioned (120), is inserted into location hole one by one (212) and therewith it is connected;
(IV) superstructure of the wall connecting is prefabricated components (3), and joint bar positioning device (2) is adjusted to pour with concrete It builds finished surface (110) (d) spaced apart, distance water between concreting finished surface (110) and prefabricated components (3) The height of carvel joint;
(V) it is in the milk between the concreting finished surface (110) and prefabricated components (3), more than horizontal joint Joint bar (120) is adjusted again.
2. joint bar construction method as described in claim 1, which is characterized in that the joint bar positioning device (2) is poured with concrete Building finished surface (110) spacing distance (d) is 20mm.
3. joint bar construction method as described in claim 1, which is characterized in that the positioning body (210) is equipped with location hole (212) and the positioning plate of channel of vibrating (211), angle steel (220) are equipped within the positioning plate one week.
4. joint bar construction method as described in claim 1, which is characterized in that the diameter of the location hole (212) is than to be positioned The big 1-3mm of diameter of joint bar (120).
CN201610405076.1A 2016-06-08 2016-06-08 Joint bar constructing structure and method Active CN105908977B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610405076.1A CN105908977B (en) 2016-06-08 2016-06-08 Joint bar constructing structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610405076.1A CN105908977B (en) 2016-06-08 2016-06-08 Joint bar constructing structure and method

Publications (2)

Publication Number Publication Date
CN105908977A CN105908977A (en) 2016-08-31
CN105908977B true CN105908977B (en) 2019-02-15

Family

ID=56750576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610405076.1A Active CN105908977B (en) 2016-06-08 2016-06-08 Joint bar constructing structure and method

Country Status (1)

Country Link
CN (1) CN105908977B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759280B (en) * 2016-12-22 2018-08-21 中国十七冶集团有限公司 A kind of extra-long foundation pile foundation joint bar positioning construction method
CN106759939A (en) * 2016-12-29 2017-05-31 上海建工五建集团有限公司 The attachment structure and method of vertical precast concrete
CN107083804B (en) * 2017-06-09 2019-05-10 中建七局第四建筑有限公司 A kind of wall structure column joint bar construction method
CN107130590B (en) * 2017-06-26 2022-04-22 中国核工业第二二建设有限公司 Device for accurately inserting reinforcing steel bars into plain concrete pile and construction method
CN107675838A (en) * 2017-09-26 2018-02-09 中国二十二冶集团有限公司 Assembled architecture sidewalk brick precast beam embedded sleeve barrel joint bar construction method
CN108193598A (en) * 2017-12-05 2018-06-22 上海市基础工程集团有限公司 The column joint bar mounting and positioning device and method of bearing platform construction
CN109208783A (en) * 2018-10-09 2019-01-15 中国建筑第七工程局有限公司 A kind of connecting node positioning device, connection structure and its construction method for exempting from binding
CN110453796B (en) * 2019-09-06 2024-02-23 吉林建筑科技学院 Construction tool and construction method for sealing joints of prefabricated building conversion layer
CN111424706A (en) * 2020-03-31 2020-07-17 上海宝冶集团有限公司 Construction method of basement wall foundation-free joint bar

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594641A (en) * 2015-01-28 2015-05-06 北京住总集团有限责任公司 Reinforcing bar positioning fixture and reinforcing bar positioning method for prefabrication wall installation
CN105003029A (en) * 2015-07-22 2015-10-28 山东明达建筑科技有限公司 Sleeve bar straightening butt joint formwork

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110247291A1 (en) * 2010-04-07 2011-10-13 Adrian Hammon Reinforcement Bar Support Device
CN102425310B (en) * 2011-12-15 2014-02-19 中国二十二冶集团有限公司 Assembly-type residential shear wall structural wall body vertical connection construction method
GB2503228A (en) * 2012-06-19 2013-12-25 Laing O Rourke Plc Pre-cast column assembly with reinforcement and connection parts
CN205012665U (en) * 2015-08-27 2016-02-03 中国建筑第六工程局有限公司 Temporary fixing device of concrete wall joint bar
CN205857745U (en) * 2016-06-08 2017-01-04 成都建筑工程集团总公司 Joint bar constructing structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594641A (en) * 2015-01-28 2015-05-06 北京住总集团有限责任公司 Reinforcing bar positioning fixture and reinforcing bar positioning method for prefabrication wall installation
CN105003029A (en) * 2015-07-22 2015-10-28 山东明达建筑科技有限公司 Sleeve bar straightening butt joint formwork

Also Published As

Publication number Publication date
CN105908977A (en) 2016-08-31

Similar Documents

Publication Publication Date Title
CN105908977B (en) Joint bar constructing structure and method
CN205857530U (en) Joint bar positioner
CN104895092B (en) The method that a kind of interim lattice column of inner support is used as permanent structure post
CN108240041B (en) A kind of bean column node reinforcing bar avoiding structure and its construction method
CN105256932B (en) The connection steel node of precast concrete column and prefabricated concrete floor
CN107060327A (en) Detachable tripod post-cast strip independent support system and use method thereof
CN108952014A (en) A kind of shear force wall reinforcing steel bar positioning device
CN106437033A (en) Embedded column footing of steel tube concrete column
CN205857745U (en) Joint bar constructing structure
CN213741571U (en) Prefabricated column and beam column node for prefabricated concrete building structure reserved steel bar perforation
JPH0412111Y2 (en)
JP2002242300A (en) Connecting method between precast concrete beams in beam-column joint part
CN210597648U (en) Prefabricated component steel bar connection structure
CN209907737U (en) Reserved joint connecting steel bar connecting mechanism for staged construction of concrete structure
CN103352568A (en) Method for building constructional column on foundation pad
CN210216483U (en) Foundation and foundation bearing platform thereof
CN110805147A (en) Constructional column embedded steel bar inserting device and construction method thereof
JP2008190175A (en) Joining method and joint structure of precast reinforced concrete beam members
CN105715042B (en) Tool-type building drop panel assembly and its construction method
CN209066610U (en) A kind of filling wall drawknot positioning tool
CN110821039B (en) Construction method of steel ladle beam supporting structure
CN211922151U (en) Connection structure of crashproof kerbstone and lane board in shield tunnel
KR100509262B1 (en) The apparatus of attaching between concrete and steel structural members and attaching method
CN206396782U (en) A kind of positioner for pre-embedded anchoring bolts of being constructed on isolated footing
CN205558300U (en) Bar reinforcement positioning device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No.111 Babao Street, Chengdu, Sichuan 610000

Patentee after: Chengdu Construction Industry Group Co.,Ltd.

Address before: No. 111, Babao Street, Chengdu, Sichuan 610000

Patentee before: CHENGDU CONSTRUCTION ENGINEERING Group Corp.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210316

Address after: No.30, Section 1, Fuqing Road, Jinniu District, Chengdu, Sichuan 610000

Patentee after: CHENGDU SECOND CONSTRUCTION ENGINEERING Co.,Ltd. OF CDCEG

Patentee after: Chengdu Construction Industry Group Co.,Ltd.

Address before: No. 111, Babao Street, Chengdu, Sichuan 610000

Patentee before: Chengdu Construction Industry Group Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210325

Address after: No.111 Babao Street, Qingyang District, Chengdu, Sichuan 610000

Patentee after: Chengdu Construction Industry Group Co.,Ltd.

Address before: No.30, Section 1, Fuqing Road, Jinniu District, Chengdu, Sichuan 610000

Patentee before: CHENGDU SECOND CONSTRUCTION ENGINEERING Co.,Ltd. OF CDCEG

Patentee before: Chengdu Construction Industry Group Co.,Ltd.