CN206396782U - A kind of positioner for pre-embedded anchoring bolts of being constructed on isolated footing - Google Patents

A kind of positioner for pre-embedded anchoring bolts of being constructed on isolated footing Download PDF

Info

Publication number
CN206396782U
CN206396782U CN201720033398.8U CN201720033398U CN206396782U CN 206396782 U CN206396782 U CN 206396782U CN 201720033398 U CN201720033398 U CN 201720033398U CN 206396782 U CN206396782 U CN 206396782U
Authority
CN
China
Prior art keywords
cotton rope
construction
timber
positioning
positioning timber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720033398.8U
Other languages
Chinese (zh)
Inventor
任思刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Feiyue Steel Structure Engineering Co Ltd
Original Assignee
Shandong Feiyue Steel Structure Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Feiyue Steel Structure Engineering Co Ltd filed Critical Shandong Feiyue Steel Structure Engineering Co Ltd
Priority to CN201720033398.8U priority Critical patent/CN206396782U/en
Application granted granted Critical
Publication of CN206396782U publication Critical patent/CN206396782U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a kind of positioner for pre-embedded anchoring bolts of being constructed on isolated footing, including:The predetermined altitude laid by theodolite and the first positioning timber, the second positioning timber, the 3rd positioning timber and the 4th positioning timber spaced a predetermined distance, the construction cotton rope of connection first between the first positioning timber and the 3rd positioning timber, the construction cotton rope of connection second between the second positioning timber and the 4th positioning timber, the first construction cotton rope and the described second construction cotton rope intersecting vertical;The foundation bolt includes multiple, and multiple foundation bolts are centrally located at the top of the first construction cotton rope and the described second construction cotton rope crosspoint, the foundation bolt and flushed with the described first construction cotton rope with the described second height for constructing cotton rope crosspoint.Positioned by the positioner, pre-buried foundation bolt construction precision is high, and axial dimension and absolute altitude can control to arrive zero error.The steel member of subsequent construction, is easily installed, and speed of application is faster.

Description

A kind of positioner for pre-embedded anchoring bolts of being constructed on isolated footing
Technical field
The utility model is related to a kind of positioner for pre-embedded anchoring bolts of being constructed on isolated footing.
Background technology
Pre-embedded anchoring bolts on isolated footing, are structure type common in architectural engineering, steel-structure factory building, high-tension line Basis and assembled architecture basis just use this structure type.This basis, the accuracy of embedding anchor bolts is critically important, Foundation construction it is good again, if position (axial location and height) incorrect or bigger error of embedding anchor bolts, also only It can again be constructed after demolition blasting, both influence the duration, very big economic loss is caused again, so must have one during construction correctly Localization method.
Utility model content
The purpose of this utility model is to provide a kind of positioner for pre-embedded anchoring bolts of being constructed on isolated footing, to solve Easily there is the technical problem of deviation in current embedding anchor bolts position.
In order to solve the above technical problems, the utility model provides a kind of determining for pre-embedded anchoring bolts of being constructed on isolated footing Position device, it is characterised in that including:
The predetermined altitude laid by theodolite and the first positioning timber spaced a predetermined distance, the second positioning timber, the Three position timbers and the 4th positioning timber, the construction line of connection first between the first positioning timber and the 3rd positioning timber Rope, it is described second positioning timber and it is described 4th positioning timber between connection second construct cotton rope, it is described first construction cotton rope with The second construction cotton rope intersecting vertical;
The foundation bolt includes multiple, and multiple foundation bolts are centrally located at the first construction cotton rope with described second Construct cotton rope crosspoint, with the described first construction cotton rope and the height in the described second construction cotton rope crosspoint at the top of the foundation bolt Degree is flushed.
Further, the foundation bolt is arranged in template, and is fixed by stirrup.
Further, the foundation bolt includes four, and the point midway of adjacent foundation bolt line is applied described first On work cotton rope or the second construction cotton rope.
Further, the concrete of the fixed foundation bolt is poured in the template.
Compared with prior art, the beneficial effects of the utility model are:
The positioner for pre-embedded anchoring bolts of being constructed on a kind of isolated footing that the utility model is provided, including:Pass through warp Predetermined altitude that latitude instrument is laid and the first positioning timber, the second positioning timber, the 3rd positioning timber and the spaced a predetermined distance Four positioning timbers, the construction cotton rope of connection first between the first positioning timber and the 3rd positioning timber, described second determines The construction cotton rope of connection second between position timber and the 4th positioning timber, the first construction cotton rope and the described second construction line Rope intersecting vertical;The foundation bolt include it is multiple, multiple foundation bolts be centrally located at it is described first construction cotton rope with it is described With the described first construction cotton rope and the described second construction cotton rope crosspoint at the top of second construction cotton rope crosspoint, the foundation bolt Height flush.Positioned by the positioner, pre-buried foundation bolt construction precision is high, and axial dimension and absolute altitude can be controlled To zero error.The steel member of subsequent construction, is easily installed, and speed of application is faster.
Brief description of the drawings
Fig. 1 diagrammatically illustrates the structural representation of the utility model embodiment concrete application;
Fig. 2 diagrammatically illustrates the structural representation at another visual angle of the utility model embodiment concrete application.
Reference in figure:
1st, the first positioning timber;2nd, the second positioning timber;3rd, the 3rd positioning timber;4th, the 4th positioning timber;5th, first apply Work cotton rope;6th, the second construction cotton rope;7th, foundation bolt;8th, template.
Embodiment
Embodiment of the present utility model is described in detail below, but the utility model can be defined by the claims Implement with the multitude of different ways of covering.
It refer to shown in Fig. 1 and Fig. 2, the utility model embodiment provides pre-embedded anchoring bolts of being constructed on a kind of isolated footing Positioner, including:The predetermined altitude laid by theodolite and the first positioning timber 1, second spaced a predetermined distance is determined The position positioning positioning timber 4 of timber 3 and the 4th of timber the 2, the 3rd, between the first positioning timber 1 and the 3rd positioning timber 3 The first construction cotton rope 5 is connected, the construction cotton rope 6 of connection second between the second positioning timber 2 and the 4th positioning timber 4, The first construction cotton rope 5 and the described second construction intersecting vertical of cotton rope 6;The foundation bolt 7 includes multiple, multiple lower margin spiral shells Bolt 7 is centrally located at the first construction cotton rope 5 and the described second construction cotton rope 6 crosspoint, the top of foundation bolt 7 and institute The height that the first construction cotton rope 5 is stated with the described second construction cotton rope 6 crosspoint is flushed.
Positioned by the positioner, pre-buried foundation bolt construction precision is high, and axial dimension and absolute altitude can control to arrive Zero error.The steel member of subsequent construction, is easily installed, and speed of application is faster.
The foundation bolt 7 is arranged in template 8, and is fixed by stirrup.The foundation bolt 7 is adjacent including four The point midway of the line of foundation bolt 7 is on the described first construction construction cotton rope 6 of cotton rope 5 or second.Poured in the template 8 The concrete of the fixed foundation bolt 7.
The operation principle of the utility model embodiment is that as Figure 1-Figure 2, the utility model embodiment provides one kind The positioner for pre-embedded anchoring bolts of being constructed on isolated footing, first, lays four in basic surrounding theodolite and is mutually perpendicular to Positioning timber (first positioning timber 1, second positioning timber the 2, the 3rd positioning timber 3 and the 4th positioning timber 4), pull on construction Cotton rope (the first construction construction of cotton rope 5 and second cotton rope 6).First construction cotton rope 5 and second construction cotton rope 6 and pre-embedded anchoring bolts Orientation axis it is consistent.Fig. 2 is the altitude location figure of this location technology, is applied the first construction cotton rope 5 with second with spirit level It is high consistent with the top mark of foundation bolt 7 that the height of work cotton rope 6 is set.
Before casting concrete, foundation bolt 7 is fixed on location-plate with stirrup, is placed in template 8, mould is fixed on flitch On plate 7, highly concordant with the second construction cotton rope 6 with the first construction cotton rope 5, the line midpoint per adjacent two foundation bolts 7 is just Fall well on the first construction construction cotton rope 6 of cotton rope 5 or second, the early stage positioning of pre-embedded anchoring bolts 7 is just completed.
During casting concrete, the foundation bolt 7 fixed may be shifted, so, after concreting, it is necessary to enter immediately Row is repositioned, it is ensured that finished product after concreting basis, the height of foundation bolt 7 still with the first construction cotton rope 5 and the Two construction cotton ropes 6 are concordant, and the line midpoint of every two foundation bolts 7 still just falls constructs in the first construction cotton rope 5 or second On cotton rope 6.Occur to handle before concrete setting during error, the method for processing is:If height and construction cotton rope are uneven Together, just when concrete does not solidify, raise or reduce the heights of roofs of foundation bolt 7;It is also when mixed if axial location has error Solidifying soil is not solidified, and the line midpoint of every two bolts is adjusted to overlap with the second construction cotton rope 6 with the first construction cotton rope 5, so, Pre-buried foundation bolt 7 is with regard to precise positioning, and after concrete formation, pre-buried foundation bolt 7 has not a particle of error.
Preferred embodiment of the present utility model is these are only, the utility model is not limited to, for this area Technical staff for, the utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle within, Any modification, equivalent substitution and improvements made etc., should be included within protection domain of the present utility model.

Claims (4)

1. a kind of positioner for pre-embedded anchoring bolts of being constructed on isolated footing, it is characterised in that including:
The predetermined altitude laid by theodolite and the first positioning timber (1) spaced a predetermined distance, the second positioning timber (2), 3rd positioning timber (3) and the 4th positioning timber (4), between the first positioning timber (1) and the 3rd positioning timber (3) The construction cotton rope of connection first (5), the second construction is connected between the second positioning timber (2) and the described 4th positioning timber (4) Cotton rope (6), the first construction cotton rope (5) and described second construction cotton rope (6) intersecting vertical;
The foundation bolt (7) includes multiple, and multiple foundation bolts (7) are centrally located at the first construction cotton rope (5) and institute Second construction cotton rope (6) crosspoint is stated, foundation bolt (7) top is applied with the described first construction cotton rope (5) with described second The height in work cotton rope (6) crosspoint is flushed.
2. the positioner for pre-embedded anchoring bolts of being constructed on isolated footing according to claim 1, it is characterised in that described Foundation bolt (7) is arranged in template (8), and is fixed by stirrup.
3. the positioner for pre-embedded anchoring bolts of being constructed on isolated footing according to claim 2, it is characterised in that described Foundation bolt (7) includes four, and the point midway of adjacent foundation bolt (7) line is in the described first construction cotton rope (5) or second Construct on cotton rope (6).
4. the positioner for pre-embedded anchoring bolts of being constructed on isolated footing according to claim 3, it is characterised in that described The concrete of the fixed foundation bolt (7) is poured in template (8).
CN201720033398.8U 2017-01-11 2017-01-11 A kind of positioner for pre-embedded anchoring bolts of being constructed on isolated footing Expired - Fee Related CN206396782U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720033398.8U CN206396782U (en) 2017-01-11 2017-01-11 A kind of positioner for pre-embedded anchoring bolts of being constructed on isolated footing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720033398.8U CN206396782U (en) 2017-01-11 2017-01-11 A kind of positioner for pre-embedded anchoring bolts of being constructed on isolated footing

Publications (1)

Publication Number Publication Date
CN206396782U true CN206396782U (en) 2017-08-11

Family

ID=59513069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720033398.8U Expired - Fee Related CN206396782U (en) 2017-01-11 2017-01-11 A kind of positioner for pre-embedded anchoring bolts of being constructed on isolated footing

Country Status (1)

Country Link
CN (1) CN206396782U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677201A (en) * 2017-01-14 2017-05-17 山东飞越钢结构工程有限公司 Positioning method of built-in foundation bolts constructed on independent foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677201A (en) * 2017-01-14 2017-05-17 山东飞越钢结构工程有限公司 Positioning method of built-in foundation bolts constructed on independent foundation

Similar Documents

Publication Publication Date Title
CN104895092B (en) The method that a kind of interim lattice column of inner support is used as permanent structure post
CN209636847U (en) A kind of adjustable tower crane built-in fitting accurate positioning tool
CN102162305B (en) Construction process for installing elastic slippage shock isolation support
CN102943565B (en) Construction method of large-sized arc-shaped wall
CN100476142C (en) Construction method for combined V-shape steel pipe concrete pile
CN103993597B (en) A kind of high accuracy vertical pillars stake construction method
CN103590603B (en) Large span multi-curvature shell structure of reinforced concrete method
CN103469806A (en) Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die
CN103526930A (en) Multi-directional intersection reinforced bare concrete inclined column construction method
CN105421476B (en) The construction method and mounting structure of tower crane built-in fitting are installed on raft foundation
CN106592990A (en) Prefabricated building foundation column bar precise positioning tool and positioning method
CN206127746U (en) Isolation bearing handles accurate location structure of pre -buried steel sheet in back
CN105696800A (en) Temporary fixed sleeve frame for preventing relative displacement generated during construction of steel-structured anchor bolts
CN104897143B (en) A kind of cylinder forced centering observation pier and its method for embedding
CN103469732B (en) Construction method of preformed holes for foundation bolts of bridge support
CN113202222A (en) Construction method for assembled type superposed beam slab
CN207047881U (en) The prefabricated cushion cap of core is filled with joint bar
CN206396782U (en) A kind of positioner for pre-embedded anchoring bolts of being constructed on isolated footing
CN114809029A (en) High cutting slope anchor rod frame beam coupling construction method
CN107299764A (en) A kind of concrete apparatus and construction method for being conveniently constructed the positioning of post cage bar
CN106759943A (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN104264682A (en) Anchor traction wall protection pile base layer concrete beam support pouring technology
CN108756243A (en) Girder steel and concrete ring beam, the structure-integrated construction of concrete floor
CN205713091U (en) A kind of diagonal column mold plate system
CN104947853B (en) A kind of Inner standpipe formula cast-in-situ reinforced concrete column and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170811

Termination date: 20190111