CN102425310A - Assembly-type residential shear wall structural wall body vertical connection construction method - Google Patents

Assembly-type residential shear wall structural wall body vertical connection construction method Download PDF

Info

Publication number
CN102425310A
CN102425310A CN2011104200249A CN201110420024A CN102425310A CN 102425310 A CN102425310 A CN 102425310A CN 2011104200249 A CN2011104200249 A CN 2011104200249A CN 201110420024 A CN201110420024 A CN 201110420024A CN 102425310 A CN102425310 A CN 102425310A
Authority
CN
China
Prior art keywords
wall
shear wall
prefabricated
sleeve
anchor connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104200249A
Other languages
Chinese (zh)
Other versions
CN102425310B (en
Inventor
李哲龙
陈学军
李向宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP
China 22MCC Group Corp Ltd
Original Assignee
1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP, China 22MCC Group Corp Ltd filed Critical 1 ST CONSTRUCTION CO Ltd OF 22 MCC GROUP
Priority to CN201110420024.9A priority Critical patent/CN102425310B/en
Publication of CN102425310A publication Critical patent/CN102425310A/en
Application granted granted Critical
Publication of CN102425310B publication Critical patent/CN102425310B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a prefabricated shear wall body vertical connection construction method, in particular to an assembly-type residential shear wall structural wall body vertical connection construction method, which is characterized in that: when a prefabricated lower layer wall body is connected with a prefabricated upper layer wall body, supporting leg parts on two ends of the bottom part of a shear wall body are connected with each other through a reinforced bushing anchoring grouting method, and preformed steel reinforced parts on the middle part of the shear wall are connected with each other through a binding and overlapping method. When an upper layer wall body is prefabricated, anchoring connection bushings are respectively embedded on the supporting leg parts on two ends of the shear wall, the middle part of the shear wall is produced into a feeding passage for pouring concrete at a later period by embedding a steel bushing, self-compacting concrete is poured towards the middle part of the shear wall from a feeding port on the top part of the feeding passage, and high-strength grouting materials are fulfilled into the anchoring connection bushing at high pressure through a high-pressure grouting machine. Due to the adoption of the method, the quantity of the connection bushing can be reduced, the cost can be saved, and the connection quality and the connection speed can be improved. The weaknesses of the traditional shear wall vertical connection installation process that the cost is high, the construction speed is slow, the quality is difficult to control, and the like can be overcome.

Description

The vertical connection construction method of assembled-type house parts of shear wall structure wall body
Technical field:
The present invention relates to the vertical connection construction method of prefabricated shear wall body of wall, specifically is the vertical connection construction method of a kind of assembled-type house parts of shear wall structure wall body.
Background technology:
At present; In the vertical installation process of prefabricated shear wall body of wall; The longitudinal reinforcement of node and seam crossing connects and adopts sleeves grouting connection, mechanical connections more, is welded to connect and connected mode such as anchor connection indirectly; These connected mode technical requirementss are high, and difficulty of construction is big, has directly caused the increase of construction cost.
Summary of the invention:
The present invention is intended to solve high, slow, the uppity shortcoming of quality of speed of application of cost that the vertical connection construction method of traditional shear wall exists, and a kind of easy to control the quality, vertical connection construction method of assembled-type house parts of shear wall structure wall body simple, with low cost of constructing is provided.
The technical scheme that the present invention addresses the above problem employing is:
The vertical connection construction method of a kind of assembled-type house parts of shear wall structure wall body, carry out as follows:
A. prefabricated lower floor body of wall: during prefabricated lower floor body of wall; The sleeve anchor connection reinforcing bar extension at supporting leg position, shear wall two ends is not less than anchorage length, and the overlap joint connecting reinforcement length in reserve of shear wall middle part bar splicing jointing is not less than the colligation overlap joint and connects length;
B. prefabricated upper strata body of wall: during the body of wall of prefabricated upper strata, at the pre-buried anchor connection sleeve of inside concrete at the supporting leg position at shear wall two ends, said anchor connection sleeve is connected with upper strata sleeve anchor connection reinforcing bar; At shear wall middle part bar splicing jointing pre-buried steel sleeve pipe; The placed in the middle setting of said steel sleeve is embedded in the concrete; And vertically connect whole shear wall body of wall; After reaching design strength 70%, the concrete of treating prefabricated shear wall body of wall extracts steel sleeve again out, thus at the inner blanking channel that forms the later stage concreting of shear wall body of wall;
C. upper and lower two-layer body of wall butt joint: at lower floor's body of wall position construction to be connected one deck seat slurry mortar; Lift by crane the upper strata body of wall then; The pre-buried anchor connection sleeve in body of wall leg section position, upper strata is aimed at the sleeve anchor connection reinforcing bar in lower floor's body of wall; Adjust the colligation overlap joint reinforcing bar position in the two body of wall middle part bar splicing jointings simultaneously, after adjusting, again the upper strata body of wall is slowly fallen; And it is firm tiltedly to draw support to carry out with the special-purpose body of wall of prefabricated units, and the reinforcing bar binding overlap joint that carries out then in the bar splicing jointing connects;
D. slip casting and concreting: the first step, with the high-pressure slip-casting machine anchor connection sleeve at supporting leg position, shear wall two ends is carried out high-pressure slip-casting, till the anchor connection sleeve is all filled with high-strength grout; In second step, repair colligation overlap joint rebar spacing and position in the adjustment bar splicing jointing, and this position is reconfigured template carry out shutoff; In the 3rd step, the top feed opening of body of wall blanking channel is aided with grout hopper and cooperates and to build self-compacting concrete from the upper strata, treat that self-compacting concrete reaches certain intensity after, stripping, so far, two-layer up and down prefabricated shear wall body of wall vertically connects construction and finishes.
Technical scheme according to the invention; Adopted the sleeve anchoring to be connected the method that combines with overlap joint; Promptly adopt sleeve to connect at shear wall body of wall supporting leg position, two ends, bottom (also claiming sleeve anchor connection section) to be connected, reserved steel bar position (also claiming the bar splicing jointing) adopts the colligation overlap joint to connect in the middle of the shear wall.Compared with prior art, its beneficial effect is:
1. reduce the connection number that the anchor connection sleeve connects, greatly reduced construction cost.
2. because of having reduced anchor connection sleeve connection number, the up and down two-layer body of wall that makes more or less freely when making on-the-spot the installation docks, thereby has accelerated installation rate greatly, has practiced thrift man-hour.
What adopted 3. prefabricated shear wall body of wall middle part is that the reinforcing bar binding overlap joint connects, and installs template at last again and carries out cast-in-placely again, makes the easy to control the quality of this connecting portion like this, thereby guarantees architecture quality.
Description of drawings:
Fig. 1 is the structural representation of lower floor's body of wall.
Fig. 2 is a 1-1 sectional view among Fig. 1.
Fig. 3 is the structural representation of upper strata body of wall.
Fig. 4 is a 2-2 sectional view among Fig. 3.
Fig. 5 is that upper and lower layer body of wall connects sketch map.
Fig. 6 is an A portion enlarged drawing among Fig. 5.
Fig. 7 is a B portion enlarged drawing among Fig. 5.
Among the figure: 1-lower floor body of wall, 2-lower floor sleeve anchor connection reinforcing bar, 3-lower floor overlap joint connecting reinforcement, 4-upper strata body of wall; 5-anchor connection sleeve, 6-upper strata overlap joint connecting reinforcement, 7-upper strata sleeve anchor connection reinforcing bar; The 8-blanking channel, 9-sleeve venthole, 10-sleeve grout hole; 11-seat slurry mortar, 12-high-strength grout, 13-self-compacting concrete.
The specific embodiment:
Below in conjunction with accompanying drawing and embodiment the present invention is detailed.
The vertical connection construction method of the described assembled-type house parts of shear wall structure wall body of present embodiment, its step is following:
A. prefabricated lower floor body of wall 1:
Referring to Fig. 1, Fig. 2; Lower floor's sleeve anchor connection reinforcing bar 2 extensions at supporting leg position, lower floor's body of wall 1 two ends should meet the requirement of sleeve grouting technique; The anchorage length of reinforcing bar in sleeve is controlled in 120-150mm scope, and lower floor's overlap joint connecting reinforcement 3 extensions of middle part bar splicing jointing are generally 41D (D is a bar diameter).
B. prefabricated upper strata body of wall 4:
Referring to Fig. 3, Fig. 4; The inside concrete at supporting leg position, upper strata body of wall 4 two ends is embedded with two anchor connection sleeves 5; This anchor connection sleeve 5 effectively connects with upper strata sleeve anchor connection reinforcing bar 6 earlier; During lower floor to be installed body of wall 1, the center distance that connects 2, two anchor connection sleeves 5 of lower floor's sleeve anchor connection reinforcing bars with this anchor connection sleeve 5 again is 150mm; Pre-buried two diameters of shear wall middle part bar splicing jointing are the 100mm steel sleeve; The placed in the middle setting of two steel sleeves is embedded in the concrete; Spacing is 850mm; And vertically connect whole shear wall body of wall, after the concrete of treating prefabricated shear wall body of wall reaches design strength 70%, extract steel sleeve out with mechanical means again; And the preformed hole that inner two diameters that form of shear wall body of wall this moment are 100mm will be built this blanking channel 8 closely knit during concreting as the blanking channel 8 of later stage concreting together.
C. lower floor's body of wall is installed in butt joint:
Referring to Fig. 5, Fig. 6 and Fig. 7; At the thick special-purpose seat slurry mortar 11 of lower floor's body of wall 1 position construction one deck 15mm to be connected; Adopt the special-purpose prefabricated units suspender upper strata body of wall 4 of slinging with crane then; Lower floor's sleeve anchor connection reinforcing bar 2 that the pre-buried anchor connection sleeve 5 in upper strata body of wall 4 supporting leg positions is aimed in lower floor's body of wall 1 makes lower floor's sleeve anchor connection reinforcing bar 2 stretch into anchor connection sleeve 5, adjusts the lower floor's overlap joint connecting reinforcement 3 of treating colligation and overlap joint connecting reinforcement 6 positions, upper strata in the two body of wall middle part bar splicing jointings simultaneously; After adjusting; Again upper strata body of wall 4 is slowly fallen, and it is firm tiltedly to draw support to carry out with the special-purpose body of wall of prefabricated units, carries out the reinforcing bar binding overlap joint then and connects.
D. slip casting and concreting: the first step, with the high-pressure slip-casting machine anchor connection sleeve 5 at supporting leg position, shear wall two ends is carried out high-pressure slip-casting, till anchor connection sleeve 5 is all filled with high-strength grout 12; In second step, repair spacing and position that the interior lower floor of adjustment bar splicing jointing overlaps connecting reinforcement 3 and upper strata overlap joint connecting reinforcement 6, and this position is reconfigured template with the position shutoff of body of wall groove; In the 3rd step, the top feed opening of body of wall 4 blanking channels 8 is aided with grout hopper and cooperates and to build self-compacting concrete 13 from the upper strata, treat that self-compacting concrete 13 reaches certain intensity after, stripping.
So far, two-layer up and down prefabricated shear wall body of wall vertically connect the construction finish.

Claims (1)

1. vertical connection construction method of assembled-type house parts of shear wall structure wall body, carry out as follows:
A. prefabricated lower floor body of wall: during prefabricated lower floor body of wall; The sleeve anchor connection reinforcing bar extension at supporting leg position, shear wall two ends is not less than anchorage length, and the overlap joint connecting reinforcement length in reserve of shear wall middle part bar splicing jointing is not less than the colligation overlap joint and connects length;
B. prefabricated upper strata body of wall: during the body of wall of prefabricated upper strata, at the pre-buried anchor connection sleeve of inside concrete at the supporting leg position at shear wall two ends, said anchor connection sleeve is connected with upper strata sleeve anchor connection reinforcing bar; At shear wall middle part bar splicing jointing pre-buried steel sleeve pipe; The placed in the middle setting of said steel sleeve is embedded in the concrete; And vertically connect whole shear wall body of wall; After reaching design strength 70%, the concrete of treating prefabricated shear wall body of wall extracts steel sleeve again out, thus at the inner blanking channel that forms the later stage concreting of shear wall body of wall;
C. upper and lower two-layer body of wall butt joint: at lower floor's body of wall position construction to be connected one deck seat slurry mortar; Lift by crane the upper strata body of wall then; The pre-buried anchor connection sleeve in body of wall leg section position, upper strata is aimed at the sleeve anchor connection reinforcing bar in lower floor's body of wall; Adjust the colligation overlap joint reinforcing bar position in the two body of wall middle part bar splicing jointings simultaneously, after adjusting, again the upper strata body of wall is slowly fallen; And it is firm tiltedly to draw support to carry out with the special-purpose body of wall of prefabricated units, and the reinforcing bar binding overlap joint that carries out then in the bar splicing jointing connects;
D. slip casting and concreting: the first step, with the high-pressure slip-casting machine anchor connection sleeve at supporting leg position, shear wall two ends is carried out high-pressure slip-casting, till the anchor connection sleeve is all filled with high-strength grout; In second step, repair colligation overlap joint rebar spacing and position in the adjustment bar splicing jointing, and this position is reconfigured template carry out shutoff; In the 3rd step, the top feed opening of body of wall blanking channel is aided with grout hopper and cooperates and to build self-compacting concrete from the upper strata, treat that self-compacting concrete reaches certain intensity after, stripping, so far, two-layer up and down prefabricated shear wall body of wall vertically connects construction and finishes.
CN201110420024.9A 2011-12-15 2011-12-15 Assembly-type residential shear wall structural wall body vertical connection construction method Active CN102425310B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110420024.9A CN102425310B (en) 2011-12-15 2011-12-15 Assembly-type residential shear wall structural wall body vertical connection construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110420024.9A CN102425310B (en) 2011-12-15 2011-12-15 Assembly-type residential shear wall structural wall body vertical connection construction method

Publications (2)

Publication Number Publication Date
CN102425310A true CN102425310A (en) 2012-04-25
CN102425310B CN102425310B (en) 2014-02-19

Family

ID=45959335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110420024.9A Active CN102425310B (en) 2011-12-15 2011-12-15 Assembly-type residential shear wall structural wall body vertical connection construction method

Country Status (1)

Country Link
CN (1) CN102425310B (en)

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102661012A (en) * 2012-05-31 2012-09-12 东南大学 Edge member connecting structure of assembly type concrete shear wall
CN102877649A (en) * 2012-10-27 2013-01-16 二十二冶集团第一建设有限公司 Prefabricated concrete structure interlayer pouring construction method
CN102936929A (en) * 2012-11-29 2013-02-20 东南大学 Prefabricated assembling whole type shear wall connected with staggered-height vertical steel bar
CN102943536A (en) * 2012-11-29 2013-02-27 东南大学 Prefabricated integral type shear wall
CN102972222A (en) * 2012-06-08 2013-03-20 有利华建筑预制件有限公司 Prefabricated flower groove
CN102995745A (en) * 2012-12-27 2013-03-27 沈阳易筑建材经销有限公司 Integrally-assembled concrete structural system adopting steel bar lapping mode
CN104260198A (en) * 2014-10-25 2015-01-07 中国二十二冶集团有限公司 Concrete prefabricated wall body and vertical pouring hole remaining method thereof
CN104314314A (en) * 2014-11-17 2015-01-28 中冶建筑研究总院有限公司 Grouting connection construction method
CN104453013A (en) * 2014-03-11 2015-03-25 朱彤 Prefabricated wall component and fabricated reinforced concrete shear wall
CN104727546A (en) * 2013-12-21 2015-06-24 中建四局第三建筑工程有限公司 Method for using aluminum alloy form board to pour concrete floor and transmission hole mould of method
CN104727547A (en) * 2013-12-21 2015-06-24 中建四局第三建筑工程有限公司 Method for positioning aluminum alloy formworks for pouring upper-layer walls or columns and aluminum alloy formwork base
CN103422674B (en) * 2013-09-03 2016-03-30 二十二冶集团第一建设有限公司 Prefabricated concrete structure Cast-in-Situ Segment concrete construction method
CN105735466A (en) * 2016-03-30 2016-07-06 上海建工二建集团有限公司 Prefabricated wall column one-segment type steel rib connection structure and method
CN105804410A (en) * 2016-05-26 2016-07-27 安徽宇辉新型建筑材料有限公司 Sub-cabin pressure grouting method for vertical connection of prefabricated concrete structure
CN105908974A (en) * 2016-04-13 2016-08-31 江苏华江建设集团有限公司 Method of steel-bar sleeve grouting connection construction for vertical precast concrete component
CN105908977A (en) * 2016-06-08 2016-08-31 成都建筑工程集团总公司 Joint bar construction structure and method
CN106760228A (en) * 2017-01-18 2017-05-31 成张佳宁 The method of precast shear wall wall Vertical bar connection
CN106836547A (en) * 2017-03-07 2017-06-13 安徽天筑建设(集团)有限公司 The construction method of prefabricated assembled shear wall structure
CN106948493A (en) * 2017-04-05 2017-07-14 桂林理工大学 A kind of pre- seat slurry fabricated construction component connection method
CN107574934A (en) * 2017-09-26 2018-01-12 中国二十二冶集团有限公司 Fabricated shear wall embedded sleeve barrel joint bar construction method
CN107675838A (en) * 2017-09-26 2018-02-09 中国二十二冶集团有限公司 Assembled architecture sidewalk brick precast beam embedded sleeve barrel joint bar construction method
CN108252521A (en) * 2018-01-22 2018-07-06 中国建筑科学研究院建筑机械化研究分院 Vacuum negative pressure type grouting method and system
CN108589970A (en) * 2018-05-18 2018-09-28 中国二十二冶集团有限公司 The construction method of prefabricated window frame shear wall
CN108612315A (en) * 2018-05-14 2018-10-02 重庆宜府住工科技有限公司 A kind of assembled mixed structure Frame-Shear Wall building system and construction method
CN108643381A (en) * 2018-05-18 2018-10-12 中国二十二冶集团有限公司 Assembly of shear wall structure is without support bottom bridging method
CN109281423A (en) * 2017-07-20 2019-01-29 李聪 A kind of Linear shear wall and its construction method with top pillar
CN110485647A (en) * 2018-07-23 2019-11-22 李藏柱 Sleeve, prefabricated components connector, prefabricated components and prefabricated components assembly
CN110700439A (en) * 2019-10-23 2020-01-17 杭州昂创科技有限公司 Prefabricated assembly type shear wall rapid formwork erecting connection construction method
CN111877691A (en) * 2020-08-12 2020-11-03 湖南建工五建建筑工业化有限公司 Prefabricated stacked elevator shaft and installation method thereof
CN111894205A (en) * 2020-07-31 2020-11-06 上海宝冶集团有限公司 Construction method for separating one from another for vertical steel bars of shear wall
CN112900882A (en) * 2021-01-22 2021-06-04 中国建筑第八工程局有限公司 Construction method of slow-bonding prestressed tendon penetrating through post-pouring area
CN113585534A (en) * 2021-08-16 2021-11-02 漯河职业技术学院 Assembled shear force wall
CN115075420A (en) * 2021-03-12 2022-09-20 新疆大学 Large-direct corrugated pipe slurry anchor lap joint assembly type shear wall and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3990193A (en) * 1972-04-18 1976-11-09 Ray Orlando F Prefabricated building module and modular construction method for the module
CN101761158A (en) * 2010-01-05 2010-06-30 中国建筑第八工程局有限公司 Method and structure for manufacturing shear wall
CN101787708A (en) * 2010-02-10 2010-07-28 黄靓 Integrally-assembled cantilever-type retaining wall and construction method thereof
CN102235093A (en) * 2010-04-22 2011-11-09 上海市第七建筑有限公司 Construction method for cast-in-situ connecting joint of prefabricated member
CN102251607A (en) * 2011-05-04 2011-11-23 南京工业大学 Reinforced concrete superposed wall node connecting structure and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3990193A (en) * 1972-04-18 1976-11-09 Ray Orlando F Prefabricated building module and modular construction method for the module
CN101761158A (en) * 2010-01-05 2010-06-30 中国建筑第八工程局有限公司 Method and structure for manufacturing shear wall
CN101787708A (en) * 2010-02-10 2010-07-28 黄靓 Integrally-assembled cantilever-type retaining wall and construction method thereof
CN102235093A (en) * 2010-04-22 2011-11-09 上海市第七建筑有限公司 Construction method for cast-in-situ connecting joint of prefabricated member
CN102251607A (en) * 2011-05-04 2011-11-23 南京工业大学 Reinforced concrete superposed wall node connecting structure and construction method

Cited By (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102661012A (en) * 2012-05-31 2012-09-12 东南大学 Edge member connecting structure of assembly type concrete shear wall
CN102972222A (en) * 2012-06-08 2013-03-20 有利华建筑预制件有限公司 Prefabricated flower groove
CN102877649A (en) * 2012-10-27 2013-01-16 二十二冶集团第一建设有限公司 Prefabricated concrete structure interlayer pouring construction method
CN102877649B (en) * 2012-10-27 2014-10-08 二十二冶集团第一建设有限公司 Prefabricated concrete structure interlayer pouring construction method
CN102943536B (en) * 2012-11-29 2015-09-16 东南大学 A kind of fabricated assembly overall shear wall
CN102936929A (en) * 2012-11-29 2013-02-20 东南大学 Prefabricated assembling whole type shear wall connected with staggered-height vertical steel bar
CN102943536A (en) * 2012-11-29 2013-02-27 东南大学 Prefabricated integral type shear wall
CN102995745A (en) * 2012-12-27 2013-03-27 沈阳易筑建材经销有限公司 Integrally-assembled concrete structural system adopting steel bar lapping mode
CN103422674B (en) * 2013-09-03 2016-03-30 二十二冶集团第一建设有限公司 Prefabricated concrete structure Cast-in-Situ Segment concrete construction method
CN104727546A (en) * 2013-12-21 2015-06-24 中建四局第三建筑工程有限公司 Method for using aluminum alloy form board to pour concrete floor and transmission hole mould of method
CN104727547A (en) * 2013-12-21 2015-06-24 中建四局第三建筑工程有限公司 Method for positioning aluminum alloy formworks for pouring upper-layer walls or columns and aluminum alloy formwork base
CN104453013A (en) * 2014-03-11 2015-03-25 朱彤 Prefabricated wall component and fabricated reinforced concrete shear wall
CN104260198A (en) * 2014-10-25 2015-01-07 中国二十二冶集团有限公司 Concrete prefabricated wall body and vertical pouring hole remaining method thereof
CN104314314A (en) * 2014-11-17 2015-01-28 中冶建筑研究总院有限公司 Grouting connection construction method
CN105735466A (en) * 2016-03-30 2016-07-06 上海建工二建集团有限公司 Prefabricated wall column one-segment type steel rib connection structure and method
CN105735466B (en) * 2016-03-30 2018-12-18 上海建工二建集团有限公司 Prefabricated wall column one-part form steel bar connecting structure and method
CN105908974A (en) * 2016-04-13 2016-08-31 江苏华江建设集团有限公司 Method of steel-bar sleeve grouting connection construction for vertical precast concrete component
CN105804410B (en) * 2016-05-26 2018-07-27 安徽宇辉新型建筑材料有限公司 Prefabricated concrete structure is vertically connected with dividing storehouse slip casing by pressure method
CN105804410A (en) * 2016-05-26 2016-07-27 安徽宇辉新型建筑材料有限公司 Sub-cabin pressure grouting method for vertical connection of prefabricated concrete structure
CN105908977A (en) * 2016-06-08 2016-08-31 成都建筑工程集团总公司 Joint bar construction structure and method
CN106760228A (en) * 2017-01-18 2017-05-31 成张佳宁 The method of precast shear wall wall Vertical bar connection
CN106836547A (en) * 2017-03-07 2017-06-13 安徽天筑建设(集团)有限公司 The construction method of prefabricated assembled shear wall structure
CN106836547B (en) * 2017-03-07 2018-12-04 安徽天筑建设(集团)有限公司 The construction method of prefabricated assembled shear wall structure
CN106948493A (en) * 2017-04-05 2017-07-14 桂林理工大学 A kind of pre- seat slurry fabricated construction component connection method
CN109281423A (en) * 2017-07-20 2019-01-29 李聪 A kind of Linear shear wall and its construction method with top pillar
CN107675838A (en) * 2017-09-26 2018-02-09 中国二十二冶集团有限公司 Assembled architecture sidewalk brick precast beam embedded sleeve barrel joint bar construction method
CN107574934A (en) * 2017-09-26 2018-01-12 中国二十二冶集团有限公司 Fabricated shear wall embedded sleeve barrel joint bar construction method
CN108252521A (en) * 2018-01-22 2018-07-06 中国建筑科学研究院建筑机械化研究分院 Vacuum negative pressure type grouting method and system
CN108612315A (en) * 2018-05-14 2018-10-02 重庆宜府住工科技有限公司 A kind of assembled mixed structure Frame-Shear Wall building system and construction method
CN108589970A (en) * 2018-05-18 2018-09-28 中国二十二冶集团有限公司 The construction method of prefabricated window frame shear wall
CN108643381A (en) * 2018-05-18 2018-10-12 中国二十二冶集团有限公司 Assembly of shear wall structure is without support bottom bridging method
CN110485647A (en) * 2018-07-23 2019-11-22 李藏柱 Sleeve, prefabricated components connector, prefabricated components and prefabricated components assembly
CN110700439A (en) * 2019-10-23 2020-01-17 杭州昂创科技有限公司 Prefabricated assembly type shear wall rapid formwork erecting connection construction method
CN110700439B (en) * 2019-10-23 2021-06-04 杭州昂创科技有限公司 Prefabricated assembly type shear wall rapid formwork erecting connection construction method
CN111894205A (en) * 2020-07-31 2020-11-06 上海宝冶集团有限公司 Construction method for separating one from another for vertical steel bars of shear wall
CN111877691A (en) * 2020-08-12 2020-11-03 湖南建工五建建筑工业化有限公司 Prefabricated stacked elevator shaft and installation method thereof
CN112900882A (en) * 2021-01-22 2021-06-04 中国建筑第八工程局有限公司 Construction method of slow-bonding prestressed tendon penetrating through post-pouring area
CN115075420A (en) * 2021-03-12 2022-09-20 新疆大学 Large-direct corrugated pipe slurry anchor lap joint assembly type shear wall and construction method thereof
CN113585534A (en) * 2021-08-16 2021-11-02 漯河职业技术学院 Assembled shear force wall

Also Published As

Publication number Publication date
CN102425310B (en) 2014-02-19

Similar Documents

Publication Publication Date Title
CN102425310B (en) Assembly-type residential shear wall structural wall body vertical connection construction method
CN105019475B (en) Fabricated assembly overall concrete pipe gallery and construction
CN104847014A (en) Vertical connection structure for precast concrete shear walls and construction method
CN108560544B (en) Sleeve connection assembled pile foundation and construction method thereof
CN106894587A (en) Precast stair connection method
CN105926771B (en) A kind of the interior joint connection structure and its construction method of prefabricated integral frame column beam
CN202391019U (en) End part thickened grouting connector of steel bar
CN207176717U (en) A kind of assembly concrete foot joint of encased steel plate
CN107044177A (en) A kind of assembly concrete shear wall fractionation, assembled attachment structure and connection method
CN107254933A (en) The high-rise single through hole precast shear wall of assembled and its assembling structure and construction method
CN206174195U (en) Assembled concrete shear force wall split, assemble connection structure
CN206279628U (en) A kind of precast concrete reinforcing bar grouting connecting structure
CN104631440B (en) A kind of existing large-section in-situ concrete pile strength core increases foundation pit supporting construction and constructional method
CN105525753A (en) Method and structure for simultaneously constructing constructional column and main body structure
CN207003723U (en) High-rise assembled single row of holes precast shear wall and its assembling structure
CN208981531U (en) A kind of prefabricated assembled parapet connection structure
CN108316513A (en) A kind of rapid construction assembly of shear wall structure and its construction method
CN106049704A (en) Prefabricated, cast-in-situ, combined type bare concrete exterior wall structure and construction method
CN105908899A (en) Core-grouted assembly-type concrete column and construction method of same
CN107675838A (en) Assembled architecture sidewalk brick precast beam embedded sleeve barrel joint bar construction method
AU2013366093B2 (en) Reinforced blockwork construction method
CN106049665B (en) The construction method of the cast-in-place core of light block wall
CN107558351A (en) Abdomen bag bottom is trapezoidal(Waveform)Steel plate combination box beam and its construction method
CN106703291A (en) Joint pouring structure between prefabricated columns and construction method thereof
CN204475714U (en) A kind of ready-package precast stair

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant