CN105908864B - 填充砌体与框架剪力墙预防界面裂缝结构的施工方法 - Google Patents
填充砌体与框架剪力墙预防界面裂缝结构的施工方法 Download PDFInfo
- Publication number
- CN105908864B CN105908864B CN201610354895.8A CN201610354895A CN105908864B CN 105908864 B CN105908864 B CN 105908864B CN 201610354895 A CN201610354895 A CN 201610354895A CN 105908864 B CN105908864 B CN 105908864B
- Authority
- CN
- China
- Prior art keywords
- wall
- wall column
- construction
- column
- masonry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/562—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with fillings between the load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/64—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610354895.8A CN105908864B (zh) | 2016-05-25 | 2016-05-25 | 填充砌体与框架剪力墙预防界面裂缝结构的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610354895.8A CN105908864B (zh) | 2016-05-25 | 2016-05-25 | 填充砌体与框架剪力墙预防界面裂缝结构的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105908864A CN105908864A (zh) | 2016-08-31 |
CN105908864B true CN105908864B (zh) | 2018-02-27 |
Family
ID=56742324
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610354895.8A Active CN105908864B (zh) | 2016-05-25 | 2016-05-25 | 填充砌体与框架剪力墙预防界面裂缝结构的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105908864B (zh) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107401231A (zh) * | 2017-07-21 | 2017-11-28 | 马明才 | 混凝土立柱内定型棒施工结构 |
CN107237424A (zh) * | 2017-07-26 | 2017-10-10 | 天津三建建筑工程有限公司 | 一种主体结构与填充墙的拉结施工方法 |
CN110344497B (zh) * | 2018-04-03 | 2024-03-22 | 保定市建筑设计院有限公司 | 一种门式刚架轻型房屋 |
CN110067401A (zh) * | 2019-03-25 | 2019-07-30 | 北京筑福国际抗震技术有限责任公司 | 一种既有砌体结构采用装配式预制板墙加固及其施工方法 |
CN110409669B (zh) * | 2019-07-24 | 2021-02-09 | 北京建筑大学 | 采用竖向钢筋加强的无构造柱夯土墙体及其建造方法 |
CN110685373B (zh) * | 2019-09-16 | 2020-12-29 | 浙江绿筑集成科技有限公司 | 一种集成外墙砌筑系统的施工方法 |
CN110939216A (zh) * | 2019-11-14 | 2020-03-31 | 孟庆春 | 一种基于石膏空心砌块的免抹灰墙体 |
CN112523393B (zh) * | 2020-11-26 | 2021-11-30 | 浙江世润建创科技发展有限公司 | 一种圆形混凝土柱与砌体填充墙构造柱衔接段的施工方法 |
CN114941428A (zh) * | 2022-05-29 | 2022-08-26 | 五冶集团上海有限公司 | 一种端部构造柱支模优化方法 |
CN116607646B (zh) * | 2023-07-21 | 2023-10-03 | 中建四局建设发展有限公司 | 一种用于工业厂房墙柱防爆节点的施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11280178A (ja) * | 1998-03-27 | 1999-10-12 | Asahi Chem Ind Co Ltd | 壁梁用の補強筋構造及び壁梁構造及び建物の耐力壁構造 |
CN103266767A (zh) * | 2013-05-27 | 2013-08-28 | 中国航天建设集团有限公司 | 混凝土结构与填充墙间裂缝防治施工工法 |
CN103469939A (zh) * | 2013-09-24 | 2013-12-25 | 中国建筑第二工程局有限公司 | 一种砌体填充墙与主体柔性连接抗震结构及其施工方法 |
CN104989100A (zh) * | 2015-05-25 | 2015-10-21 | 中国十七冶集团有限公司 | 砌筑墙体与混凝土墙柱交接处防裂缝施工方法 |
CN205875457U (zh) * | 2016-05-25 | 2017-01-11 | 杭州江润科技有限公司 | 填充砌体与框架剪力墙预防界面裂缝结构 |
-
2016
- 2016-05-25 CN CN201610354895.8A patent/CN105908864B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11280178A (ja) * | 1998-03-27 | 1999-10-12 | Asahi Chem Ind Co Ltd | 壁梁用の補強筋構造及び壁梁構造及び建物の耐力壁構造 |
CN103266767A (zh) * | 2013-05-27 | 2013-08-28 | 中国航天建设集团有限公司 | 混凝土结构与填充墙间裂缝防治施工工法 |
CN103469939A (zh) * | 2013-09-24 | 2013-12-25 | 中国建筑第二工程局有限公司 | 一种砌体填充墙与主体柔性连接抗震结构及其施工方法 |
CN104989100A (zh) * | 2015-05-25 | 2015-10-21 | 中国十七冶集团有限公司 | 砌筑墙体与混凝土墙柱交接处防裂缝施工方法 |
CN205875457U (zh) * | 2016-05-25 | 2017-01-11 | 杭州江润科技有限公司 | 填充砌体与框架剪力墙预防界面裂缝结构 |
Also Published As
Publication number | Publication date |
---|---|
CN105908864A (zh) | 2016-08-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105908864B (zh) | 填充砌体与框架剪力墙预防界面裂缝结构的施工方法 | |
CN105888108B (zh) | 内置定位预制件钢筋混凝土剪力墙及施工方法 | |
CN106677069A (zh) | 一种桥墩整体支模一次成型结构的施工方法 | |
CN209482591U (zh) | 预制模壳构造柱建造结构 | |
CN206015861U (zh) | 轻质砌块墙现浇芯体 | |
CN204983662U (zh) | 一种对拉螺杆与钢管排架组合单侧支模装置 | |
CN107143065A (zh) | 预制承重混凝土墙板组合结构及施工方法 | |
CN105155724A (zh) | 一种与框架结构填充墙同时施工的构造柱的施工方法 | |
CN105696790B (zh) | 一种双层连梁洞口模板系统及其应用于双层连梁的工法 | |
CN105525753A (zh) | 一种构造柱与主体结构同时施工的方法及结构 | |
CN104929278A (zh) | 一种装配式密柱空心剪力墙结构 | |
CN205875457U (zh) | 填充砌体与框架剪力墙预防界面裂缝结构 | |
CN107083804B (zh) | 一种墙体构造柱插筋施工方法 | |
CN113530086B (zh) | 一种柱体钢筋龙骨的支护装置 | |
CN207812307U (zh) | 斜拉桥主塔及钢锚梁的施工系统 | |
CN106759873A (zh) | 一种新型装配整体式框架结构预制柱与预制梁连接节点构造 | |
CN108316150A (zh) | 斜拉桥主塔及钢锚梁的施工系统和施工方法 | |
CN206016230U (zh) | 基于装配式连墙件外墙脚手架体系 | |
CN106049665B (zh) | 轻质砌块墙现浇芯体的施工方法 | |
CN111576620A (zh) | 一种劲性混凝土结构梁柱核心区的施工方法 | |
CN204780635U (zh) | 一种超宽变截面连续梁0#块固结及解除施工结构 | |
CN101550724A (zh) | 大跨度预应力后张纵横框架梁施工方法 | |
CN106049687A (zh) | 采取套管改善抗震性能的空间夹心节点及施工方法 | |
CN102936953B (zh) | “大”字型劲钢结构模板施工方法 | |
CN213449077U (zh) | 一种无梁预应力张拉结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Jin Jinzhu Inventor after: Peng Yuyu Inventor after: Xi Qingshan Inventor after: Wang Qingzhong Inventor after: Qin Peiran Inventor before: Wang Xinquan Inventor before: Xu Mingdi Inventor before: Zhu Kai |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180104 Address after: 325000 Zhejiang Province, Wenzhou city Lucheng District Tangjiaqiao road nature homes 5 room 2101 Applicant after: Zhajiang Xinyu Construction Co., Ltd. Address before: 310015 Hangzhou Wanda Commercial Center, Zhejiang, building 3, unit 1901, room 3 Applicant before: Hangzhou Jiang Run Science and Technology Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |