CN105888294B - A kind of chain saw is inverse to tear floor construction method open - Google Patents

A kind of chain saw is inverse to tear floor construction method open Download PDF

Info

Publication number
CN105888294B
CN105888294B CN201610243655.0A CN201610243655A CN105888294B CN 105888294 B CN105888294 B CN 105888294B CN 201610243655 A CN201610243655 A CN 201610243655A CN 105888294 B CN105888294 B CN 105888294B
Authority
CN
China
Prior art keywords
floor
chain saw
hole
longitudinally cutting
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610243655.0A
Other languages
Chinese (zh)
Other versions
CN105888294A (en
Inventor
卜昌富
尤雪春
宋在元
董鸽
沈立
丁月
盛治华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Publication of CN105888294A publication Critical patent/CN105888294A/en
Application granted granted Critical
Publication of CN105888294B publication Critical patent/CN105888294B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • E04G23/082Wrecking of buildings using shears, breakers, jaws and the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Floor construction method is torn open the invention discloses a kind of chain saw is inverse, it include: line setting, parallel longitudinally cutting line is respectively set in the two sides of the length direction of floor to be removed, several and perpendicular transverse cut of longitudinally cutting line is arranged in interval between two longitudinally cutting lines, and floor to be removed is divided into several piecemeals;Transverse cut and longitudinally cutting line intersection open up chain saw lacing hole on floor to be removed, and hole for hoist is arranged on every piece of piecemeal;Chain saw is placed in below floor to be removed, along each transverse cut transverse cuts floor to be removed;Floor to be removed along two longitudinally cutting line ecto-entad block-by-blocks it is longitudinally cutting after transfer respectively, until completing the cutting decentralization of all piecemeals.The present invention floor for being difficult to positive dismounting limited to upper space carries out reversed Demolition Construction, solve the problems, such as that Demolition Construction can not be successfully development, the high-intensitive construction that large area is dug when eliminating reversed Demolition Construction, improves the construction efficiency of specific condition lower floor plate dismounting.

Description

A kind of chain saw is inverse to tear floor construction method open
Technical field
The present invention relates to reinforced concrete structure dismountings, and in particular to a kind of chain saw is inverse to tear floor construction method open.
Background technique
With the rapid development of modern architecture industry, because using function to change or the factors such as dilatation being needed to influence, Old building Reconstruction and extension project is also increasing, wherein being no lack of existing conventional construction technology is difficult to the engineering smoothly completed.
In traditional reconstruction and extension project, the dismounting of floor generallys use the mechanical equipments such as pneumatic pick, disk saw and carries out in plate face Positive Demolition Construction.However the restriction when the construction space on floor top by surrounding enviroment, such as covering new construction floor causes Upper operating limited space, it may be difficult to use traditional positive method for dismounting, and board bottom progress reversely cut floor, not only Construction intensity is high, and inefficiency.
Summary of the invention
The present invention in order to overcome the above deficiency, provide one kind can increase mechanized construction degree, reduce construction intensity, The chain saw of raising construction efficiency is inverse to tear floor construction method open.
In order to solve the above-mentioned technical problem, the technical scheme is that
A kind of chain saw is inverse to tear floor construction method open, comprising the following steps:
S1: line setting is respectively set parallel longitudinally cutting line in the two sides of the length direction of floor to be removed, and two Several and perpendicular transverse cut of longitudinally cutting line is arranged in interval between longitudinally cutting line, if floor to be removed is divided into Dry piecemeal;
S2: transverse cut and longitudinally cutting line intersection open up chain saw lacing hole, every piece of piecemeal on floor to be removed Upper setting hole for hoist;
S3: chain saw is placed in below floor to be removed, along each transverse cut transverse cuts floor to be removed;
S4: chain saw is placed in below floor to be removed, floor to be removed is along two longitudinally cutting line ecto-entad block-by-blocks It is transferred respectively after longitudinally cutting by several times, before longitudinally cutting every time, is respectively arranged below support frame in two pieces of piecemeals to be transferred, often It is secondary it is longitudinally cutting after, support frame as described above is removed, until completing the cutting decentralization of all piecemeals.
Further, in the step S1, the piecemeal size of floor to be removed is according to suspender, support frame and periphery fixed knot Structure bearing capacity determines jointly.
Further, in the step S1, floor to be removed is in rectangle, the short side of rectangle and horizontally-parallel, long side with indulge To parallel.
Further, in the step S2, the hole for hoist is opened in each piecemeal center of floor to be removed.
Further, in the step S3, before each transverse cuts, the cutting chain rope of chain saw is each passed through floor to be removed Correspondence transverse cut both ends chain saw lacing hole.
Further, in the step S4, the bearing capacity of support frame as described above is greater than floor monolithic piecemeal weight to be removed.
Further, in the step S4, one end of the suspender is fixed on the fixed structure of periphery, the suspender it is another One end is fixed at the hole for hoist of piecemeal by lifting rope.
Further, in the step S4, the lifting rope is fixed at the hole for hoist of piecemeal by a fixed device, described Fixed device includes a transverse baffle being set to below hole for hoist, and the lifting rope passes through hole for hoist and fixes with the transverse baffle Connection, the size of the transverse baffle are greater than the size of the hole for hoist.
Further, it in the step S4, when longitudinally cutting, saw while cutting using two chain of stations in groups.
Chain saw provided by the invention is inverse to tear floor construction method open, and floor, which is divided into, can support the piecemeal hung to carry out chain Saw cut is hung, and not only solves upper space limited the problem of can not constructing, and reduce the construction that board bottom is reversely cut Intensity and security risk.
Detailed description of the invention
Fig. 1 is the inverse flow chart for tearing floor construction method open of chain saw of the present invention;
Fig. 2 is the inverse transverse cuts floor map for tearing floor construction method open of chain saw of the present invention;
Fig. 3 is the inverse transverse cuts diagrammatic cross-section for tearing floor construction method open of chain saw of the present invention;
Fig. 4 is the inverse longitudinally cutting floor map for tearing floor construction method open of chain saw of the present invention;
Fig. 5 is the inverse longitudinally cutting diagrammatic cross-section for tearing floor construction method open of chain saw of the present invention;
Fig. 6 is the inverse lifting schematic diagram for tearing floor construction method open of chain saw of the present invention.
Shown in Fig. 2-6: 1, floor to be removed;21, transverse cut;22, longitudinally cutting line;3, chain saw lacing hole;4, Hole for hoist;5, chain saw;6, cutting chain rope;7, support frame;8, suspender;9, lifting rope;10, periphery fixed structure;11, fixed device.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing:
As shown in figures 1 to 6, the present invention provides that a kind of chain saw is inverse to tear floor construction method open, comprising the following steps:
S1: parallel longitudinally cutting line is respectively set in the two sides of the length direction of floor 1 to be removed for line setting 22, interval setting is several with the perpendicular transverse cut 21 of longitudinally cutting line 22 between two longitudinally cutting lines 22, will be to be removed Floor 1 is divided into several piecemeals.The piecemeal size of floor 1 to be removed is held according to suspender 8, support frame 7 and periphery fixed structure 10 Power is carried to determine jointly.In the present embodiment, floor 1 to be removed is in rectangle, the short side of rectangle and horizontally-parallel, long side and longitudinal is put down Row.
S2: transverse cut 21 and longitudinally cutting 22 intersection of line open up chain saw lacing hole 3 on floor 1 to be removed, often Hole for hoist 4 is set on block piecemeal.The aperture of chain saw lacing hole 3 is respectively greater than the outer diameter of cutting chain rope 6,4 aperture of hole for hoist difference Greater than the outer diameter of lifting rope 9.In order to more smoothly hang piecemeal, in the step S2, the hole for hoist 4 is opened in building to be removed The each piecemeal of plate 1 center.
S3: chain saw 5 is placed in below floor to be removed, along each 21 transverse cuts of transverse cut floor 1 to be removed.Institute It states in step S3, before each transverse cuts, the cutting chain rope 6 of chain saw 5 is each passed through the correspondence transverse cut of floor 1 to be removed The chain saw lacing hole 3 at 21 both ends.Wherein, it is cut once along every transverse cut 21, wire rope handling and cutting need to be repeated every time During which work can use the transverse steel carrying of floor 1 to be removed.
S4: chain saw 5 is placed in 1 lower section of floor to be removed, floor 1 to be removed is along two longitudinally cutting 22 ecto-entads of line Block-by-block by several times it is longitudinally cutting after transfer respectively, every time it is longitudinally cutting before, be respectively arranged below and be used in two pieces of piecemeals to be transferred The support frame 7 of the piecemeal is supported when cutting, after longitudinally cutting every time, support frame as described above 7 is removed, smoothly to transfer described point Block, until completing the cutting decentralization of all piecemeals.The decentralization, which refers to, hangs the piecemeal cut down downwards with suspender 8.Every time Under discharge two pieces of piecemeals after, then carry out cutting next time.Preferably, support frame as described above 7 uses packaged type frame body, is conducive to Construction efficiency is improved, the bearing capacity of support frame as described above 7 should be greater than the weight of monolithic after 1 piecemeal of floor to be removed.When longitudinally cutting, It can be cut simultaneously using two chain of stations saw 5 in groups, chain saw 5 can also be increased, suitably according to actual needs so as to shorten cutting chain rope 6 Length.
Preferably, in the step S4, one end of the suspender 8 is fixed on periphery fixed structure 10, the suspender 8 The other end is fixed at the hole for hoist 4 of piecemeal by lifting rope 9.The lifting rope is fixed on the lifting of piecemeal by a fixed device 11 At hole 4, the fixed device includes a transverse baffle being set to below hole for hoist, the lifting rope 9 pass through hole for hoist 4 with it is described Transverse baffle is fixedly connected, and the size of the transverse baffle is greater than the size of the hole for hoist 4.
In conclusion tearing floor construction method open using chain saw of the present invention is inverse, floor 1 to be removed is divided into support and is hung The piecemeal put is hung using the cutting of chain saw 5, not only solves upper space limited the problem of can not constructing, and reduce board bottom The construction intensity and security risk reversely cut.
Although embodiments of the present invention are illustrated in specification, these embodiments are intended only as prompting, It should not limit protection scope of the present invention.It is equal that various omission, substitution, and alteration are carried out without departing from the spirit and scope of the present invention It should be included within the scope of the present invention.

Claims (8)

1. a kind of chain saw is inverse to tear floor construction method open, which comprises the following steps:
S1: parallel longitudinally cutting line is respectively set in the two sides of the length direction of floor to be removed for line setting, and two is longitudinal Several and perpendicular transverse cut of longitudinally cutting line is arranged in interval between cutting line, and floor to be removed is divided into several points Block;
S2: transverse cut and longitudinally cutting line intersection open up chain saw lacing hole on floor to be removed, set on every piece of piecemeal Set hole for hoist;
S3: chain saw is placed in below floor to be removed, along each transverse cut transverse cuts floor to be removed, is laterally cut every time Before cutting, the cutting chain rope of chain saw is each passed through the chain saw lacing hole at the correspondence transverse cut both ends of floor to be removed;
S4: chain saw is placed in below floor to be removed, and floor to be removed is along two longitudinally cutting line ecto-entad block-by-blocks gradation It is transferred respectively after longitudinally cutting, before longitudinally cutting every time, is respectively arranged below support frame in two pieces of piecemeals to be transferred, it is vertical every time To after cutting, support frame as described above is removed, until completing the cutting decentralization of all piecemeals.
2. chain saw is inverse according to claim 1 tears floor construction method open, which is characterized in that in the step S1, building to be removed The piecemeal size of plate determines jointly according to suspender, support frame and periphery fixed structure bearing capacity.
3. chain saw is inverse according to claim 1 tears floor construction method open, which is characterized in that in the step S1, building to be removed Plate is in rectangle, the short side of rectangle and horizontally-parallel, long side with it is longitudinally parallel.
4. chain saw is inverse according to claim 1 tears floor construction method open, which is characterized in that in the step S2, the lifting Hole is opened in each piecemeal center of floor to be removed.
5. chain saw is inverse according to claim 1 tears floor construction method open, which is characterized in that in the step S4, the support The bearing capacity of frame is greater than floor monolithic piecemeal weight to be removed.
6. chain saw is inverse according to claim 2 tears floor construction method open, which is characterized in that in the step S4, the suspender One end be fixed on the fixed structure of periphery, the other end of the suspender is fixed at the hole for hoist of piecemeal by lifting rope.
7. chain saw is inverse according to claim 6 tears floor construction method open, which is characterized in that in the step S4, the lifting rope It is fixed at the hole for hoist of piecemeal by a fixed device, the fixed device includes a transverse gear being set to below hole for hoist Plate, the lifting rope pass through hole for hoist and are fixedly connected with the transverse baffle, and the size of the transverse baffle is greater than the hole for hoist Size.
8. chain saw is inverse according to claim 1 tears floor construction method open, which is characterized in that longitudinally cutting in the step S4 When, it saws while cutting using two chain of stations in groups.
CN201610243655.0A 2015-12-31 2016-04-19 A kind of chain saw is inverse to tear floor construction method open Active CN105888294B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201511030091 2015-12-31
CN2015110300914 2015-12-31

Publications (2)

Publication Number Publication Date
CN105888294A CN105888294A (en) 2016-08-24
CN105888294B true CN105888294B (en) 2018-12-18

Family

ID=56704917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610243655.0A Active CN105888294B (en) 2015-12-31 2016-04-19 A kind of chain saw is inverse to tear floor construction method open

Country Status (1)

Country Link
CN (1) CN105888294B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193894A (en) * 2017-12-05 2018-06-22 深圳市工勘岩土集团有限公司 The construction method of rope saw dismantling concrete wall
CN108756295A (en) * 2018-06-14 2018-11-06 上海二十冶建设有限公司 The former pond platform removal method of newly-increased net circulation cooling tower
CN109208938B (en) * 2018-10-22 2020-11-27 深圳市工勘岩土集团有限公司 Directional nondestructive static cutting demolition processing method for reinforced concrete slab
CN109972858A (en) * 2019-02-28 2019-07-05 广东天盛装饰消防工程有限公司 Shockproof concrete building structures method for dismounting
CN111997409A (en) * 2020-08-28 2020-11-27 湖南城建职业技术学院 Building is demolishd and is used laborsaving crushing apparatus of floor
CN113718667B (en) * 2021-09-02 2023-05-09 中铁二十局集团第三工程有限公司 Existing bridge pier breaking method and bridge bracket replacing construction process
CN113843899B (en) * 2021-10-20 2024-02-20 中南大学 Separation method for abandoned buildings adjacent to existing buildings underwater
CN114278114A (en) * 2022-02-09 2022-04-05 中建八局深圳科创发展有限公司 Method for dismantling multi-layer continuous cantilever plate outside high-rise building

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102650170A (en) * 2012-05-03 2012-08-29 中国十七冶集团有限公司 Vibration-free cutting method for equipment concrete foundation
CN102808526A (en) * 2011-06-01 2012-12-05 永升建设集团有限公司 Nondestructive demolition construction method of reinforced concrete frame beam
CN103291085A (en) * 2013-06-07 2013-09-11 陈春来 Concrete static force cutting dismantling construction method
JP2014001561A (en) * 2012-06-19 2014-01-09 Kajima Corp Demolition method and demolition auxiliary device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102808526A (en) * 2011-06-01 2012-12-05 永升建设集团有限公司 Nondestructive demolition construction method of reinforced concrete frame beam
CN102650170A (en) * 2012-05-03 2012-08-29 中国十七冶集团有限公司 Vibration-free cutting method for equipment concrete foundation
JP2014001561A (en) * 2012-06-19 2014-01-09 Kajima Corp Demolition method and demolition auxiliary device
CN103291085A (en) * 2013-06-07 2013-09-11 陈春来 Concrete static force cutting dismantling construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"无损性切割技术在房屋整体改造中的应用";夏晓兵;《无损性切割技术在房屋整体改造中的应用》;20110331;第40卷(第337期);第25页第4.1节 *

Also Published As

Publication number Publication date
CN105888294A (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN105888294B (en) A kind of chain saw is inverse to tear floor construction method open
CN109056557A (en) A kind of existing method for bridge construction of decomposition dismounting
CN204689430U (en) To Construction of Silo movable hoisting device
CN102632313B (en) Cutting method of Z-shaped notch of H-shaped steel
CN105908991B (en) A kind of reverse Demolition Construction method of floor suspension type
CN103061265A (en) Construction method for lifting combined reinforcement cages
CN203795311U (en) Multi-leg high pier and slip form construction device
CN209872117U (en) Hoisting device and hoisting system
CN204001751U (en) Super high steel structure construction overhanging unloading platform
CN106080965A (en) A kind of method for supporting always organized for boats and ships topside curved section and device
CN105883580B (en) A kind of track crane girder web plate hoisting
CN106320681A (en) Elevator shaft standard operation platform and implementation platform
CN103628409A (en) Construction device for anti-collision wall of viaduct
CN205034948U (en) Rack formula hanging beam device
CN204252022U (en) A kind of packaged type steel box-girder frange plate welding operation platform
CN207296454U (en) Edge protection system
CN101734549A (en) Lifting sling
CN208517821U (en) A kind of simple hoisting apparatus for removing box beam beret slice
CN205709490U (en) A kind of novel hoisting tool
CN105464066B (en) The construction method that a kind of Bailey bracket of the high drop beam slab closing of large span is removed
CN206156589U (en) Transport lifting hook that electric power pole was used
CN204022373U (en) For pushing tow temporary supporting part, remove the hanging device of use
CN204780429U (en) It carries wire rope who takes measure roof beam to be exclusively used in flexible slipform of prilling tower
CN103669219A (en) Simultaneous slip-form construction device of multi-limb high pier
CN203530858U (en) Viaduct anti-collision wall construction device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20160824

Assignee: Shanghai Yuxia Construction Engineering Co.,Ltd.

Assignor: SHANGHAI NO.7 CONSTRUCTION Co.,Ltd.

Contract record no.: X2021310000010

Denomination of invention: A construction method of reverse demolition of floor by chain saw

Granted publication date: 20181218

License type: Common License

Record date: 20210402

EE01 Entry into force of recordation of patent licensing contract