CN109972858A - Shockproof concrete building structures method for dismounting - Google Patents

Shockproof concrete building structures method for dismounting Download PDF

Info

Publication number
CN109972858A
CN109972858A CN201910150046.4A CN201910150046A CN109972858A CN 109972858 A CN109972858 A CN 109972858A CN 201910150046 A CN201910150046 A CN 201910150046A CN 109972858 A CN109972858 A CN 109972858A
Authority
CN
China
Prior art keywords
cutting
floor
dismounting
building structures
concrete building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910150046.4A
Other languages
Chinese (zh)
Inventor
罗文忠
郑育展
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Tiansheng Decoration Fire Engineering Co Ltd
Original Assignee
Guangdong Tiansheng Decoration Fire Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Tiansheng Decoration Fire Engineering Co Ltd filed Critical Guangdong Tiansheng Decoration Fire Engineering Co Ltd
Priority to CN201910150046.4A priority Critical patent/CN109972858A/en
Publication of CN109972858A publication Critical patent/CN109972858A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • E04G23/082Wrecking of buildings using shears, breakers, jaws and the like

Abstract

The invention discloses shockproof concrete building structures method for dismounting, and the method for dismounting includes step 1: line setting, and snap the line pops up bore hole size to be cut and pops up cutting line to be cut;Step 2: boring lifting eye, the components such as bottle gouard moved by hands and fixation, suspension hook are installed;Step 3: hanging, bottle gouard moved by hands one end is connect with suspension hook, the other end pulls in advance;Step 4: boulder blasting cutting carries out boulder blasting cutting along cutting line by cutting scheme plan view;Step 5: concrete block hangs shifting, lifts by crane, transports after cutting, and carries out plastering plaster to floor cutting mouth.Preparation of construction is also carried out before the step 1 comprising scene prepares, mechanical equipment prepares, calculates to be drilled and cuts the weight and the support of installation door cabinet frame of floor.The present invention have in demolishing process guarantees in construction shop normally do business, business activities, it is free from dust, shockproof, it is small on other structures influence.

Description

Shockproof concrete building structures method for dismounting
Technical field
The present invention relates to a kind of method for dismounting, more particularly, to a kind of shockproof concrete building structures method for dismounting.
Background technique
With the continuous propulsion of China's urban modernization, old house is removed and the demands such as extending old building, renovation are being continuously increased. Currently, most of building is all built using concrete, common side during being removed to entire building room Method are as follows: mechanical removal and demolition blasting.But it for extending old building, renovation of the house, shop finishing etc., generally requires to remove part wall Transformation, the mechanical removals and demolition blasting at this time such as body, floor or installation transmission ladder can not adapt to this demand.For routine Direct cutting disassembling, it is uneven not only to occur load during cutting, malformation, and vibration is big, there is crack, and And very big dust can be generated, it can not normally do business for shop, influence shop income.Therefore, for carrying out concrete How to accomplish the business when carrying out Demolition Construction in building structure demolishing process, small, nothing is influenced on other structures in demolishing process Vibration, free from dust are this case problems to be solved.
Summary of the invention
It is an object of the present invention to provide shockproof concrete building structures method for dismounting, have in demolishing process in construction Guarantee shop normally do business, business activities, it is free from dust, shockproof, it is small on other structures influence the advantages that.
To achieve the above object, the technical scheme adopted by the invention is that:
Shockproof concrete building structures method for dismounting, comprising the following steps:
Step 1: line setting, snap the line pop up bore hole size to be cut and pop up cutting line to be cut;
Step 2: boring lifting eye, the components such as bottle gouard moved by hands and fixation, suspension hook are installed;
Step 3: hanging, bottle gouard moved by hands one end is connect with suspension hook, the other end pulls in advance;
Step 4: boulder blasting cutting carries out boulder blasting cutting along cutting line by cutting scheme plan view;
Step 5: concrete block hangs shifting, lifts by crane, transports after cutting, and carries out plastering plaster to floor cutting mouth.
Further, preparation of construction is also carried out before the step 1.
Further, the preparation of construction includes that scene prepares, mechanical equipment prepares, calculates to be drilled and cut floor Weight and the support of installation door cabinet frame.
Further, next layer of cutting floor needed for the door cabinet frame is supported on is installed, and is used to support to be cut The floor cut, the weight for cutting floor that be drilled is according to formula: cutting floor weight=length × width × height × 2500kg/m3Into Row calculates.
Further, bottle gouard moved by hands hoisting weight should be greater than being drilled and cut the 1.2 of floor weight in the step 2 Times.
Further, the line setting in the step 1 is to be positioned using measuring instrument to quasi- piecemeal cutting part, is used Ink fountain carries out snap the line, determines that piecemeal cutting position, snap the line pop up bore hole size to be cut and pop up cutting to be cut Line guarantees the accuracy of piecemeal cutting position.
Further, the brill lifting eye in the step 2 is by drilling machine in required four for cutting the bulk floor Lifting eye is bored on angle respectively, and suspension hook is put into lifting eye and is fixed.
Further, pre- hang in the step 3 is by the way that bottle gouard moved by hands one end to be connect with suspension hook, and the other end, which pulls, matches The cutting of step 4 boulder blasting is closed, keeps the cutting cube holding of required cutting in drilling cutting process horizontal, prevents cutting cube from deforming.
Further, the boulder blasting cutting in the step 4, is first drilled with drilling machine, then uses cutting machine edge The hole bored cut, during drilling cutting, due to cutting using piecemeal, not only can effectively guarantee structure It is unaffected, and the destruction to other structures is reduced, it is shockproof, to accomplish to influence other structures position small.
Further, the drill diameter is determined according to the required side length for cutting the bulk floor, is determined and is closed System is as shown in the table:
Bit diameter Φ Cutting cube side length
63mm <1500mm
76mm 1500-2000mm
83mm 2000-2500mm
89mm 2500-3000mm
102mm 3000mm-3500
Further, when the boulder blasting in the step 4 is cut, temporary support should be taken to arrange at the positions such as beam slab bottom It applies, key position need to reinforce original structure, and subsequent concrete cutting can be carried out after strenthening member reaches design requirement Work.
Further, the boulder blasting cutting in the step 4 further includes dedusting, measurements for reduction, i.e., cuts through in drilling In journey install depositing dust spraying apparatus be dusted, depositing dust, the dustiness in air can be effectively reduced, to guarantee shop inner edge Construction side guarantees normal business, business activities.
Further, it when the concrete in the step 5 is lifted by crane, transported, should follow from top to bottom, in order successively by cross Lifting dismounting is carried out, interchange operation is prevented;It removes operation to carry out according to the opposite sequence of construction, forbids the people that stands on floor Or heap putting material.
Further, the dregs in the entire demolishing process will be cleared with removing with tissue, prevent from causing secondary pollution, Accomplish that removing a vehicle clears up a vehicle, not only guarantees construction speed, but also protection environment.
The present invention compared with the existing technology the advantages of be:
1. carrying out drilling piecemeal cutting according to cutting scheme plan view, not only reduce to other structures in the construction process It destroys, it is shockproof, and accomplish to influence other structures position small.
2. because slinging suspension hook using piecemeal cutting cooperation bottle gouard moved by hands in entirely drilling cutting process, it is possible to have The guarantee structure of effect is unaffected.
3. the dustiness in air is greatly reduced by setting depositing dust spraying apparatus in entirely drilling cutting process, Accomplish that dustlessization is constructed.
4. solving the problems, such as to guarantee normally business, business activities in construction;It is suitable for that larger range is promoted.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the shockproof concrete building structures method for dismounting embodiment 1 of the present invention;
Fig. 2 is the structural schematic diagram of the shockproof concrete building structures method for dismounting embodiment 2 of the present invention;
Fig. 3 is the cutting planes schematic diagram of present invention drilling cutting.
In figure: 1. purpose floors, 2. bottle gouards moved by hands, 3. pre- piecemeals cutting floors, a 4. lower floors, 5. template platforms, 6. Door cabinet frame support, 7. original structure columns, 8. concrete floors.
Specific embodiment
The present invention will be further described with reference to the accompanying drawing.
As shown in Figure 1-3, the invention discloses shockproof concrete building structures method for dismounting, comprising the following steps:
Step 1: line setting, snap the line pop up bore hole size to be cut and pop up cutting line to be cut;
Step 2: boring lifting eye, the components such as bottle gouard moved by hands 2 and fixation, suspension hook are installed;
Step 3: hanging, 2 one end of bottle gouard moved by hands is connect with suspension hook, the other end pulls in advance;
Step 4: boulder blasting cutting carries out boulder blasting cutting along cutting line by cutting scheme plan view;
Step 5: concrete block hangs shifting, lifts by crane, transports after cutting, and carries out plastering plaster to floor cutting mouth.
The bottle gouard moved by hands 2, drilling cutting machine and depositing dust spraying apparatus (not marking in figure) belong to the prior art, herein not It repeats again.
In order to the clearer understanding present invention, it is described in detail taking the embodiment as an example:
Embodiment 1
As shown in Figure 1, the present embodiment carries out drilling cutting for removing certain five floor computer room floor of television transmitting station, Demolition Construction step are as follows:
Scene prepares:
(1) it is familiar with the overview and ambient enviroment of split floor first, understands fully structure situation, the building situation, water of building Electricity and equipment pipe situation, hidden facility situation.Removing responsible person will be according to Design of Construction Organization and act of technique for security to ginseng Add staff's progress of dismounting is detailed to tell somebody what one's real intentions are, and carries out corresponding safety education work.
(2) construction site is then cleared up, the goods and materials removed in range, equipment are removed, carries out to enclose accordingly and cover;
(3) mechanical equipment prepares
According to the practical circumstances of projects, it is as follows to be equipped with mechanical equipment:
(4) it calculates to be drilled and cuts the weight of floor, 0.75m × 0.55m × 0.35m × 2500kg/m3=361kg, The hoisting weight of required bottle gouard moved by hands 2 should be greater than 361kg × 1.2=433.2kg.
(5) installation door cabinet frame support 6, at four buildings 4 (1 represents five buildings in the present embodiment, and 4 represent four buildings) to the building removed Plate part carries out installation door cabinet frame support 6 and forms template platform 5, is used to support the floor to be cut.
Step 1, line setting:
Using measuring instrument, quasi- piecemeal cutting part is positioned, snap the line is carried out with ink fountain, determines piecemeal cutting position, bullet Line pops up bore hole size to be cut and pops up cutting line to be cut, guarantees the accuracy of piecemeal cutting position.
Step 2, lifting eye is bored:
Diameter is used to bore lifting eye respectively on four angles that pre- piecemeal cuts floor 3 for the water drilling of 100mm, and by suspension hook Lifting eye is put into be fixed;
Step 3, it hangs in advance:
2 one end of bottle gouard moved by hands is connect with suspension hook, the other end pulls the cutting of 4 boulder blasting of matching step, cuts drilling The cutting cube cut needed in the process keeps horizontal, prevents cutting cube from deforming.Key position need to add original structure column 7 Gu subsequent drilling cutting work can be carried out after strenthening member reaches design requirement.
Step 4, boulder blasting is cut:
Diameter is used to drill for the water drilling of 100mm along the drill hole line popped up in step 1, with cutting after the completion of drilling Machine carries out piecemeal cutting along cutting line, makes cutting cube holding horizontal always during cutting, prevents from cutting in cutting process Cut block deformation.Further include dedusting, measurements for reduction during boulder blasting cutting, i.e., depositing dust is installed in drilling cutting process Spraying apparatus is dusted, depositing dust, can effectively reduce the dustiness in air, to guarantee that shop inner edge construction side guarantees just Often business, business activities.
Step 5: concrete block hangs shifting: the concrete block after the completion of cutting being sling by bottle gouard moved by hands 2, and is transported.It cuts Hanging after the completion of cutting is moved work and should be followed from top to bottom, successively carries out lifting dismounting by cross in order, prevents interchange operation; It removes operation to carry out according to the opposite sequence of construction, forbids stand people or heap putting material on floor, check the lifting of bottle gouard moved by hands 2 Weight.
Dregs in entire demolishing process will be cleared with removing with tissue, prevented from causing secondary pollution, accomplished to remove a vehicle A vehicle is cleared up, not only guarantees construction speed, but also protection environment.
Embodiment 2
The present embodiment needs to install to pass for dish ladder carries out cutting floor by certain tri- building Lou Si Yi Guan carries out drilling cutting, Demolition Construction step are as follows:
Scene prepares:
(1) it is familiar with the overview and ambient enviroment of split floor first, understands fully structure situation, the building situation, water of building Electricity and equipment pipe situation, hidden facility situation.Removing responsible person will be according to Design of Construction Organization and act of technique for security to ginseng Add staff's progress of dismounting is detailed to tell somebody what one's real intentions are, and carries out corresponding safety education work.
(2) construction site is then cleared up, the goods and materials removed in range, equipment are removed, carries out to enclose accordingly and cover;
(3) mechanical equipment prepares
According to the practical circumstances of projects, it is as follows to be equipped with mechanical equipment:
(4) it calculates to be drilled and cuts the weight of floor, 1.1m × 0.9m × 0.1m × 2500kg/m3=247.5kg, institute The hoisting weight of bottle gouard moved by hands 2 is needed to should be greater than 247.5kg × 1.2=297kg.
(5) installation door cabinet frame support 6, at three buildings 4 (1 represents four buildings in the present embodiment, and 4 represent three buildings) to the building removed Plate part carries out installation door cabinet frame support 6 and forms template platform 5, is used to support the floor to be cut.
Step 1, line setting:
Using measuring instrument, quasi- piecemeal cutting part is positioned, snap the line is carried out with ink fountain, determines piecemeal cutting position, bullet Line pops up bore hole size to be cut and pops up cutting line to be cut, guarantees the accuracy of piecemeal cutting position.
Step 2, lifting eye is bored:
Diameter is used to bore lifting eye respectively on four angles that pre- piecemeal cuts floor 3 for the water drilling of 63mm, and by suspension hook Lifting eye is put into be fixed;
Step 3, it hangs in advance:
2 one end of bottle gouard moved by hands is connect with suspension hook, the other end pulls the cutting of 4 boulder blasting of matching step, cuts drilling The cutting cube cut needed in the process keeps horizontal, prevents cutting cube from deforming.Key position need to add original structure column 7 Gu subsequent drilling cutting work can be carried out after strenthening member reaches design requirement.
Step 4, boulder blasting is cut:
Diameter is used to drill for the water drilling of 63mm along the drill hole line popped up in step 1, with cutting after the completion of drilling Machine carries out piecemeal cutting along cutting line, makes cutting cube holding horizontal always during cutting, prevents from cutting in cutting process Cut block deformation.Further include dedusting, measurements for reduction during boulder blasting cutting, i.e., depositing dust is installed in drilling cutting process Spraying apparatus is dusted, depositing dust, can effectively reduce the dustiness in air, to guarantee that shop inner edge construction side guarantees just Often business, business activities.
Step 5: concrete block hangs shifting: the concrete block after the completion of cutting being sling by bottle gouard moved by hands 2, and is transported.It cuts Dismounting work after the completion of cutting should follow from top to bottom, successively carry out lifting dismounting by cross in order, prevent interchange operation; It removes operation to carry out according to the opposite sequence of construction, forbids stand people or heap putting material on floor, check the lifting of bottle gouard moved by hands 2 Weight.
Dregs in entire demolishing process will be cleared with removing with tissue, prevented from causing secondary pollution, accomplished to remove a vehicle A vehicle is cleared up, not only guarantees construction speed, but also protection environment.
The present invention not only guarantees to reduce the destruction to other structures, nothing in the construction process by using drilling piecemeal cutting Vibration, and can effectively guarantee that structure is unaffected;It, will by setting depositing dust spraying apparatus during drilling construction Dustiness in air greatly reduces, and accomplishes that dustlessization is constructed.

Claims (9)

1. shockproof concrete building structures method for dismounting, it is characterised in that: the method for dismounting the following steps are included:
Step 1: line setting, snap the line pop up bore hole size to be cut and pop up cutting line to be cut;
Step 2: boring lifting eye, the components such as bottle gouard moved by hands and fixation, suspension hook are installed;
Step 3: hanging, bottle gouard moved by hands one end is connect with suspension hook, the other end pulls in advance;
Step 4: boulder blasting cutting carries out boulder blasting cutting along cutting line by cutting scheme plan view;
Step 5: concrete block hangs shifting, lifts by crane, transports after cutting, and carries out plastering plaster to floor cutting mouth.
2. shockproof concrete building structures method for dismounting according to claim 1, it is characterised in that: the step 1 it It is preceding also to carry out preparation of construction.
3. shockproof concrete building structures method for dismounting according to claim 2, it is characterised in that: the preparation of construction Prepare including scene, mechanical equipment prepares, calculates to be drilled and cuts the weight and the support of installation door cabinet frame of floor.
4. shockproof concrete building structures method for dismounting according to claim 3, it is characterised in that: the door cabinet frame branch The next layer supportted in required cutting floor is installed, and the floor to be cut is used to support.
5. shockproof concrete building structures method for dismounting according to claim 1, it is characterised in that: in the step 2 Bottle gouard moved by hands hoisting weight, which should be greater than being drilled, cuts 1.2 times of floor weight.
6. shockproof concrete building structures method for dismounting according to claim 1, it is characterised in that: in the step 2 Brill lifting eye be that lifting eye is bored on required four angles for cutting the bulk floor by drilling machine respectively, and suspension hook is put into Lifting eye is fixed.
7. shockproof concrete building structures method for dismounting according to claim 1, it is characterised in that: in the step 4 Boulder blasting cutting, first drilled with drilling machine, then cut with cutting machine along the hole bored.
8. shockproof concrete building structures method for dismounting according to claim 7, it is characterised in that: the drilling machine drill Head diameter is determined according to the required side length for cutting the bulk floor.
9. shockproof concrete building structures method for dismounting according to claim 1, it is characterised in that: in the step 4 Boulder blasting cutting further include dedusting, measurements for reduction, i.e., in drilling cutting process installation depositing dust spraying apparatus be dusted, Depositing dust can effectively reduce the dustiness in air.
CN201910150046.4A 2019-02-28 2019-02-28 Shockproof concrete building structures method for dismounting Pending CN109972858A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910150046.4A CN109972858A (en) 2019-02-28 2019-02-28 Shockproof concrete building structures method for dismounting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910150046.4A CN109972858A (en) 2019-02-28 2019-02-28 Shockproof concrete building structures method for dismounting

Publications (1)

Publication Number Publication Date
CN109972858A true CN109972858A (en) 2019-07-05

Family

ID=67077580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910150046.4A Pending CN109972858A (en) 2019-02-28 2019-02-28 Shockproof concrete building structures method for dismounting

Country Status (1)

Country Link
CN (1) CN109972858A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512895A (en) * 2019-08-22 2019-11-29 温州金茂建设有限公司 A kind of high-rise cast-in-place concrete building demolition construction method
CN110905232A (en) * 2019-11-29 2020-03-24 上海宝冶市政工程有限公司 Mechanical static force dismantling method for concrete structure
CN111764313A (en) * 2020-07-08 2020-10-13 中铁广州工程局集团深圳工程有限公司 Construction method for dismantling multi-layer steel structure overbridge
CN113356217A (en) * 2021-05-25 2021-09-07 中煤江南建设发展集团有限公司 Method for dismantling bottom plate in foundation pit supporting structure
CN114278114A (en) * 2022-02-09 2022-04-05 中建八局深圳科创发展有限公司 Method for dismantling multi-layer continuous cantilever plate outside high-rise building
CN114293813A (en) * 2021-12-20 2022-04-08 中建二局装饰工程有限公司 Floor slab cutting and reinforcing structure and construction method
CN114922463A (en) * 2022-05-27 2022-08-19 中建二局第三建筑工程有限公司 Vibration-free cantilever plate block dismantling construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291085A (en) * 2013-06-07 2013-09-11 陈春来 Concrete static force cutting dismantling construction method
CN104695314A (en) * 2015-02-17 2015-06-10 中交一航局第四工程有限公司 Construction method for cutting concrete by using diamond wire saw
CN105888294A (en) * 2015-12-31 2016-08-24 上海建工七建集团有限公司 Construction method for reversely removing floor slab by using chain saw
CN107642251A (en) * 2017-09-20 2018-01-30 江山(福建)建设工程有限公司 A kind of high-rise cast-in-place concrete building demolition construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291085A (en) * 2013-06-07 2013-09-11 陈春来 Concrete static force cutting dismantling construction method
CN104695314A (en) * 2015-02-17 2015-06-10 中交一航局第四工程有限公司 Construction method for cutting concrete by using diamond wire saw
CN105888294A (en) * 2015-12-31 2016-08-24 上海建工七建集团有限公司 Construction method for reversely removing floor slab by using chain saw
CN107642251A (en) * 2017-09-20 2018-01-30 江山(福建)建设工程有限公司 A kind of high-rise cast-in-place concrete building demolition construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
盛慧: "谈盘锯式钢混结构无损切割施工", 《安徽建筑》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512895A (en) * 2019-08-22 2019-11-29 温州金茂建设有限公司 A kind of high-rise cast-in-place concrete building demolition construction method
CN110905232A (en) * 2019-11-29 2020-03-24 上海宝冶市政工程有限公司 Mechanical static force dismantling method for concrete structure
CN111764313A (en) * 2020-07-08 2020-10-13 中铁广州工程局集团深圳工程有限公司 Construction method for dismantling multi-layer steel structure overbridge
CN113356217A (en) * 2021-05-25 2021-09-07 中煤江南建设发展集团有限公司 Method for dismantling bottom plate in foundation pit supporting structure
CN114293813A (en) * 2021-12-20 2022-04-08 中建二局装饰工程有限公司 Floor slab cutting and reinforcing structure and construction method
CN114278114A (en) * 2022-02-09 2022-04-05 中建八局深圳科创发展有限公司 Method for dismantling multi-layer continuous cantilever plate outside high-rise building
CN114922463A (en) * 2022-05-27 2022-08-19 中建二局第三建筑工程有限公司 Vibration-free cantilever plate block dismantling construction method
CN114922463B (en) * 2022-05-27 2023-09-29 中建二局第三建筑工程有限公司 Vibration-free cantilever plate block dismantling construction method

Similar Documents

Publication Publication Date Title
CN109972858A (en) Shockproof concrete building structures method for dismounting
CN102808526A (en) Nondestructive demolition construction method of reinforced concrete frame beam
CN105569376B (en) The Demolition Construction method of construction wall
CN104727236B (en) A kind of whole bridge beam based on ground supports transfers the construction method of dismounting system
CN106320691A (en) Aluminum-wood formwork construction method
CN108894488A (en) A kind of construction method of Novel section steel keel steel and wood composite template
CN112112418A (en) Construction method of high-rise building aluminum formwork climbing frame combined system
CN109404010B (en) Aluminum tunnel mold system and operation method thereof
CN106121255A (en) Apparatus installed by a kind of Super High glass curtain wall
CN109252693A (en) Concrete support system mechanical coupling segment cutting construction method without support collet
CN203403674U (en) Instrumental adjustable stair steel formwork
CN106337520A (en) The construction technology of large-cell point glass curtain wall
CN105672536B (en) A kind of installation method of light cellular partition board
CN111576878A (en) Construction process for quick-release system of aluminum alloy template
CN105569328B (en) The concealed wall-connecting piece of curtain wall engineering external scaffolding and its construction technology
CN210263867U (en) Climb a passageway plate turnover
CN108952157A (en) Aluminum alloy mould plate and climbing frame share the construction of screw hole
CN109162466A (en) Room level units formula curtain wall installing structure and method
CN211444835U (en) Tower body tile holding mounting and dismounting device of tower crane
CN205713035U (en) All steel for climbing frame protects crane
CN205936609U (en) Tunnel shaft mouth safety protection dish
Kurakova Use of formwork systems in high-rise construction
CN205259574U (en) Quick assembly and disassembly safety protection screen
CN218927467U (en) Opening tool of tower barrel and processing device of slicing tower
CN217841502U (en) Movable platform ladder stand

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190705