CN205713035U
CN205713035U CN201620413979.XU CN201620413979U CN205713035U CN 205713035 U CN205713035 U CN 205713035U CN 201620413979 U CN201620413979 U CN 201620413979U CN 205713035 U CN205713035 U CN 205713035U
Authority
CN
China
Prior art keywords
steel
expanded metal
metal lath
crane
vertical guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620413979.XU
Other languages
Chinese (zh)
Inventor
潘静
童成章
许军军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Han'an Longxing Science And Technology Co Ltd
Original Assignee
Hubei Han'an Longxing Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Han'an Longxing Science And Technology Co Ltd filed Critical Hubei Han'an Longxing Science And Technology Co Ltd
Priority to CN201620413979.XU priority Critical patent/CN205713035U/en
Application granted granted Critical
Publication of CN205713035U publication Critical patent/CN205713035U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of all steel for climbing frame and protect crane, the vertical guide including the wall-attached supporting seat being arranged on building, being arranged on wall-attached supporting seat, multilamellar steel walkway board, expanded metal lath connecting plate and steel framework expanded metal lath.This utility model all uses steel material, and facade protection is made up of steel framework steel framework expanded metal lath, horizontal plane protection sizing steel walkway board assembles, and so, constitutes whole support body and completely encloses, and walks in all steel protection crane, safety as indoor.Effectively eliminate that construction site traditional pin hand cradle is unsettled, high-altitude, face the high-risk operations risk of sky, and, remote manipulation automatically controlled with modern technologies, there is significantly " three is anti-" effect.

Description

All steel for climbing frame protects crane
Technical field
This utility model belongs to attachment type raise scaffold technical field.It is specifically related to a kind of for climbing frame All steel protection crane.
Background technology
Skyscraper (including the cartridge type building such as civic building building, industry Mai Ta processed) on existing building building site Construction have with outer protective scaffold, for a long time, use and land double-pole scaffold or overhanging type Scaffold, the quantity of its consumption steel, timber, bamboo wood and plastic is big, set up maintenance expenses of labour With height, operational hazards often have fall, parabolic, fire incident occur.
Utility model content
The purpose of this utility model is to overcome above-mentioned a kind of all steel for climbing frame of not enough offer to protect Crane.
This utility model includes the wall-attached supporting seat 1 being arranged on building 14 and is arranged on wall-attached supporting seat Vertical guide 2 on 1, also includes multilamellar steel walkway board 4, expanded metal lath connecting plate 13 and steel framework steel Expanded metals 5, described vertical guide 2 is arranged on the side of multilamellar steel walkway board 4, and described expanded metal lath connects Plate 13 is arranged on the opposite side of multilamellar steel walkway board 4, and described steel framework expanded metal lath 5 is arranged on expanded metal lath On connecting plate 13, between described vertical guide 2 and expanded metal lath connecting plate 13, it is provided with rigid support 6, institute Stating and be provided with vertical rod 3 between vertical guide 2, described vertical guide about 2 is respectively arranged at two ends with suspension centre 10 and lower suspension centre 9, described vertical guide 2 is provided with motor hoist 11, described wall-attached supporting seat 1 It is provided with and anti-fall shores 8.
This utility model all uses steel material, it may be assumed that instead of traditional pin hand cradle with steel framework expanded metal lath Dense mesh screen, instead of traditional wood, bamboo scaffold board with steel framework steel walkway board.Facade protects by steel framework Steel framework expanded metal lath composition, horizontal plane protection sizing steel walkway board assemble, and so, constitute whole frame Body completely encloses, and walks in all steel protection crane, safety as indoor.Effectively eliminate and build Build that building site traditional pin hand cradle is unsettled, high-altitude, face the high-risk operations risk of sky, and automatically controlled by modern technologies, Remote manipulation, has significantly " three prevent " effect (fall arrest, anti-parabolic, fire-proof).Thus Solve the safety management difficult problem for a long time with construction site falling from high altitude Frequent Accidents, and then be society Safety and family have stably made contribution!Additionally, all steel protection crane workshop standardized production, work Ground assemblingization is assembled, and high-altitude is removed after using completion.Avoid the messy, scattered of traditional pin hand cradle tool Fall and repeatability is had bad luck, promote job site civilized construction.And its attractive in appearance, grand image appearance, The working environment that in support body, safety is clean and tidy, the most effectively improves China's construction site civilized construction water Flat.Prior also have, and economically lands compared with double-pole scaffold or overhanging scaffold with traditional, Then save steel more than 80%, save labour cost more than 30%.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
Fig. 2 is this utility model side view.
Detailed description of the invention
Below in conjunction with specific embodiment, this utility model is further described:
A kind of all steel for climbing frame protects crane, including the wall-attached supporting seat 1 being arranged on building 14 And the vertical guide 2 being arranged on wall-attached supporting seat 1, also include multilamellar steel walkway board 4, expanded metal lath Connecting plate 13 and steel framework expanded metal lath 5, described vertical guide 2 is arranged on multilamellar steel walkway board 4 Side, described expanded metal lath connecting plate 13 is arranged on the opposite side of multilamellar steel walkway board 4, described steel framework Expanded metal lath 5 is arranged on expanded metal lath connecting plate 13, described vertical guide 2 and expanded metal lath connecting plate 13 Between be provided with rigid support 6, be provided with vertical rod 3 between described vertical guide 2, in described vertical guide 2 Under be respectively arranged at two ends with suspension centre 10 and lower suspension centre 9, described vertical guide 2 is provided with electronic lifting Machine 11, described wall-attached supporting seat 1 is provided with anti-fall shores 8.Described wall-attached supporting seat 1 is provided with lifting and hangs Seat 7.It is provided with sensor 12 below described motor hoist 11.
This utility model major function is to meet high-rise building safe civilized construction needs.Support body is whole Material is made up of the steel sectional material such as square steel tube, steel plate.Facade protection is made up of steel framework expanded metal lath, level Face protection sizing steel walkway board and steel assemble from wall turnover panel, by various seal approach, constitute Whole support body completely encloses;Walk in all steel protection crane, safety as indoor.And install Operation is all carried out in low latitudes such as level land or two layers of podiums, thus has stopped that traditional pin hand cradle is unsettled, high-altitude High-risk operations risk.Again because of section bar steel such as material whole user steel pipe, steel plates, do not use and appoint The plastics of what timber of form, bamboo wood or Dense mesh screen etc, to stop comburant, so, use complete Steel protection crane does not have fire and occurs.It is achieved thereby that the fall arrest of construction site work high above the ground, Anti-parabolic, fire-proof " three prevent " effect, the safety having ensured high-building construction personnel of hommization. Additionally, all steel protection crane workshop standardized production, assemble in siteization are assembled, high-altitude uses completes Remove after work.Avoid traditional pin hand cradle tool messy, be scattered and repeatability is had bad luck, promote construction On-the-spot civilized construction.And its attractive in appearance, grand image appearance, the working environment that in support body, safety is clean and tidy, The most effectively improve China's construction site civilized construction level.This project is greatly lowered resource and disappears Consumption, saves steel, reduces recruitment.This project, in the range of national existing specification is filled perhaps, is designed as five The support body of times story height.The section bar steel such as material whole user steel pipe, steel plate, do not use any shape The plastics of the timber of formula, bamboo wood or Dense mesh screen etc, to stop comburant.This project is from factory process Then arrive building site to assemble, traditional with on construction site land compared with double frame or suspension scaffold, save 80% Above steel, save more than 22% artificial, decrease with achieving noticeable achievement construction site to the consumption of resource and Artificial use.This project fruitfully achieves construction site energy-saving and emission-reduction, reduce construction site because of Consumption resource is many and increases the environmental pollution that experienced steel industry produces.It is known that since Gai Gekaifang, built Build industry and become one of china natural resources consumption and environmental pollution major fields.Steel are only used from construction site In common steel tube as a example by, build steel pipe needed for the Business Building of the 36 layers of 180m in building sets up scaffold and buckle Part is about 563 tons.According to data introduction: " often produce one ton of steel, need to consume about 700 kilograms coals Carbon, the Ore of more than 1.6 tons, 3.8 tons of water, power consumption 158kw, also coke powder 52kg, steam 10kg, Nitrogen 30m3, oxygen 35m3, compressed air 13m3Etc. resource.Additionally, often produce one ton of steel, arrange Release carbon dioxide and other large quantity of exhaust gas, waste residue and the pollutant of 1.7 tons.Now with certain 36 layers of 180m Business Building as a example by, use this utility model with set up land the outer protective frame of double frame energy resource consumption with Pollution is compared: all steel protection crane saves steel 488 tons, thus reduce 341.6 tons of coals, 780 Ton Ore, save 1855 tons of water, reduce discharge carbon dioxide 829.5 tons and other large quantity of exhaust gas, useless Slag and pollutant.Use all steel protective frame energy-conservation, reduce discharging, low-carbon (LC) and environmental-protection function, it is clear that. In attachment type raise scaffold industry, the pioneering load robot control system(RCS) that limits uses " built-in " to synchronize Control device and Radio Transmission Technology.Solve universality in current similar item control system to deposit Broken string, loose contact, system easily interrupt and misoperation inefficacy or parts damage etc. common therefore Barrier.
To sum up, compared with what this utility model was traditional with on construction site land double frame or suspension scaffold, Security civilization, potentiation consumption reduction, economize on resources and energy-saving and emission-reduction aspect has remarkable result.
All parts are in workshop processing, and transport assembles to building site or low latitude disposably installs Use.The most often after construction one layer, up promote one layer with motor apparatus, until rising to construction Building top layer, or remove or the most successively decline dismounting when carrying out exterior wall finishing operation bottom.This practicality is new Type major function is to meet high-rise building safe civilized construction needs.Support body all material by square steel tube, The steel sectional materials such as steel plate are made.Facade protection is made up of steel framework expanded metal lath, horizontal plane protection sizing steel Walkway board processed and steel assemble from wall turnover panel, by taking the steel material of these facades and plane to seal Measure, constitutes whole support body and completely encloses;Walk in all steel protection crane, as indoor Safety.And installation exercise is all carried out in low latitudes such as level land or two layers of podiums, after once mounting, use work Completion of works terminates, and centre does not has high-altitude, unsettled installation again, sets up or maintenance activity.Stop completely Traditional pin hand cradle the end of from less than top layer will unsettled, high-altitude install, set up or the height of maintenance activity Danger operating risk.Again because of section bar steel such as material whole user steel pipe, steel plates, do not use any shape The plastics of the timber of formula, bamboo wood or Dense mesh screen etc, to stop comburant, so, use all steel to prevent Protect crane and do not have fire generation.It is achieved thereby that the fall arrest of construction site work high above the ground, anti-throwing Thing, fire-proof " three prevent " effect, the safety having ensured high-building construction personnel of hommization.This Outward, all steel protection crane workshop standardized production, assemble in siteization are assembled, and high-altitude uses completion Rear dismounting.Avoid traditional pin hand cradle tool messy, be scattered and repeatability is had bad luck, promoting construction existing Field civilized construction.And its attractive in appearance, grand image appearance, the working environment that in support body, safety is clean and tidy. This utility model, in industry, the pioneering load robot control system(RCS) that limits that takes the lead in uses " built-in " to synchronize Control device and Radio Transmission Technology.This system hardware is by master control cabinet, sub-control box, power line and band The parts compositions such as " built-in " motor hoist of load transducer, its systems soft ware is by load signal Feedback, puts position signal transformational analysis, signal, instruction transmitting-receiving, processing center, desktop manipulation center etc. Composition." built-in " sync control device and Radio Transmission Technology basic functional principle be----at frame During body lift work, the sensor being arranged in motor hoist, by five tooth major axis of elevator and The assemblies such as left and right sidesing wall plate gather payload data information, feed back to master control after being delivered to sub-control box analyzing and processing Cabinet processed, for central processing unit analysis.Each seat in the plane load and state are acquired and real by central processing unit Time show current state.When the load of certain seat in the plane exceedes setting value 15%, master control cabinet is just with acousto-optic shape Formula automatic buzzing warning and display alarm seat in the plane, when more than 30%, turn-key system is reported to the police in automatic buzzing While, power-off immediately, force this group jacking equipment autostop, until failture evacuation." built-in Formula " sync control device and Radio Transmission Technology Main Feature are can to go out this utility model Now surpass design load or mistake load situation is predicted, forecasts and pre-control, also solve current similar products In control system, the broken string of universality existence, loose contact, system are easily interrupted and misoperation The most common failures such as inefficacy or parts damage.

Claims (3)

1. for an all steel protection crane for climbing frame, attached including be arranged on building (14) Wall bearing (1) and the vertical guide (2) being arranged on wall-attached supporting seat (1), it is characterised in that: Also include multilamellar steel walkway board (4), expanded metal lath connecting plate (13) and steel framework expanded metal lath (5), Described vertical guide (2) is arranged on the side of multilamellar steel walkway board (4), and described expanded metal lath connects Plate (13) is arranged on the opposite side of multilamellar steel walkway board (4), and described steel framework expanded metal lath (5) is pacified Be contained on expanded metal lath connecting plate (13), described vertical guide (2) and expanded metal lath connecting plate (13) it Between be provided with rigid support (6), be provided with vertical rod (3) between described vertical guide (2), described vertically lead Rail (2) is respectively arranged at two ends with suspension centre (10) and lower suspension centre (9), described vertical guide (2) up and down On motor hoist (11) is installed, described wall-attached supporting seat (1) is provided with anti-fall shores (8).
All steel for climbing frame the most according to claim 1 protects crane, it is characterised in that: Described wall-attached supporting seat (1) is provided with lifting hanging seat (7).
All steel for climbing frame the most according to claim 1 or claim 2 protects crane, it is characterised in that: Described motor hoist (11) lower section is provided with sensor (12).
CN201620413979.XU 2016-05-09 2016-05-09 All steel for climbing frame protects crane Expired - Fee Related CN205713035U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620413979.XU CN205713035U (en) 2016-05-09 2016-05-09 All steel for climbing frame protects crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620413979.XU CN205713035U (en) 2016-05-09 2016-05-09 All steel for climbing frame protects crane

Publications (1)

Publication Number Publication Date
CN205713035U true CN205713035U (en) 2016-11-23

Family

ID=57304455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620413979.XU Expired - Fee Related CN205713035U (en) 2016-05-09 2016-05-09 All steel for climbing frame protects crane

Country Status (1)

Country Link
CN (1) CN205713035U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316632A (en) * 2018-01-26 2018-07-24 上海建工四建集团有限公司 The outer safeguard structure and its application method of integral hoisting scaffold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108316632A (en) * 2018-01-26 2018-07-24 上海建工四建集团有限公司 The outer safeguard structure and its application method of integral hoisting scaffold

Similar Documents

Publication Publication Date Title
CN208518310U (en) All steel type attachment type raise scaffold
CN201826516U (en) Novel attached lifting scaffold
CN201826542U (en) Self-climbing protective screening
CN205713035U (en) All steel for climbing frame protects crane
CN208103685U (en) The detachable multilayer hanging-basket of high altitude operation
CN204081424U (en) A kind of for the removable steel inclined ladder in boat segmental construction
CN203783171U (en) Assembled-type overhanging protective canopy for high-rise building construction
CN203271166U (en) Temporary protective guard for elevator shaft door opening
CN201305994Y (en) Automatic plate turnover mechanism for floor passage of construction elevator
CN109162466A (en) Room level units formula curtain wall installing structure and method
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN207144446U (en) A kind of construction Skidproof hanging cradle
CN202990406U (en) Bowl buckle type scaffold
CN203594215U (en) High-altitude large-area work platform semi-automatic lifting apparatus
CN209723565U (en) Attached tower crane attachment construction operation platform outside a kind of steel-core wall structure
CN207647201U (en) Die mould metal Roof security fixed clamp
CN206000194U (en) A kind of elevator hoistways soft or hard safeguard structure
CN203499232U (en) Attached lifting scaffold
CN203977844U (en) A kind of for the fixing steel pipe iron wire fastener of building trade
CN203905436U (en) Steel chimney annular installation platform
CN203373983U (en) Discharging platform capable of rising and falling along with climbing frame
CN207079909U (en) Peripheral scaffold connecting structure
CN208980220U (en) A kind of light unpowered tower crane promotion operation protecting screen frame body of Super High
CN206554262U (en) A kind of dismantled and assembled suspension type housing of environment-friendly and energy-efficient
CN110778095A (en) External protection frame of assembled structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123