CN105888294A - Construction method for reversely removing floor slab by using chain saw - Google Patents
Construction method for reversely removing floor slab by using chain saw Download PDFInfo
- Publication number
- CN105888294A CN105888294A CN201610243655.0A CN201610243655A CN105888294A CN 105888294 A CN105888294 A CN 105888294A CN 201610243655 A CN201610243655 A CN 201610243655A CN 105888294 A CN105888294 A CN 105888294A
- Authority
- CN
- China
- Prior art keywords
- floor
- chain saw
- construction method
- floor slab
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/08—Wrecking of buildings
- E04G23/082—Wrecking of buildings using shears, breakers, jaws and the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a construction method for reversely removing a floor slab by using a chain saw. The construction method comprises the following steps: locating and paying off, respectively arranging longitudinal cutting lines which are parallel to each other at two sides of a to-be-removed floor slab along the length direction, arranging a plurality of horizontal cutting lines which are vertical to the longitudinal cutting lines between the two longitudinal cutting lines at intervals, and dividing the to-be-removed floor slab into a plurality of blocks; forming chain saw lacing holes in connected positions of the horizontal cutting lines and the longitudinal cutting lines on the to-be-removed floor slab, forming a hoisting hole in each block; putting the chain saw under the to-be-removed floor slab, and horizontally cutting the to-be-removed floor slab along each horizontal cutting line; after longitudinally cutting the to-be-removed floor slab from outside to inside one by one along the two longitudinal cutting lines, respectively putting down the blocks until completing the cutting and the putting down of all blocks. According to the construction method disclosed by the invention, the floor slab which has an limited upper space and is difficult to forwards remove is subjected to reverse removing construction, the problem that removing construction cannot be successfully carried out is solved, high-strength construction of large-area excavation during the reverse removing construction is removed, and the construction efficiency of removing the floor slab under a special condition is increased.
Description
Technical field
The present invention relates to reinforced concrete structure remove, be specifically related to a kind of chain saw against tearing floor construction method open.
Background technology
Along with developing rapidly of modern architecture industry, because using changing function or needing the factor impacts such as dilatation, old
The reconstruction and extension project of building is the most increasing, is wherein no lack of the work that existing conventional construction technology is difficult to smoothly complete
Journey.
In traditional reconstruction and extension project, the dismounting of floor generally uses the plant equipment such as pneumatic pick, dish saw in plate
Face carries out forward Demolition Construction.But when the construction space on floor top is restricted by surrounding enviroment, as added
The upper operating limited space that lid new construction floor causes, it may be difficult to use traditional forward method for dismounting, and
Reversely cutting floor at the bottom of plate, not only construction intensity is high, and inefficiency.
Summary of the invention
The present invention is in order to overcome above deficiency, it is provided that one can increase mechanized construction degree, reduce and execute
Work intensity, improve that the chain saw of efficiency of construction is inverse tears floor construction method open.
In order to solve above-mentioned technical problem, the technical scheme is that
A kind of chain saw is inverse tears floor construction method open, comprises the following steps:
S1: line setting, is respectively provided with parallel longitudinal direction in the both sides of the length direction of floor to be removed and cuts
Secant, between two longitudinally cutting lines, interval arranges the transverse cut that some and longitudinally cutting line is perpendicular, will
Floor to be removed is divided into some piecemeals;
S2: transverse cut and longitudinally cutting line intersection offer chain saw lacing hole, often on floor to be removed
On block piecemeal, hole for hoist is set;
S3: be positioned over by chain saw below floor to be removed, along each transverse cut transverse cuts building to be removed
Plate;
S4: chain saw is positioned over below floor to be removed, floor to be removed along two longitudinally cutting lines by extroversion
Transfer respectively after interior block-by-block is by several times longitudinally cutting, the most longitudinally cutting before, below two pieces of piecemeals to be transferred
Be respectively provided with bracing frame, the most longitudinally cutting after, remove support frame as described above, until completing cutting of all piecemeals
Cut off and put.
Further, in described step S1, the piecemeal size of floor to be removed according to suspender, bracing frame and
Periphery fixed structure bearing capacity determines jointly.
Further, in described step S1, floor to be removed is rectangular, the minor face of rectangle with horizontally-parallel,
Long limit is with parallel longitudinal.
Further, in described step S2, described hole for hoist is opened in floor to be removed each piecemeal central authorities.
Further, in described step S3, before each transverse cuts, the cutting chain rope of chain saw is each passed through
The chain saw lacing hole at the corresponding transverse cut two ends of floor to be removed.
Further, in described step S4, the bearing capacity of support frame as described above is more than floor monolithic to be removed
Piecemeal weight.
Further, in described step S4, one end of described suspender is fixed on periphery fixed structure, institute
The other end stating suspender is fixed at the hole for hoist of piecemeal by lifting rope.
Further, in described step S4, described lifting rope is fixed on the lifting of piecemeal by a fixing device
At hole, described fixing device includes that one is arranged at the transverse baffle below hole for hoist, and described lifting rope is through lifting
Hole is fixing with described transverse baffle to be connected, and the size of described transverse baffle is more than the size of described hole for hoist.
Further, in described step S4, time longitudinally cutting, use two chain of stations saws to cut in groups simultaneously.
The chain saw that the present invention provides is inverse tears floor construction method open, is divided into by floor and can support the piecemeal hung
Carry out chain saw cut to hang, not only solve the limited problem that cannot construct of upper space, and reduce plate
Construction intensity that the end reversely cuts and security risk.
Accompanying drawing explanation
Fig. 1 is the inverse flow chart tearing floor construction method open of chain saw of the present invention;
Fig. 2 is the inverse transverse cuts floor map tearing floor construction method open of chain saw of the present invention;
Fig. 3 is the inverse transverse cuts generalized section tearing floor construction method open of chain saw of the present invention;
Fig. 4 is the inverse longitudinally cutting floor map tearing floor construction method open of chain saw of the present invention;
Fig. 5 is the inverse longitudinally cutting generalized section tearing floor construction method open of chain saw of the present invention;
Fig. 6 is the inverse lifting schematic diagram tearing floor construction method open of chain saw of the present invention.
Shown in Fig. 2-6: 1, floor to be removed;21, transverse cut;22, longitudinally cutting line;3、
Chain saw lacing hole;4, hole for hoist;5, chain saw;6, cutting chain rope;7, bracing frame;8, suspender;9、
Lifting rope;10, periphery fixed structure;11, fixing device.
Detailed description of the invention
The present invention is described in detail below in conjunction with the accompanying drawings:
As shown in figures 1 to 6, the present invention provides a kind of chain saw against tearing floor construction method open, comprises the following steps:
S1: line setting, is respectively provided with parallel longitudinal direction in the both sides of the length direction of floor 1 to be removed
Line of cut 22, between two longitudinally cutting lines 22, interval arranges the horizontal stroke that some and longitudinally cutting line 22 is perpendicular
To line of cut 21, floor 1 to be removed is divided into some piecemeals.The big rootlet of piecemeal of floor 1 to be removed
Jointly determine according to suspender 8, bracing frame 7 and periphery fixed structure 10 bearing capacity.In the present embodiment, wait to tear open
Except floor 1 is rectangular, the minor face of rectangle is with horizontally-parallel, and long limit is with parallel longitudinal.
S2: transverse cut 21 is offered chain saw with longitudinally cutting line 22 intersection and worn on floor 1 to be removed
Cord hole 3, every piece of piecemeal arranges hole for hoist 4.The aperture of chain saw lacing hole 3 is respectively greater than cutting chain rope 6
External diameter, hole for hoist 4 aperture is respectively greater than the external diameter of lifting rope 9.In order to more smoothly hang piecemeal, institute
Stating in step S2, described hole for hoist 4 is opened in each piecemeal of floor 1 to be removed central authorities.
S3: chain saw 5 is positioned over below floor to be removed, to be removed along each transverse cut 21 transverse cuts
Floor 1.In described step S3, before each transverse cuts, the cutting chain rope 6 of chain saw 5 is each passed through to be treated
Remove the chain saw lacing hole 3 at corresponding transverse cut 21 two ends of floor 1.Wherein, laterally cut along every
Secant 21 cuts once, need to repeat wire rope handling every time and can utilize building to be removed with cutting work, period
The transverse steel carrying of plate 1.
S4: being positioned over by chain saw 5 below floor 1 to be removed, floor 1 to be removed is along two longitudinally cutting lines
Transfer respectively after 22 ecto-entad block-by-blocks are by several times longitudinally cutting, the most longitudinally cutting before, to be transferred two
Block piecemeal supports the bracing frame 7 of described piecemeal when being respectively arranged below for cutting, the most longitudinally cutting after,
Remove support frame as described above 7, to transfer described piecemeal smoothly, until the cutting completing all piecemeals is transferred.Institute
State to transfer and refer to hang downwards, with suspender 8, the piecemeal cut down.After discharging two pieces of piecemeals under Mei Ci, then enter
Row cutting next time.Preferably, support frame as described above 7 uses packaged type support body, is conducive to improving construction
Efficiency, the bearing capacity of support frame as described above 7 should be greater than the weight of monolithic after floor 1 piecemeal to be removed.Longitudinally cut
When cutting, two chain of stations saws 5 can be used in groups to cut, it is possible to the most suitably increase chain saw 5 simultaneously,
Thus shorten the length of cutting chain rope 6.
Preferably, in described step S4, one end of described suspender 8 is fixed on periphery fixed structure 10,
The other end of described suspender 8 is fixed at the hole for hoist 4 of piecemeal by lifting rope 9.Described lifting rope is solid by one
Determining device 11 and be fixed at the hole for hoist 4 of piecemeal, described fixing device includes that one is arranged at below hole for hoist
Transverse baffle, described lifting rope 9 fixes with described transverse baffle through hole for hoist 4 and is connected, described transverse gear
The size of plate is more than the size of described hole for hoist 4.
In sum, using chain saw of the present invention against tearing floor construction method open, being divided into by floor 1 to be removed can
Use chain saw 5 cutting to hang supporting the piecemeal that hangs, not only solve that upper space is limited cannot construct
Problem, and reduce the construction intensity and security risk reversely cut at the bottom of plate.
Although in description being illustrated embodiments of the present invention, but these embodiments are intended only as
Prompting, should not limit protection scope of the present invention.Carry out various province without departing from the spirit and scope of the present invention
Slightly, replace and change should be included in protection scope of the present invention.
Claims (9)
1. a chain saw is against tearing floor construction method open, it is characterised in that comprise the following steps:
S1: line setting, is respectively provided with parallel in the both sides of the length direction of floor to be removed
Longitudinally cutting line, between two longitudinally cutting lines, interval arranges the horizontal stroke that some and longitudinally cutting line is perpendicular
To line of cut, floor to be removed is divided into some piecemeals;
S2: transverse cut and longitudinally cutting line intersection offer chain saw wire rope handling on floor to be removed
Hole, every piece of piecemeal arranges hole for hoist;
S3: be positioned over by chain saw below floor to be removed, waits to tear open along each transverse cut transverse cuts
Except floor;
S4: be positioned over by chain saw below floor to be removed, floor to be removed is along two longitudinally cutting lines
Transfer respectively after ecto-entad block-by-block is by several times longitudinally cutting, the most longitudinally cutting before, to be transferred
Two pieces of piecemeals are respectively arranged below bracing frame, the most longitudinally cutting after, remove support frame as described above, directly
Transfer to the cutting completing all piecemeals.
The most according to claim 1, chain saw is inverse tears floor construction method open, it is characterised in that described step
In S1, the piecemeal size of floor to be removed is common according to suspender, bracing frame and periphery fixed structure bearing capacity
Determine.
The most according to claim 1, chain saw is inverse tears floor construction method open, it is characterised in that described step
In S1, floor to be removed is rectangular, and the minor face of rectangle is with horizontally-parallel, and long limit is with parallel longitudinal.
The most according to claim 1, chain saw is inverse tears floor construction method open, it is characterised in that described step
In S2, described hole for hoist is opened in floor to be removed each piecemeal central authorities.
The most according to claim 1, chain saw is inverse tears floor construction method open, it is characterised in that described step
In S3, before each transverse cuts, the cutting chain rope of chain saw is each passed through the correspondence of floor to be removed and laterally cuts
The chain saw lacing hole at secant two ends.
The most according to claim 1, chain saw is inverse tears floor construction method open, it is characterised in that described step
In S4, the bearing capacity of support frame as described above is more than floor monolithic piecemeal weight to be removed.
The most according to claim 1, chain saw is inverse tears floor construction method open, it is characterised in that described step
In S4, one end of described suspender is fixed on periphery fixed structure, and the other end of described suspender passes through lifting rope
It is fixed at the hole for hoist of piecemeal.
The most according to claim 1, chain saw is inverse tears floor construction method open, it is characterised in that described step
In S4, described lifting rope is fixed at the hole for hoist of piecemeal by a fixing device, and described fixing device includes
One is arranged at the transverse baffle below hole for hoist, and described lifting rope is fixing even through hole for hoist and described transverse baffle
Connecing, the size of described transverse baffle is more than the size of described hole for hoist.
The most according to claim 1, chain saw is inverse tears floor construction method open, it is characterised in that described step
In S4, time longitudinally cutting, use two chain of stations saws to cut in groups simultaneously.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511030091 | 2015-12-31 | ||
CN2015110300914 | 2015-12-31 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105888294A true CN105888294A (en) | 2016-08-24 |
CN105888294B CN105888294B (en) | 2018-12-18 |
Family
ID=56704917
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610243655.0A Active CN105888294B (en) | 2015-12-31 | 2016-04-19 | A kind of chain saw is inverse to tear floor construction method open |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105888294B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108193894A (en) * | 2017-12-05 | 2018-06-22 | 深圳市工勘岩土集团有限公司 | The construction method of rope saw dismantling concrete wall |
CN108756295A (en) * | 2018-06-14 | 2018-11-06 | 上海二十冶建设有限公司 | The former pond platform removal method of newly-increased net circulation cooling tower |
CN109208938A (en) * | 2018-10-22 | 2019-01-15 | 深圳市工勘岩土集团有限公司 | Armoured concrete slab orients lossless static(al) and processing method is cut and disassembled |
CN109972858A (en) * | 2019-02-28 | 2019-07-05 | 广东天盛装饰消防工程有限公司 | Shockproof concrete building structures method for dismounting |
CN111997409A (en) * | 2020-08-28 | 2020-11-27 | 湖南城建职业技术学院 | Building is demolishd and is used laborsaving crushing apparatus of floor |
CN113718667A (en) * | 2021-09-02 | 2021-11-30 | 中铁二十局集团第三工程有限公司 | Existing pier breaking method and bridge support replacing construction process |
CN113843899A (en) * | 2021-10-20 | 2021-12-28 | 中南大学 | Method and system for separating abandoned buildings adjacent to existing underwater buildings |
CN114278114A (en) * | 2022-02-09 | 2022-04-05 | 中建八局深圳科创发展有限公司 | Method for dismantling multi-layer continuous cantilever plate outside high-rise building |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102650170A (en) * | 2012-05-03 | 2012-08-29 | 中国十七冶集团有限公司 | Vibration-free cutting method for equipment concrete foundation |
CN102808526A (en) * | 2011-06-01 | 2012-12-05 | 永升建设集团有限公司 | Nondestructive demolition construction method of reinforced concrete frame beam |
CN103291085A (en) * | 2013-06-07 | 2013-09-11 | 陈春来 | Concrete static force cutting dismantling construction method |
JP2014001561A (en) * | 2012-06-19 | 2014-01-09 | Kajima Corp | Demolition method and demolition auxiliary device |
-
2016
- 2016-04-19 CN CN201610243655.0A patent/CN105888294B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102808526A (en) * | 2011-06-01 | 2012-12-05 | 永升建设集团有限公司 | Nondestructive demolition construction method of reinforced concrete frame beam |
CN102650170A (en) * | 2012-05-03 | 2012-08-29 | 中国十七冶集团有限公司 | Vibration-free cutting method for equipment concrete foundation |
JP2014001561A (en) * | 2012-06-19 | 2014-01-09 | Kajima Corp | Demolition method and demolition auxiliary device |
CN103291085A (en) * | 2013-06-07 | 2013-09-11 | 陈春来 | Concrete static force cutting dismantling construction method |
Non-Patent Citations (1)
Title |
---|
夏晓兵: ""无损性切割技术在房屋整体改造中的应用"", 《无损性切割技术在房屋整体改造中的应用》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108193894A (en) * | 2017-12-05 | 2018-06-22 | 深圳市工勘岩土集团有限公司 | The construction method of rope saw dismantling concrete wall |
CN108756295A (en) * | 2018-06-14 | 2018-11-06 | 上海二十冶建设有限公司 | The former pond platform removal method of newly-increased net circulation cooling tower |
CN109208938A (en) * | 2018-10-22 | 2019-01-15 | 深圳市工勘岩土集团有限公司 | Armoured concrete slab orients lossless static(al) and processing method is cut and disassembled |
CN109972858A (en) * | 2019-02-28 | 2019-07-05 | 广东天盛装饰消防工程有限公司 | Shockproof concrete building structures method for dismounting |
CN111997409A (en) * | 2020-08-28 | 2020-11-27 | 湖南城建职业技术学院 | Building is demolishd and is used laborsaving crushing apparatus of floor |
CN113718667A (en) * | 2021-09-02 | 2021-11-30 | 中铁二十局集团第三工程有限公司 | Existing pier breaking method and bridge support replacing construction process |
CN113843899A (en) * | 2021-10-20 | 2021-12-28 | 中南大学 | Method and system for separating abandoned buildings adjacent to existing underwater buildings |
CN113843899B (en) * | 2021-10-20 | 2024-02-20 | 中南大学 | Separation method for abandoned buildings adjacent to existing buildings underwater |
CN114278114A (en) * | 2022-02-09 | 2022-04-05 | 中建八局深圳科创发展有限公司 | Method for dismantling multi-layer continuous cantilever plate outside high-rise building |
Also Published As
Publication number | Publication date |
---|---|
CN105888294B (en) | 2018-12-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888294A (en) | Construction method for reversely removing floor slab by using chain saw | |
CN204475841U (en) | Self lift type shaft template device | |
CN106276577A (en) | The suspension bracket of a kind of framework isolated footing and operational approach | |
CN108625884A (en) | Closed intermediate ventilating shaft bears the construction method that endless tube piece is removed | |
CN105781590A (en) | Technology for disassembling negative rings of TBM (tunnel boring machine) arrival hole | |
CN109252693A (en) | Concrete support system mechanical coupling segment cutting construction method without support collet | |
CN204689430U (en) | To Construction of Silo movable hoisting device | |
CN105908991A (en) | Floor suspension type reverse demolition construction method | |
CN103863937A (en) | Lifting appliance for large aluminum alloy round bars while leaving out of well | |
CN103061265A (en) | Construction method for lifting combined reinforcement cages | |
CN111691699A (en) | Construction method for replacing vestibule floor slab | |
CN109488345A (en) | A kind of construction method of tunnel arch Fast Installation | |
CN203394080U (en) | Loading cage special for building blocks | |
CN106121254B (en) | The construction method of heavy component transportation system after a kind of disassembly of contrary sequence method | |
CN205222427U (en) | A hang material device for tray dress building material | |
CN209299080U (en) | A kind of rotor magnetic pole coil detachment device | |
CN208056079U (en) | A kind of annular weir builds mechanism | |
CN105883580A (en) | Technology for hoisting web of girder by using rail-mounted gantry crane | |
CN220811582U (en) | Auxiliary hoisting device for tunnel steel arch | |
CN205132931U (en) | Tower crane balance arm direction is adhered to and is demolishd device | |
CN204548867U (en) | Glass lifting device | |
CN216445795U (en) | Bridge formwork support convenient to dismantle fast | |
CN103669219A (en) | Simultaneous slip-form construction device of multi-limb high pier | |
CN103712786A (en) | Rope threading method of test platform of winch mechanism and corresponding test platform | |
CN206156589U (en) | Transport lifting hook that electric power pole was used |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20160824 Assignee: Shanghai Yuxia Construction Engineering Co.,Ltd. Assignor: SHANGHAI NO.7 CONSTRUCTION Co.,Ltd. Contract record no.: X2021310000010 Denomination of invention: A construction method of reverse demolition of floor by chain saw Granted publication date: 20181218 License type: Common License Record date: 20210402 |
|
EE01 | Entry into force of recordation of patent licensing contract |