CN103669219A - Simultaneous slip-form construction device of multi-limb high pier - Google Patents
Simultaneous slip-form construction device of multi-limb high pier Download PDFInfo
- Publication number
- CN103669219A CN103669219A CN201310592923.6A CN201310592923A CN103669219A CN 103669219 A CN103669219 A CN 103669219A CN 201310592923 A CN201310592923 A CN 201310592923A CN 103669219 A CN103669219 A CN 103669219A
- Authority
- CN
- China
- Prior art keywords
- construction
- wire rope
- hopper
- gantry
- truss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明属于高墩滑模施工的技术领域,具体涉及一种多肢薄壁空心高墩同时滑模施工装置,解决了传统滑模施工工艺用于多肢高墩的施工,存在施工周期长、成本高,施工质量、安全控制难度大的问题。其包括滑模部分、提升部分以及物资运输部分,滑模部分包括多肢高墩的面板以及将这些面板连接为一体的对称结构的桁架。本发明的有益效果:避免滑模施工过程中荷载不匀的弊端;形成多个施工工作面,可以交替进行作业,减少了砼浇筑的等待时间;加快了施工进度,同时减少了吊车或砼泵的投入,节约了施工成本;降低了不利天气对施工的影响,保证施工质量及滑模施工的连续性;提高了施工工效,缩短总体施工工期的1/2甚至更多。
The invention belongs to the technical field of sliding form construction of high piers, and in particular relates to a simultaneous sliding form construction device for multi-leg thin-walled hollow high piers, which solves the problem of long construction period and long construction period when the traditional sliding form construction technology is used in the construction of multi-leg high piers. High cost, difficult construction quality and safety control. It includes a sliding form part, a lifting part and a material transportation part, and the sliding form part includes panels of multi-leg high piers and trusses of a symmetrical structure connecting these panels as a whole. Beneficial effects of the present invention: avoid the disadvantages of uneven load in the slipform construction process; form multiple construction working faces, which can be alternately carried out, reducing the waiting time for concrete pouring; speeding up the construction progress and reducing the number of cranes or concrete pumps The investment saves construction costs; reduces the impact of adverse weather on construction, ensures construction quality and continuity of slipform construction; improves construction efficiency and shortens 1/2 or more of the overall construction period.
Description
技术领域 technical field
本发明属于高墩滑模施工的技术领域,具体涉及一种多肢薄壁空心高墩同时滑模施工装置。 The invention belongs to the technical field of sliding form construction of high piers, and in particular relates to a simultaneous sliding form construction device for multi-leg thin-walled hollow high piers.
背景技术 Background technique
滑模是一种施工高耸混凝土建筑的方法,公知的滑模装置是由若干模板、支撑架和顶升或提升系统组成的,其工作原理是提升系统提升模板,是模板与模板内混凝土之间产生滑动,并随模板的提升不断地建筑混凝土,实现混凝土结构的高度增加。 Slip form is a method of constructing high-rise concrete buildings. The known slip form device is composed of several formwork, support frame and jacking or lifting system. Sliding is generated and the concrete is continuously built as the formwork is lifted to achieve an increase in the height of the concrete structure.
随着高速公路施工越来越多地进入山区,许多新型更加简易的桥墩结构型式运用于施工领域,频频出现更高的桥墩高度。高墩施工过程中前期施工场地布置,施工技术、成本控制以及工期履约的难度越来越大。原有的高墩施工方法采用翻模、液压爬模施工较多,针对单根墩柱进行施工作业,施工施工工期较长、施工成本相对较高,且对于高墩的施工质量、安全控制难度大。 As expressway construction increasingly enters mountainous areas, many new and simpler pier structures are used in the construction field, and higher pier heights frequently appear. In the process of high pier construction, it is more and more difficult to arrange the construction site in the early stage, construction technology, cost control and performance of the construction period. The original high pier construction method uses more turning formwork and hydraulic climbing formwork construction, and the construction work is carried out for a single pier column. The construction period is long, the construction cost is relatively high, and it is difficult to control the construction quality and safety of the high pier. big.
发明内容 Contents of the invention
本发明为了解决传统滑模施工工艺用于多肢高墩的施工,存在施工周期长、成本高,施工质量、安全控制难度大的问题,提供了一种多肢薄壁空心高墩同时滑模施工装置及其施工方法。 In order to solve the problems that the traditional sliding form construction technology is used in the construction of multi-leg high piers, there are problems such as long construction period, high cost, difficult construction quality and safety control, and provides a multi-leg thin-walled hollow high pier sliding form at the same time Construction device and its construction method.
本发明采用如下的技术方案实现: The present invention adopts following technical scheme to realize:
一种多肢空心高墩同滑施工装置,包括滑模部分、提升部分以及物资运输部分,所述的滑模部分包括多肢高墩的面板以及将这些面板连接为一体的对称结构的桁架。 A co-sliding construction device for a multi-leg hollow high pier includes a sliding form part, a lifting part and a material transportation part. The sliding form part includes a panel of a multi-leg high pier and a symmetrically structured truss connecting these panels into one.
所述的物资运输部分包括对应每肢高墩中心设置的龙门架,龙门架两立柱底部安装于桁架顶部,龙门架的横梁两端分别设有滑轮I,两个滑轮I上穿设有钢丝绳I,钢丝绳I一端连接有料斗,钢丝绳I另一端连接有卷扬机。 The material transportation part includes a gantry frame corresponding to the center of the high pier of each limb, the bottom of the two columns of the gantry frame is installed on the top of the truss, pulleys I are respectively provided at both ends of the beam of the gantry frame, and steel wire ropes I are threaded on the two pulleys I. , one end of the wire rope I is connected with a hopper, and the other end of the wire rope I is connected with a winch.
龙门架悬挂有料斗的一端设置有水平横梁滑轮组,水平横梁滑轮组包括扁担梁,扁担梁与龙门架横梁垂直,扁担梁两端分别设有滑轮II,两滑轮II上穿设有钢丝绳II,钢丝绳II一端与地面固定连接,钢丝绳II另一端通过两级定滑轮与配重端连接,料斗两侧设有引导环,钢丝绳II穿设于料斗两侧的引导环内,料斗的运行轨迹经过的桁架部位设置料斗过孔。 The end of the gantry suspension with the hopper is provided with a horizontal beam pulley block, which includes a pole beam, which is perpendicular to the beam of the gantry frame, and pulleys II are respectively installed at both ends of the pole beam. One end is fixedly connected to the ground, and the other end of the steel wire rope II is connected to the counterweight end through two-stage fixed pulleys. There are guide rings on both sides of the hopper, and the steel wire rope II is passed through the guide rings on both sides of the hopper. The truss part where the running track of the hopper passes Set the hopper via.
所述提升部分包括高墩墩柱结构范围相对于墩柱中心对称设置的若干爬杆,桁架顶部对应爬杆设置有提升架,提升架上安装有可套于爬杆上的穿心式千斤顶,爬杆上还设置有位于千斤顶之上、可移动也可固定的限位环。 The lifting part includes several climbing poles arranged symmetrically with respect to the center of the pier column in the structure range of the high pier pier. The top of the truss is provided with a lifting frame corresponding to the climbing pole. The climbing rod is also provided with a movable and fixed limit ring located on the jack.
桁架顶部为上操作平台,桁架底部连接有吊架,吊架上设有下操作平台,上操作平台和下操作平台周侧分别设有防护栏。 The top of the truss is an upper operating platform, the bottom of the truss is connected with a hanger, the hanger is provided with a lower operating platform, and the surrounding sides of the upper operating platform and the lower operating platform are respectively provided with guardrails.
所述的龙门架顶部还设有三角架,三角架上设有遮雨棚。 The top of the gantry frame is also provided with a tripod, and the tripod is provided with a rain shelter.
本发明具有如下有益效果:多肢同滑工作平台,便于材料临时堆放及顶部荷载的均匀分布,避免滑模施工过程中荷载不匀的弊端;形成多个施工工作面,可以交替进行作业,减少了砼浇筑的等待时间;利用龙门架、通过快速卷扬机提升砼及其他材料,塔吊只吊装钢筋,对施工机械进行分工,加快了施工进度,同时减少了吊车或砼泵的投入,节约了施工成本;在龙门架顶部设置有遮雨、遮阳棚,降低了不利天气对施工的影响,保证施工质量及滑模施工的连续性;多肢高墩同时施工,提高了施工工效,缩短总体施工工期的1/2甚至更多。 The invention has the following beneficial effects: the multi-leg co-sliding working platform facilitates the temporary stacking of materials and the uniform distribution of the top load, and avoids the disadvantages of uneven load during the sliding formwork construction process; multiple construction working surfaces can be formed, and operations can be carried out alternately, reducing The waiting time for concrete pouring is shortened; the gantry is used to lift concrete and other materials through the fast winch, and the tower crane only lifts the steel bars, and the construction machinery is divided into labor, which speeds up the construction progress, reduces the investment of cranes or concrete pumps, and saves construction costs. ;The top of the gantry frame is equipped with a rain shelter and sunshade, which reduces the impact of adverse weather on the construction, ensures the construction quality and the continuity of the slipform construction; multi-leg high piers are constructed at the same time, which improves the construction efficiency and shortens the overall construction period. 1/2 or even more.
附图说明 Description of drawings
图1为本发明一种实施方式:双肢高墩滑模体平面示意图; Fig. 1 is an embodiment of the present invention: a schematic plan view of a sliding formwork body with high pier with both limbs;
图2为本发明另一种实施方式:四肢高墩滑模体平面示意图; Fig. 2 is another embodiment of the present invention: a schematic plan view of the sliding formwork with high pier for limbs;
图3为本发明的结构示意图; Fig. 3 is a structural representation of the present invention;
图4为本发明物资运输部分结构示意图; Fig. 4 is a structural schematic diagram of the material transportation part of the present invention;
图5为提升装置遮雨、遮阳棚结构示意图; Fig. 5 is a structural schematic diagram of the lifting device for sheltering from the rain and the awning;
图中:1-桁架,2-面板,3-提升架,4-千斤顶,5-防护栏,6-龙门架,7-吊架,8-上操作平台,9-下操作平台,10-墩柱,11-卷扬机,12-滑轮I,13-钢丝绳I,14-料斗,15-滑轮II,16-扁担梁,17-钢丝绳II,18-引导环,19-支撑架I,20-配重端,21-三角架,22-龙门架横梁,23-爬杆。 In the figure: 1-truss, 2-panel, 3-lifting frame, 4-jack, 5-guard rail, 6-gantry, 7-hanger, 8-upper operation platform, 9-lower operation platform, 10-pier Column, 11-hoist, 12-pulley I, 13-wire rope I, 14-hopper, 15-pulley II, 16-shoulder beam, 17-wire rope II, 18-guide ring, 19-support frame I, 20-counterweight End, 21-tripod, 22-gantry beam, 23-climbing pole.
具体实施方式 Detailed ways
结合附图对本发明的具体实施方式作进一步说明。 The specific embodiments of the present invention will be further described in conjunction with the accompanying drawings.
一、多肢空心高墩同滑施工装置,包括滑模部分以及操作平台、提升部分以及物资运输部分,滑模部分包括多肢高墩的面板2以及将这些面板2连接为一体的对称结构的桁架。提升部分包括提升架;物资运输部分包括龙门架。通过提升部分向上提升,提升部分带动桁架,桁架带动各个面板整体向上移动,整个操作平台一同向上滑升,形成多肢空心高墩同滑。 1. The multi-leg hollow high pier co-sliding construction device includes the sliding form part, the operating platform, the lifting part and the material transportation part. The sliding form part includes the panel 2 of the multi-leg high pier and the symmetrical structure connecting these panels 2 into one truss. The lifting part includes a lifting frame; the material transportation part includes a gantry. The lifting part is lifted upwards, the lifting part drives the truss, and the truss drives each panel to move upwards as a whole, and the entire operation platform slides upwards together, forming a multi-legged hollow high pier that slides together.
二、本发明滑模体的施工结构如下: Two, the construction structure of the sliding form body of the present invention is as follows:
1、桁架 1. Truss
桁架用来支撑、加固模板,形成整体平作平台的支撑体系,其为对称结构。将多肢高墩的各个面板连接为一体。进行详细的受力检算,选用L100×10mm角钢作为桁架梁主筋,主肋采用L63×6mm角钢,斜肋采用L50×5mm角钢,形成结构牢固、自重轻便的桁架系统。桁架梁间的连接以焊接为主,部分采用栓接,便于滑升过程中有系梁结构物时进行拆除。 The truss is used to support and strengthen the formwork to form a support system for the overall flat work platform, which is a symmetrical structure. Connect the various panels of the multi-legged pier as a whole. For detailed force checking and calculation, L100×10mm angle steel is selected as the main reinforcement of the truss beam, L63×6mm angle steel is used for the main rib, and L50×5mm angle steel is used for the diagonal rib, forming a truss system with firm structure and light weight. The connection between the truss girders is mainly welded, and some are bolted, which is convenient for removal when there is a tie beam structure during the sliding process.
2、面板 2. Panel
面板为成型模具,其自身刚度、表面平整度直接影响着脱模混凝土的成型及表观质量。面板采用厚度为δ6mm钢板制作;根据气候特点,为防止滑模施工中,因大风荷载对模板的影响,面板高度取1.26m;为了便于脱模及模体自身的安全,面板安装时按形成一定的锥度,上下口相差2mm。 The panel is a forming mold, and its own rigidity and surface smoothness directly affect the forming and appearance quality of the demoulding concrete. The panel is made of steel plate with a thickness of δ6mm; according to the climate characteristics, in order to prevent the impact of strong wind load on the formwork during the sliding formwork construction, the height of the panel is 1.26m; The taper, the difference between the upper and lower mouth is 2mm.
3、提升部分 3. Lifting part
提升部分包括高墩墩柱10结构范围相对于墩柱10中心对称设置的若干爬杆23,桁架1顶部对应爬杆23设置有提升架3,提升架3上安装有可套于爬杆上的穿心式千斤顶4,爬杆23上还设置有位于千斤顶4之上、可移动也可固定的限位环。
The lifting part includes a number of climbing
提升架为滑模体与混凝土之间的联系构件,用于支撑模板体、桁架、工作平台,避免变形,并通过安装在其横梁上的千斤顶支撑在爬杆上,整个滑升荷载将通过提升架传递给爬杆,根据施工经验采用“F”型提升架,其主梁,及纵向的梁采用[18a槽钢,千斤顶底座(及提升架横向梁)为12mm厚钢板,筋板为8mm钢板;爬杆由φ48*3.5mm的钢管制成,爬杆连接采用焊接连接,钢管在连接处焊接后,采用磨光机进行打磨,使钢管表面光滑,让千斤顶能顺利通过,焊接处要饱满, 爬杆表面不得有油漆和铁锈。提升架的布置要均匀、对称,保证荷载能均匀传递到每个千斤顶及整体桁架,形成整体受力结构体系。爬杆上设置有限位环,限位环位于千斤顶上方,限位环通过定位件固定于爬杆上,千斤顶到位后,拆除限位环,向上移动,重新固定,以此重复。 The lifting frame is the connecting member between the sliding formwork body and the concrete. It is used to support the formwork body, truss, and working platform to avoid deformation. It is supported on the climbing pole by the jack installed on its beam. The entire sliding load will be lifted The frame is passed to the climbing pole, and the "F" type lifting frame is adopted according to the construction experience. The main beam and the longitudinal beam are made of [18a channel steel, the jack base (and the horizontal beam of the lifting frame) are 12mm thick steel plates, and the reinforcement plates are 8mm steel plates The climbing rod is made of φ48*3.5mm steel pipe, and the connection of the climbing rod is welded. After the steel pipe is welded at the joint, it is polished with a grinder to make the surface of the steel pipe smooth, so that the jack can pass through smoothly, and the welding place should be full. There must be no paint and rust on the surface of the climbing pole. The layout of the lifting frame should be uniform and symmetrical to ensure that the load can be evenly transmitted to each jack and the overall truss to form an overall force-bearing structural system. A limit ring is arranged on the climbing pole, and the limit ring is located above the jack. The limit ring is fixed on the climbing pole through a positioning piece. After the jack is in place, the limit ring is removed, moved upward, fixed again, and repeated.
4、物资运输部分 4. Material transportation part
物资运输部分包括对应每肢高墩中心设置的龙门架6,龙门架通常设置于墩柱中心(受力平衡),其尺寸大小与墩柱的几何尺寸相对应。龙门架6两立柱底部安装于桁架1顶部,龙门架的横梁两端分别设有滑轮I12,两个滑轮I上穿设有钢丝绳I13,钢丝绳I13一端连接有料斗14,钢丝绳I13另一端连接有卷扬机11,料斗14的运行轨迹经过的桁架1部位设置料斗过孔。龙门架6悬挂有料斗14的一端设置有水平横梁滑轮组,水平横梁滑轮组包括扁担梁16,扁担梁16与龙门架横梁22垂直,扁担梁16两端分别设有滑轮II15,两滑轮II上穿分别设有钢丝绳II17,钢丝绳II17一端与地面固定连接,钢丝绳II17另一端通过两级定滑轮与配重端20连接,料斗14两侧设有引导环18,钢丝绳II17穿设于料斗两侧的引导环18内。
The material transportation part includes a
用于施工过程中的砼及其他小型材料的运输,提供垂直的运输通道。通过卷扬机及滑轮组进行料斗的上下提升,砼通过简易流槽进入料斗及进入滑模体,为减少料斗快速提升过程中出现的晃动等不安全因素,在龙门架一端设置水平横梁滑轮组,下方钢丝绳II一端固定于地面,一端设置为滑轮,通过配重端形成料斗上下滑槽,料斗两侧设置引导环,确保料斗提升时不大幅摇摆。钢丝绳II在配重端设置有多余钢丝绳,通过配重端处固定的绳卡进行钢丝绳的收放(主要是放),根据配重端随滑模体向上移动所提升的高度,由下方的操作人员松开绳卡,可将配重端放至地面,完成一次钢丝绳的延长。使用完成后,松开固定端后,一头进行卷收,一头用细绳吊下,防止钢丝绳因重力突然掉下发生危险,钢丝绳子收完后,松开细绳端,再收至墩顶后,完成钢丝绳的收放。 It is used for the transportation of concrete and other small materials during the construction process, and provides vertical transportation channels. The hoist and pulley block are used to lift the hopper up and down, and the concrete enters the hopper and the sliding form body through a simple flow trough. In order to reduce unsafe factors such as shaking during the rapid lifting of the hopper, a horizontal beam pulley block is set at one end of the gantry, and the steel wire rope II below One end is fixed on the ground, and the other end is set as a pulley. The upper and lower troughs of the hopper are formed through the counterweight end. Guide rings are set on both sides of the hopper to ensure that the hopper does not swing greatly when it is lifted. The steel wire rope II is provided with redundant steel wire ropes at the counterweight end, and the steel wire rope is retracted (mainly released) through the fixed rope clamp at the counterweight end. When the personnel release the rope clamp, the counterweight end can be placed on the ground to complete the extension of the wire rope once. After use, after loosening the fixed end, one end is rolled up, and the other end is hung down with a thin rope to prevent the steel wire rope from falling suddenly due to gravity. , to complete the retraction of the wire rope.
滑模体向上滑升时,整个龙门架向上滑升,配重端一同向上提高,当提高至离地面1m左右时,进行配重端的下放,实现重复提升并保证引导环内的竖向钢丝顺直; When the sliding form body slides upwards, the entire gantry slides upwards, and the counterweight end rises upward together. When it is raised to about 1m above the ground, the counterweight end is lowered to realize repeated lifting and ensure the vertical steel wire in the guide ring is smooth. straight;
在龙门架两端设置三角架,上面设置棚布,起到遮雨、遮阳棚效果,在棚布两端用线绳捆绑,人工拉动固定既可实现棚布的收放效果,操作简便。 A tripod is set at both ends of the gantry frame, and a shed cloth is set on it to play the effect of sheltering from the rain and the sun. The two ends of the shed cloth are tied with strings, and manual pulling and fixing can realize the retractable effect of the shed cloth, and the operation is simple.
5、操作平台 5. Operating platform
桁架1顶部为上操作平台8,桁架1底部连接有吊架7,吊架7上设有下操作平台9,上操作平台8和下操作平台9周侧分别设有防护栏5。操作平台上下两部分,进行施工材料的堆放、提供作业人员作业平台,同时保证滑模体装置荷载的均匀分布,防止模板偏位。材料堆放于结构物中间,人员数量在周边基本固定,同时,多肢结构较单肢结构自身能够形成一个稳定的支撑体系。
The top of the truss 1 is an upper operating platform 8, the bottom of the truss 1 is connected with a
6、液压系统 6. Hydraulic system
液压系统由液压千斤顶、液压控制台、油路和支承杆等部分组成。液压千斤顶型号为:100型楔块式千斤顶,每个千斤顶上安装针型阀,以控制进油;液压控制台采用自动控制YYKZT36型号,液压系统安装完毕,要进行试运转,先进行充油排气,加压至12Mpa,每次持压5分钟,重复3次,各密封处无渗漏,进行全面检查,待各部分工作正常后,再插入支承杆;油管采用高压无缝钢管组成,为了保持各台千斤顶的供油均匀,便于调整千斤顶的升差,采用三级并联方式。即:从液压控制台通过主油管至分油器为一级,从分油器经分油管至支分油器为二级,从支分油器经支油管(胶管)至千斤顶为三级。由液压控制台到各分油器及由分、支分油管到各千斤顶的管线长度,设计时应尽量相同。 The hydraulic system consists of hydraulic jacks, hydraulic consoles, oil circuits and support rods. The model of the hydraulic jack is: 100-type wedge-type jack, and a needle valve is installed on each jack to control the oil inlet; the hydraulic console adopts the automatic control YYKZT36 model. Air, pressurize to 12Mpa, hold the pressure for 5 minutes each time, repeat 3 times, there is no leakage at each seal, conduct a comprehensive inspection, and insert the support rod after all parts work normally; the oil pipe is composed of high-pressure seamless steel pipe, in order To keep the oil supply of each jack uniform, it is convenient to adjust the lift difference of the jack, and adopt the three-stage parallel connection method. That is: from the hydraulic console through the main oil pipe to the oil distributor is the first level, from the oil distributor through the oil distributor to the branch oil distributor is the second level, and from the branch oil distributor through the branch oil pipe (hose) to the jack is the third level. The length of the pipelines from the hydraulic control console to each oil distributor and from the branch and branch oil pipes to each jack should be designed to be the same as possible.
三、多肢高墩的施工方法,其步骤如下: 3. The construction method of multi-leg high pier, the steps are as follows:
1)、滑模体的设计与制作; 1) Design and manufacture of sliding formwork;
1.1)滑模装置的设计,通过对滑模荷载的分析计算,特别是滑模装置过程中的荷载不均匀、防倾斜、抗风等方面,考虑施工期间各种不利天气及周边环境的影响,选择合理的液压系统及支承杆承载能力,经过认真分析、检算,形成多肢同滑的模板结构体系。 1.1) The design of the sliding form device, through the analysis and calculation of the sliding form load, especially the uneven load, anti-tilt, wind resistance and other aspects in the process of the sliding form device, taking into account the influence of various adverse weather and surrounding environment during the construction period, A reasonable hydraulic system and bearing capacity of support rods are selected, and after careful analysis and calculation, a formwork structure system with multiple limbs sliding together is formed.
1.2)整个装置使用的材料均为建筑市场常见材料,费用成本低,易于购置及现场加工。采用角钢焊接成桁架型式,砼面板采用厚度为6mm的钢板,钢板与桁架焊接成整体。桁架安装完成的同时,面板安装完成,安装液压装置、脚手板及防护栏杆。 1.2) The materials used in the whole device are common materials in the construction market, with low cost and easy purchase and on-site processing. The angle steel is welded into a truss type, the concrete panel is made of a steel plate with a thickness of 6mm, and the steel plate and the truss are welded into a whole. At the same time as the truss installation is completed, the panel installation is completed, and the hydraulic device, scaffolding board and protective railing are installed.
2)、龙门架的安装; 2), the installation of the gantry;
高墩施工中,砼的有效输送成为加快施工工序的一项重要指标。采用简易龙龙门架配合快卷扬机形成安全、高效的砼输送装置,同时可以运输一些其它简易材料。同时设置有遮雨、遮阳棚,降低了不利天气对施工的影响,保证施工质量及滑模施工的连续性。 In the construction of high piers, the effective transportation of concrete has become an important index to speed up the construction process. The simple gantry frame and the fast winch are used to form a safe and efficient concrete conveying device, and some other simple materials can be transported at the same time. At the same time, there are rain shelters and sunshades, which reduce the impact of adverse weather on the construction, and ensure the construction quality and the continuity of the sliding form construction.
3)、模体向上滑升; 3) The phantom slides upward;
在滑模体检校合格后,进行砼浇筑施工,当底层30cm混凝土强度达到0.2Mpa-0.4Mpa,且能保证其表面及棱角不至因模板滑升受损时,模体开始滑升,模体向上滑升30-50cm后,进行整个滑模装置的测量及校正,保证模体的平面位置及高程精度;进行钢筋、劲性骨架的接长及砼的连续浇筑,直至墩顶。如遇有横系梁,可将系梁端的面板带桁架整体拆除,其余模板继续向上滑升至面板下边与系梁顶端平行即可,系梁施工完成后,安装系梁端模板及桁架,继续向上滑升,直至另一条系梁或墩顶。 After passing the sliding form physical inspection, the concrete pouring construction will be carried out. When the concrete strength of the bottom 30cm reaches 0.2Mpa-0.4Mpa, and the surface and corners of the formwork can not be damaged due to the sliding of the formwork, the formwork will start to slide up. After sliding up 30-50cm, measure and correct the entire sliding form device to ensure the plane position and elevation accuracy of the formwork; carry out the extension of steel bars and stiff skeletons and continuous pouring of concrete until the top of the pier. If there is a horizontal tie beam, the panel and truss at the end of the tie beam can be removed as a whole, and the rest of the formwork can be slid up until the bottom of the panel is parallel to the top of the tie beam. Slide up to the top of another tie beam or pier.
4)、模体的拆除; 4), the removal of the phantom;
模体滑升达到空仓位置时,利用塔吊进行分块拆除,拆除过程中,未拆除部分采用钢筋绳在墩顶利用预埋钢筋临时固定。拆除顺序:⑴拆除液压油路系统;⑵拆除内模板及其支撑系统;⑶拆除操作平台外栏杆外钢圈;⑷拆除提升架,割断支撑杆。 When the formwork slides up to the position of the empty warehouse, the tower crane is used to dismantle it block by block. During the dismantling process, the unremoved part is temporarily fixed on the pier top with pre-embedded steel bars by steel ropes. Removal sequence: ⑴Remove the hydraulic oil circuit system; ⑵Remove the inner formwork and its support system; ⑶Remove the outer steel ring of the outer railing of the operation platform; ⑷Remove the lifting frame and cut off the support rod.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310592923.6A CN103669219B (en) | 2013-11-22 | 2013-11-22 | Many limbs height pier is with sliding construction equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310592923.6A CN103669219B (en) | 2013-11-22 | 2013-11-22 | Many limbs height pier is with sliding construction equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103669219A true CN103669219A (en) | 2014-03-26 |
| CN103669219B CN103669219B (en) | 2016-04-20 |
Family
ID=50307934
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310592923.6A Expired - Fee Related CN103669219B (en) | 2013-11-22 | 2013-11-22 | Many limbs height pier is with sliding construction equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103669219B (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110080118A (en) * | 2019-06-04 | 2019-08-02 | 中交一公局第一工程有限公司 | Vertical transport for slding form operation rises system and its construction method certainly |
| CN112726424A (en) * | 2021-02-01 | 2021-04-30 | 广西路建工程集团有限公司 | Method for disassembling concrete top plate bottom die after support |
| CN115522473A (en) * | 2022-11-07 | 2022-12-27 | 中国建筑第八工程局有限公司 | A bridge pier making machine and its construction method |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH062429A (en) * | 1992-06-19 | 1994-01-11 | Tobishima Corp | Slip form device |
| CN202064281U (en) * | 2011-04-19 | 2011-12-07 | 中铁二十三局集团第三工程有限公司 | Slip form frame |
| CN203201139U (en) * | 2012-08-21 | 2013-09-18 | 郑州煤炭工业(集团)工程有限公司 | Multi-chamber vertical-shaft overhead truss integrated slipform device |
| CN203795311U (en) * | 2013-11-22 | 2014-08-27 | 中铁三局集团有限公司 | Multi-leg high pier and slip form construction device |
-
2013
- 2013-11-22 CN CN201310592923.6A patent/CN103669219B/en not_active Expired - Fee Related
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH062429A (en) * | 1992-06-19 | 1994-01-11 | Tobishima Corp | Slip form device |
| CN202064281U (en) * | 2011-04-19 | 2011-12-07 | 中铁二十三局集团第三工程有限公司 | Slip form frame |
| CN203201139U (en) * | 2012-08-21 | 2013-09-18 | 郑州煤炭工业(集团)工程有限公司 | Multi-chamber vertical-shaft overhead truss integrated slipform device |
| CN203795311U (en) * | 2013-11-22 | 2014-08-27 | 中铁三局集团有限公司 | Multi-leg high pier and slip form construction device |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110080118A (en) * | 2019-06-04 | 2019-08-02 | 中交一公局第一工程有限公司 | Vertical transport for slding form operation rises system and its construction method certainly |
| CN112726424A (en) * | 2021-02-01 | 2021-04-30 | 广西路建工程集团有限公司 | Method for disassembling concrete top plate bottom die after support |
| CN115522473A (en) * | 2022-11-07 | 2022-12-27 | 中国建筑第八工程局有限公司 | A bridge pier making machine and its construction method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103669219B (en) | 2016-04-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106702910B (en) | A kind of main girder construction technique of the double rope face low-pylon cable-stayed bridges of double tower | |
| CN113235472B (en) | Concrete placement platform truck is contained to apron | |
| CN104631333B (en) | Arch bridge needle beam, stringer and floorings cast-in-place construction travelling bridge and method | |
| CN206796168U (en) | The complete erecting device of prefabricated case beam reinforcing bar is used in construction | |
| CN110453613B (en) | Full-section one-step suspension casting construction method for large-span beam bridge box girder | |
| CN204151823U (en) | Along building the one-sided cantilever hydraulic template trolley of side wall under covered back-digging structural slab | |
| CN111287095A (en) | Special construction method for main beam of lower-towing super-large bridge | |
| CN201411665Y (en) | Pier hydraulic leveling inner climbing sliding formwork | |
| CN104695337A (en) | Self-lifting sliding and turnover construction system and construction method | |
| CN209873572U (en) | A temporary navigable lifting station with adjustable vertical lifting height | |
| CN108118620B (en) | Integral self-climbing integrated platform for bridge tower construction and construction method thereof | |
| CN110792265A (en) | Large-span combined overweight eccentric slope angle steel structure overall synchronous jacking equipment | |
| CN103669219B (en) | Many limbs height pier is with sliding construction equipment | |
| CN102225580B (en) | Method for longitudinally moving box girder internal mold | |
| CN214993219U (en) | Concrete placement platform truck is contained to apron | |
| CN206986743U (en) | A kind of fixed trestle navigable vertical lift device | |
| CN202064281U (en) | Slip form frame | |
| CN202401753U (en) | Sliding die device | |
| CN203795311U (en) | Multi-leg high pier and slip form construction device | |
| CN203613464U (en) | Slip form construction cargo transportation device | |
| CN207512610U (en) | A kind of assembled bridge pier construction operation platform | |
| CN205224045U (en) | Examine and repair gate slot second phase concrete construction device | |
| CN205152807U (en) | Downgoing movable formwork bridge construction machine is demolishd and is hoisted construction structures with girder | |
| CN107881926A (en) | A kind of combined cradle and its construction method with full circle swinging loop wheel machine | |
| CN116122579B (en) | Hoisting method for bidirectional bending dome bracket |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160420 |