CN109488345A CN201811398170.4A CN201811398170A CN109488345A CN 109488345 A CN109488345 A CN 109488345A CN 201811398170 A CN201811398170 A CN 201811398170A CN 109488345 A CN109488345 A CN 109488345A
Authority
CN
China
Prior art keywords
arch
tunnel
sections
section
pin main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811398170.4A
Other languages
Chinese (zh)
Inventor
邵凡
谭伟成
郎媛
丁毅群
范志远
张惠斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Keda Intelligent Equipments Inc Co
Original Assignee
Changsha Keda Intelligent Equipments Inc Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Keda Intelligent Equipments Inc Co filed Critical Changsha Keda Intelligent Equipments Inc Co
Priority to CN201811398170.4A priority Critical patent/CN109488345A/en
Publication of CN109488345A publication Critical patent/CN109488345A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches

Abstract

The invention discloses a kind of construction methods of tunnel arch Fast Installation, comprising: which arch is divided at least two sections according to the arch span that tunnel needs, wherein one section is main arch section, and arch section supplemented by remaining section, wherein main arch section is that more piece arch section is spliced outside tunnel;It is outside tunnel that more Pin main arch sections are assembled good on rack, while transverse bar and mesh sheet being welded in more Pin main arch sections, so that more Pin main arch sections is formed integral structure;More Pin main arch sections are hung on the multiple arch clamping pallet of principal arm using hoisting mechanism;Arch machine drives tunnel into more Pin main arch sections, and reaches tunnel tunnel face;More Pin main arch sections are once lifted and reach installation site by arch owner cantilever crane, and manipulator station is on the ground or assembled integral by remaining arch section and more Pin main arch sections with left and right secondary arm frame.Construction technology provided by the invention can significantly improve construction efficiency, and save artificial.

Description

A kind of construction method of tunnel arch Fast Installation
Technical field
The present invention relates to a kind of tunnel arch installation method, especially a kind of construction method of tunnel arch Fast Installation.
Background technique
In constructing tunnel, when country rock grade is poor, generally require to carry out arch supporting, to improve the stabilization of country rock Property.
Existing arch machine all can only once stand a Pin arch, and arch be substantially all be divided into segment by loading machine or other Transport vehicle transports tunnel, and short arch is then combined into long arch, and arch is taken machine by the manipulator or hanging apparatus of arch machine On hand, then manipulator clamping arch docks tool in the sky.After the completion of arch splicing, manipulator will also hang on arch machine hanging basket Steel mesh and weldering transverse bar.Generally speaking, the vertical arch of the existing arch machine only artificial vertical simple copy encircleed, complicated construction technique, Efficiency is lower than artificial.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of applying for tunnel arch Fast Installation that efficiency can be made to improve Work method.
To solve the above-mentioned problems, the technical scheme adopted by the invention is that: a kind of construction of tunnel arch Fast Installation Method comprising following steps:
1) arch is divided at least two sections according to the arch span that tunnel needs, wherein one section is main arch section, supplemented by remaining section Arch section, wherein main arch section is that more piece arch section is spliced outside tunnel;
2) outside tunnel that more Pin main arch sections are assembled good on rack, while transverse bar and mesh sheet are welded in more Pin main arch sections On, so that more Pin main arch sections is formed integral structure;
3) more Pin main arch sections are hung on the multiple arch clamping pallet of main boom using hoisting mechanism;
4) arch machine drives tunnel into more Pin main arch sections, and reaches tunnel tunnel face;
5) more Pin main arch sections are once lifted and reach installation site by arch owner cantilever crane, and manipulator station is on the ground or with left and right Secondary arm frame is assembled integral by auxiliary arch section and more Pin main arch sections.
The arch machine includes wheel undercarriage, and platform is disposed on the wheel undercarriage, has been arranged in juxtaposition on the platform The main boom and left and right secondary arm frame, wherein main boom is equipped with the multiple arch clamping pallet, sets on the left and right secondary arm frame There is the hoisting mechanism.
Arc size, the spacing of more Pin main arch sections as needed are assembled integral.
The arch machine stands the arch installation that one, two, three steps are carried out on a step.
The arch machine stands the arch installation that two, three steps are carried out on two steps.
Whole Pin arch is divided at least two sections by the present invention, wherein main arch section for more piece arch section is spliced outside tunnel and The arch section of single-unit or splicing at, remaining arch section, and more Pin main arch sections splice outside tunnel it is into a single integrated structure after, it is whole Tunnel tunnel face is transported to by arch machine, then tunnel is encircleed into dress by the collective effect of the left and right secondary arm frame of arch and main boom and is spelled One is dressed up, the quick closure of tunnel support is realized, can at least save the construction time of half, greatly improve construction personnel Safety and construction efficiency.
Detailed description of the invention
Fig. 1 is more Pin main arch sections of the invention schematic diagram assembled on rack.
Fig. 2 is the schematic diagram that arch machine of the invention lifts more Pin main arch sections.
Fig. 3 is the schematic diagram that the more Pin main arch sections of arch machine band of the invention drive tunnel into.
Fig. 4 is the schematic diagram that more Pin main arch sections of the invention lift.
Fig. 5 is the schematic diagram of arch assembly of the present invention.
Specific embodiment
The invention will be further described with embodiment with reference to the accompanying drawing.
Arch is divided into three sections according to the arch span that tunnel needs first, including a main arch section 1 and two auxiliary arches Frame section, the main arch section are that more piece arch section is spliced outside tunnel, and auxiliary arch section is the arch section of single-unit or splicing.
As shown in Figure 1, have rack 2 outside tunnel, arc size, the spacing that more Pin main arch sections 1 are needed according to tunnel It is arranged in above rack 2, while transverse bar and mesh sheet being welded in more Pin main arch sections 1, more Pin main arch sections 1 is made to form integrated knot Structure.
As shown in Fig. 2, the arch machine 3 includes chassis 5 and platform 4, left secondary cantilever crane 6, main boom are disposed on platform 4 8, right secondary arm frame 10 is equipped with hoisting mechanism 7 on left secondary cantilever crane 6, multiple arch clamping pallet 15 is housed in main boom 8.Utilize lifting Mechanism 7 can lift more Pin main arch sections 1 on the multiple arch clamping pallet 15 for being placed into main boom 8 from rack 2.
As shown in figure 3, arch machine 3 drives tunnel 9 into more Pin main arch sections 1.
As shown in figure 4, main boom 8 is unfolded before arch machine 3 is parked in the face in tunnel 9, more Pin main arch sections 1 are lifted To installation site.
As shown in figure 5, main boom 8, which lifts more Pin main arch sections 1, arrives installation site, it is slack later.Left secondary cantilever crane 6 is opened up It opens, manipulator 13 thereon clamps 1 assembly of auxiliary arch 11 and more Pin main arch sections on the left side.Right secondary arm frame 10 is unfolded, thereon The auxiliary arch 12 and more Pin main arch sections 1 on the clamping of manipulator 14 the right are assembled.

Claims (5)

1. a kind of construction method of tunnel arch Fast Installation, it is characterised in that include the following steps:
1) arch is divided at least two sections according to the arch span that tunnel needs, wherein one section is main arch section, supplemented by remaining section Arch section, wherein main arch section is that more piece arch section is spliced outside tunnel;
2) outside tunnel that more Pin main arch sections are assembled good on rack, while transverse bar and mesh sheet are welded in more Pin main arch sections On, so that more Pin main arch sections is formed integral structure;
3) more Pin main arch sections are hung on the multiple arch clamping pallet of main boom using hoisting mechanism;
4) arch machine drives tunnel into more Pin main arch sections, and reaches tunnel tunnel face;
5) more Pin main arch sections are once lifted and reach installation site by arch owner cantilever crane, and manipulator station is on the ground or with left and right Secondary arm frame is assembled integral by auxiliary arch section and more Pin main arch sections.
2. a kind of construction method of tunnel arch Fast Installation according to claim 1, which is characterized in that the arch machine Including wheel undercarriage, it is disposed with platform on the wheel undercarriage, the main boom and left and right pair have been arranged in juxtaposition on the platform Cantilever crane, wherein main boom is equipped with the multiple arch clamping pallet, and the left and right secondary arm frame is equipped with the hoisting mechanism.
3. a kind of construction method of tunnel arch Fast Installation according to claim 1, which is characterized in that more Pin masters Arc size, the spacing of arch section as needed are assembled integral.
4. a kind of construction method of tunnel arch Fast Installation according to claim 1, which is characterized in that the arch machine Stand the arch installation that one, two, three steps are carried out on a step.
5. a kind of construction method of tunnel arch Fast Installation according to claim 1, which is characterized in that the arch machine Stand the arch installation that two, three steps are carried out on two steps.
CN201811398170.4A 2018-11-22 2018-11-22 A kind of construction method of tunnel arch Fast Installation Pending CN109488345A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811398170.4A CN109488345A (en) 2018-11-22 2018-11-22 A kind of construction method of tunnel arch Fast Installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811398170.4A CN109488345A (en) 2018-11-22 2018-11-22 A kind of construction method of tunnel arch Fast Installation

Publications (1)

Publication Number Publication Date
CN109488345A true CN109488345A (en) 2019-03-19

Family

ID=65697408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811398170.4A Pending CN109488345A (en) 2018-11-22 2018-11-22 A kind of construction method of tunnel arch Fast Installation

Country Status (1)

Country Link
CN (1) CN109488345A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109882214A (en) * 2019-04-03 2019-06-14 蓝传雯 A kind of multi-functional arch installation trolley
CN113464177A (en) * 2021-08-05 2021-10-01 长沙科达智能装备股份有限公司 Tunnel arch centering machine and arch centering construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952474A (en) * 2016-07-08 2016-09-21 山东大学 Rapid construction method for primary support of confined concrete of large-section tunnel
CN106761854A (en) * 2017-01-09 2017-05-31 北京新能正源环境科技有限公司 The installation method of tunnel arch
CN207348868U (en) * 2017-09-28 2018-05-11 中铁五局集团有限公司 A kind of new Multifunctional performing machine for constructing tunnel
CN108119171A (en) * 2018-01-31 2018-06-05 湖南五新隧道智能装备股份有限公司 A kind of multifunctional tunnel bow member Mobile workbench
CN108331603A (en) * 2018-04-04 2018-07-27 湖南五新隧道智能装备股份有限公司 A kind of multi-functional trolley and its construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952474A (en) * 2016-07-08 2016-09-21 山东大学 Rapid construction method for primary support of confined concrete of large-section tunnel
CN106761854A (en) * 2017-01-09 2017-05-31 北京新能正源环境科技有限公司 The installation method of tunnel arch
CN207348868U (en) * 2017-09-28 2018-05-11 中铁五局集团有限公司 A kind of new Multifunctional performing machine for constructing tunnel
CN108119171A (en) * 2018-01-31 2018-06-05 湖南五新隧道智能装备股份有限公司 A kind of multifunctional tunnel bow member Mobile workbench
CN108331603A (en) * 2018-04-04 2018-07-27 湖南五新隧道智能装备股份有限公司 A kind of multi-functional trolley and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109882214A (en) * 2019-04-03 2019-06-14 蓝传雯 A kind of multi-functional arch installation trolley
CN109882214B (en) * 2019-04-03 2024-03-08 四川蓝海智能装备制造有限公司 Multifunctional arch centering installation trolley
CN113464177A (en) * 2021-08-05 2021-10-01 长沙科达智能装备股份有限公司 Tunnel arch centering machine and arch centering construction method

Similar Documents

Publication Publication Date Title
CN107191676B (en) Buried pipeline construction method
CN102019998B (en) Erection embarking method of upper and lower water side cabins
CN109488345A (en) A kind of construction method of tunnel arch Fast Installation
CN204689430U (en) To Construction of Silo movable hoisting device
CN103692096B (en) Single-unit crane arm production line balance method and flow line production device
CN206346764U (en) A kind of push mode section of jurisdiction fast unloading device
JP4397716B2 (en) Heavy object placement method and system
CN111608686B (en) Pipe piece assembling system and working method thereof
CN110159287B (en) Novel cutter conveying system and conveying method thereof
JPH08209629A (en) Overhanging type construction device for bridge
CN206279555U (en) Purlin vehicle type closure construction system
CN212688732U (en) Rush-repair beam erecting device
CN105151999A (en) Portable iron core overturning mechanism
US3302806A (en) Method and apparatus for removing the crane deck from a crane carrier
CN107777589A (en) A kind of 1600T masts arm frame always spells technique
CN211819443U (en) A conveyer for shield constructs section of jurisdiction
CN209890978U (en) Device for removing TBM/shield tunnel track
CN208749374U (en) A kind of excavation stand hangs translation mechanism
CN107881921B (en) Hiding type beam transporting vehicle
CN206129292U (en) Novel landing stage platform truck
CN205500638U (en) Simply hoist transportation equipment
KR102621638B1 (en) Apparatus, System and Method for disassembling Masonry Structure
CN111943045B (en) Method for hoisting rear matched trolley of shield tunneling machine
JP5880341B2 (en) Tower tank construction equipment and construction method
CN204712632U (en) Laminating machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190319

RJ01 Rejection of invention patent application after publication