CN107777589A - A kind of 1600T masts arm frame always spells technique - Google Patents

A kind of 1600T masts arm frame always spells technique Download PDF

Info

Publication number
CN107777589A
CN107777589A CN201710907608.6A CN201710907608A CN107777589A CN 107777589 A CN107777589 A CN 107777589A CN 201710907608 A CN201710907608 A CN 201710907608A CN 107777589 A CN107777589 A CN 107777589A
Authority
CN
China
Prior art keywords
arm support
workshop
lifted
arm
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710907608.6A
Other languages
Chinese (zh)
Inventor
周路林
施浩杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Zhenhua Heavy Equipment Manufacturing Co Ltd
Original Assignee
Nantong Zhenhua Heavy Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Zhenhua Heavy Equipment Manufacturing Co Ltd filed Critical Nantong Zhenhua Heavy Equipment Manufacturing Co Ltd
Priority to CN201710907608.6A priority Critical patent/CN107777589A/en
Publication of CN107777589A publication Critical patent/CN107777589A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/60Derricks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • B23K31/02Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a kind of 1600T masts arm frame always spells group in technique, including arm support workshop moulding bed arrangement, arm support workshop, precision size Control, arm support workshop is lifted, arm support is transported, 1600T crane barges are lifted.The advantage of the invention is that:Whole arm support is up to 99 meters, and weight has reached 510T, to shorten construction period, it is ensured that welding quality, is classified as arm support root, group during middle part and these three parts of head are carried out, general assembly being carried out after the completion for the treatment of middle group.Arm support is because length is longer and arm support main couple is body structure, inside is provided with dividing plate, the form progress group that we employ segmentation group is prefabricated, and scene carries out group's corner weld submerged arc automatic welding using oblique gesture moulding bed, shortens the construction period of the nearly half of arm support in this way.

Description

A kind of 1600T masts arm frame always spells technique
Technical field
The present invention relates to machinery manufacturing technology field, more particularly to a kind of 1600T masts arm frame always spells technique.
Background technology
With the long-range strategic demand of country, the long-term interest of country name race, it is extremely great to develop the meaning of marine resources, meaning Justice is very far-reaching.With the continuous development of extra large work project, higher requirement it is also proposed to its supporting hardware device, build now The 1600T masts made hang a loop wheel machine for current largest domestic, and the volume that it can solve extra large work project is big, weight weight, difficult At sea to lift by crane this bottleneck.1600T masts are hung to be made up of arm support, reversing chassis, upper pillar stand and lower pillar stand, its arm support length Long, weight weight, construction precision requires the high emphasis and difficult point for turning into whole mast and hanging construction.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of 1600T mast arm framves that can shorten construction period always to spell Technique.
In order to solve the above technical problems, the technical scheme is that:A kind of 1600T masts arm frame always spells technique, its Innovative point is:Turn including group, precision size Control, the lifting of arm support workshop, arm support in arm support workshop moulding bed arrangement, arm support workshop Fortune, 1600T crane barges are lifted, and are comprised the following steps that:
(1)Arm support workshop moulding bed arrangement:
1)Arm support is spliced by the middle part of arm support root, arm support and arm support head;
2)Arm support is always spelled, and spliced weight is about 510t, and later stage transhipment is lifted using two 200+200 drivings;
3)Total moulding bed of spelling suitably is adjusted using group moulding bed in original;
4)Carry out position of foetus arrangement and mark ground line-transect, mark arm support center line, appearance profile line;
5)Each section is positioned according to precalculated position, is applied for checking and examination before weldering, structure and location data it is qualified after welded;
6)Arm support pays attention to being welded in strict accordance with WPS when splicing;
7)Butt weld carries out 100%UT+100%MT inspections;
8)Cylinder moulding bed need to be with built-in fitting firm welding;
9)Root processing support is cut off after the completion of total spelling, pays attention to retaining 5mm polishing surpluses;
10)Welding box body order is please symmetrically welded by left figure signal;
(2)Group in arm support workshop:
1)Upper tire positioning in the middle part of arm support is first lifted, is adjusted in place according to the position line marked in advance;
2)Tire on arm support root is lifted, is adjusted by ground line-transect, line cutting surplus;
3)Tire on arm support head is lifted, is adjusted by ground line-transect.Line cutting surplus;
4)Size is applied for checking and examination before arm support weldering;
5)Freezed after size qualification;
(3)Precision size Control:
Integral marking carries out bore hole to arm support hinge after the completion of arm support welding:Respectively towards arm support root on the basis of auxiliary hook otic placode center Rule in portion;Surplus is not processed on the outside of arm support steel bushing, and bore hole installation need to be carried out to the structure at the hinge of arm support root, and last basis is drawn Line is processed to arm support steel bushing endoporus;
(4)Arm support workshop lifts:Weight is about 510T after arm support is always spelled, and is lifted using two 200T+200T drivings;Lifting Preceding preparation:150T shackles 4;4, φ 87*16m steel wire ropes;
(5)Arm support is transported:
Arm support transhipment uses 2 200T, and 1 280T flat car is transported through:
1)Structural integrity need to be used, weld seam is transported through through the qualified transferring platform of nondestructive testing;
2)After the completion of arm support overall package, shopwork is carried out out, needs to arrange excessive slope in advance if the workshop gradient is excessive, Flat car transferring platform and chock reference by location drawing, scene adjust according to actual conditions, and chock is placed on the structure prime time as far as possible Place;
3)Arm support head plate car scene carries out place mat using rail;
(6)1600T crane barges are lifted:
Prepare before lifting:4, φ 135*35M steel wire ropes;150T shackles 4.
Further, the step(2)In, the requirement of arm support linearity is:Every meter is less than 2mm, and total length is less than 5mm;Arm support Requirement for horizontality is:≤6mm.
Further, the step(4)And step(6)Lifting points for attention be:Before segmental hoisting, each hang is checked Whether point, steel wire rope and shackle are defective, are then reeved according to process program and shackle;Lifting process needs slowly, steadily, Abnormal conditions occur need to stop lifting immediately, and pending fault continues operation after excluding;Increase anti-shake rope, the side of being conveniently adjusted before lifting To.
The advantage of the invention is that:Whole arm support is up to 99 meters, and weight has reached 510T, to shorten construction period, it is ensured that Welding quality, it is classified as arm support root, group during middle part and these three parts of head are carried out, general assembly being carried out after the completion for the treatment of middle group. Arm support is because length is longer and arm support main couple is body structure, and inside is provided with dividing plate, and we employ the form of segmentation group Carry out group is prefabricated, and scene carries out group's corner weld submerged arc automatic welding using oblique gesture moulding bed, shortens arm support in this way The construction period of nearly half.
Brief description of the drawings
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.
Fig. 1 is arm support workshop moulding bed layout drawing of the present invention.
Fig. 2 is arm support workshop of the present invention erection drawing.
Fig. 3 is that arm support of the present invention transports schematic diagram.
Fig. 4 is that arm support crane barge of the present invention lifts schematic diagram.
Embodiment
The following examples can make professional and technical personnel that the present invention be more fully understood, but therefore not send out this It is bright to be limited among described scope of embodiments.
A kind of 1600T masts arm frame always spells group, accuracy rule in technique, including arm support workshop moulding bed arrangement, arm support workshop Very little control, the lifting of arm support workshop, arm support transhipment, 1600T crane barges are lifted, and are comprised the following steps that:
(1)Arm support workshop moulding bed arrangement, as shown in Figure 1:
1)Arm support is spliced by the middle part of arm support root, arm support and arm support head;
2)Arm support is always spelled, and spliced weight is about 510t, and later stage transhipment is lifted using two 200+200 drivings;
3)Total moulding bed of spelling suitably is adjusted using group moulding bed in original;
4)Carry out position of foetus arrangement and mark ground line-transect, mark arm support center line, appearance profile line;
5)Each section is positioned according to precalculated position, is applied for checking and examination before weldering, structure and location data it is qualified after welded;
6)Arm support pays attention to being welded in strict accordance with WPS when splicing;
7)Butt weld carries out 100%UT+100%MT inspections;
8)Cylinder moulding bed need to be with built-in fitting firm welding;
9)Root processing support is cut off after the completion of total spelling, pays attention to retaining 5mm polishing surpluses;
10)Welding box body order is please symmetrically welded by left figure signal.
(2)Group in arm support workshop:
1)Upper tire positioning in the middle part of arm support is first lifted, is adjusted in place according to the position line marked in advance;
2)Tire on arm support root is lifted, is adjusted by ground line-transect, line cutting surplus;
3)Tire on arm support head is lifted, is adjusted by ground line-transect.Line cutting surplus;
4)Size is applied for checking and examination before arm support weldering;
5)Freezed after size qualification;
6)Arm support linearity requires:Every meter is less than 2mm, and total length is less than 5mm;
7)Arm support requirement for horizontality is:≤6mm.
(3)Precision size Control:
Integral marking carries out bore hole to arm support hinge after the completion of arm support welding:Respectively towards arm support root on the basis of auxiliary hook otic placode center Rule in portion;Surplus is not processed on the outside of arm support steel bushing, and bore hole installation need to be carried out to the structure at the hinge of arm support root, and last basis is drawn Line is processed to arm support steel bushing endoporus.
(4)Arm support workshop lifts, as shown in Figure 2:Weight is about 510T after arm support is always spelled, using two 200T+200T rows Car is lifted;Prepare before lifting:150T shackles 4;4, φ 87*16m steel wire ropes;
Lifting points for attention is:Before segmental hoisting, check whether each suspension centre, steel wire rope and shackle are defective, then according to work Skill scheme reeves and shackle;Lifting process needs slowly, steadily, and abnormal conditions occur need to stop lifting immediately, pending fault row Continue operation after removing;Increase anti-shake rope, is conveniently adjusted direction before lifting.
(5)Arm support is transported, as shown in Figure 3:
Arm support transhipment uses 2 200T, and 1 280T flat car is transported through:
1)Structural integrity need to be used, weld seam is transported through through the qualified transferring platform of nondestructive testing;
2)After the completion of arm support overall package, shopwork is carried out out, needs to arrange excessive slope in advance if the workshop gradient is excessive, Flat car transferring platform and chock reference by location drawing, scene adjust according to actual conditions, and chock is placed on the structure prime time as far as possible Place;
3)Arm support head plate car scene carries out place mat using rail.
(6)1600T crane barges are lifted, as shown in Figure 4:
Prepare before lifting:4, φ 135*35M steel wire ropes;150T shackles 4.
Lifting points for attention is:Before segmental hoisting, check whether each suspension centre, steel wire rope and shackle are defective, Ran Hougen Reeved according to process program and shackle;Lifting process needs slowly, steadily, and abnormal conditions occur need to stop lifting immediately, treats event Barrier continues operation after excluding;Increase anti-shake rope, is conveniently adjusted direction before lifting.
The general principle and principal character and advantages of the present invention of the present invention has been shown and described above.The skill of the industry For art personnel it should be appreciated that the present invention is not limited to the above embodiments, described in above-described embodiment and specification is explanation The principle of the present invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these Changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and Its equivalent thereof.

Claims (3)

1. a kind of 1600T masts arm frame always spells technique, it is characterised in that:Including in arm support workshop moulding bed arrangement, arm support workshop Group, precision size Control, the lifting of arm support workshop, arm support transhipment, 1600T crane barges are lifted, and are comprised the following steps that:
(1)Arm support workshop moulding bed arrangement:
1)Arm support is spliced by the middle part of arm support root, arm support and arm support head;
2)Arm support is always spelled, and spliced weight is about 510t, and later stage transhipment is lifted using two 200+200 drivings;
3)Total moulding bed of spelling suitably is adjusted using group moulding bed in original;
4)Carry out position of foetus arrangement and mark ground line-transect, mark arm support center line, appearance profile line;
5)Each section is positioned according to precalculated position, is applied for checking and examination before weldering, structure and location data it is qualified after welded;
6)Arm support pays attention to being welded in strict accordance with WPS when splicing;
7)Butt weld carries out 100%UT+100%MT inspections;
8)Cylinder moulding bed need to be with built-in fitting firm welding;
9)Root processing support is cut off after the completion of total spelling, pays attention to retaining 5mm polishing surpluses;
10)Welding box body order is please symmetrically welded by left figure signal;
(2)Group in arm support workshop:
1)Upper tire positioning in the middle part of arm support is first lifted, is adjusted in place according to the position line marked in advance;
2)Tire on arm support root is lifted, is adjusted by ground line-transect, line cutting surplus;
3)Tire on arm support head is lifted, is adjusted by ground line-transect;
Line cutting surplus;
4)Size is applied for checking and examination before arm support weldering;
5)Freezed after size qualification;
(3)Precision size Control:
Integral marking carries out bore hole to arm support hinge after the completion of arm support welding:Respectively towards arm support root on the basis of auxiliary hook otic placode center Rule in portion;Surplus is not processed on the outside of arm support steel bushing, and bore hole installation need to be carried out to the structure at the hinge of arm support root, and last basis is drawn Line is processed to arm support steel bushing endoporus;
(4)Arm support workshop lifts:Weight is about 510T after arm support is always spelled, and is lifted using two 200T+200T drivings;Lifting Preceding preparation:150T shackles 4;4, φ 87*16m steel wire ropes;
(5)Arm support is transported:
Arm support transhipment uses 2 200T, and 1 280T flat car is transported through:
1)Structural integrity need to be used, weld seam is transported through through the qualified transferring platform of nondestructive testing;
2)After the completion of arm support overall package, shopwork is carried out out, needs to arrange excessive slope in advance if the workshop gradient is excessive, Flat car transferring platform and chock reference by location drawing, scene adjust according to actual conditions, and chock is placed on the structure prime time as far as possible Place;
3)Arm support head plate car scene carries out place mat using rail;
(6)1600T crane barges are lifted:
Prepare before lifting:4, φ 135*35M steel wire ropes;150T shackles 4.
2. a kind of 1600T masts arm frame according to claim 1 always spells technique, it is characterised in that:The step(2) In, the requirement of arm support linearity is:Every meter is less than 2mm, and total length is less than 5mm;Arm support requirement for horizontality is:≤6mm.
3. a kind of 1600T masts arm frame according to claim 2 always spells technique, it is characterised in that:The step(4)With Step(6)Lifting points for attention be:Before segmental hoisting, check whether each suspension centre, steel wire rope and shackle are defective, Ran Hougen Reeved according to process program and shackle;Lifting process needs slowly, steadily, and abnormal conditions occur need to stop lifting immediately, treats event Barrier continues operation after excluding;Increase anti-shake rope, is conveniently adjusted direction before lifting.
CN201710907608.6A 2017-09-29 2017-09-29 A kind of 1600T masts arm frame always spells technique Pending CN107777589A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710907608.6A CN107777589A (en) 2017-09-29 2017-09-29 A kind of 1600T masts arm frame always spells technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710907608.6A CN107777589A (en) 2017-09-29 2017-09-29 A kind of 1600T masts arm frame always spells technique

Publications (1)

Publication Number Publication Date
CN107777589A true CN107777589A (en) 2018-03-09

Family

ID=61434046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710907608.6A Pending CN107777589A (en) 2017-09-29 2017-09-29 A kind of 1600T masts arm frame always spells technique

Country Status (1)

Country Link
CN (1) CN107777589A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110482420A (en) * 2019-08-16 2019-11-22 南通振华重型装备制造有限公司 A kind of floating crane truss-type cantilever crane integral constructing method
CN114031008A (en) * 2021-12-07 2022-02-11 南通振华重型装备制造有限公司 Modularized final assembly process for floating crane

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007302433A (en) * 2006-05-12 2007-11-22 Kobelco Cranes Co Ltd Boom of crane
CN101590985A (en) * 2009-07-02 2009-12-02 长沙中联重工科技发展股份有限公司 Crawler crane and jib thereof
CN102489888A (en) * 2011-11-29 2012-06-13 武汉船用机械有限责任公司 Welding method for high-strength steel truss-type cantilever crane
CN102674167A (en) * 2011-03-07 2012-09-19 徐工集团工程机械股份有限公司建设机械分公司 Integrated arm frame and crane with arm frame
CN103332611A (en) * 2013-04-23 2013-10-02 上海振华重工(集团)股份有限公司 Fabrication method of arm support of crane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007302433A (en) * 2006-05-12 2007-11-22 Kobelco Cranes Co Ltd Boom of crane
CN101590985A (en) * 2009-07-02 2009-12-02 长沙中联重工科技发展股份有限公司 Crawler crane and jib thereof
CN102674167A (en) * 2011-03-07 2012-09-19 徐工集团工程机械股份有限公司建设机械分公司 Integrated arm frame and crane with arm frame
CN102489888A (en) * 2011-11-29 2012-06-13 武汉船用机械有限责任公司 Welding method for high-strength steel truss-type cantilever crane
CN103332611A (en) * 2013-04-23 2013-10-02 上海振华重工(集团)股份有限公司 Fabrication method of arm support of crane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110482420A (en) * 2019-08-16 2019-11-22 南通振华重型装备制造有限公司 A kind of floating crane truss-type cantilever crane integral constructing method
CN114031008A (en) * 2021-12-07 2022-02-11 南通振华重型装备制造有限公司 Modularized final assembly process for floating crane
CN114031008B (en) * 2021-12-07 2023-10-24 南通振华重型装备制造有限公司 Modularized final assembly process of floating crane

Similar Documents

Publication Publication Date Title
CN102071644B (en) Lifting installation method of integral bridge arch rib
CN105397351B (en) Onsite vertical mounting method for segmentally-prefabricated tower body
CN103332611A (en) Fabrication method of arm support of crane
CN107244382A (en) The assemble method of lashing bridge and container ship
CN107352450B (en) FPSO cranes stack shell and its construction installation method
CN107777589A (en) A kind of 1600T masts arm frame always spells technique
CN107717346A (en) A kind of 1600T masts hang on mast building technology
CN214167082U (en) Special lifting device for pressure vessel
CN109231023B (en) Method for installing jib system of portal crane
CN103072899B (en) Hoisting technology for ultra-large type cylinder block
CN106006408A (en) Integral transport and lift method for large hull stern cabin block
CN114955887B (en) Method for installing portal crane on ship
CN102381438B (en) Wholly lifting mounting method for wholly built upstairs stem section of large-size semi-submerged ship
US10167852B2 (en) Saddle and hook system
CN106586805A (en) Lifting appliance special for large component conveying frame
CN104234636B (en) Jack-up unit derrick installation method
CN105781205A (en) In-place guiding device for segmented hoisting and air pairing of heavy tower equipment
CN103846672B (en) Method for mounting rack on standard knot and technological equipment thereof
CN107498270A (en) A kind of 1600T masts arm frame root manufacture craft
CN204198229U (en) A kind ofly realize joining the lifting beam device hanging segmentation tread flaking
CN109488345A (en) A kind of construction method of tunnel arch Fast Installation
CN102190242B (en) Hoisting device of large-size metal structural member
CN111792002A (en) Assembling method for bow main section of bulk carrier
CN112456305A (en) Linear segmented turning-over method
CN107618999B (en) Hoisting tool and hoisting method for narrow space of bridge beam bottom and pier stud

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180309