CN105887701A - 悬索桥上部结构拆除与更换安装方法 - Google Patents
悬索桥上部结构拆除与更换安装方法 Download PDFInfo
- Publication number
- CN105887701A CN105887701A CN201610238815.2A CN201610238815A CN105887701A CN 105887701 A CN105887701 A CN 105887701A CN 201610238815 A CN201610238815 A CN 201610238815A CN 105887701 A CN105887701 A CN 105887701A
- Authority
- CN
- China
- Prior art keywords
- suspension bridge
- new
- former
- main push
- trestle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/02—Suspension bridges
Abstract
本发明提供了一种悬索桥上部结构拆除与更换安装方法,包括以下步骤:a.在悬索桥外侧搭设与其平行的栈桥,栈桥两端与对应的悬索桥两端的引桥连接;b.检查悬索桥两端的锚碇,确定其处于正常工作状态;c.分段拆除悬索桥上部的原加劲梁;d.拆除原加劲梁对应的原吊杆、原索夹;e.通过履带吊起吊主缆实现悬索桥上部原主缆的拆除;f.通过履带吊起吊新主缆实现安装;g.通过测量放样在相应位置安装新索夹及新吊杆;h.履带吊分节起吊各段新加劲梁节段至指定位置,待全部新加劲梁节段安装完毕后,将所有节段连接成为整体。本发明最大限度的缩短悬索桥上部结构拆除与更换施工工期,减少因悬索桥上部结构拆除与更换所带来的负面影响。
Description
技术领域
本发明属于桥梁维护施工领域,具体涉及一种悬索桥上部结构拆除与更换安装方法。
背景技术
悬索桥(平原地区)因其良好的适用性及美观性被广泛应用于桥梁中,其在国内发展的高峰期起于20世纪90年代。近些年来,有少部分悬索桥出现了病害,主要是上部结构主缆、吊杆的锈蚀、腐化和断丝,加劲梁的破坏等。可以预见,随着服役年限的增加,悬索桥的病害将会陆续出现,对悬索桥上部结构进行维修加固以及快速拆除与更换技术的研究将会非常有现实意义。目前,悬索桥的新建技术比较成熟,但在上部结构安装时,通常使用缆索吊作为吊装设备,需要搭设猫道作为施工平台,而猫道在空中非常不平稳,具有较大的安全隐患,加上缆索吊非常笨重移动速度缓慢,导致上部结构安装工期较长。悬索桥的维修加固目前则主要是停留在小修小补上,少部分采用增加斜拉索等改变结构受力体系的方法对悬索桥进行加固并取得不错工程效果,但对需要快速拆除与更换主缆、吊杆、加劲梁等上部结构的技术研究较少。因此,研究出一种悬索桥上部结构快速拆除与更换安装的方法意义重大。
发明内容
本发明的目的就是针对现有技术的缺陷,提供一种悬索桥上部结构拆除与更换安装方法,实现悬索桥主缆、吊杆、加劲梁等的快速拆除与更换安装,最大限度的缩短悬索桥上部结构拆除与更换施工工期,减少因悬索桥上部结构拆除与更换所带来的负面影响。
本发明提供了一种悬索桥上部结构拆除与更换安装方法,其特征在于:它包括以下步骤:
a.在悬索桥外侧搭设与其平行的栈桥,用于行人、车辆临时通行以及吊装运输平台,栈桥两端与对应的悬索桥两端的引桥连接;
b.检查悬索桥两端的锚碇,确定其处于正常工作状态;
c.分段拆除悬索桥上部的原加劲梁;
d.拆除原加劲梁对应的原吊杆、原索夹;
e.在栈桥上对应悬索桥索塔位置处布置履带吊,通过其起吊主缆实现悬索桥上部原主缆的拆除;
f.新主缆在栈桥上展索完成后,通过履带吊起吊新主缆实现安装;
g.新主缆安装完成后,通过测量放样在相应位置安装新索夹及新吊杆;
h.履带吊分节起吊各段新加劲梁节段至指定位置,待全部新加劲梁节段安装完毕后,将所有节段连接成为整体。
本发明还包括以下步骤:
i.在已经连为整体的新加劲梁上表面铺设桥面铺装、安装护栏,并做好新主缆、新索夹、新吊杆、新加劲梁及护栏的防腐涂装工作;
j.开放悬索桥的交通,拆除栈桥。
所述步骤a中栈桥设置于距离悬索桥外侧2m~3m的位置;栈桥端部向悬索桥弯折且固定于悬索桥索塔的一侧。
所述于步骤c包括以下步骤:将原加劲梁按照节段进行分解,使每节段原加劲梁均处于自由状态,在栈桥平台上采用履带吊按照全桥对称原则分节段吊起原加劲梁,将连接的原吊杆割断后将原加劲梁吊装至停在栈桥的平板车上或下放至停在桥下的驳船上并运走。
所述步骤e包括以下步骤:在栈桥上对应于悬索桥索塔位置处分别布置2台履带吊,2台履带吊同时起吊原主缆,将其吊起脱离鞍座后通过吊车收臂及转臂将原主缆吊装至栈桥上方,下放吊钩将原主缆卸于栈桥上,待原主缆完全卸载后,拆除原主缆于锚碇处的锚固装置,将原主缆切割后运走。
所述步骤f包括以下步骤:将新主缆在栈桥上展索,并做好长度标记,展索完成后将新主缆两端分别锚固于两端锚碇处;2台履带吊同时起吊将新主缆吊起后,通过吊车伸臂及转臂将新主缆吊装至鞍座上方,下放吊钩并解除联系,对新主缆索力及标高进行相应调整。
所述步骤h包括以下步骤:待新主缆及新吊杆全部安装到位后,将预制好的新加劲梁按照全桥对称原则分节段运至现场,由停在栈桥平台上的履带吊吊起至指定位置,将新吊杆与新加劲梁进行连接并调整好标高和索力值,同时调整好主塔鞍座位置;待全部新加劲梁节段安装完毕后,将所有节段连接成为整体。
本发明的悬索桥上部结构的拆除与更换整个过程中,不需要架设猫道及拆除猫道,只需搭设一个栈桥,整个悬索桥拆除与更换安装过程更加安全、简单、方便、快捷。加劲梁的拆除与安装均可采用履带吊在栈桥上直接进行施工,可以不设置缆索吊来进行加劲梁的拆除与安装,使用履带吊拆除与安装加劲梁比使用缆索吊更安全、灵活、方便、快捷。悬索桥主缆拆除及更换安装均直接采用履带吊直接吊装,比传统的利用猫道架设主缆更安全、方便、快捷,而且有利于对主缆的保护,主缆损伤几率小。搭设的栈桥,既可以作为施工平台,又可以作为悬索桥上部结构拆除与更换期间的临时通道,确保了桥梁两端小型汽车及行人的通行。
附图说明
图1是本发明总体平面布置示意图;
图2是主梁拆除示意图;
图3是主梁安装示意图;
其中,1-悬索桥,2-栈桥,3-锚碇,4-原加劲梁,5-履带吊,6-原吊杆,7-原主缆,8-索塔,9-新主缆,10-新吊杆,11-新加劲梁。
具体实施方式
下面结合附图和具体实施例对本发明作进一步的详细说明,便于清楚地了解本发明,但它们不对本发明构成限定。
如图1所示,本发明一种悬索桥上部结构拆除与更换安装方法,
具体实施步骤如下:
步骤一:。在距离悬索桥1外侧2m~3m的位置,搭设栈桥2。栈桥平行于悬索桥1,用于行人、车辆临时通行以及吊装运输平台的栈桥2。栈桥2与悬索桥1两端的道路(引桥)相接;栈桥端部向悬索桥弯折且固定于悬索桥索塔的一侧,保证栈桥安装的稳定性。
步骤二:检查确定锚碇3处于正常工作状态,保证其与旧主缆的有效连接。
步骤三:将原加劲梁4按照节段进行分解,使每节段原加劲梁均处于自由状态,在栈桥平台上直接采用履带吊5按照全桥对称原则分节段吊起原加劲梁4,将连接的原吊杆6割断,再将原加劲梁4吊装至栈桥2上并运走。
步骤四:待原加劲梁4拆除后,将对应的原吊杆6全部拆除;或同时拆除主缆上的所有锁夹及防护设施。
步骤五:利用吊车将原主缆分束或整体起吊脱离主塔鞍座。
在栈桥上布置2台履带吊5,分别布置在对应于索塔8位置处的栈桥2上,2台履带吊5同时起吊将原主缆7吊起脱离索塔8后,通过吊车收臂及转臂将原主缆7吊装至栈桥2上方,下放吊钩将原主缆7卸于栈桥2上,待原主缆7完全下放到栈桥2上面后,拆除主缆于锚碇3处的锚固装原置,将原主缆分段切割后运走。
步骤六:安装新主缆9。主新缆7在栈桥2上展索,并做好长度标记,展索完成后将新主缆9两端分别锚固于两端锚碇3处。在栈桥2上布置2台履带吊5,分别布置在对应于索塔8位置处的栈桥2上,2台履带吊5同时起吊将新主缆9吊起后,通过吊车伸臂及转臂将主缆吊装至索塔8鞍座上方,下放吊钩并解除联系,对主缆索力及标高进行相应调整,确保主缆安装稳定性的同时有效保护主缆。
步骤七:新主缆9安装完成后,通过测量放样在相应位置安装好新吊杆10。
步骤八:待新主缆9及新吊杆10全部安装到位后,将预制好的新加劲梁11按照全桥对称原则分节段运至现场,由停在栈桥2平台上的履带吊5吊起至指定位置,将新吊杆10与新加劲梁11进行连接并调整好标高和索力值,同时调整好索塔8鞍座位置。待全部新加劲梁11节段安装完毕后,将所有节段连接成为整体。
步骤九:待悬索桥1所有构件均更换安装完成后,开放悬索桥1的交通,拆除栈桥2。
本说明书未作详细描述的内容属于本领域专业技术人员公知的现有技术。
Claims (7)
1.一种悬索桥上部结构拆除与更换安装方法,其特征在于:它包括以下步骤:
a.在悬索桥外侧搭设与其平行的栈桥,用于行人、车辆临时通行以及吊装运输平台,栈桥两端与对应的悬索桥两端的引桥连接;
b.检查悬索桥两端的锚碇,确定其处于正常工作状态;
c.分段拆除悬索桥上部的原加劲梁;
d.拆除原加劲梁对应的原吊杆、原索夹;
e.在栈桥上对应悬索桥索塔位置处布置履带吊,通过其起吊原主缆实现悬索桥上部原主缆的拆除;
f.新主缆在栈桥上展索完成后,通过履带吊起吊新主缆实现安装;
g.新主缆安装完成后,通过测量放样在相应位置安装新索夹及新吊杆;
h.履带吊分节起吊各段新加劲梁节段至指定位置,待全部新加劲梁节段安装完毕后,将所有节段连接成为整体。
2.根据权利要求1所述的悬索桥上部结构拆除与更换安装方法,其特征在于还包括以下步骤:
i.在已经连为整体的新加劲梁上表面铺设桥面铺装、安装护栏,并做好新主缆、新索夹、新吊杆、新加劲梁及护栏的防腐涂装工作;
j.开放悬索桥的交通,拆除栈桥。
3.根据权利要求1所述的悬索桥上部结构拆除与更换安装方法,其特征在于步骤a中栈桥设置于距离悬索桥外侧2m~3m的位置;栈桥端部向悬索桥弯折且固定于悬索桥索塔的一侧。
4.根据权利要求1所述的悬索桥上部结构拆除与更换安装方法,其特征在于步骤c包括以下步骤:将原加劲梁按照节段进行分解,使每节段原加劲梁均处于自由状态,在栈桥平台上采用履带吊按照全桥对称原则分节段吊起原加劲梁,将连接的原吊杆割断后将原加劲梁吊装至停在栈桥的平板车上或下放至停在桥下的驳船上并运走。
5.根据权利要求1所述的悬索桥上部结构拆除与更换安装方法,其特征在于步骤e包括以下步骤:在栈桥上对应于悬索桥索塔位置处分别布置2台履带吊,2台履带吊同时起吊原主缆;完成原主缆的解缆工作后,将其吊起脱离鞍座后通过吊车收臂及转臂将原主缆吊装至栈桥上方,下放吊钩将原主缆卸于栈桥上,待原主缆完全卸载后,拆除原主缆于锚碇处的锚固装置,将原主缆切割后运走。
6.根据权利要求1所述的悬索桥上部结构拆除与更换安装方法,其特征在于步骤f包括以下步骤:将新主缆在栈桥上展索,并做好长度标记,展索完成后将新主缆两端分别锚固于两端锚碇处;2台履带吊同时起吊将新主缆吊起,通过吊车伸臂及转臂将新主缆吊装至鞍座上方,下放吊钩并解除联系,对新主缆索力及标高进行相应调整并完成新主缆的束缆工作。
7.根据权利要求1所述的悬索桥上部结构拆除与更换安装方法,其特征在于步骤h包括以下步骤:待新主缆及新吊杆全部安装到位后,将预制好的新加劲梁按照全桥对称原则分节段运至现场,由停在栈桥平台上的履带吊吊起至指定位置,将新吊杆与新加劲梁进行连接并调整好标高和索力值,同时调整好主塔鞍座位置;待全部新加劲梁节段安装完毕后,将所有节段连接成为整体。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610238815.2A CN105887701B (zh) | 2016-04-18 | 2016-04-18 | 悬索桥上部结构拆除与更换安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610238815.2A CN105887701B (zh) | 2016-04-18 | 2016-04-18 | 悬索桥上部结构拆除与更换安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105887701A true CN105887701A (zh) | 2016-08-24 |
CN105887701B CN105887701B (zh) | 2018-01-30 |
Family
ID=56703866
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610238815.2A Active CN105887701B (zh) | 2016-04-18 | 2016-04-18 | 悬索桥上部结构拆除与更换安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105887701B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106978784A (zh) * | 2017-05-26 | 2017-07-25 | 贵州桥梁建设集团有限责任公司 | 一种大跨径公路悬索桥拆除施工方法 |
CN110820522A (zh) * | 2019-11-22 | 2020-02-21 | 柳州欧维姆机械股份有限公司 | 一种悬索桥更换主缆用吊索转换装置、吊索及施工方法 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101215822A (zh) * | 2008-01-08 | 2008-07-09 | 中交第二公路勘察设计研究院有限公司 | 悬索桥锚碇可更换式预应力的方法及装置 |
CN102071651A (zh) * | 2010-12-15 | 2011-05-25 | 江苏法尔胜新日制铁缆索有限公司 | 悬索桥吊索换索方法 |
CN102286943A (zh) * | 2011-08-23 | 2011-12-21 | 河海大学 | 悬索桥吊索更换装置 |
CN102477716A (zh) * | 2010-11-23 | 2012-05-30 | 中国二十冶集团有限公司 | 栈桥式梁板桥在两岸为滩涂的内陆河流中的应用 |
CN102561215A (zh) * | 2012-02-20 | 2012-07-11 | 四川天元机械工程股份有限公司 | 一种悬索桥散索套更换方法 |
CN102286942B (zh) * | 2011-08-23 | 2013-03-06 | 河海大学 | 系杆拱桥吊杆更换装置 |
CN103225269A (zh) * | 2013-04-17 | 2013-07-31 | 河海大学 | 悬索桥吊索自动控制更换装置及基于该更换装置的吊索更换方法 |
WO2013179549A1 (ja) * | 2012-06-01 | 2013-12-05 | 株式会社Ihiインフラシステム | 斜ケーブルの取り替え方法及び斜ケーブル取り替え用仮ハンガー |
RU2539461C1 (ru) * | 2013-10-09 | 2015-01-20 | Общество с ограниченной ответственностью "НПП СК МОСТ" | Способ уширения мостового сооружения с использованием вантовой системы |
JP5826570B2 (ja) * | 2010-11-12 | 2015-12-02 | 三井住友建設株式会社 | 既設橋梁の保護管補修方法およびその方法に使用される型枠材 |
-
2016
- 2016-04-18 CN CN201610238815.2A patent/CN105887701B/zh active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101215822A (zh) * | 2008-01-08 | 2008-07-09 | 中交第二公路勘察设计研究院有限公司 | 悬索桥锚碇可更换式预应力的方法及装置 |
JP5826570B2 (ja) * | 2010-11-12 | 2015-12-02 | 三井住友建設株式会社 | 既設橋梁の保護管補修方法およびその方法に使用される型枠材 |
CN102477716A (zh) * | 2010-11-23 | 2012-05-30 | 中国二十冶集团有限公司 | 栈桥式梁板桥在两岸为滩涂的内陆河流中的应用 |
CN102071651A (zh) * | 2010-12-15 | 2011-05-25 | 江苏法尔胜新日制铁缆索有限公司 | 悬索桥吊索换索方法 |
CN102286943A (zh) * | 2011-08-23 | 2011-12-21 | 河海大学 | 悬索桥吊索更换装置 |
CN102286942B (zh) * | 2011-08-23 | 2013-03-06 | 河海大学 | 系杆拱桥吊杆更换装置 |
CN102561215A (zh) * | 2012-02-20 | 2012-07-11 | 四川天元机械工程股份有限公司 | 一种悬索桥散索套更换方法 |
WO2013179549A1 (ja) * | 2012-06-01 | 2013-12-05 | 株式会社Ihiインフラシステム | 斜ケーブルの取り替え方法及び斜ケーブル取り替え用仮ハンガー |
CN103225269A (zh) * | 2013-04-17 | 2013-07-31 | 河海大学 | 悬索桥吊索自动控制更换装置及基于该更换装置的吊索更换方法 |
RU2539461C1 (ru) * | 2013-10-09 | 2015-01-20 | Общество с ограниченной ответственностью "НПП СК МОСТ" | Способ уширения мостового сооружения с использованием вантовой системы |
Non-Patent Citations (2)
Title |
---|
孙孝婷: "江阴大桥短吊索损坏原因分析与更换", 《黑龙江交通科技》 * |
曾智荣,江湧: "海珠桥悬吊体系拆除施工工艺研究", 《世界桥梁》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106978784A (zh) * | 2017-05-26 | 2017-07-25 | 贵州桥梁建设集团有限责任公司 | 一种大跨径公路悬索桥拆除施工方法 |
CN106978784B (zh) * | 2017-05-26 | 2018-07-27 | 贵州桥梁建设集团有限责任公司 | 一种大跨径公路悬索桥拆除施工方法 |
CN110820522A (zh) * | 2019-11-22 | 2020-02-21 | 柳州欧维姆机械股份有限公司 | 一种悬索桥更换主缆用吊索转换装置、吊索及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105887701B (zh) | 2018-01-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106087752B (zh) | 多跨提篮拱桥施工方法 | |
CN104195952A (zh) | 应用于钢混混合梁斜拉桥钢箱梁架设方法 | |
CN105442458B (zh) | 一种斜拉桥异形塔柱的斜拉索挂设安装方法 | |
JP2912222B2 (ja) | 橋梁の桁架設工法 | |
CN111042540A (zh) | 超大跨度预应力管桁架地面挂索空中对接的施工方法 | |
CN102251483B (zh) | 自提升附着式吊机吊装钢管混凝土格构桥墩的施工方法 | |
CN101210415A (zh) | 桥梁主塔横梁顶钢箱梁节段的安装方法 | |
CN109183629A (zh) | 一种大悬臂盖梁预制拼装方法 | |
CN109797649B (zh) | 一种不影响桥面交通的检修车吊装方案 | |
CN108221694B (zh) | 安装大跨度拱桥系杆的方法 | |
CN103882812A (zh) | 斜拉索桥中跨主梁的施工方法 | |
CN202530769U (zh) | 大跨度钢结构高空分段吊装支撑系统 | |
CN208088097U (zh) | 一种三塔悬索桥主梁安装施工结构 | |
CN207267966U (zh) | 溜索式无支架支座更换操作平台 | |
CN106285019B (zh) | 一种局限空间下的天车安装方法 | |
CN111691305A (zh) | 一种悬索桥主梁安装方法 | |
CN105887701A (zh) | 悬索桥上部结构拆除与更换安装方法 | |
CN105586832A (zh) | 悬挂式猫道面网安装系统 | |
CN105932601A (zh) | 架空地线断股修补方法 | |
CN105781210A (zh) | 一种锥形塔架及其工具节辅助穿心式整体提升施工方法 | |
CN106012841A (zh) | 缆索吊机及其安装方法 | |
CN106120573B (zh) | 跨海多跨提篮拱桥自平衡扣挂施工方法 | |
CN205529915U (zh) | 一种梯型桅杆式悬拼吊机 | |
CN201605110U (zh) | 悬臂施工桁车前端吊装波形钢腹板装置 | |
CN204959611U (zh) | 用于高速公路建设桥梁护栏基座模板的吊装设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: Room 2101-2104, 21 / F, unit a, block a, Hubei science and technology venture building, Xiaohongshan East District, Wuchang District, Wuhan City, Hubei Province, 430061 Patentee after: CCCC Road & Bridge Special Engineering Co.,Ltd. Address before: 430071 20 / F, Dongsha building, 122 Zhongbei Road, Wuchang, Wuhan, Hubei Province Patentee before: CCCC ROAD & BRIDGE SPECIAL ENGINEERING Co.,Ltd. |
|
CP03 | Change of name, title or address |