CN105863253A - 整体支模异步浇筑楼梯间墙柱支模体系及施工方法 - Google Patents

整体支模异步浇筑楼梯间墙柱支模体系及施工方法 Download PDF

Info

Publication number
CN105863253A
CN105863253A CN201610357177.6A CN201610357177A CN105863253A CN 105863253 A CN105863253 A CN 105863253A CN 201610357177 A CN201610357177 A CN 201610357177A CN 105863253 A CN105863253 A CN 105863253A
Authority
CN
China
Prior art keywords
staircase
wall column
formwork
construction
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610357177.6A
Other languages
English (en)
Other versions
CN105863253B (zh
Inventor
王新泉
徐明迪
朱凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heng De Construction Company Limited
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201610357177.6A priority Critical patent/CN105863253B/zh
Publication of CN105863253A publication Critical patent/CN105863253A/zh
Application granted granted Critical
Publication of CN105863253B publication Critical patent/CN105863253B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及整体支模异步浇筑楼梯间墙柱支模体系及施工方法,结构主要包括:竖向支撑杆、斜向支撑杆、木方、框架梁底模、已施工楼板、楼板梁、现浇楼梯、梯梁、梯段板底模、可伸缩支撑、休息平台底模、休息平台板、梯梁下部模板、施工楼板、楼梯踏步挡板、楼梯施工缝挡板、楼梯施工缝清扫口、楼梯上部定位板、施工梯段板、短支撑、施工楼板底模、楼梯间墙模板、楼梯间墙、框架梁、墙柱斜撑、加固横杆。主要施工步骤包括:1)钢筋绑扎;2)墙柱支模;3)支撑安装;4)混凝土浇筑;5)墙柱拆模。本发明涉及的施工方法能解决楼梯间剪力墙柱错台的质量通病,提高了楼梯间混凝土整体的观感质量,具有较好的经济技术效益。

Description

整体支模异步浇筑楼梯间墙柱支模体系及施工方法
技术领域
本发明涉及整体支模异步浇筑楼梯间墙柱支模体系及施工方法。
技术背景
我国的房地产业持续走高,剪力墙结构在高层住宅中的应用更加广泛,剪力墙结构中的楼梯间凸显了剪力墙上下层之间分次浇捣所产生的错台问题,在楼梯施工过程中,通常将楼梯与结构平板划分为同一施工段。混凝土浇筑时,根据施工段的划分,通常是支模支到结构平板,混凝土浇筑到平板,然后支设上一层的墙柱模板,再进行下一施工段的施工,这样在两次支设模板的过程中就容易在楼层处形成错台。
鉴于此,如何通过一些技术措施解决上下层剪力墙之间错台的产生,是一个亟需解决的问题。
发明内容
本发明的目的在于提供一种整体支模异步浇筑楼梯间墙柱支模体系及施工方法。
为实现上述目的,本发明采用了以下技术方案:
这种整体支模异步浇筑楼梯间墙柱支模体系,包括:竖向支撑杆、斜向支撑杆、木方、框架梁底模、已施工楼板、楼板梁、现浇楼梯、梯梁、梯段板底模、可伸缩支撑、休息平台底模、休息平台板、梯梁下部模板、施工楼板、楼梯踏步挡板、楼梯施工缝挡板、楼梯施工缝清扫口、楼梯上部定位板、施工梯段板、短支撑、施工楼板底模、楼梯间墙模板、楼梯间墙、框架梁、墙柱斜撑、加固横杆、横向连接杆、楼梯加固横杆、内部钢肋、定位板、定位块、墙竖向筋、墙箍筋、墙横向筋、L型钢板。楼梯间墙柱模板一侧设置墙柱斜撑,另一侧设置楼梯加固横杆,框架梁底模与竖向支撑杆之间设置木方,施工楼板底模下部设置短支撑,施工梯段板每个踏步外侧竖向设置楼梯踏步挡板,定位板焊接定位块,墙竖向筋卡入定位板与定位块形成的凹槽之中,定位板之间焊接内部钢肋。
这种整体支模异步浇筑楼梯间墙柱的施工方法,包括以下施工步骤:
1)钢筋绑扎:先进行楼板和梁的钢筋绑扎,再进行楼梯间墙柱钢筋的绑扎,楼梯间墙柱的钢筋绑扎前先进行钢筋定位,墙竖向筋卡入定位板与定位块形成的凹槽之中,定位板之间焊接内部钢肋,定位块顶住楼梯间墙柱模板;
2)墙柱支模:楼梯间墙柱模板一侧设置墙柱斜撑,另一侧设置楼梯加固横杆,墙柱脚部设置L型钢板压脚,通过临时支撑固定;
3)支撑安装:楼梯间墙柱模板外部支撑采用斜向支撑杆和墙柱斜撑以及可伸缩支撑组合使用,楼梯间内部两墙柱之间模板外侧支撑采用楼梯加固横杆;
4)混凝土浇筑:待楼梯间梁板浇筑完毕后,进行楼梯间墙柱混凝土的浇筑,按每层施工的顺序浇筑,浇筑范围为超出上层楼梯间休息平台板的范围;
5)墙柱拆模:拆除砌体部位的墙柱模板,保留楼梯间墙柱的模板,先拆掉支撑,再卸掉钢管及楞木,然后用撬杠轻轻撬动模板,使模板与混凝土脱离。在拆模中,应保留施工层休息平台以上的墙柱模板,该位置模板应在上一层结构层施工完成后,方可拆除。
作为优选:步骤1中所述的定位块顶住楼梯间墙柱模板一端到墙横向筋的距离为混凝土保护层厚度。
本发明的有益效果是:
(1)整板支模异步浇筑改变楼梯间剪力墙柱错台的质量通病,提高了楼梯间混凝土整体的观感质量。
(2)楼梯间剪力墙的混凝土浇筑时还需分次浇筑,在进行下一次浇筑时省去了对楼梯间内侧剪力墙内模的调整校正工序,减少了检查环节,同时降低了工人的劳动强度。
(3)模板拆除后不再需要人工进行楼梯间混凝土剪力墙根部的修补或剔凿,节省人工。
附图说明
图1是整体支模异步浇筑楼梯间墙柱支模体系示意图;
图2是楼梯间结构剖面图;
图3是墙柱钢筋定位示意图;
图中:1.竖向支撑杆、2.斜向支撑杆、3.木方、4.框架梁底模、5.已施工楼板、6.楼板梁、7.现浇楼梯、8.梯梁、9.梯段板底模、10.可伸缩支撑、11.休息平台底模、12.休息平台板、13.梯梁下部模板、14.施工楼板、15.楼梯踏步挡板、16.楼梯施工缝挡板、17.楼梯施工缝清扫口、18.楼梯上部定位板、19.施工梯段板、20.短支撑、21.施工楼板底模、22.楼梯间墙柱模板、23.楼梯间墙柱、24.框架梁、25.墙柱斜撑、26.加固横杆、27.横向连接杆、28.楼梯加固横杆、29.内部钢肋、30.定位板、31.定位块、32.墙竖向筋、33.墙箍筋、34.墙横向筋、35.L型钢板。
具体实施方式
本实施方式钢结构焊接工艺、螺栓连接施工工艺、模板设置工艺等本实施中就不在累述,重点阐述本发明涉及结构的实施方式。
这种整体支模异步浇筑楼梯间墙柱支模体系,包括:竖向支撑杆1、斜向支撑杆2、木方3、框架梁底模4、已施工楼板5、楼板梁6、现浇楼梯7、梯梁8、梯段板底模9、可伸缩支撑10、休息平台底模11、休息平台板12、梯梁下部模板13、施工楼板14、楼梯踏步挡板15、楼梯施工缝挡板16、楼梯施工缝清扫口17、楼梯上部定位板18、施工梯段板19、短支撑20、施工楼板底模21、楼梯间墙柱模板22、楼梯间墙柱23、框架梁24、墙柱斜撑25、加固横杆26、横向连接杆27、楼梯加固横杆28、内部钢肋29、定位板30、定位块31、墙竖向筋32、墙箍筋33、墙横向筋34、L型钢板35。楼梯间墙柱模板22一侧设置墙柱斜撑26,另一侧设置楼梯加固横杆28,框架梁底模4与竖向支撑杆1之间设置木方3,施工楼板底模21下部设置短支撑20,施工梯段板19每个踏步外侧竖向设置楼梯踏步挡板15,定位板30焊接定位块31,墙竖向筋33卡入定位板30与定位块31形成的凹槽之中,定位板30之间焊接内部钢肋29。
这种整体支模异步浇筑楼梯间墙柱支模体系的施工方法,包括以下施工步骤:
1)钢筋绑扎:先进行楼板和梁的钢筋绑扎,再进行楼梯间墙柱钢筋23的绑扎,楼梯间墙柱23钢筋绑扎前先进行钢筋定位,墙竖向筋33卡入定位板30与定位块31形成的凹槽之中,定位板30之间焊接内部钢肋29,定位块31顶住墙柱模板;
2)墙柱支模:楼梯间墙柱模板22一侧设置墙柱斜撑26,另一侧设置楼梯加固横杆28,墙柱脚部设置L型钢板35压脚,通过横向连接的支撑固定;
3)支撑安装:楼梯间墙柱模板外部支撑采用斜向支撑杆2和墙柱斜撑25以及可伸缩支撑10组合使用,楼梯间内部两墙柱之间模板外侧支撑采用楼梯加固横杆28;
4)混凝土浇筑:待楼梯间梁板浇筑完毕后,进行楼梯间墙柱23混凝土的浇筑,按每层施工的顺序浇筑,浇筑范围为超出上层楼梯间休息平台板12的范围;
5)墙柱拆模:拆除砌体部位的墙柱模板,保留楼梯间墙柱23的模板,先拆掉支撑,再卸掉钢管及楞木,然后用撬杠轻轻撬动模板,使模板与混凝土脱离。在拆模中,应保留施工层休息平台以上的墙柱模板,该位置模板应在上一层结构层施工完成后,方可拆除;
步骤1中所述的定位块31顶住楼梯间墙柱模板22一端到墙横向筋34的距离为混凝土保护层厚度。
参照图1所示,图中:L型钢板可选用废弃的钢材,切割长度为不小于墙体长度,不足长度的可采用焊接的形式连接起来。
参照图2所示,图中:楼梯加固横杆28每层不少于两道设置,其下方可设置短加固横杆不小于每300mm一道设置。
参照图3所示,图中:定位板30可采用薄钢板,按照墙竖向筋32的直径确定定位板30上凹槽的宽度,再进行相应位置上定位块31的焊接,定位块31焊接前进行计算,使其靠近墙柱模板一端到墙横向筋34的距离等于墙柱混凝土保护层厚度。

Claims (3)

1.一种整体支模异步浇筑楼梯间墙柱支模体系,其特征在于,包括:竖向支撑杆(1)、斜向支撑杆(2)、木方(3)、框架梁底模(4)、已施工楼板(5)、楼板梁(6)、现浇楼梯(7)、梯梁(8)、梯段板底模(9)、可伸缩支撑(10)、休息平台底模(11)、休息平台板(12)、梯梁下部模板(13)、施工楼板(14)、楼梯踏步挡板(15)、楼梯施工缝挡板(16)、楼梯施工缝清扫口(17)、楼梯上部定位板(18)、施工梯段板(19)、短支撑(20)、施工楼板底模(21)、楼梯间墙柱模板(22)、楼梯间墙柱(23)、框架梁(24)、墙柱斜撑(25)、加固横杆(26)、横向连接杆(27)、楼梯加固横杆(28)、内部钢肋(29)、定位板(30)、定位块(31)、墙竖向筋(32)、墙箍筋(33)、墙横向筋(34)、L型钢板(35);楼梯间墙柱模板(22)一侧设置墙柱斜撑(25),另一侧设置楼梯加固横杆(28),框架梁底模(4)与竖向支撑杆(1)之间设置木方(3),施工楼板底模(21)下部设置短支撑(20),施工梯段板(19)每个踏步外侧竖向设置楼梯踏步挡板(15),定位板(30)焊接定位块(31),墙竖向筋(32)卡入定位板(30)与定位块(31)形成的凹槽之中,定位板(30)之间焊接内部钢肋(29)。
2.整体支模异步浇筑楼梯间墙柱支模体系的施工方法,其特征在于,包括以下施工步骤:
1)钢筋绑扎:先进行楼板和梁的钢筋绑扎,再进行楼梯间墙柱(23)的钢筋绑扎,楼梯间墙柱(23)的钢筋绑扎前先进行钢筋定位,墙竖向筋(32)卡入定位板(30)与定位块(31)形成的凹槽之中,定位板(30)之间焊接内部钢肋(29),定位块(31)顶住楼梯间墙柱模板(22);
2)墙柱支模:楼梯间墙柱模板(22)一侧设置墙柱斜撑(25),另一侧设置楼梯加固横杆(28),墙柱脚部设置L型钢板(35)压脚,通过临时支撑固定;
3)支撑安装:楼梯间墙柱模板(22)外部支撑采用斜向支撑杆(2)和墙柱斜撑(25)以及可伸缩支撑(10)组合使用,楼梯间内部两墙柱之间模板外侧支撑采用楼梯加固横杆(28);
4)混凝土浇筑:待楼梯间梁板浇筑完毕后,进行楼梯间墙柱(23)混凝土的浇筑,按每层施工的顺序浇筑,浇筑范围为超出上层楼梯间休息平台板(12)的范围;
5)墙柱拆模:拆除砌体部位的墙柱模板,保留楼梯间墙柱(23)的模板,先拆掉支撑,再卸掉钢管及楞木,然后用撬杠轻轻撬动模板,使模板与混凝土脱离;在拆模中,应保留施工层休息平台以上的墙柱模板,该位置模板应在上一层结构层施工完成后,方可拆除。
3.根据权利要求2所述的整体支模异步浇筑楼梯间墙柱支模体系的施工方法,其特征在于,步骤1)中所述的定位块(31)顶住楼梯间墙柱模板(22)一端到墙横向筋(34)的距离为混凝土保护层厚度。
CN201610357177.6A 2016-05-25 2016-05-25 整体支模异步浇筑楼梯间墙柱支模体系及施工方法 Active CN105863253B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610357177.6A CN105863253B (zh) 2016-05-25 2016-05-25 整体支模异步浇筑楼梯间墙柱支模体系及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610357177.6A CN105863253B (zh) 2016-05-25 2016-05-25 整体支模异步浇筑楼梯间墙柱支模体系及施工方法

Publications (2)

Publication Number Publication Date
CN105863253A true CN105863253A (zh) 2016-08-17
CN105863253B CN105863253B (zh) 2018-06-01

Family

ID=56642094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610357177.6A Active CN105863253B (zh) 2016-05-25 2016-05-25 整体支模异步浇筑楼梯间墙柱支模体系及施工方法

Country Status (1)

Country Link
CN (1) CN105863253B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106771100A (zh) * 2016-12-30 2017-05-31 山东省建筑科学研究院 预制混凝土楼梯结构性能检验加载支架
CN108222505A (zh) * 2017-12-28 2018-06-29 中国建筑第八工程局有限公司 楼梯踏步施工缝的留置方法
CN108277895A (zh) * 2018-03-21 2018-07-13 江苏省华建建设股份有限公司 一种复合保温外墙系统及施工方法
CN108930402A (zh) * 2018-07-23 2018-12-04 中建铝新材料河南有限公司 一种铝合金模板在楼梯梯段后置一层施工中的工艺
CN109019255A (zh) * 2018-09-29 2018-12-18 广西大学 直达住户原大门的新式加装电梯
CN114319852A (zh) * 2022-01-20 2022-04-12 深圳市嘉盛建筑工程有限公司 铝合金全封闭楼梯模板
CN114704037A (zh) * 2022-02-17 2022-07-05 安徽金鹏建设集团股份有限公司 一种转折型楼梯间模板一次成型分次浇筑施工方法
CN114922351A (zh) * 2022-07-01 2022-08-19 瑞洲建设集团有限公司 一种柱、梁钢筋用双向保护层垫块施工方法
CN115095080A (zh) * 2022-07-19 2022-09-23 华神建设集团有限公司 超高超重大跨度现浇混凝土梁施工方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111519895A (zh) * 2020-05-15 2020-08-11 启东建筑集团有限公司 楼梯间梯、墙整体钢模板浇筑施工方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383590A (zh) * 2011-07-11 2012-03-21 雷灿波 一种分体建筑模板组合系统
CN102535846A (zh) * 2012-02-22 2012-07-04 王志成 房屋建筑整体浇注一次成型施工工艺
CN203238941U (zh) * 2013-05-12 2013-10-16 中国十七冶集团有限公司 墙柱砼二次接茬处理定型模板支撑系统装置
CN103806643A (zh) * 2014-02-25 2014-05-21 绍兴县明煌建材科技有限公司 一种剪力墙钢模板组件及其施工方式
CN104120805A (zh) * 2014-07-28 2014-10-29 中建四局第三建筑工程有限公司 一种砼砌墙体的施工方法及结构
CN104196235A (zh) * 2014-08-28 2014-12-10 中国三冶集团有限公司 一种可移动模板支撑桁架及其施工方法
US20150306904A1 (en) * 2014-04-28 2015-10-29 Kaysi Darrah Wall appliqué
KR101562825B1 (ko) * 2015-06-10 2015-10-30 (주)케이디 엔지니어링 건축사사무소 조립식 계단 거푸집
CN105113787A (zh) * 2015-09-20 2015-12-02 刘其标 清水混凝土锯齿型封闭式楼梯钢模板装置
CN205875706U (zh) * 2016-05-25 2017-01-11 杭州江润科技有限公司 整体支模异步浇筑楼梯间墙柱支模体系

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383590A (zh) * 2011-07-11 2012-03-21 雷灿波 一种分体建筑模板组合系统
CN102535846A (zh) * 2012-02-22 2012-07-04 王志成 房屋建筑整体浇注一次成型施工工艺
CN203238941U (zh) * 2013-05-12 2013-10-16 中国十七冶集团有限公司 墙柱砼二次接茬处理定型模板支撑系统装置
CN103806643A (zh) * 2014-02-25 2014-05-21 绍兴县明煌建材科技有限公司 一种剪力墙钢模板组件及其施工方式
US20150306904A1 (en) * 2014-04-28 2015-10-29 Kaysi Darrah Wall appliqué
CN104120805A (zh) * 2014-07-28 2014-10-29 中建四局第三建筑工程有限公司 一种砼砌墙体的施工方法及结构
CN104196235A (zh) * 2014-08-28 2014-12-10 中国三冶集团有限公司 一种可移动模板支撑桁架及其施工方法
KR101562825B1 (ko) * 2015-06-10 2015-10-30 (주)케이디 엔지니어링 건축사사무소 조립식 계단 거푸집
CN105113787A (zh) * 2015-09-20 2015-12-02 刘其标 清水混凝土锯齿型封闭式楼梯钢模板装置
CN205875706U (zh) * 2016-05-25 2017-01-11 杭州江润科技有限公司 整体支模异步浇筑楼梯间墙柱支模体系

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106771100A (zh) * 2016-12-30 2017-05-31 山东省建筑科学研究院 预制混凝土楼梯结构性能检验加载支架
CN108222505A (zh) * 2017-12-28 2018-06-29 中国建筑第八工程局有限公司 楼梯踏步施工缝的留置方法
CN108222505B (zh) * 2017-12-28 2020-04-24 中国建筑第八工程局有限公司 楼梯踏步施工缝的留置方法
CN108277895A (zh) * 2018-03-21 2018-07-13 江苏省华建建设股份有限公司 一种复合保温外墙系统及施工方法
CN108930402A (zh) * 2018-07-23 2018-12-04 中建铝新材料河南有限公司 一种铝合金模板在楼梯梯段后置一层施工中的工艺
CN108930402B (zh) * 2018-07-23 2020-06-26 中建铝新材料河南有限公司 一种铝合金模板在楼梯梯段后置一层施工中的工艺
CN109019255A (zh) * 2018-09-29 2018-12-18 广西大学 直达住户原大门的新式加装电梯
CN114319852A (zh) * 2022-01-20 2022-04-12 深圳市嘉盛建筑工程有限公司 铝合金全封闭楼梯模板
CN114704037A (zh) * 2022-02-17 2022-07-05 安徽金鹏建设集团股份有限公司 一种转折型楼梯间模板一次成型分次浇筑施工方法
CN114922351A (zh) * 2022-07-01 2022-08-19 瑞洲建设集团有限公司 一种柱、梁钢筋用双向保护层垫块施工方法
CN115095080A (zh) * 2022-07-19 2022-09-23 华神建设集团有限公司 超高超重大跨度现浇混凝土梁施工方法
CN115095080B (zh) * 2022-07-19 2023-11-10 华神建设集团有限公司 超高超重大跨度现浇混凝土梁施工方法

Also Published As

Publication number Publication date
CN105863253B (zh) 2018-06-01

Similar Documents

Publication Publication Date Title
CN105863253B (zh) 整体支模异步浇筑楼梯间墙柱支模体系及施工方法
CN106677069B (zh) 一种桥墩整体支模一次成型结构的施工方法
CN101818570B (zh) 高层建筑梁式结构转换层的施工方法
CN106223516B (zh) Alc蒸压加气混凝土条板倾斜隔墙结构及施工方法
CN105804395B (zh) 基于整体式定型模板的楼梯一次连续浇筑成型施工方法
CN102587659A (zh) 一种以混凝土柱支顶后浇带两侧结构的施工方法
CN108265885A (zh) 高大非正交大倾角异型混凝土斜柱的施工方法
CN110219461A (zh) 一种内筒铝模板与外框木模板组合模板施工方法
CN106120562A (zh) 高架桥钢棒牛腿盖梁支模架整体吊装施工方法
CN107090971A (zh) 一种快速准确安装烟道拱顶模板的方法和装置
CN106638947A (zh) 预制框架结构及其串连预制建筑方法
CN103821361B (zh) 改进的分次浇筑楼梯间柱支模施工方法
CN106703407A (zh) 悬挑梁板双层型钢支撑架施工方法
CN106032704A (zh) 一种以混凝土柱支顶后浇带两侧结构的施工方法
CN205894681U (zh) 一种封闭式楼梯模板
CN107401279A (zh) 一次性整体浇筑楼梯间墙梯组合钢模板安装施工方法
CN103276894A (zh) 空心楼盖大截面梁式转换层的支撑体系及施工工艺
CN106285002A (zh) 现浇楼面高低差工具式吊模施工方法
CN109457960B (zh) 一种用于现浇楼梯踏步整体装配式可调通用模具
CN205875706U (zh) 整体支模异步浇筑楼梯间墙柱支模体系
CN109235871B (zh) 变截面结构铝合金模板施工方法
CN103397778A (zh) 高层商住楼结构转换层施工方法
CN104131635B (zh) 一种预制楼梯间周边剪力墙施工方法及施工平台
CN107060338A (zh) 一种支模二次浇筑楼梯间柱的方法
CN114277672B (zh) 一种大跨度预应力混凝土盖梁构造及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Qiang

Inventor after: Shen Guofang

Inventor after: Tang Zeyuan

Inventor after: Shen Jianfeng

Inventor after: Yao Dezhong

Inventor after: Tan Liming

Inventor before: Wang Xinquan

Inventor before: Xu Mingdi

Inventor before: Zhu Kai

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20180507

Address after: 313200 room 1701, Wulipai Road, Wu Kang Street, Deqing County, Huzhou, Zhejiang, 1701

Applicant after: Heng De Construction Company Limited

Address before: 310015 room 3, unit 3, Wanda Commercial Center, Hangzhou, Zhejiang, 1901.

Applicant before: Hangzhou Jiang Run Science and Technology Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant