CN105696603A - 一种用于深挖沟槽的桁架支撑钢板桩支护装置及方法 - Google Patents
一种用于深挖沟槽的桁架支撑钢板桩支护装置及方法 Download PDFInfo
- Publication number
- CN105696603A CN105696603A CN201610221482.2A CN201610221482A CN105696603A CN 105696603 A CN105696603 A CN 105696603A CN 201610221482 A CN201610221482 A CN 201610221482A CN 105696603 A CN105696603 A CN 105696603A
- Authority
- CN
- China
- Prior art keywords
- steel sheet
- sheet pile
- purlin
- truss
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
一种用于深挖沟槽的桁架支撑钢板桩支护装置及方法,它涉及钢板桩支护装置及方法,以解决目前在深挖沟槽工程中单层单杆支撑钢板桩横向失稳问题,它包括两组钢板桩、多组桁架机构和n个围檩;两组钢板桩并排设置,每层围檩单元由正对设置的两个围檩构成,围檩与钢板桩固接,相邻两层围檩单元之间沿围檩长度方向相间布置有多组桁架机构,每组桁架机构包括四个横向支撑杆和八个斜支撑杆,横向支撑杆与围檩固接,相邻两个横向支撑杆之间交叉布置有与四个围檩固接的两个斜支撑杆。支护方法步骤:一、插打钢板桩,钢板桩通过振动打桩机打入土体当中,二、支护及沟槽开挖。本发明用于深挖沟槽钢板桩支护。
Description
技术领域
本发明涉及钢板桩支护装置及方法,具体涉及一种适用于沟槽深挖施工过程的保护土体稳定的桁架支撑钢板桩支护装置及方法,属于支护工程领域。
背景技术
钢板桩支护是基坑开挖过程中保证土体稳定的一种重要措施,一般在钢板桩顶部都要采用支撑体系,常规的顶部支撑体系都都为单层单杆的横向支撑,该种支撑由于是单层单杆,各个横向支撑之间并没有联系,无法保证横向稳定,在深挖沟槽工程中,尤其是沟槽曲线段位置,由于纵向土压力差容易导致钢板桩支护横向失稳,造成支护失效。
发明内容
本发明是为解决目前在深挖沟槽工程中单层单杆支撑钢板桩横向失稳问题,进而提供一种用于深挖沟槽的桁架支撑钢板桩支护装置及方法。
本发明为解决上述问题采取的技术方案是:
一种用于深挖沟槽的桁架支撑钢板桩支护装置包括两组钢板桩、多组桁架机构和n个围檩;n为偶数且n≥4;
两组钢板桩并排设置,两组钢板桩之间纵向设置有n个围檩,沿钢板桩的高度方向相间布置有多层围檩单元,每层围檩单元由正对设置的两个围檩构成,围檩与钢板桩固接,相邻两层围檩单元之间沿围檩长度方向相间布置有多组桁架机构,每组桁架机构包括四个横向支撑杆和八个斜支撑杆,横向支撑杆与围檩固接,相邻两个横向支撑杆之间交叉布置有与四个围檩固接的两个斜支撑杆。
一种用于深挖沟槽的桁架支撑钢板桩支护方法步骤是:
一、插打钢板桩,确定钢板桩插打范围,钢板桩插打范围即深基坑范围,钢板桩通过振动打桩机打入土体当中,
二、支护及沟槽开挖,在钢板桩顶部焊接围檩,在围檩上焊接横向支撑杆和斜支撑杆,完成支护结构后,进行深沟槽开挖。
本发明与现有技术相比具有以下有益效果:一、本发明适用于开挖宽度较小,开挖深度较大的沟槽工程,能够有效的保护土体稳定性;本发明也可以用于一定宽度的基坑深挖工程。二、本发明通过桁架机构的支撑能够保证沟槽在曲线段处不发生纵向失稳问题,防止了钢板桩支护产生过大的位移造成支护失效的现象,保证钢板桩的横向和纵向稳定性。三、本发明支护工艺简便易行,本发明支护方法保证了施工质量。
附图说明
图1是本发明的整体结构主视图;
图2是图1的俯视图。
具体实施方式
具体实施方式一:结合图1-图2说明,本实施方式的一种用于深挖沟槽的桁架支撑钢板桩支护装置,它包括两组钢板桩1、多组桁架机构2和n个围檩3;n为偶数且n≥4;
两组钢板桩1并排设置,两组钢板桩1之间纵向设置有n个围檩3,沿钢板桩1的高度方向相间布置有多层围檩单元,每层围檩单元由正对设置的两个围檩3构成,围檩3与钢板桩1固接,相邻两层围檩单元之间沿围檩长度方向相间布置有多组桁架机构2,每组桁架机构2包括四个横向支撑杆2-1和八个斜支撑杆2-2,横向支撑杆2-1与围檩3固接,相邻两个横向支撑杆2-1之间交叉布置有与四个围檩3固接的两个斜支撑杆2-2。
本实施方式的钢板桩1通过振动打桩机打入土体,在顶部焊接围檩3,然后焊接横向支撑杆2-1和斜向支撑杆2-2。
具体实施方式二:结合图1说明,本实施方式的围檩3的数量为四个。如此设置,四个围檩3构成双层围檩单元,满足实际深挖沟槽的需要。其它与具体实施方式一相同。
具体实施方式三:结合图2说明,本实施方式的相邻两层围檩单元之间沿围檩长度方向相间布置有两组桁架机构2。如此设置,两组桁架机构沿围檩长度方向相间布置满足设计要求和实际深挖沟槽的需要。其它与具体实施方式一或二相同。
具体实施方式四:结合图2说明,本实施方式的钢板桩1为U形钢板桩或Z形钢板桩。如此设置,取材方便,U形钢板桩生产便捷,抗弯刚度高,实际使用时可预制,Z形钢板桩截面模量和抗弯刚度高,满足实际需要。其它与具体实施方式三相同。
具体实施方式五:结合图1和图2说明,本实施方式的围檩3与钢板桩1焊接,横向支撑杆2-1与围檩3焊接,斜支撑杆2-2与围檩3焊接。如此设置,采用焊接固定,保证了装置的稳定性和强度。
具体实施方式六:结合图1-图2说明,本实施方式的一种用于深挖沟槽的桁架支撑钢板桩支护方法步骤是:
一、插打钢板桩,确定钢板桩1插打范围,钢板桩1插打范围即深基坑范围,钢板桩1通过振动打桩机打入土体当中;
二、支护及沟槽开挖,在钢板桩1顶部焊接围檩3,在围檩3上焊接横向支撑杆2-1和斜支撑杆2-2,完成支护结构后,进行深沟槽开挖。
相邻两个横向支撑杆2-1之间的围檩3上焊接交叉布置的两个斜支撑杆2-2,进行深基坑或沟槽开挖。
本实施方式钢板桩1插打范围适合宽度较小,开挖深度较大的沟槽的范围。钢板桩打入深度通过钢板桩稳定性计算得到,然后将每层围檩焊接到钢板桩顶部,每层围檩位置通过钢板桩稳定性计算得到,钢板桩稳定性计算见GB50017-2012钢结构设计规范,然后在围檩上焊接横向支撑杆和斜向支撑杆。
Claims (6)
1.一种用于深挖沟槽的桁架支撑钢板桩支护装置,其特征在于:它包括两组钢板桩(1)、多组桁架机构(2)和n个围檩(3);n为偶数且n≥4;
两组钢板桩(1)并排设置,两组钢板桩(1)之间纵向设置有n个围檩(3),沿钢板桩(1)的高度方向相间布置有多层围檩单元,每层围檩单元由正对设置的两个围檩(3)构成,围檩(3)与钢板桩(1)固接,相邻两层围檩单元之间沿围檩长度方向相间布置有多组桁架机构(2),每组桁架机构(2)包括四个横向支撑杆(2-1)和八个斜支撑杆(2-2),横向支撑杆(2-1)与围檩(3)固接,相邻两个横向支撑杆(2-1)之间交叉布置有与四个围檩(3)固接的两个斜支撑杆(2-2)。
2.根据权利要求1所述的一种用于深挖沟槽的桁架支撑钢板桩支护装置,其特征在于:围檩(3)的数量为四个。
3.根据权利要求1或2所述的一种用于深挖沟槽的桁架支撑钢板桩支护装置,其特征在于:相邻两层围檩单元之间沿围檩长度方向相间布置有两组桁架机构(2)。
4.根据权利要求3所述的一种用于深挖沟槽的桁架支撑钢板桩支护装置,其特征在于:钢板桩(1)为U形钢板桩或Z形钢板桩。
5.根据权利要求1、2或4所述的一种用于深挖沟槽的桁架支撑钢板桩支护装置,其特征在于:围檩(3)与钢板桩(1)焊接,横向支撑杆(2-1)与围檩(3)焊接,斜支撑杆(2-2)与围檩(3)焊接。
6.一种用于深挖沟槽的桁架支撑钢板桩支护方法,其特征在于:该支护方法步骤是:
一、插打钢板桩,确定钢板桩(1)插打范围,钢板桩(1)插打范围即深基坑范围,钢板桩(1)通过振动打桩机打入土体当中;
二、支护及沟槽开挖,在钢板桩(1)顶部焊接围檩(3),在围檩(3)上焊接横向支撑杆(2-1)和斜支撑杆(2-2),完成支护结构后,进行深沟槽开挖。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610221482.2A CN105696603A (zh) | 2016-04-11 | 2016-04-11 | 一种用于深挖沟槽的桁架支撑钢板桩支护装置及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610221482.2A CN105696603A (zh) | 2016-04-11 | 2016-04-11 | 一种用于深挖沟槽的桁架支撑钢板桩支护装置及方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105696603A true CN105696603A (zh) | 2016-06-22 |
Family
ID=56219797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610221482.2A Pending CN105696603A (zh) | 2016-04-11 | 2016-04-11 | 一种用于深挖沟槽的桁架支撑钢板桩支护装置及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105696603A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109267564A (zh) * | 2018-10-31 | 2019-01-25 | 佛山科学技术学院 | 一种复合型钢板桩地连墙 |
CN109555128A (zh) * | 2017-12-28 | 2019-04-02 | 中建科技有限公司深圳分公司 | 综合管廊明挖施工用挡土墙装置 |
CN109555154A (zh) * | 2017-12-28 | 2019-04-02 | 中建科技有限公司深圳分公司 | 综合管廊明挖施工方法 |
CN116446407A (zh) * | 2023-05-15 | 2023-07-18 | 中国十七冶集团有限公司 | 一种临近既有构筑物的沿河深沟槽开挖施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050010616A (ko) * | 2003-07-21 | 2005-01-28 | 김정균 | 건축용 흙막이 횡트러스 버팀 공법 및 구조 |
CN201924365U (zh) * | 2011-01-17 | 2011-08-10 | 东南大学 | 一种钢板桩管桩组合基坑支护结构 |
CN102286980A (zh) * | 2011-07-11 | 2011-12-21 | 福建工大建筑设计院 | 钢桁架式基坑支护结构 |
CN203034462U (zh) * | 2012-12-06 | 2013-07-03 | 东南大学 | 一种地下空间钢桁架基坑支护结构 |
CN203034464U (zh) * | 2012-12-17 | 2013-07-03 | 广东省基础工程公司 | 一种桁架式基坑支护结构 |
KR101307821B1 (ko) * | 2013-05-08 | 2013-09-23 | 주식회사 시티기술단 | 작업공간의 확보를 위한 지중 토류벽 구조 |
CN205576935U (zh) * | 2016-04-11 | 2016-09-14 | 中铁建大桥工程局集团第四工程有限公司 | 一种用于深挖沟槽的桁架支撑钢板桩支护装置 |
-
2016
- 2016-04-11 CN CN201610221482.2A patent/CN105696603A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050010616A (ko) * | 2003-07-21 | 2005-01-28 | 김정균 | 건축용 흙막이 횡트러스 버팀 공법 및 구조 |
CN201924365U (zh) * | 2011-01-17 | 2011-08-10 | 东南大学 | 一种钢板桩管桩组合基坑支护结构 |
CN102286980A (zh) * | 2011-07-11 | 2011-12-21 | 福建工大建筑设计院 | 钢桁架式基坑支护结构 |
CN203034462U (zh) * | 2012-12-06 | 2013-07-03 | 东南大学 | 一种地下空间钢桁架基坑支护结构 |
CN203034464U (zh) * | 2012-12-17 | 2013-07-03 | 广东省基础工程公司 | 一种桁架式基坑支护结构 |
KR101307821B1 (ko) * | 2013-05-08 | 2013-09-23 | 주식회사 시티기술단 | 작업공간의 확보를 위한 지중 토류벽 구조 |
CN205576935U (zh) * | 2016-04-11 | 2016-09-14 | 中铁建大桥工程局集团第四工程有限公司 | 一种用于深挖沟槽的桁架支撑钢板桩支护装置 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109555128A (zh) * | 2017-12-28 | 2019-04-02 | 中建科技有限公司深圳分公司 | 综合管廊明挖施工用挡土墙装置 |
CN109555154A (zh) * | 2017-12-28 | 2019-04-02 | 中建科技有限公司深圳分公司 | 综合管廊明挖施工方法 |
CN109267564A (zh) * | 2018-10-31 | 2019-01-25 | 佛山科学技术学院 | 一种复合型钢板桩地连墙 |
CN109267564B (zh) * | 2018-10-31 | 2020-07-07 | 佛山科学技术学院 | 一种复合型钢板桩地连墙 |
CN116446407A (zh) * | 2023-05-15 | 2023-07-18 | 中国十七冶集团有限公司 | 一种临近既有构筑物的沿河深沟槽开挖施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105696603A (zh) | 一种用于深挖沟槽的桁架支撑钢板桩支护装置及方法 | |
JP5719700B2 (ja) | ハニカム状3次元立体セル構造体ブロックの斜面上への敷設方法 | |
KR102097855B1 (ko) | 더블 아이 빔에 압축응력이 도입된 자립식 흙막이 공법 | |
CN203614107U (zh) | 马头门复合支护结构 | |
CN205576935U (zh) | 一种用于深挖沟槽的桁架支撑钢板桩支护装置 | |
CN205024600U (zh) | 一种用于桥梁水中桩基施工的作业平台 | |
CN206409743U (zh) | 地下管线的钢管桩支撑结构 | |
CN212428842U (zh) | 适用于碎屑片岩地层深埋隧道组合支护结构 | |
JP2013015015A (ja) | 山留壁の構造と構築方法 | |
JP2007247308A (ja) | 斜杭からなる組杭の引き抜き耐力増強工法及び同工法よりなる構造 | |
KR20100061932A (ko) | 아치형 강판 파일을 이용한 흙막이 가시설 구조 | |
JP6374712B2 (ja) | 鉄筋コンクリート造基礎梁の補強構造及び補強用ユニット | |
JP6070118B2 (ja) | 土留壁構造、土留壁構造の構築方法 | |
CN211849466U (zh) | 大型动荷载下深基坑支护体系 | |
CN213392201U (zh) | 软弱围岩隧道换拱临时支护及超前导向结构体系 | |
JP2014141828A (ja) | 扁平トンネルの構築方法 | |
KR20120049603A (ko) | 트러스형 말뚝 배열 구조를 가지는 흙막이 구조물 및 그 시공방법 | |
CN105909255A (zh) | 一种采用掌子面临时约束超短台阶的大跨软弱围岩隧道施工方法 | |
JP2017119953A (ja) | 逆打ち工法を用いた建築方法 | |
KR200459483Y1 (ko) | 강관 병행 h?시트 파일을 이용한 시공구조 | |
CN113668404B (zh) | 钢栈桥整体稳定性提升方法 | |
KR101598048B1 (ko) | 고강도 격자지보 | |
JP6581821B2 (ja) | プレキャストコンクリート製のボックスカルバート | |
JP2019190162A (ja) | 鋼材の組合せ構造体,山留支保工構造,及び構築方法 | |
CN104452837B (zh) | 深厚淤泥地层中群桩基础竖向静载的试验方法及试验装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160622 |
|
WD01 | Invention patent application deemed withdrawn after publication |