CN105673074B - The local buried gutter structure of Tunnel Base - Google Patents
The local buried gutter structure of Tunnel Base Download PDFInfo
- Publication number
- CN105673074B CN105673074B CN201610033038.8A CN201610033038A CN105673074B CN 105673074 B CN105673074 B CN 105673074B CN 201610033038 A CN201610033038 A CN 201610033038A CN 105673074 B CN105673074 B CN 105673074B
- Authority
- CN
- China
- Prior art keywords
- tunnel
- inspection shaft
- buried gutter
- drainage pipe
- tunnel base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007689 inspection Methods 0.000 claims abstract description 45
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 29
- 230000035515 penetration Effects 0.000 claims description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 239000004576 sand Substances 0.000 claims description 6
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 5
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 239000004746 geotextile Substances 0.000 claims description 3
- 238000004080 punching Methods 0.000 claims description 3
- 238000011144 upstream manufacturing Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 9
- 239000000758 substrate Substances 0.000 description 6
- 239000000945 filler Substances 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 239000011435 rock Substances 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000005098 hot rolling Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F16/00—Drainage
- E21F16/02—Drainage of tunnels
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a kind of local buried gutter structure of Tunnel Base, including the multiple inspection shafts for being located at the central drainage pipe in tunnel inverted arch filling and being set along central drainage pipe length direction;Tunnel Base is provided with the buried gutter in part, the one end in the buried gutter in part is equipped with end inspection shaft, end inspection shaft downstream is equipped with charge for remittance well, is connected between end inspection shaft and charge for remittance well by a plurality of vertical aqueduct and a plurality of longitudinal aqueduct, charge for remittance well is connected with central drainage pipe;Tunnel Base ponding is come together in by the buried gutter in part in the inspection shaft of end, then enters charge for remittance well by vertical aqueduct and longitudinal aqueduct, is then discharged outside hole by central drainage pipe.The present invention is suitable for Tunnel Base local draining, reduce the difficulty of construction of the elongated setting center Deeply buried ditch in tunnel and risk and project cost, reduce the water pressure that tunnel structure is born, it prevents tunnel liner structure percolating water during construction and operation from even causing Lining cracks, ensures operation security.
Description
Technical field
The present invention relates to a kind of Tunnel Base gutter structures, and in particular to a kind of to be arranged on Tunnel Base locally buried
Gutter structure.
Background technology
At present, there are two types of modes for Tunnel Base draining:A kind of is that the ponding in tunnel is entered lateral sulcus by abutment wall drain hole,
The Central drain being located in inverted arch filling is introduced from lateral sulcus again, this method is more universal;Another kind is at tunnel bottom setting center
Deeply buried ditch or drain cavern, by outside the direct ejectment to hole of water, this method in Han Qu or the more use of severe cold area Portal Section,
Its situation also has use.Although these drainage systems can smoothly be implemented on all kinds of stratum, and play certain effect, applying
It has also been found that many problems, are mainly shown as during work and operation:
When using first method, sole must enter Central drain by abutment wall drain hole, and Central drain position
In inverted arch filling in, there are tunnel bottom draining it is difficult the problem of, from the point of view of the tunnel runed, when the ponding of tunnel bottom
It can not be successfully when draining, the lighter penetrates into railway roadbed along weak location upwards, and substrate is risen soil, and severe one causes inverted arch to fill and road
Bed cracking floats, and even jeopardizes driving when serious.And when using second method, the water base instinct in tunnel is smoothly arranged
Go out, but the elongated use center Deeply buried ditch in one side tunnel or drain cavern can make project cost remain high;On the other hand, with reference to
Previous construction experience applies center Deeply buried ditch or drain cavern in a wide range of slotting of tunnel bottom, and construction and excavation easily causes just
Phase supporting inverted arch can not be closed in time, also easily cause tunnel arch wall unstability when being excavated using explosion means, greatly increase construction
Risk, while there is also many hidden danger after the completion of constructing.
Since tunnel is a kind of long and narrow structures, often geological conditions variation is frequent, it is necessary to take the buried row in part
Ditch solves the drainage problem of Tunnel Base.
Invention content
The present invention is exactly to solve above-mentioned the problems of the prior art, provides a kind of locally buried draining of Tunnel Base
Ditch structure.
In order to achieve the above object, the present invention adopts the following technical scheme that:
The local buried gutter structure of Tunnel Base of the present invention, including being located at the central drainage pipe in tunnel inverted arch filling
With the multiple inspection shafts set along central drainage pipe length direction;Tunnel Base is provided with the buried gutter in part, and part is buried
The one end in gutter is equipped with end inspection shaft, and end inspection shaft downstream is equipped with charge for remittance well, leads between end inspection shaft and charge for remittance well
It crosses a plurality of vertical aqueduct to connect with a plurality of longitudinal aqueduct, charge for remittance well is connected with central drainage pipe;Tunnel Base ponding is by office
The buried gutter in portion is come together in the inspection shaft of end, then enters charge for remittance well by vertical aqueduct and longitudinal aqueduct, is then led to
It crosses outside central drainage pipe discharge hole.
Central drainage pipe, locally buried gutter and longitudinal aqueduct is consistent with the circuit longitudinal slope gradient.
The central drainage pipe is made of more drainpipes, and crosses end inspection shaft between two parties and in the inspection shaft of end
It does not turn off, the single drainpipe tube coupling length setting charge for remittance well of the central drainage pipe of 1.4 ~ 1.6 times of inspection shaft spaced downstream in end.
Concrete pedestal, the buried gutter in part and concrete pedestal are provided with below the buried gutter in the part
Between using the good coarse sand of water penetration and gravel backfill it is closely knit.Package is permeable on the outside of the steel floral tube that the buried gutter in part uses
Geotextiles install punching bellows in steel floral tube;Steel floral tube top half drills, and 10~16mm of aperture, pitch of holes 10cm are in
Quincuncial arrangement.
It is backfilled to and is put down with central drainage pipe top surface using the good coarse sand of water penetration and gravel in the end inspection shaft
Together, the four corners position of end inspection shaft sets four vertical aqueducts, vertical aqueduct and the charge for remittance well in downstream and center draining
Pipe is connected by longitudinal aqueduct;Vertical aqueduct and longitudinal aqueduct use pvc pipe.
The upstream face side Tunnel Base of the end inspection shaft well bore is poured with lower part using non-fine concrete, with
Just water-collecting capacity is improved.
The invention has the advantages and positive effects that:
The local buried gutter structure of Tunnel Base of the present invention, suitable for Tunnel Base local draining, by tunnel
The buried gutter in substrate setting part and setting end inspection shaft, after the water of substrate is imported end inspection shaft along buried gutter
It is introduced in charge for remittance well through longitudinally, laterally aqueduct and is discharged into Central drain, discharged outside hole, realize self-draining through Central drain
Function so as to reduce the difficulty of construction and risk and project cost of the elongated setting center Deeply buried ditch in tunnel or drain cavern, subtracts
The water pressure that structure during small constructing tunnel and during operation is born prevents tunnel from being served as a contrast during construction period and operation
It builds structural percolating water and even causes Lining cracks, ensure operation security.
Description of the drawings
Fig. 1 is the longitudinal section view of the local buried gutter structure of Tunnel Base of the present invention;
Fig. 2 is the vertical view in the local buried gutter of Tunnel Base of the present invention;
Fig. 3 is the sectional view of I-I lines along Fig. 1;
Fig. 4 is the sectional view of II-II lines along Fig. 1;
Fig. 5 is the profile of III-III lines along Fig. 1.
Critical piece symbol description in attached drawing:
1:Central drainage pipe 2:The buried gutter in part
3:Inspection shaft 4:End inspection shaft
5:Charge for remittance well 6:Vertical aqueduct
7:Longitudinal aqueduct 8:Water penetration filler
9:Concrete bed 10:Non-fine concrete.
Specific embodiment
To the Tunnel Base of the present invention, locally buried gutter structure is done further in the following with reference to the drawings and specific embodiments
Explanation.Following each embodiments are merely to illustrate the present invention and not limitation of the present invention.
The local buried gutter structure of Tunnel Base of the present invention, suitable for Tunnel Base local draining.The discharge structure
It takes in the buried gutter of Tunnel Base local setting, setting end inspection shaft and charge for remittance well, by the water of substrate along buried draining
Ditch is discharged into Central drain after importing end inspection shaft in longitudinally, laterally aqueduct introducing charge for remittance well, and hole is discharged through Central drain
Outside.
Fig. 1 is the longitudinal section view of the local buried gutter structure of Tunnel Base of the present invention;Fig. 2 is the tunnel base of the present invention
The vertical view in the local buried gutter in bottom.As depicted in figs. 1 and 2, the local buried gutter structure of Tunnel Base of the invention, packet
The setting central drainage pipe 1 in tunnel inverted arch filling is included, in the buried gutter 2, Duo Gejian in the part of Tunnel Base local setting
Look into 3, end inspection shafts 4 of well, a charge for remittance well 5, a plurality of vertical aqueduct 6 and a plurality of longitudinal aqueduct 7.Central drainage pipe
The Tunnel Base part of 1 lower section is provided with the buried gutter 2 in part.The buried gutter 2 in part is adapted to using non-totally-enclosed anti-
The tunnel of water, mainly suitable for be arranged on tunnel trunk country rock be rich water Quaternary Strata, tertiary stratum, soft rock strata and ground
Matter structural belt;In addition, change of properties section also has certain adaptability after meeting water for rich water ground consisting of hard rock substrate.
Inspection shaft 3 is set along 1 length direction of central drainage pipe, and an inspection shaft is set per 30m.The buried gutter 2 in part
Interior water flows into the end inspection shaft 4 of low side setting.Water in end inspection shaft 4 is vertical by four vertical aqueducts 6 and two
It is discharged outside hole through central drainage pipe 1 after the inflow charge for remittance of aqueduct 7 well 5, realizes self-draining function.
Central drainage pipe 1, the buried gutter 2 in part and two longitudinal aqueducts 7 and the tunnel inner orbit circuit longitudinal slope gradient
Unanimously.
Central drainage pipe 1 is made of more drainpipes, and cross between two parties end inspection shaft 4 and in end inspection shaft 4 not
It disconnects, i.e., the water of central drainage pipe 1 does not enter end inspection shaft 4.The center of 1.4 ~ 1.6 times of 4 spaced downstream of inspection shaft in end
The single drainpipe tube coupling length setting charge for remittance well 5 of drainpipe.
Fig. 3 is the sectional view of I-I lines along Fig. 1;As shown in figure 3, the buried gutter 2 in part sets concrete bed 9,
It is backfilled closely knit between pedestal using water penetration filler 8.The good coarse sand of water penetration and gravel can be used in water penetration filler 8.
The buried gutter 2 in part is using the seamless steel floral tube of hot rolling, steel pipe upper half section borehole, 10 mm of aperture~16mm, pitch of holes
10cm, in quincuncial arrangement;Steel floral tube outer wrapping permeable geotextiles install punching bellows in pipe, can effectively prevent part
Buried gutter 2 is blocked, and the ponding of Tunnel Base can enter the buried gutter in part.
Fig. 4 is the sectional view of II-II lines along Fig. 1;As shown in figure 4, it is returned in end inspection shaft 4 using water penetration filler 8
Be filled to it is concordant with the top of central drainage pipe 1, and in four vertical drainage pipes 6 of quadrangle setting.Pvc pipe can be used in vertical drainage pipe 6,
The good coarse sand of water penetration and gravel can be selected in water penetration filler 8.
Fig. 5 is the profile of III-III lines along Fig. 1.As shown in figure 5,4 well bore upstream face one of end inspection shaft
Side Tunnel Base is poured with lower part using non-fine concrete 10, can improve the water-collecting capacity of end inspection shaft.
The present invention is by the buried gutter of Tunnel Base local setting, setting end inspection shaft and charge for remittance well, by perpendicular
The water of substrate is ultimately discharged into Central drain heel row to, longitudinal aqueduct and appears outer, realizes automatic drainage function.Reduce tunnel
The difficulty of construction and risk and project cost of elongated setting center Deeply buried ditch or drain cavern, during reducing constructing tunnel and are transported
The water pressure that structure during battalion is born prevents tunnel liner structure percolating water during construction period and operation from even causing
Lining cracks ensure operation security.
Claims (7)
1. a kind of local buried gutter structure of Tunnel Base, including being located at the central drainage pipe in tunnel inverted arch filling( 1)
With along central drainage pipe( 1)Multiple inspection shafts of length direction setting( 3);It is characterized in that:Tunnel Base is provided with office
The buried gutter in portion( 2), the buried gutter in part( 2)One end be equipped with end inspection shaft( 4), end inspection shaft(
4)Downstream is equipped with charge for remittance well( 5), end inspection shaft( 4)With charge for remittance well( 5)Between pass through four vertical aqueducts( 6)
With two longitudinal aqueducts( 7)Even
It is logical, charge for remittance well( 5)With central drainage pipe( 1)Connection;Tunnel Base ponding is by the buried gutter in part( 2)Collect
In end inspection shaft( 4)It is interior, then upwardly through vertical aqueduct( 6)With longitudinal aqueduct( 7)Into charge for remittance well(
5), then pass through central drainage pipe( 1)It discharges outside hole.
2. the local buried gutter structure of Tunnel Base according to claim 1, it is characterised in that:Central drainage pipe(
1), the buried gutter in part( 2)With longitudinal aqueduct( 7)It is consistent with the circuit longitudinal slope gradient.
3. the local buried gutter structure of Tunnel Base according to claim 1, it is characterised in that:The center draining
Pipe( 1)It is made of more drainpipes, and crosses end inspection shaft between two parties( 4)And do not turned off in the inspection shaft of end, it is holding
Portion's inspection shaft( 4)The single drainpipe tube coupling length setting charge for remittance well of central drainage pipe of .6 times of spaced downstream 1 .4 ~ 1(
5).
4. the local buried gutter structure of Tunnel Base according to claim 1, it is characterised in that:The part is buried
Gutter( 2)Lower section be provided with concrete pedestal( 9), the buried gutter in part( 2)With concrete pedestal( 9)It
Between using the good coarse sand of water penetration and gravel backfill it is closely knit.
5. the local buried gutter structure of Tunnel Base according to claim 4, it is characterised in that:The buried gutter in part
( 2)Permeable geotextiles are wrapped up on the outside of the steel floral tube of use, punching bellows is installed in steel floral tube;Steel floral tube top half drills,
10~16mm of aperture, pitch of holes 10cm, in quincuncial arrangement.
6. the local buried gutter structure of Tunnel Base according to claim 3, it is characterised in that:The end checks
Well( 4)It is interior using the good coarse sand of water penetration and gravel is backfilled to and central drainage pipe( 1)Either flush, end inspection shaft
( 4)Four corners position set four vertical aqueducts( 6), vertical aqueduct( 6)With the charge for remittance well in downstream( 5)With in
Heart drainpipe( 1)Pass through longitudinal aqueduct( 7)Connection;Vertical aqueduct( 6)With longitudinal aqueduct( 7)Use
Pvc pipe.
7. the local buried gutter structure of Tunnel Base according to claim 6, it is characterised in that:End inspection shaft(
4)The upstream face side Tunnel Base of well bore is poured with lower part using non-fine concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610033038.8A CN105673074B (en) | 2016-01-19 | 2016-01-19 | The local buried gutter structure of Tunnel Base |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610033038.8A CN105673074B (en) | 2016-01-19 | 2016-01-19 | The local buried gutter structure of Tunnel Base |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105673074A CN105673074A (en) | 2016-06-15 |
CN105673074B true CN105673074B (en) | 2018-06-26 |
Family
ID=56301428
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610033038.8A Active CN105673074B (en) | 2016-01-19 | 2016-01-19 | The local buried gutter structure of Tunnel Base |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105673074B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106150547B (en) * | 2016-07-29 | 2018-05-18 | 中国铁道科学研究院铁道建筑研究所 | A kind of prefabricated assembled drainage system of railway tunnel bottom |
CN106049543B (en) * | 2016-08-03 | 2019-07-30 | 中国铁路设计集团有限公司 | Tunnel inspection shaft with sluicing anti-floating function |
CN107201908B (en) * | 2017-06-16 | 2023-10-31 | 中铁五局集团有限公司 | Construction method for deep-buried central ditch of tunnel in severe cold region |
CN109441489B (en) * | 2018-12-29 | 2024-04-05 | 中国铁路设计集团有限公司 | Tunnel deep-buried central ditch supporting structure and supporting construction method |
CN109630194B (en) * | 2019-01-29 | 2024-02-23 | 中国建筑一局(集团)有限公司 | Karst region fault fracture zone tunnel water burst treatment structure and construction method thereof |
CN111577383B (en) * | 2020-05-11 | 2021-04-09 | 中铁一局集团有限公司 | Method for treating tunnel leakage water in alpine region |
CN113217098B (en) * | 2021-05-21 | 2022-03-22 | 中铁隧道局集团有限公司 | Construction drainage method and device suitable for extra-long deep-buried tunnel |
CN117127440B (en) * | 2023-10-27 | 2024-03-12 | 中国铁路设计集团有限公司 | Double-block ballastless track structure of railway tunnel and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102661171A (en) * | 2012-05-02 | 2012-09-12 | 中铁十一局集团第五工程有限公司 | Frost damage prevention drainage system for tunnel |
CN102678174A (en) * | 2012-05-28 | 2012-09-19 | 中交第一公路勘察设计研究院有限公司 | Tunnel drainage system passing through permafrost region and non-frozen ground region and arrangement method thereof |
CN102996178A (en) * | 2012-12-13 | 2013-03-27 | 中铁四局集团第二工程有限公司 | Drainage system for tunnel in severe cold region |
CN104727834A (en) * | 2015-01-21 | 2015-06-24 | 中铁五局(集团)有限公司 | Summer-time face excavation construction method for high and cold permafrost ultra-long highway tunnel |
CN204960952U (en) * | 2015-08-19 | 2016-01-13 | 铁道第三勘察设计院集团有限公司 | Tunnel structure with hoop heat preservation rubble french drain |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3445690B2 (en) * | 1995-08-11 | 2003-09-08 | タキロン株式会社 | Drainage tube mounting structure |
JPH09166000A (en) * | 1995-12-14 | 1997-06-24 | Kumakigumi:Kk | Water leakage preventive method of tunnel |
-
2016
- 2016-01-19 CN CN201610033038.8A patent/CN105673074B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102661171A (en) * | 2012-05-02 | 2012-09-12 | 中铁十一局集团第五工程有限公司 | Frost damage prevention drainage system for tunnel |
CN102678174A (en) * | 2012-05-28 | 2012-09-19 | 中交第一公路勘察设计研究院有限公司 | Tunnel drainage system passing through permafrost region and non-frozen ground region and arrangement method thereof |
CN102996178A (en) * | 2012-12-13 | 2013-03-27 | 中铁四局集团第二工程有限公司 | Drainage system for tunnel in severe cold region |
CN104727834A (en) * | 2015-01-21 | 2015-06-24 | 中铁五局(集团)有限公司 | Summer-time face excavation construction method for high and cold permafrost ultra-long highway tunnel |
CN204960952U (en) * | 2015-08-19 | 2016-01-13 | 铁道第三勘察设计院集团有限公司 | Tunnel structure with hoop heat preservation rubble french drain |
Non-Patent Citations (1)
Title |
---|
巴朗山隧道中心排水沟设计参数研究;陈子龙等;《四川建筑》;20140630;第34卷(第3期);第106页第2段,图7 * |
Also Published As
Publication number | Publication date |
---|---|
CN105673074A (en) | 2016-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105673074B (en) | The local buried gutter structure of Tunnel Base | |
CN104264557B (en) | One is partly filled out and is partly dug ecological road structure and construction method | |
CN203515597U (en) | Tunnel structure applicable to soft stratum | |
CN105586859B (en) | Integral irrigation and drainage pipe system of saline-alkali soil farmland and construction method | |
CN105937196B (en) | A kind of roadbed peg board formula spells wide structure and construction method | |
CN105863671A (en) | Frame type low-position draining system tunnel lining structure | |
CN102400713B (en) | Method for auxiliary construction of water falling in tunnel by communicated channel | |
CN109797769B (en) | Collapsible loess area underground comprehensive pipe gallery foundation structure and construction method thereof | |
CN103939109B (en) | The permanent shutoff inclined shaft structure of isolating with tunnel | |
CN104404974A (en) | High-pressure-bearing water and thick sand and pebble formation deep foundation pit grouting bottom-sealing structure and construction technology thereof | |
CN103088836A (en) | Sedimentation control method for pumping water and performing reinjection in well casing simultaneously | |
CN107882042A (en) | Supporting construction and its construction method are supportted before a kind of bellows | |
CN105926391B (en) | A kind of curb method for widening of existing railway roadbed | |
CN206942786U (en) | A kind of advanced pre-add fixing structure of high-moisture percentage loess tunnel | |
CN205349419U (en) | Escape canal structure is buried deeply to tunnel basement part | |
CN105604088B (en) | A kind of medium-and low-speed maglev is low to put the existing barricade micro-disturbance ruggedized construction of circuit | |
CN204551510U (en) | A kind of filled-up ground catchments pressure reduction well drop and drainage structure | |
CN207944450U (en) | soft foundation reinforcing structure | |
CN111271118B (en) | Drainage structure suitable for reconstruction of karst tunnel bottom structure and construction method thereof | |
CN203050779U (en) | Tunnel drainage structure suitable for bias pressure rich water strata | |
CN105443141A (en) | Tunnel base reinforcement method | |
CN204252148U (en) | High artesian thick sand-pebble layer deep foundation ditch slip casting back cover structure | |
CN110004954A (en) | Intratectal anchor caverns structure and its construction method | |
CN113464174B (en) | Construction method of tunnel row waterproof comprehensive treatment system | |
CN105064384B (en) | Vacuum tube well precipitation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 300142 Hebei District, Zhongshan Road, No. 10, Applicant after: China Railway Design Group Limited Address before: 300142 Hebei District, Zhongshan Road, No. 10, Applicant before: China Railway Third Survey and Design Institute Group Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |