CN103939109B - The permanent shutoff inclined shaft structure of isolating with tunnel - Google Patents

The permanent shutoff inclined shaft structure of isolating with tunnel Download PDF

Info

Publication number
CN103939109B
CN103939109B CN201410159719.XA CN201410159719A CN103939109B CN 103939109 B CN103939109 B CN 103939109B CN 201410159719 A CN201410159719 A CN 201410159719A CN 103939109 B CN103939109 B CN 103939109B
Authority
CN
China
Prior art keywords
inclined shaft
wall
tunnel
block wall
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410159719.XA
Other languages
Chinese (zh)
Other versions
CN103939109A (en
Inventor
张剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201410159719.XA priority Critical patent/CN103939109B/en
Publication of CN103939109A publication Critical patent/CN103939109A/en
Application granted granted Critical
Publication of CN103939109B publication Critical patent/CN103939109B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of permanent shutoff inclined shaft structure of isolating with tunnel.Inclined shaft is temporary works, and supporting measure is relatively weak, and easily produce phenomenon of caving in, ground water seepage cannot be derived.The present invention by strengthening bottom inclined shaft lining cutting as permanent structure, along inclined shaft channel setting inclined shaft well bore stone cut off wall and twice block wall; The upper toe of first block wall body of wall has dug horizontal well to ditch, the vertical well dug bottom access body of wall is to ditch, access horizontal well that body of wall descending toe digs again to gutter channel, the vertical well arranged along first block wall descending side is to gutter channel, through second block wall, access inclined shaft enter tunnel mouth goes up a slope the horizontal well that digs to gutter channel in, and the vertical well passing through this place is to the lateral sulcus in gutter incoming tunnel, finally discharges.Inclined shaft and tunnel safety can be isolated by the present invention, again can by the water normal excretion in inclined shaft, and ensure inclined shaft shaft bottom structural safety, draining is unimpeded, can not threaten to tunnel itself.

Description

The permanent shutoff inclined shaft structure of isolating with tunnel
Technical field
The invention belongs to tunnel traffic field of engineering technology, be specifically related to a kind of permanent shutoff inclined shaft structure of isolating with tunnel.
Background technology
The traffic engineering such as China railways, highway has built a large amount of construction of tunnel, length and super long tunnel are in order to accelerating construction progress, shortening construction period, often the Combining with terrain condition setting service galleries such as inclined shaft, Heng Dong, vertical shaft are as the means increasing work plane, and more in the majority with inclined shaft.Inclined shaft is temporary works often, only use in construction period, therefore its supporting measure is relatively weak, construction period can take local stiffening measure at any time, after finishing using, long-term placement then easily produces phenomenon of caving in, falling rocks tumbles and can cause direct harm to tunnel bottom inclined shaft, simultaneously, all ground water seepage is had in general inclined shaft, flowing water can only flow to tunnel Zheng Dong along slope, as carried silt secretly, then be easy to block Zheng Dong gutter, therefore, need to take a kind of appropriate plugging structure, inclined shaft and tunnel safety are isolated, simultaneously again can by the water normal excretion in inclined shaft, to avoid threatening to tunnel itself.
Summary of the invention
The object of this invention is to provide a kind of permanent shutoff inclined shaft structure of isolating with tunnel, inclined shaft and tunnel safety can be isolated, again can by the water normal excretion in inclined shaft.
The technical solution adopted in the present invention is:
The permanent shutoff inclined shaft structure of isolating with tunnel, is provided with the inclined shaft passage of incoming tunnel, it is characterized in that:
Inclined shaft passage arranges shaft bottom permanent lining, secondary lining formation reinforcing section to the access section in tunnel, is disposed with inclined shaft well bore stone cut off wall and twice block wall in the inclined shaft passage of reinforcing section Zi upward slope to descending;
The upper toe of inclined shaft well bore stone cut off wall body of wall dig horizontal well to ditch, the vertical well buried underground with body of wall bottom to gutter be communicated with;
The upper toe of first block wall body of wall dig horizontal well to ditch, this horizontal well to ditch access first block wall body of wall bottom the vertical well that digs to ditch, this vertical well to the horizontal well that digs of ditch access first block wall body of wall descending toe to gutter channel, this horizontal well to the vertical well that arranges of gutter channel and first block wall descending side to gutter channel be communicated with, this vertical well to gutter channel through second block wall, access inclined shaft enter tunnel mouth go up a slope the horizontal well that digs to gutter channel in, this horizontal well to gutter channel by this place indulge well to gutter incoming tunnel in lateral sulcus.
Be provided with in the body of wall of inclined shaft well bore stone cut off wall and first block wall vertical well to spilled water hole.
Between first block wall and second block wall gutter channel path on, between second block wall and tunnel gutter channel path on all dug sedimentation basin.
The ditch of first block wall is through locating with the gutter channel of second block wall through locating all to offer inspection passage, and the inspection channel setting of first block wall has steel casement door.
The entrance of all spilled water holes and gutter is provided with screen pack.
The present invention has the following advantages:
The present invention is based on the existence conditions of inclined shaft, one to twice block wall is set bottom inclined shaft, one to two sedimentation basin, inclined shaft and tunnel safety can be isolated, by the water normal excretion in inclined shaft, inclined shaft shaft bottom structural safety can be ensured again, draining is unimpeded, can not threaten to tunnel itself, well bore stone cut off wall also can keep at a certain distance away according to factors such as inclined shaft length and arrange flexibly, plurality of advantages such as having easy construction, reduce investment outlay, be safe and reliable.
Accompanying drawing explanation
Fig. 1 is plan view of the present invention.
Fig. 2 is longitudinal plan of the present invention.
Fig. 3 is the present invention I-I sectional drawing.
Fig. 4 is the present invention II-II sectional drawing.
In figure, 1-shaft bottom permanent lining, secondary lining, 2-second block wall, 3-checks passage, 4-first block wall, 5-inclined shaft well bore stone cut off wall, 6-spilled water hole, 7-gutter, 8-ditch, 9-sedimentation basin, 10-gutter channel, 11-steel casement door.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the present invention will be described in detail.
The permanent shutoff inclined shaft structure that a kind of and tunnel that the present invention relates to isolates, carry out transforming the structure of reinforcing to existing inclined shaft passage, comprise the inclined shaft passage of incoming tunnel, inclined shaft passage arranges shaft bottom permanent lining, secondary lining 1 formation reinforcing section to the access section in tunnel, reinforces the rock mass in inclined shaft passage.Inclined shaft well bore stone cut off wall 5 and twice block wall is disposed with Zi upward slope to descending in the inclined shaft passage of reinforcing section.
Inclined shaft well bore stone cut off wall 5 is used for the Rolling Stone after tackling inclined shaft partial collapse, avoid the block wall directly impacting descending, the quantity of inclined shaft well bore stone cut off wall 5 can be arranged flexibly according to inclined shaft length separation certain distance, the upper toe of inclined shaft well bore stone cut off wall 5 body of wall dig horizontal well to ditch 8, the vertical well buried underground with body of wall bottom to gutter 7 be communicated with.
The upper toe of first block wall 4 body of wall dig horizontal well to ditch 8, this horizontal well to ditch 8 access the vertical well that digs bottom first block wall 4 body of wall to ditch 8, this vertical well to ditch 8 access horizontal well that first block wall 4 body of wall descending toe digs to gutter channel 10, this horizontal well to the vertical well that arranges of gutter channel 10 and first block wall 4 descending side to gutter channel 10 be communicated with, this vertical well to gutter channel 10 through second block wall 2, access inclined shaft enter tunnel mouth go up a slope the horizontal well that digs to gutter channel 10 in, this horizontal well to gutter channel 10 by this place indulge well to gutter 7 incoming tunnel in lateral sulcus.
Be provided with in the body of wall of inclined shaft well bore stone cut off wall 5 and first block wall 4 vertical well to spilled water hole 6.Between first block wall 4 and second block wall 2 gutter channel 10 path on, between second block wall 2 and tunnel gutter channel 10 path on all dug sedimentation basin 9, to precipitate silt, what ensure outflow is clear water, results in blockage after avoiding flowing into tunnel lateral sulcus.The ditch 8 of first block wall 4 checks passage 3 through place and the gutter channel 10 of second block wall 2 through locating all to offer, and the inspection passage 3 of first block wall 4 is provided with steel casement door 11.The entrance of all spilled water holes 6 and gutter 7 is provided with screen pack, prevents blocking, makes inclined shaft seep water unimpeded excretion to tunnel lateral sulcus finally discharge tunnel.
Content of the present invention is not limited to cited by embodiment, and the conversion of those of ordinary skill in the art by reading manual of the present invention to any equivalence that technical solution of the present invention is taked, is claim of the present invention and contains.

Claims (5)

1. the permanent shutoff inclined shaft structure of isolating with tunnel, is provided with the inclined shaft passage of incoming tunnel, it is characterized in that:
Inclined shaft passage arranges shaft bottom permanent lining, secondary lining (1) formation reinforcing section to the access section in tunnel, is disposed with inclined shaft well bore stone cut off wall (5) and twice block wall in the inclined shaft passage of reinforcing section Zi upward slope to descending;
The upper toe of inclined shaft well bore stone cut off wall (5) body of wall dig horizontal well to ditch (8), the vertical well buried underground with body of wall bottom to gutter (7) be communicated with;
The upper toe of first block wall (4) body of wall dig horizontal well to ditch (8), this horizontal well to ditch (8) access first block wall (4) body of wall bottom the vertical well that digs to ditch (8), this vertical well to the horizontal well that digs of ditch (8) access first block wall (4) body of wall descending toe to gutter channel (10), this horizontal well to the vertical well that arranges of gutter channel (10) and first block wall (4) descending side to gutter channel (10) be communicated with, this vertical well to gutter channel (10) through second block wall (2), access inclined shaft enter tunnel mouth go up a slope the horizontal well that digs to gutter channel (10) in, this horizontal well to gutter channel (10) by this place indulge well to gutter (7) incoming tunnel in lateral sulcus.
2. permanent shutoff inclined shaft structure of isolating with tunnel according to claim 1, is characterized in that:
Be provided with in the body of wall of inclined shaft well bore stone cut off wall (5) and first block wall (4) vertical well to spilled water hole (6).
3. permanent shutoff inclined shaft structure of isolating with tunnel according to claim 1, is characterized in that:
Between first block wall (4) and second block wall (2) gutter channel (10) path on, between second block wall (2) and tunnel gutter channel (10) path on all dug sedimentation basin (9).
4. permanent shutoff inclined shaft structure of isolating with tunnel according to claim 3, is characterized in that:
The ditch (8) of first block wall (4) checks passage (3) through place and the gutter channel (10) of second block wall (2) through locating all to offer, and the inspection passage (3) of first block wall (4) is provided with steel casement door (11).
5. permanent shutoff inclined shaft structure of isolating with tunnel according to claim 4, is characterized in that:
The entrance of all spilled water holes (6) and gutter (7) is provided with screen pack.
CN201410159719.XA 2014-04-21 2014-04-21 The permanent shutoff inclined shaft structure of isolating with tunnel Active CN103939109B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410159719.XA CN103939109B (en) 2014-04-21 2014-04-21 The permanent shutoff inclined shaft structure of isolating with tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410159719.XA CN103939109B (en) 2014-04-21 2014-04-21 The permanent shutoff inclined shaft structure of isolating with tunnel

Publications (2)

Publication Number Publication Date
CN103939109A CN103939109A (en) 2014-07-23
CN103939109B true CN103939109B (en) 2016-04-13

Family

ID=51186955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410159719.XA Active CN103939109B (en) 2014-04-21 2014-04-21 The permanent shutoff inclined shaft structure of isolating with tunnel

Country Status (1)

Country Link
CN (1) CN103939109B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790351B (en) * 2015-04-23 2016-05-11 化工部长沙设计研究院 There is the flood drainage system plugging structure of the underground spring of row and mine tailing water seepage function
CN105604607B (en) * 2016-03-02 2017-12-26 中铁第一勘察设计院集团有限公司 Separate system and its shunt method between the ditch of both sides in rich water tunnel provided with inclined shaft
CN109681213B (en) * 2019-01-09 2024-03-08 济南城建集团有限公司 Construction method for accelerating urban underground road by adding vertical shaft turning positive hole at inclined shaft end
CN113565524B (en) * 2021-08-04 2022-04-08 中铁二院工程集团有限责任公司 Groove type inclined shaft and tunnel structure capable of preventing outburst sand gushing in operation period and design method
CN113685227B (en) * 2021-08-25 2022-04-12 中铁二院工程集团有限责任公司 Swing wing type structure for preventing and treating sudden water gushing during operation of inclined shaft and design method
CN114483185B (en) * 2022-02-17 2022-09-13 中铁二院工程集团有限责任公司 Overflow-prevention structure for operating period of diffusion-accumulation inclined shaft and construction method
CN114960483B (en) * 2022-04-22 2024-01-12 浙江华东工程建设管理有限公司 Diversion tail water hole reconstruction plugging head upstream permanent drainage structure and drainage method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002371785A (en) * 2001-06-19 2002-12-26 Okumura Corp Method for draining pressurized water in ground on planned tunneling line
CN202047865U (en) * 2011-04-21 2011-11-23 王国伟 Simple U-shaped enclosed water guide apparatus used in coal mine tunnel
CN202937303U (en) * 2012-12-14 2013-05-15 中铁二十三局集团有限公司 Drainage system for extra-long tunnel
CN203114340U (en) * 2013-01-17 2013-08-07 陕西陕煤黄陵矿业有限公司 Drainage device for constructing inclined shaft
CN203796274U (en) * 2014-04-21 2014-08-27 中铁第一勘察设计院集团有限公司 Permanent inclined shaft blocking structure isolated from tunnel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002371785A (en) * 2001-06-19 2002-12-26 Okumura Corp Method for draining pressurized water in ground on planned tunneling line
CN202047865U (en) * 2011-04-21 2011-11-23 王国伟 Simple U-shaped enclosed water guide apparatus used in coal mine tunnel
CN202937303U (en) * 2012-12-14 2013-05-15 中铁二十三局集团有限公司 Drainage system for extra-long tunnel
CN203114340U (en) * 2013-01-17 2013-08-07 陕西陕煤黄陵矿业有限公司 Drainage device for constructing inclined shaft
CN203796274U (en) * 2014-04-21 2014-08-27 中铁第一勘察设计院集团有限公司 Permanent inclined shaft blocking structure isolated from tunnel

Also Published As

Publication number Publication date
CN103939109A (en) 2014-07-23

Similar Documents

Publication Publication Date Title
CN103939109B (en) The permanent shutoff inclined shaft structure of isolating with tunnel
CN104694746B (en) A kind of method of ion adsorption type re in_situ leaching and leaching ore deposit system thereof
CN101922303B (en) Method for treating tunnel passing through underground river karst hall
CN103758123B (en) The construction method of manually digging hole filling pile retaining wall lining
CN104060620B (en) Deep basal pit Karst Fissures water controling method
CN105179011B (en) A kind of tunnel closure facility and its method for blocking
CN104453913A (en) Vertical shaft working face ahead pre-grouting method
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN207633352U (en) A kind of slope reinforcement structure for rapid rescue construction
CN104791007B (en) A kind of water discharge method passing through during rich water crushed zone constructing tunnel
CN102400713B (en) Method for auxiliary construction of water falling in tunnel by communicated channel
CN107131001A (en) A kind of and water delivery and the Railway Tunnel of communication function
CN112814737B (en) Collapse column advanced treatment method and system based on laminated multi-branch horizontal well
CN108678753B (en) Reverse-slope tunnel construction method
CN104234726A (en) Internal dewatering and drainage construction method for tunnel passing through water-rich unconformable contact zone
CN208533546U (en) A kind of series-parallel underground stereo drainage system suitable for side landslide engineering
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN107503774A (en) A kind of construction of combination piping lane without surface precipitation Construction Method of Metro Station
CN203796274U (en) Permanent inclined shaft blocking structure isolated from tunnel
CN102720511A (en) Tunnel construction structure for draining and desilting
CN206592151U (en) A kind of stifled row's integrated structure of rich water karst tunnel
CN102296962B (en) Adverse slope excavating construction method of large-section tunnel in water-rich tunnel section
RU2590153C1 (en) Method for cascade dehydration of landslip body of slopes or walls
CN204899930U (en) Secretly dig leading dry out well in subway hole
CN102168582A (en) Drainage method for groundwater in construction of deviated well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant